ML20135E512: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. .
{{#Wiki_filter:.
Seotember 11,198'i Docket No. 50-293 Mr. William D. Harrington Senior Vice President, Nuclear Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199
Seotember 11,198'i Docket No. 50-293 Mr. William D. Harrington Senior Vice President, Nuclear Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199


==Dear Mr. Harrington:==
==Dear Mr. Harrington:==
==SUBJECT:==
==SUBJECT:==
IMPLICATIONS OF SALEM ATWS EVENTS -
IMPLICATIONS OF SALEM ATWS EVENTS -
ACTION ITEM 1.1 - POST TRIP REVIEW Re:       Pilgrim Nuclear Power Station We have completed our review of your November 7,1983 and August 13, 1985 submittals relative to Action Item 1.1 of the Salem ATWS Events which you provided in response to our Generic Letter No. 83-28.
ACTION ITEM 1.1 - POST TRIP REVIEW Re:
Pilgrim Nuclear Power Station We have completed our review of your November 7,1983 and August 13, 1985 submittals relative to Action Item 1.1 of the Salem ATWS Events which you provided in response to our Generic Letter No. 83-28.
Based on our review, we conclude that the Post Trip Review Program and Procedures for Pilgrim Station are acceptable.
Based on our review, we conclude that the Post Trip Review Program and Procedures for Pilgrim Station are acceptable.
Our Safety Evaluation supporting our conclusions is enclosed.
Our Safety Evaluation supporting our conclusions is enclosed.
Sincerely,
Sincerely, Original signed by/
!                                            Original signed by/
Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing
Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing


==Enclosure:==
==Enclosure:==
As stated 8509160425 850911 PDR ADOCK 05000293 cc w/ enclosure:
P PDR See next page DISTRIBUTION M e filec HThompson ELJordan Gray File NRC PDR OELD JPartlow DShum Local PDR SNorris Grimes RKarsch ORBf2 Reading PLeech ACRS (10)
OR #2:DL ORB #2:
ORB
:DL-S rr s:
Pleech '
DVassallo 09/11/85.
09/11/85 09/// /85


As stated              8509160425 850911 PDR    ADOCK 05000293 cc w/ enclosure:      P                  PDR See next page DISTRIBUTION                                                                :
Mr. William D. Harrington Boston Edison Company Pilgrim Nuclear Power Station cc:
M e filec              HThompson            ELJordan          Gray File NRC PDR                OELD                  JPartlow          DShum Local PDR              SNorris                Grimes            RKarsch ORBf2 Reading          PLeech                ACRS (10)                      ,
OR #2:DL        ORB #2:        ORB    :DL-S rr s:          Pleech '        DVassallo 09/11/85.        09/11/85        09/// /85
 
Mr. William D. Harrington Boston Edison Company               Pilgrim Nuclear Power Station cc:
Mr. Charles J. Mathis, Station Mgr.
Mr. Charles J. Mathis, Station Mgr.
Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Resident Inspector's Office                                       s U. S. Nuclear Regulatory Commission Post Office Box 867 Plymouth, Massachusetts 02360 Mr. David F. Tarantino Chairman, Board of Selectman 11 Lincoln Street Plymouth, Massachusetts 02360 Office of the Commissioner Massachusetts Department of Environmental Quality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General 1 Ashburton Place 19th Floor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director                                   i Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street Boston, Massachusetts 02111 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. A. Victor Morisi                                               .
Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Resident Inspector's Office s
Boston Edison Company                                               [
U. S. Nuclear Regulatory Commission Post Office Box 867 Plymouth, Massachusetts 02360 Mr. David F. Tarantino Chairman, Board of Selectman 11 Lincoln Street Plymouth, Massachusetts 02360 Office of the Commissioner Massachusetts Department of Environmental Quality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General 1 Ashburton Place 19th Floor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director i
25 Braintree Hill Park Rockdale Street                                                     i Braintree, Massachusetts 02184
Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street Boston, Massachusetts 02111 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. A. Victor Morisi Boston Edison Company
                                                                              ?
[
25 Braintree Hill Park Rockdale Street i
Braintree, Massachusetts 02184
?
l}}
l}}

Latest revision as of 02:09, 12 December 2024

Forwards Safety Evaluation Supporting Util post-trip Review Program & Procedures,Based on Review of 831107 & 850813 Submittals Re Action Item 1.1 Concerning Salem ATWS Events
ML20135E512
Person / Time
Site: Pilgrim
Issue date: 09/11/1985
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20135E515 List:
References
GL-83-28, NUDOCS 8509160425
Download: ML20135E512 (2)


Text

.

Seotember 11,198'i Docket No. 50-293 Mr. William D. Harrington Senior Vice President, Nuclear Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199

Dear Mr. Harrington:

SUBJECT:

IMPLICATIONS OF SALEM ATWS EVENTS -

ACTION ITEM 1.1 - POST TRIP REVIEW Re:

Pilgrim Nuclear Power Station We have completed our review of your November 7,1983 and August 13, 1985 submittals relative to Action Item 1.1 of the Salem ATWS Events which you provided in response to our Generic Letter No. 83-28.

Based on our review, we conclude that the Post Trip Review Program and Procedures for Pilgrim Station are acceptable.

Our Safety Evaluation supporting our conclusions is enclosed.

Sincerely, Original signed by/

Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing

Enclosure:

As stated 8509160425 850911 PDR ADOCK 05000293 cc w/ enclosure:

P PDR See next page DISTRIBUTION M e filec HThompson ELJordan Gray File NRC PDR OELD JPartlow DShum Local PDR SNorris Grimes RKarsch ORBf2 Reading PLeech ACRS (10)

OR #2:DL ORB #2:

ORB

DL-S rr s:

Pleech '

DVassallo 09/11/85.

09/11/85 09/// /85

Mr. William D. Harrington Boston Edison Company Pilgrim Nuclear Power Station cc:

Mr. Charles J. Mathis, Station Mgr.

Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Resident Inspector's Office s

U. S. Nuclear Regulatory Commission Post Office Box 867 Plymouth, Massachusetts 02360 Mr. David F. Tarantino Chairman, Board of Selectman 11 Lincoln Street Plymouth, Massachusetts 02360 Office of the Commissioner Massachusetts Department of Environmental Quality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General 1 Ashburton Place 19th Floor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director i

Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street Boston, Massachusetts 02111 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. A. Victor Morisi Boston Edison Company

[

25 Braintree Hill Park Rockdale Street i

Braintree, Massachusetts 02184

?

l