Line 16: | Line 16: | ||
| event date = 06/17/2014 17:29 CDT | | event date = 06/17/2014 17:29 CDT | ||
| last update date = 06/17/2014 | | last update date = 06/17/2014 | ||
| title = Technical Specification Shutdown Due | | title = Technical Specification Shutdown Due to Loss of a and B Control Bay Chiller Trains | ||
| event text = At 1729 [CDT] on June 17, 2014 Browns Ferry Units 1, 2, and 3 initiated actions to commence a reactor shutdown to comply with TS LCO [Technical Specifications Limiting Condition of Operation] 3.0.3. TS LCO 3.0.3 was entered at 1632 and was required due to the concurrent loss of 'A' and 'B' Control Bay Chiller units which resulted in loss of cooling to the U1 and U2 4kV Shutdown Board Rooms. Required actions for the loss of cooling to the U1 and U2 4kV Shutdown Board Rooms is to declare the electrical equipment in the 4kV Shutdown Board Rooms inoperable. The declaration of inoperability of the equipment supported by the U1 and U2 4kV Shutdown Boards resulted in TS LCO 3.0.3 for Units 1, 2 and 3. TS LCO 3.0.3 requires actions to be initiated within one hour to place the units in MODE 2 within 10 hours; MODE 3 within 13 hours; and MODE 4 within 37 hours. | | event text = At 1729 [CDT] on June 17, 2014 Browns Ferry Units 1, 2, and 3 initiated actions to commence a reactor shutdown to comply with TS LCO [Technical Specifications Limiting Condition of Operation] 3.0.3. TS LCO 3.0.3 was entered at 1632 and was required due to the concurrent loss of 'A' and 'B' Control Bay Chiller units which resulted in loss of cooling to the U1 and U2 4kV Shutdown Board Rooms. Required actions for the loss of cooling to the U1 and U2 4kV Shutdown Board Rooms is to declare the electrical equipment in the 4kV Shutdown Board Rooms inoperable. The declaration of inoperability of the equipment supported by the U1 and U2 4kV Shutdown Boards resulted in TS LCO 3.0.3 for Units 1, 2 and 3. TS LCO 3.0.3 requires actions to be initiated within one hour to place the units in MODE 2 within 10 hours; MODE 3 within 13 hours; and MODE 4 within 37 hours. | ||
This event requires a 4 hour report IAW 50.72(b)(2)(i), 'The initiation of any nuclear plant shutdown required by the plant's Technical Specifications.' | This event requires a 4 hour report IAW 50.72(b)(2)(i), 'The initiation of any nuclear plant shutdown required by the plant's Technical Specifications.' |
Latest revision as of 21:50, 1 March 2018
Where | |
---|---|
Browns Ferry ![]() Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-0.73 h-0.0304 days <br />-0.00435 weeks <br />-9.99954e-4 months <br />) | |
Opened: | Todd Bohanan 21:45 Jun 17, 2014 |
NRC Officer: | Jeff Rotton |
Last Updated: | Jun 17, 2014 |
50207 - NRC Website
| |