Title | Technical Specification Required Shutdown Initiated |
Event Description | On March 30, 2011 at 1443 CDT, during a refueling outage, Browns Ferry Unit 2 received an invalid Common Accident Signal (CAS) as a result of maintenance activities. All four Unit 1/2 diesel [generators] auto started and all four Unit 3 diesel [generators] auto started. Unit 2 received a full Reactor SCRAM and Core Spray pumps A, B, C, and D auto started and injected into the reactor. Unit 2 Division I RHR [Residual Heat Removal] system was in Shutdown Cooling with only the C pump in service. The A RHR pump auto started and Shutdown Cooling flow increased, as expected. Unit 2 Division II RHR system was tagged out for maintenance. HPCI [High Pressure Coolant Injection] and RCIC [Reactor Core Isolation Cooling] received auto initiation signals, however the steam isolation valves were tagged closed and the systems did not start. MSIVs [Main Steam Isolation Valves] isolated as a result of the CAS signal.
Unit 1 was at 100% power when the CAS on Unit 2 occurred. This caused initiation of the Preferred Pump Logic which designates Division I CS [Core Spray] and LPCI [Low Pressure Coolant Injection] pumps on Unit 1 (1A and 1C) and the Division II pumps on Unit 2 (2B and 2D) and prevents Unit 1 Division II pumps from auto starting. This resulted in the Division II RHR and CS pumps [being] inoperable for Unit 1. Unit 1 subsequently entered Technical Specification 3.5.1, Condition H (two or more low pressure ECCS [Emergency Core Cooling System] injection/spray subsystems inoperable) which requires entering LCO 3.0.3 immediately. Unit 1 entered LCO 3.0.3 at 1443, which requires that actions shall be initiated within one hour to place the unit in Mode 2 within 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />; Mode 3 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and Mode 4 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />. At 1542 Unit 1 began lowering power in order to comply with LCO 3.0.3. CAS logic was reset at 1812 and Unit 1 exited LCOs 3.5.1.H and 3.0.3. This condition requires a four hour report in accordance with 50.72(b)(2)(i) - 'The initiation of any nuclear plant shutdown required by the plant's Technical Specifications.' The NRC Resident Inspector was notified. Service Request #346544 was initiated in the Corrective Action Program. |
Where | |
---|---|
Browns Ferry Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-0.75 h-0.0313 days <br />-0.00446 weeks <br />-0.00103 months <br />) | |
Opened: | Ray Swafford 19:57 Mar 30, 2011 |
NRC Officer: | Donald Norwood |
Last Updated: | Mar 30, 2011 |
46713 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 46713\u003C/a\u003E - \u003Ca href=\"/Browns_Ferry\" title=\"Browns Ferry\"\u003EBrowns Ferry\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETechnical Specification Required Shutdown Initiated\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 46713 - Browns Ferry\n","link":"","lat":34.70418333333333,"lon":-87.11844722222222,"icon":"/w/images/c/ce/Tennessee_Valley_Authority_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 536782018-10-21T05:00:00021 October 2018 05:00:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shut Down Due to Chemistry Limit Exceeded ENS 512312015-07-14T22:15:00014 July 2015 22:15:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 502652014-07-10T09:45:00010 July 2014 09:45:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 502072014-06-17T22:29:00017 June 2014 22:29:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown Due to Loss of a and B Control Bay Chiller Trains ENS 488222013-03-14T13:00:00014 March 2013 13:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unit 2 Shutdown Required by Technical Specifications Due to Inoperable Rcic ENS 487822013-02-25T19:13:00025 February 2013 19:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Automatic Scram Due to a Turbine Trip from a Loss of Condenser Vacuum ENS 471302011-08-06T11:17:0006 August 2011 11:17:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Initiation of Technical Specification Required Shutdown ENS 467132011-03-30T20:42:00030 March 2011 20:42:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Initiated ENS 457282010-02-26T01:35:00026 February 2010 01:35:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Rhr Inoperability ENS 451242009-06-11T20:55:00011 June 2009 20:55:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unit 2 Initiated a Tech Spec Required Shutdown Due to a Rise in Unidentified Drywell Leakage ENS 418612005-07-22T08:16:00022 July 2005 08:16:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown T/S Shutdown Due to Dc Subsystem Declared Inoperable 2018-10-21T05:00:00 | |