ENS 50903: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 03/19/2015 07:02 EDT
| event date = 03/19/2015 07:02 EDT
| last update date = 03/19/2015
| last update date = 03/19/2015
| title = Automatic Reactor Scram Due To An Oscillation Power Range Monitor Upscale Actuation
| title = Automatic Reactor Scram Due to an Oscillation Power Range Monitor Upscale Actuation
| event text = At 0702 EDT on March 19, 2015, Fermi 2 received an automatic scram due to actuation of the Reactor Protection System (RPS) function of Oscillation Power Range Monitor (OPRM) Upscale.  The plant had recently transitioned to Single Loop Operation after securing the 'A' Reactor Recirculation Pump due to loss of normal and emergency cooling water supply.  The lowest reactor water level was 134 inches above top of active fuel.  Reactor water level is being maintained in the normal band by the Feedwater and Control Rod Drive Systems.  No Safety Relief Valves (SRV) actuated.  Reactor pressure is being maintained via the Main Turbine Bypass Valves and Main Condenser.  Reactor Pressure Vessel Level 3 isolation occurred.  No additional safety system actuations occurred.  All off-site power sources were available throughout the event.  The plant is currently in Mode 3 and in a stable condition.  Investigation into the cause of the event is ongoing.
| event text = At 0702 EDT on March 19, 2015, Fermi 2 received an automatic scram due to actuation of the Reactor Protection System (RPS) function of Oscillation Power Range Monitor (OPRM) Upscale.  The plant had recently transitioned to Single Loop Operation after securing the 'A' Reactor Recirculation Pump due to loss of normal and emergency cooling water supply.  The lowest reactor water level was 134 inches above top of active fuel.  Reactor water level is being maintained in the normal band by the Feedwater and Control Rod Drive Systems.  No Safety Relief Valves (SRV) actuated.  Reactor pressure is being maintained via the Main Turbine Bypass Valves and Main Condenser.  Reactor Pressure Vessel Level 3 isolation occurred.  No additional safety system actuations occurred.  All off-site power sources were available throughout the event.  The plant is currently in Mode 3 and in a stable condition.  Investigation into the cause of the event is ongoing.
This event is being reported under the four hour Non-Emergency reporting criteria of 10CFR50.72(b)(2)(iv)(B).  The NRC Resident Inspector has been notified.
This event is being reported under the four hour Non-Emergency reporting criteria of 10CFR50.72(b)(2)(iv)(B).  The NRC Resident Inspector has been notified.

Latest revision as of 20:48, 1 March 2018

ENS 50903 +/-
Where
Fermi DTE Energy icon.png
Michigan (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
LER: 05000341/LER-2015-003
Regarding Oscillation Power Range Monitor Upscale Reactor Scram During Single Loop Operation
Time - Person (Reporting Time:+-0.18 h-0.0075 days <br />-0.00107 weeks <br />-2.46564e-4 months <br />)
Opened: Warren Paul
10:51 Mar 19, 2015
NRC Officer: Vince Klco
Last Updated: Mar 19, 2015
50903 - NRC Website
Loading map...