ENS 52825: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 06/23/2017 20:18 CDT | | event date = 06/23/2017 20:18 CDT | ||
| last update date = 06/24/2017 | | last update date = 06/24/2017 | ||
| title = Automatic Reactor Scram | | title = Automatic Reactor Scram on Main Generator Trip | ||
| event text = While performing a scheduled generator voltage regulator test, River Bend Station experienced an automatic scram when the main generator tripped. It is unknown at this time why the main generator tripped. | | event text = While performing a scheduled generator voltage regulator test, River Bend Station experienced an automatic scram when the main generator tripped. It is unknown at this time why the main generator tripped. | ||
There were no equipment issues that materially impacted post scram operator response. | There were no equipment issues that materially impacted post scram operator response. |
Latest revision as of 21:42, 1 March 2018
Where | |
---|---|
River Bend ![]() Louisiana (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-1.33 h-0.0554 days <br />-0.00792 weeks <br />-0.00182 months <br />) | |
Opened: | Timothy Gates 23:58 Jun 23, 2017 |
NRC Officer: | Howie Crouch |
Last Updated: | Jun 24, 2017 |
52825 - NRC Website
| |