ENS 53121: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:
| event date = 10/18/2017 CST
| event date = 10/18/2017 CST
| last update date = 02/05/2018
| last update date = 02/05/2018
| title = Part 21 - Deviation In Original Qualification Testing Of Sor Safety Related Switches
| title = Part 21 - Deviation in Original Qualification Testing of Sor Safety Related Switches
| event text = The following is a excerpt from a report received via email:
| event text = The following is a excerpt from a report received via email:
  "On October 18, 2017 a deviation in the original qualification testing of SOR safety-related switches was discovered by a NRC vendor inspection conducted from October 16-20, 2017. SOR continues to evaluate those items cited by NON 99900824/2017-201-01 Items 1 through 3 and other effects on safety related components identified by SOR.
  "On October 18, 2017 a deviation in the original qualification testing of SOR safety-related switches was discovered by a NRC vendor inspection conducted from October 16-20, 2017. SOR continues to evaluate those items cited by NON 99900824/2017-201-01 Items 1 through 3 and other effects on safety related components identified by SOR.

Revision as of 20:41, 1 March 2018

ENS 53121 +/-
Where
Sor Measurement And Control
Lenexa, Kansas (NRC Region 4)
Organization: Sor Measurement And Control
Reporting
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component

10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+1403.03 h58.46 days <br />8.351 weeks <br />1.922 months <br />)
Opened: Melanie Dirks
18:02 Dec 15, 2017
NRC Officer: Jeff Herrera
Last Updated: Feb 5, 2018
53121 - NRC Website