ENS 53121: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 10/18/2017 CST | | event date = 10/18/2017 CST | ||
| last update date = 02/05/2018 | | last update date = 02/05/2018 | ||
| title = Part 21 - Deviation | | title = Part 21 - Deviation in Original Qualification Testing of Sor Safety Related Switches | ||
| event text = The following is a excerpt from a report received via email: | | event text = The following is a excerpt from a report received via email: | ||
"On October 18, 2017 a deviation in the original qualification testing of SOR safety-related switches was discovered by a NRC vendor inspection conducted from October 16-20, 2017. SOR continues to evaluate those items cited by NON 99900824/2017-201-01 Items 1 through 3 and other effects on safety related components identified by SOR. | "On October 18, 2017 a deviation in the original qualification testing of SOR safety-related switches was discovered by a NRC vendor inspection conducted from October 16-20, 2017. SOR continues to evaluate those items cited by NON 99900824/2017-201-01 Items 1 through 3 and other effects on safety related components identified by SOR. |
Revision as of 20:41, 1 March 2018
Where | |
---|---|
Sor Measurement And Control Lenexa, Kansas (NRC Region 4) | |
Organization: | Sor Measurement And Control |
Reporting | |
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+1403.03 h58.46 days <br />8.351 weeks <br />1.922 months <br />) | |
Opened: | Melanie Dirks 18:02 Dec 15, 2017 |
NRC Officer: | Jeff Herrera |
Last Updated: | Feb 5, 2018 |
53121 - NRC Website | |