Sheet 1.of 2 OPERATING DATA REPORT                   Revicion 12/10/85 t
s:
    ^
Sheet 1.of 2 OPERATING DATA REPORT Revicion 12/10/85 t
^
UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA' DATE: NOVEMBER 1985 OPERATING STATUS' 1.~ Docket:-.50-382 Notes
UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA' DATE: NOVEMBER 1985 OPERATING STATUS' 1.~ Docket:-.50-382 Notes
                                                                                .(1) Maximum Dependable
.(1) Maximum Dependable
: 2. Reporting Period: SEPTEMBER 1985                                     Capacity (Gross and~
: 2. Reporting Period: SEPTEMBER 1985 Capacity (Gross and~
Net MWe) will be-3.~. Utility
Net MWe) will be-3.~. Utility


==Contact:==
==Contact:==
GEORGE MILLER ab       te b Plione Number:   (504) 467-8211 s 02) h 6
GEORGE MILLER ab te b Plione Number:
                ..                            ._                                    (25) have been revised
(504) 467-8211 s 02) h 6 (25) have been revised
          - 4. Licensed' Thermal Power'(MWt): 3390                                   to start with Commercial Operation.
- 4. Licensed' Thermal Power'(MWt): 3390 to start with Commercial Operation.
: 5. Nameplate Rating (Gross Mwe): 1153
: 5. Nameplate Rating (Gross Mwe): 1153
_ 6. Design Electrical-Rating (Net MWe): 1104 7.' Maximum Dependable Capacity (Gross MWe): (Note 1)
_ 6. Design Electrical-Rating (Net MWe): 1104 7.' Maximum Dependable Capacity (Gross MWe): (Note 1)
: 8. Maximum. Dependable Capacity (Net MWe): (Note 1)
: 8. Maximum. Dependable Capacity (Net MWe): (Note 1) 9.?If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
9.?If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:     N/A-J M
N/A-J M
              ' 10 . Power Level To Which Restricted, if Any (Net MWe):       NONE
' 10. Power Level To Which Restricted, if Any (Net MWe):
: 11. R.easons For Restrictions, If Any: N/A j~8512130496 DR 851210 ADOCK 05000382                     This Month-     Yr.-to-Date     Cumulative PDR
NONE 11.
          - 12.
R.easons For Restrictions, If Any: N/A j~8512130496 851210 DR ADOCK 05000382 This Month-Yr.-to-Date Cumulative PDR
Hours In Reporting Period                     168.0           168.0             168.0
- 12.
: 13. Number Of Hours Reactor Was Critical           149.3           149.3             149.3
Hours In Reporting Period 168.0 168.0 168.0 13.
: 14. Reactor Reserve-Shutdown Hours                                                           15~   Hours Generator On-Line                       132.7           132.7             132.7
Number Of Hours Reactor Was Critical 149.3 149.3 149.3 14.
: 16. JUnit Reserve Shutdown Hours                                                                                                                                                     .
Reactor Reserve-Shutdown Hours 15~
Hours Generator On-Line 132.7 132.7 132.7
: 16. JUnit Reserve Shutdown Hours.
m-m


g                         y 7 6 '. ,             ~ %,1 to
g y 7 6 '.,
              .1                                            ,                . .                                                                          Shact 2 of'2 .
~ %,1 to Shact 2 of'2.
                                                                  <0PERATING DATA REPORT                                                                . Revision 12/10/85
.1
((                                                                     -(Continued) 2                                                             This Month-               Yr.-to-Date                                           Cumulative 117.[ Gross-Thermal EnergyL
. Revision 12/10/85
_ Generated (MWH)                                     ~317,589-                             317,589'                                                 317,589
<0PERATING DATA REPORT
                    ~
((
118 .           Gross Electrical Energy' '
-(Continued) 2 This Month-Yr.-to-Date Cumulative 117.[ Gross-Thermal EnergyL
                                                        ~
_ Generated (MWH)
                              -Generated?(NWH)>                                    111,870                               111,870                                               1111,870
~317,589-317,589' 317,589
    ,            19. " Net Electrical Energy-JU             EGenerated (NWH)                                     105,186                               105,186-                                                   105,186
~
        ~
118.
I"20. . Unit. Service Factor:                                         79.0                                       79.0                                                     79.0 L
Gross Electrical Energy' '
              .21. TUnit Availability FactorJ 79.0                                       79.0'                                                   79.0' 7 22'. -. l- UnitT Capacity, Factor
111,870 111,870 1111,870
                              -(Using MDC Net).                                   (NOTE'1)                       (NOTE-1)                                                 (NOTE 1) s23.             Unit Capacity Factor; (Using DER 1 Net)                                   56.7                                       56.7                                                     56.7 24.' Unit-Forced Outage Rate.                                       21.0                                       21.0                                                     21.0
-Generated?(NWH)>
[25. Unit Forced Outage Hours                                         35.3                                           35.3                                                     35.3
~
              - 26 '. . Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 19. " Net Electrical Energy-JU EGenerated (NWH) 105,186 105,186-105,186 I"20.. Unit. Service Factor:
1 Unit 1 shutdown scheduled in March 1086'to perform Technical Specification y                               :surveillances requiring a unit shutdown, duration: approximately 28 days.
79.0 79.0 79.0
~
L
.21. TUnit Availability FactorJ 79.0 79.0' 79.0' 7 22'. -. l-UnitT Capacity, Factor
-(Using MDC Net).
(NOTE'1)
(NOTE-1)
(NOTE 1) s23.
Unit Capacity Factor; (Using DER 1 Net) 56.7 56.7 56.7 24.' Unit-Forced Outage Rate.
21.0 21.0 21.0
[25. Unit Forced Outage Hours 35.3 35.3 35.3
- 26 '.. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
1 Unit 1 shutdown scheduled in March 1086'to perform Technical Specification y
:surveillances requiring a unit shutdown, duration: approximately 28 days.
727. :If ' Shut' Down' At:End of Report Period, ~ Estimated Date Of' Startup:
727. :If ' Shut' Down' At:End of Report Period, ~ Estimated Date Of' Startup:
l28~1 Unit's In1 Test: Status.(Prior to Commercial Operation):
l28~1 Unit's In1 Test: Status.(Prior to Commercial Operation):
Forecast                                             Achieved ~
Forecast Achieved ~
INITIAL' CRITICALITY.                                                                                             3/4/85                           e
INITIAL' CRITICALITY.
                                                    . INITIAL ELECTRICITY                                                                                           3/18/85 COMMERCIAL OPERATION                                                                                           9/24/85
3/4/85 e
                    .)',
. INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85
  ,4                       <
.)',
u                                                                          __            _  . _ . _ _ _ _ _ . . _ _ . _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . .
,4 u
_}}
..}}

Latest revision as of 19:42, 11 December 2024

Revised Monthly Operating Rept for Sept 1985
ML20138E591
Person / Time
Site: Waterford 
Issue date: 09/30/1985
From:
LOUISIANA POWER & LIGHT CO.
To:
Shared Package
ML20138E583 List:
References
NUDOCS 8512130496
Download: ML20138E591 (2)


Text

.~

=.-

s:

Sheet 1.of 2 OPERATING DATA REPORT Revicion 12/10/85 t

^

UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA' DATE: NOVEMBER 1985 OPERATING STATUS' 1.~ Docket:-.50-382 Notes

.(1) Maximum Dependable

2. Reporting Period: SEPTEMBER 1985 Capacity (Gross and~

Net MWe) will be-3.~. Utility

Contact:

GEORGE MILLER ab te b Plione Number:

(504) 467-8211 s 02) h 6 (25) have been revised

- 4. Licensed' Thermal Power'(MWt): 3390 to start with Commercial Operation.

5. Nameplate Rating (Gross Mwe): 1153

_ 6. Design Electrical-Rating (Net MWe): 1104 7.' Maximum Dependable Capacity (Gross MWe): (Note 1)

8. Maximum. Dependable Capacity (Net MWe): (Note 1) 9.?If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

N/A-J M

' 10. Power Level To Which Restricted, if Any (Net MWe):

NONE 11.

R.easons For Restrictions, If Any: N/A j~8512130496 851210 DR ADOCK 05000382 This Month-Yr.-to-Date Cumulative PDR

- 12.

Hours In Reporting Period 168.0 168.0 168.0 13.

Number Of Hours Reactor Was Critical 149.3 149.3 149.3 14.

Reactor Reserve-Shutdown Hours 15~

Hours Generator On-Line 132.7 132.7 132.7

16. JUnit Reserve Shutdown Hours.

m-m

g y 7 6 '.,

~ %,1 to Shact 2 of'2.

.1

. Revision 12/10/85

<0PERATING DATA REPORT

((

-(Continued) 2 This Month-Yr.-to-Date Cumulative 117.[ Gross-Thermal EnergyL

_ Generated (MWH)

~317,589-317,589' 317,589

~

118.

Gross Electrical Energy' '

111,870 111,870 1111,870

-Generated?(NWH)>

~

19. " Net Electrical Energy-JU EGenerated (NWH) 105,186 105,186-105,186 I"20.. Unit. Service Factor:

79.0 79.0 79.0

~

L

.21. TUnit Availability FactorJ 79.0 79.0' 79.0' 7 22'. -. l-UnitT Capacity, Factor

-(Using MDC Net).

(NOTE'1)

(NOTE-1)

(NOTE 1) s23.

Unit Capacity Factor; (Using DER 1 Net) 56.7 56.7 56.7 24.' Unit-Forced Outage Rate.

21.0 21.0 21.0

[25. Unit Forced Outage Hours 35.3 35.3 35.3

- 26 '.. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

1 Unit 1 shutdown scheduled in March 1086'to perform Technical Specification y

surveillances requiring a unit shutdown, duration: approximately 28 days.

727. :If ' Shut' Down' At:End of Report Period, ~ Estimated Date Of' Startup:

l28~1 Unit's In1 Test: Status.(Prior to Commercial Operation):

Forecast Achieved ~

INITIAL' CRITICALITY.

3/4/85 e

. INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85

.)',

,4 u

..