Text
.~
=.-
s:
Sheet 1.of 2 OPERATING DATA REPORT Revicion 12/10/85 t
^
UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA' DATE: NOVEMBER 1985 OPERATING STATUS' 1.~ Docket:-.50-382 Notes
.(1) Maximum Dependable
- 2. Reporting Period: SEPTEMBER 1985 Capacity (Gross and~
Net MWe) will be-3.~. Utility
Contact:
GEORGE MILLER ab te b Plione Number:
(504) 467-8211 s 02) h 6 (25) have been revised
- 4. Licensed' Thermal Power'(MWt): 3390 to start with Commercial Operation.
- 5. Nameplate Rating (Gross Mwe): 1153
_ 6. Design Electrical-Rating (Net MWe): 1104 7.' Maximum Dependable Capacity (Gross MWe): (Note 1)
- 8. Maximum. Dependable Capacity (Net MWe): (Note 1) 9.?If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
N/A-J M
' 10. Power Level To Which Restricted, if Any (Net MWe):
NONE 11.
R.easons For Restrictions, If Any: N/A j~8512130496 851210 DR ADOCK 05000382 This Month-Yr.-to-Date Cumulative PDR
- 12.
Hours In Reporting Period 168.0 168.0 168.0 13.
Number Of Hours Reactor Was Critical 149.3 149.3 149.3 14.
Reactor Reserve-Shutdown Hours 15~
Hours Generator On-Line 132.7 132.7 132.7
- 16. JUnit Reserve Shutdown Hours.
m-m
g y 7 6 '.,
~ %,1 to Shact 2 of'2.
.1
. Revision 12/10/85
<0PERATING DATA REPORT
((
-(Continued) 2 This Month-Yr.-to-Date Cumulative 117.[ Gross-Thermal EnergyL
_ Generated (MWH)
~317,589-317,589' 317,589
~
118.
Gross Electrical Energy' '
111,870 111,870 1111,870
-Generated?(NWH)>
~
- 19. " Net Electrical Energy-JU EGenerated (NWH) 105,186 105,186-105,186 I"20.. Unit. Service Factor:
79.0 79.0 79.0
~
L
.21. TUnit Availability FactorJ 79.0 79.0' 79.0' 7 22'. -. l-UnitT Capacity, Factor
-(Using MDC Net).
(NOTE'1)
(NOTE-1)
(NOTE 1) s23.
Unit Capacity Factor; (Using DER 1 Net) 56.7 56.7 56.7 24.' Unit-Forced Outage Rate.
21.0 21.0 21.0
[25. Unit Forced Outage Hours 35.3 35.3 35.3
- 26 '.. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
1 Unit 1 shutdown scheduled in March 1086'to perform Technical Specification y
- surveillances requiring a unit shutdown, duration: approximately 28 days.
727. :If ' Shut' Down' At:End of Report Period, ~ Estimated Date Of' Startup:
l28~1 Unit's In1 Test: Status.(Prior to Commercial Operation):
Forecast Achieved ~
INITIAL' CRITICALITY.
3/4/85 e
. INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85
.)',
,4 u
..