Revised Monthly Operating Rept for Sept 1985
ML20138E591
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/30/1985
From:
LOUISIANA POWER & LIGHT CO.
To:
Shared Package
ML20138E583 List:
References
NUDOCS 8512130496
Download: ML20138E591 (2)


Text

.~

=.- s:

Sheet 1.of 2 OPERATING DATA REPORT Revicion 12/10/85 t

^

UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA' DATE: NOVEMBER 1985 OPERATING STATUS' 1.~ Docket:-.50-382 Notes

.(1) Maximum Dependable

2. Reporting Period: SEPTEMBER 1985 Capacity (Gross and~

Net MWe) will be-3.~. Utility

Contact:

GEORGE MILLER ab te b Plione Number: (504) 467-8211 s 02) h 6

.. ._ (25) have been revised

- 4. Licensed' Thermal Power'(MWt): 3390 to start with Commercial Operation.

5. Nameplate Rating (Gross Mwe): 1153

_ 6. Design Electrical-Rating (Net MWe): 1104 7.' Maximum Dependable Capacity (Gross MWe): (Note 1)

8. Maximum. Dependable Capacity (Net MWe): (Note 1)
9.?If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons: N/A-J M

' 10 . Power Level To Which Restricted, if Any (Net MWe): NONE

11. R.easons For Restrictions, If Any: N/A j~8512130496 DR 851210 ADOCK 05000382 This Month- Yr.-to-Date Cumulative PDR

- 12.

Hours In Reporting Period 168.0 168.0 168.0

13. Number Of Hours Reactor Was Critical 149.3 149.3 149.3
14. Reactor Reserve-Shutdown Hours 15~ Hours Generator On-Line 132.7 132.7 132.7
16. JUnit Reserve Shutdown Hours .

g y 7 6 '. , ~ %,1 to

.1 , . . Shact 2 of'2 .

<0PERATING DATA REPORT . Revision 12/10/85

(( -(Continued) 2 This Month- Yr.-to-Date Cumulative 117.[ Gross-Thermal EnergyL

_ Generated (MWH) ~317,589- 317,589' 317,589

~

118 . Gross Electrical Energy' '

~

-Generated?(NWH)> 111,870 111,870 1111,870

, 19. " Net Electrical Energy-JU EGenerated (NWH) 105,186 105,186- 105,186

~

I"20. . Unit. Service Factor: 79.0 79.0 79.0 L

.21. TUnit Availability FactorJ 79.0 79.0' 79.0' 7 22'. -. l- UnitT Capacity, Factor

-(Using MDC Net). (NOTE'1) (NOTE-1) (NOTE 1) s23. Unit Capacity Factor; (Using DER 1 Net) 56.7 56.7 56.7 24.' Unit-Forced Outage Rate. 21.0 21.0 21.0

[25. Unit Forced Outage Hours 35.3 35.3 35.3

- 26 '. . Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

1 Unit 1 shutdown scheduled in March 1086'to perform Technical Specification y :surveillances requiring a unit shutdown, duration: approximately 28 days.

727. :If ' Shut' Down' At:End of Report Period, ~ Estimated Date Of' Startup:

l28~1 Unit's In1 Test: Status.(Prior to Commercial Operation):

Forecast Achieved ~

INITIAL' CRITICALITY. 3/4/85 e

. INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85

.)',