Revised Monthly Operating Rept for Oct 1985
ML20138E676
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/31/1985
From:
LOUISIANA POWER & LIGHT CO.
To:
Shared Package
ML20138E583 List:
References
NUDOCS 8512130522
Download: ML20138E676 (2)


Text

C f d.

34 x.-;

-Sheet 1 of 2-f..

OPERATING DATA REPORT' Revision l'2/10/85

. m

-n r

J UNIT NAME: WATERFORD 3

=

.7. -

y

,. CITY / STATE: KILLONA/LA

~

DATE: NOVEMBER 1985

. OPERATING STATUS 94 -

~ ',

-1? Docket:150-382 ~

.. Notes (1) Maximum Dependable

2.(Reporting Period
OCTOBER 1985 Capacity (Gross and Net MWe) will be?

13l;Ntilityl

Contact:

l GEORGE MILLER-

"*d*f J Phone Numb'er:

(504) 467-8211 (2) Items (12) through i

~(25) have been' revised

" 9 e "4. Licensed Thermal Power (MWt): 3390-to start with f

Commercial Operation.

~

5. Nameplate Rating (Gross Mwe): 1153 "6L Design Electrical Rating-(Net MWe): 1104 l7.~1 Maximum' Dependable Capacity'(Gross MWe): (Note ~1)

/8.Shaximum' Dependable. Capacity (Net MWe): (Note 1) 19.-If Changes Occur ~in Capacity Ratings (Items Number 4 Through 8)-Since Last Report,

Give Reasons

N/A 15..PowerLevel-ToWhichRestricted,'ifAny.'(NetMWe):

NONE L11. Reasons For. Restrictions, If Any: N/A-This' Month Yr.-to-Date Cumulative.

s

.; R 12.

Hours In Reporting Period 745.0 913.0 913.0

~

.13. -Number of Hours Reactor Was Critical 537.3 686.6 686.8 14.

Reactor Reserve Shutdown Hours 15_.-Hours Generator On-Line 508.2 640.9 640.9

16. --Unit Reserve Shutdown Hours -

~

m B512130522 h h 82 PDR ADOCK PDR R

w

te

.y y e: <r Sheet 2Tof 2.

=a

i. :

0PERATING DATA' REP: T Revision 12/10/85

-(Continued)

This~ Month' Yr.-to-Date Cumulative

..p.

4 9^

J17. Gross!ThermaltEnergy 4

Generatedf(MWH)
~

~

1,581,557 1,899,146 1,899,146 I ross Electrical Energy

18.:

G

^

iGenerated (MWH)

^526,590 638,460 638^460 fl9.DNetElectridalEnergy

~

Generated (MWH)'

500,935 606,121 606,121'

!20.fUnitServ'ce' Factor-68.2 70.2.

,70.2 i

121. 'UnitLAvailability Factor:

68.2 70.2 70.2 d22 3fUniticapacity Factor

. (Using-MDC Net)-

~(NOTE 1)

(NOTE 1)-

(NOTE 1) 723. : Unit _ Capacity Factor

'(Using: DER Net)

'60.9 60.1

'60.1 124a.? Unit, Forced Outage. Rate 31.8 29.8 29.8 b

125.' : Unit Forced ~0utage Hours' 236.8 272.1 272.1

'26. [ Shutdowns ~ Scheduled dver.Next 6 Months (Type, Date,'and Duration of Each):

Unit ~ shutdown scheduled'in March 1986 to perform Technical Specification surveillances requiring a unit shutdown, duration: approximately 28 days.

-27.

'If._ Shut Down - At. En'd of Report Period, Estimated -Date Of Startup:

f28. 1 Units 1In Test: Status (PriorLto Commercial Operation):

Forecast Achieved l'

= INITIAL CRITICALITY 3/4/85 INITIAL' ELECTRICITY:

-3/18/85

. COMMERCIAL OPERATION 9/24/85 I

e i.

hk' e

-:.1...

m m

m m.

'