Text
C f d.
34 x.-;
-Sheet 1 of 2-f..
OPERATING DATA REPORT' Revision l'2/10/85
. m
-n r
J UNIT NAME: WATERFORD 3
=
.7. -
y
,. CITY / STATE: KILLONA/LA
~
DATE: NOVEMBER 1985
. OPERATING STATUS 94 -
~ ',
-1? Docket:150-382 ~
.. Notes (1) Maximum Dependable
- 2.(Reporting Period
- OCTOBER 1985 Capacity (Gross and Net MWe) will be?
13l;Ntilityl
Contact:
l GEORGE MILLER-
"*d*f J Phone Numb'er:
(504) 467-8211 (2) Items (12) through i
~(25) have been' revised
" 9 e "4. Licensed Thermal Power (MWt): 3390-to start with f
Commercial Operation.
~
- 5. Nameplate Rating (Gross Mwe): 1153 "6L Design Electrical Rating-(Net MWe): 1104 l7.~1 Maximum' Dependable Capacity'(Gross MWe): (Note ~1)
/8.Shaximum' Dependable. Capacity (Net MWe): (Note 1) 19.-If Changes Occur ~in Capacity Ratings (Items Number 4 Through 8)-Since Last Report,
- Give Reasons
N/A 15..PowerLevel-ToWhichRestricted,'ifAny.'(NetMWe):
NONE L11. Reasons For. Restrictions, If Any: N/A-This' Month Yr.-to-Date Cumulative.
s
.; R 12.
Hours In Reporting Period 745.0 913.0 913.0
~
.13. -Number of Hours Reactor Was Critical 537.3 686.6 686.8 14.
Reactor Reserve Shutdown Hours 15_.-Hours Generator On-Line 508.2 640.9 640.9
- 16. --Unit Reserve Shutdown Hours -
~
m B512130522 h h 82 PDR ADOCK PDR R
w
te
.y y e: <r Sheet 2Tof 2.
=a
- i. :
0PERATING DATA' REP: T Revision 12/10/85
-(Continued)
This~ Month' Yr.-to-Date Cumulative
..p.
4 9^
J17. Gross!ThermaltEnergy 4
- Generatedf(MWH)
- ~
~
1,581,557 1,899,146 1,899,146 I ross Electrical Energy
- 18.:
G
^
iGenerated (MWH)
^526,590 638,460 638^460 fl9.DNetElectridalEnergy
~
- Generated (MWH)'
500,935 606,121 606,121'
!20.fUnitServ'ce' Factor-68.2 70.2.
,70.2 i
121. 'UnitLAvailability Factor:
68.2 70.2 70.2 d22 3fUniticapacity Factor
. (Using-MDC Net)-
~(NOTE 1)
(NOTE 1)-
(NOTE 1) 723. : Unit _ Capacity Factor
'(Using: DER Net)
'60.9 60.1
'60.1 124a.? Unit, Forced Outage. Rate 31.8 29.8 29.8 b
125.' : Unit Forced ~0utage Hours' 236.8 272.1 272.1
'26. [ Shutdowns ~ Scheduled dver.Next 6 Months (Type, Date,'and Duration of Each):
Unit ~ shutdown scheduled'in March 1986 to perform Technical Specification surveillances requiring a unit shutdown, duration: approximately 28 days.
-27.
'If._ Shut Down - At. En'd of Report Period, Estimated -Date Of Startup:
f28. 1 Units 1In Test: Status (PriorLto Commercial Operation):
Forecast Achieved l'
= INITIAL CRITICALITY 3/4/85 INITIAL' ELECTRICITY:
-3/18/85
. COMMERCIAL OPERATION 9/24/85 I
e i.
hk' e
-:.1...
m m
m m.
'