November 8, 1985 Docket No. 50-309                                                         hh i
November 8, 1985 hh Docket No. 50-309 i
l Mr. J. B. Randazza Executive Vice President                                                         ,
l Mr. J. B. Randazza Executive Vice President Maine Yankee Atomic Power Company i
Maine Yankee Atomic Power Company                                                 i l
l 83 Edison Drive Augusta, Maine 04336 j
83 Edison Drive Augusta, Maine 04336                                                               j
f


==Dear Mr. Randazza:==
==Dear Mr. Randazza:==
f
==SUBJECT:==
==SUBJECT:==
MASONRY WALL DESIGN, IE BULLETIN 80-11                                   ;
MASONRY WALL DESIGN, IE BULLETIN 80-11 We forwarded our Safety Evaluation (SE) for the subject issue. on f
We forwarded our Safety Evaluation (SE) for the subject issue. on                 f October 22, 1984. In this SE, we concluded that the use of the arching action theory to qualify some of the unreinforced masonry walls was not acceptable and the implementation of the staff position on this methodology was required to render these walls acceptable to the staff.
October 22, 1984.
In addition, the SE also stated that the block wall on the south side of the     !
In this SE, we concluded that the use of the arching action theory to qualify some of the unreinforced masonry walls was not acceptable and the implementation of the staff position on this methodology was required to render these walls acceptable to the staff.
fuel pool should be upgraded such that it can withstand the postulated loading,   i including tornado effects.                                                       l You have now provided your response to both of the above staff positions and     1 also some additional information. The enclosed SE is based on that               !
In addition, the SE also stated that the block wall on the south side of the fuel pool should be upgraded such that it can withstand the postulated loading, i
additional information.                                                           j
including tornado effects.
    ~ You have relied upon results of a consequence analysis of the failure of the masonry wall on the south side of the fuel pool to conclude that no upgrading of this wall is required. The consequence analysis review will have to be conducted by appropriate NRR staff and will be addressed in a subsequent evaluation. The remaining issues are considered resolved.
l You have now provided your response to both of the above staff positions and 1
Sincerely,                                   !
also some additional information. The enclosed SE is based on that additional information.
l Edward J. Butcher, Acting Chief             l Operating Reactors Branch No. 3             l Divison of Licensing                         *
j
~ You have relied upon results of a consequence analysis of the failure of the masonry wall on the south side of the fuel pool to conclude that no upgrading of this wall is required. The consequence analysis review will have to be conducted by appropriate NRR staff and will be addressed in a subsequent evaluation. The remaining issues are considered resolved.
Sincerely, l
Edward J. Butcher, Acting Chief l
Operating Reactors Branch No. 3 l
Divison of Licensing


==Enclosure:==
==Enclosure:==
As stated cc w/ enclosure:
As stated cc w/ enclosure:
See next page Distribution:
See next page Distribution:
Docket File           NRC & L PDRs   Branch Files   OELD ACRS 10   HThompson EJordan               BGrimes       PKreutzer       PSears   EButcher RBosnak
Docket File NRC & L PDRs Branch Files OELD ACRS 10 HThompson EJordan BGrimes PKreutzer PSears EButcher RBosnak
      *See previous white for concurrences ORB #3:DL*           ORB #3:DL*       OR PKreutzer             PSearstef       ES c r 11/6/85               11/6/85         g /8/85 l
*See previous white for concurrences ORB #3:DL*
l 0
ORB #3:DL*
OR PKreutzer PSearstef ES c r 11/6/85 11/6/85 g /8/85 l
0


Docket No. 50-309 Mr. J. B. Randazza                                                                       !
Docket No. 50-309 Mr. J. B. Randazza Executive Vice President Maine Yankee Atomic Power Company 83 Edison Drive Augusta, Maine 04336
Executive Vice President Maine Yankee Atomic Power Company 83 Edison Drive Augusta, Maine 04336


==Dear Mr. Randazza:==
==Dear Mr. Randazza:==
==SUBJECT:==
==SUBJECT:==
MASONRY WALL DESIGN, IE BULLETIN 80-11 We forwarded our Safety Eva'luation (SE) for the subject facility on October 22, 1984           In this SE, we concluded that the use of the arching action theory to qualify some of the unreinforced masonry walls was not acceptable and the implementation of the staff position on this methodology was required to render these walls acceptable to the staff.
MASONRY WALL DESIGN, IE BULLETIN 80-11 We forwarded our Safety Eva'luation (SE) for the subject facility on October 22, 1984 In this SE, we concluded that the use of the arching action theory to qualify some of the unreinforced masonry walls was not acceptable and the implementation of the staff position on this methodology was required to render these walls acceptable to the staff.
In addition, the SE also stated that the block wall on the south side of the fuel pool should be upgraded such that it can withstand the postulated loading, including tornado effects.
In addition, the SE also stated that the block wall on the south side of the fuel pool should be upgraded such that it can withstand the postulated loading, including tornado effects.
You have now provided your response to both of the above staff positions and also some additional information. The enclosed SE is based on that additional information.
You have now provided your response to both of the above staff positions and also some additional information. The enclosed SE is based on that additional information.
You have relied upon results of a consequence analysis of the failure of the masonry wall on the south side of the fuel pool to conclude that no upgrading of this wall is required. The consequpnce analysis review will have to be conducted by appropriate NRR staff. The remaining issues are resolved.
You have relied upon results of a consequence analysis of the failure of the masonry wall on the south side of the fuel pool to conclude that no upgrading of this wall is required. The consequpnce analysis review will have to be conducted by appropriate NRR staff. The remaining issues are resolved.
                                        ,        Sincerely, Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 Divison of Licensing
Sincerely, Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 Divison of Licensing


==Enclosure:==
==Enclosure:==
As stated cc w/ enclosure:
As stated cc w/ enclosure:
See next page Distribution:
See next page Distribution:
Docket File               NRC & L PDRs   Branch Files   OELD ACRS 10   HThompson EJordan                   BGrimer.       PKreutzer     PSears   EButcher RBosnak ORB #3:DL Q'TN ORBF3:DL         ORB #3:DL PSears;ef         EButcher PKfedtzer rf /g /85                   o /g /85           / /85
Docket File NRC & L PDRs Branch Files OELD ACRS 10 HThompson EJordan BGrimer.
PKreutzer PSears EButcher RBosnak Q'TN ORB #3:DL ORBF3:DL ORB #3:DL PKfedtzer PSears;ef EButcher rf g /85 o /g /85
/ /85
/


Mr. J. B. Randazza Maine Yankee Atomic Power Company       Maine Yankee Atomic Power Station cc:
Mr. J. B. Randazza Maine Yankee Atomic Power Company Maine Yankee Atomic Power Station cc:
Charles E. Monty, President             Mr. P. L. Anderson, Project Manager Maine Yankee Atomic Power Company       Yankee Atomic Electric Company 83 Edison Drive                         1671 Worchester Road Augusta, Maine 04336                     Framingham, Massachusetts 07101 Mr. Charles B. Brinkman                 Mr. G. D. Whittier Manager - Washington Nuclear             Licensing Section Head Operations                         Maine Yankee Atomic Power Company Combustion Engineering, Inc.             83 Edison Drive 7910 Woodmont Avenue                     Augusta, Maine 04336 Bethesda, Maryland 20814 John A. Ritsher, Esquire Ropes & Gray 225 Franklin Street Boston, Massachusetts 02110 State Planning Officer Executive Department 189 State Street Augusta, Maine 04330 Mr. John H. Garrity, Plant Manager Maine Yankee Atomic Power Company P. O. Box 408 Wiscasset, Maine 04578 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 First Selectman of Wiscasset Municipal Building U.S. Route 1 Wiscasset, Maine 04578 Mr. Cornelius F. Holden Resident Inspector c/o U.S. Nuclear Regulatory Commission P. O. Box E Wiscasset, Maine 04578
Charles E. Monty, President Mr. P. L. Anderson, Project Manager Maine Yankee Atomic Power Company Yankee Atomic Electric Company 83 Edison Drive 1671 Worchester Road Augusta, Maine 04336 Framingham, Massachusetts 07101 Mr. Charles B. Brinkman Mr. G. D. Whittier Manager - Washington Nuclear Licensing Section Head Operations Maine Yankee Atomic Power Company Combustion Engineering, Inc.
                                                      . - . _ - .-  - _ _ .      ..-_ -.}}
83 Edison Drive 7910 Woodmont Avenue Augusta, Maine 04336 Bethesda, Maryland 20814 John A. Ritsher, Esquire Ropes & Gray 225 Franklin Street Boston, Massachusetts 02110 State Planning Officer Executive Department 189 State Street Augusta, Maine 04330 Mr. John H. Garrity, Plant Manager Maine Yankee Atomic Power Company P. O. Box 408 Wiscasset, Maine 04578 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 First Selectman of Wiscasset Municipal Building U.S. Route 1 Wiscasset, Maine 04578 Mr. Cornelius F. Holden Resident Inspector c/o U.S. Nuclear Regulatory Commission P. O. Box E Wiscasset, Maine 04578
..-_ -.}}

Latest revision as of 17:44, 11 December 2024

Forwards Safety Evaluation Re Review of Response to 841022 Safety Evaluation Concerning IE Bulletin 80-11, Masonry Wall Design. Consequence Analysis Concludes That No Wall Upgrading Required
ML20138R596
Person / Time
Site: Maine Yankee
Issue date: 11/08/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To: Randazza J
Maine Yankee
Shared Package
ML20138R598 List:
References
IEB-80-11, NUDOCS 8511180691
Download: ML20138R596 (3)


Text

_

~

November 8, 1985 hh Docket No. 50-309 i

l Mr. J. B. Randazza Executive Vice President Maine Yankee Atomic Power Company i

l 83 Edison Drive Augusta, Maine 04336 j

f

Dear Mr. Randazza:

SUBJECT:

MASONRY WALL DESIGN, IE BULLETIN 80-11 We forwarded our Safety Evaluation (SE) for the subject issue. on f

October 22, 1984.

In this SE, we concluded that the use of the arching action theory to qualify some of the unreinforced masonry walls was not acceptable and the implementation of the staff position on this methodology was required to render these walls acceptable to the staff.

In addition, the SE also stated that the block wall on the south side of the fuel pool should be upgraded such that it can withstand the postulated loading, i

including tornado effects.

l You have now provided your response to both of the above staff positions and 1

also some additional information. The enclosed SE is based on that additional information.

j

~ You have relied upon results of a consequence analysis of the failure of the masonry wall on the south side of the fuel pool to conclude that no upgrading of this wall is required. The consequence analysis review will have to be conducted by appropriate NRR staff and will be addressed in a subsequent evaluation. The remaining issues are considered resolved.

Sincerely, l

Edward J. Butcher, Acting Chief l

Operating Reactors Branch No. 3 l

Divison of Licensing

Enclosure:

As stated cc w/ enclosure:

See next page Distribution:

Docket File NRC & L PDRs Branch Files OELD ACRS 10 HThompson EJordan BGrimes PKreutzer PSears EButcher RBosnak

  • See previous white for concurrences ORB #3:DL*

ORB #3:DL*

OR PKreutzer PSearstef ES c r 11/6/85 11/6/85 g /8/85 l

0

Docket No. 50-309 Mr. J. B. Randazza Executive Vice President Maine Yankee Atomic Power Company 83 Edison Drive Augusta, Maine 04336

Dear Mr. Randazza:

SUBJECT:

MASONRY WALL DESIGN, IE BULLETIN 80-11 We forwarded our Safety Eva'luation (SE) for the subject facility on October 22, 1984 In this SE, we concluded that the use of the arching action theory to qualify some of the unreinforced masonry walls was not acceptable and the implementation of the staff position on this methodology was required to render these walls acceptable to the staff.

In addition, the SE also stated that the block wall on the south side of the fuel pool should be upgraded such that it can withstand the postulated loading, including tornado effects.

You have now provided your response to both of the above staff positions and also some additional information. The enclosed SE is based on that additional information.

You have relied upon results of a consequence analysis of the failure of the masonry wall on the south side of the fuel pool to conclude that no upgrading of this wall is required. The consequpnce analysis review will have to be conducted by appropriate NRR staff. The remaining issues are resolved.

Sincerely, Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 Divison of Licensing

Enclosure:

As stated cc w/ enclosure:

See next page Distribution:

Docket File NRC & L PDRs Branch Files OELD ACRS 10 HThompson EJordan BGrimer.

PKreutzer PSears EButcher RBosnak Q'TN ORB #3:DL ORBF3:DL ORB #3:DL PKfedtzer PSears;ef EButcher rf g /85 o /g /85

/ /85

/

Mr. J. B. Randazza Maine Yankee Atomic Power Company Maine Yankee Atomic Power Station cc:

Charles E. Monty, President Mr. P. L. Anderson, Project Manager Maine Yankee Atomic Power Company Yankee Atomic Electric Company 83 Edison Drive 1671 Worchester Road Augusta, Maine 04336 Framingham, Massachusetts 07101 Mr. Charles B. Brinkman Mr. G. D. Whittier Manager - Washington Nuclear Licensing Section Head Operations Maine Yankee Atomic Power Company Combustion Engineering, Inc.

83 Edison Drive 7910 Woodmont Avenue Augusta, Maine 04336 Bethesda, Maryland 20814 John A. Ritsher, Esquire Ropes & Gray 225 Franklin Street Boston, Massachusetts 02110 State Planning Officer Executive Department 189 State Street Augusta, Maine 04330 Mr. John H. Garrity, Plant Manager Maine Yankee Atomic Power Company P. O. Box 408 Wiscasset, Maine 04578 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 First Selectman of Wiscasset Municipal Building U.S. Route 1 Wiscasset, Maine 04578 Mr. Cornelius F. Holden Resident Inspector c/o U.S. Nuclear Regulatory Commission P. O. Box E Wiscasset, Maine 04578

..-_ -.