                                                      May 9,1997
May 9,1997
            EA 97-032
EA 97-032
            Mr. M. Wadley, Vice President
Mr. M. Wadley, Vice President
            Nuclear Generation                                                                                         j
Nuclear Generation
            Northern States Power Company                                                                             i
j
            414 Nicollet Mall
Northern States Power Company
            Minneapolis, MN 55401
i
            SUBJECT:       NRC INSPECTION REPORT NO. 50-263/97003(DRP)
414 Nicollet Mall
            Dear Mr. Wadley:
Minneapolis, MN 55401
            On April 11,1997, the NRC completed an inspection at your Monticello reactor facility.
SUBJECT:
            The enclosed report presents the results of that inspection.
NRC INSPECTION REPORT NO. 50-263/97003(DRP)
            During the seven week period covered by this inspection period, your conduct of activities                 !
Dear Mr. Wadley:
            at the Monticello facility was acceptable. Recent Generation Quality Service audit findings               !
On April 11,1997, the NRC completed an inspection at your Monticello reactor facility.
            demonstrated a good questioning attitude and follow through with identified concerns.                     '
The enclosed report presents the results of that inspection.
            However, we noted that some problems occurred during maintenance activities. One such                     ,
During the seven week period covered by this inspection period, your conduct of activities
            activity resulted in a loss of voltage to an essential electrical bus and starting of
at the Monticello facility was acceptable. Recent Generation Quality Service audit findings
            emergency diesel generators. Electricians failed to remove a temporarily-installed meter
demonstrated a good questioning attitude and follow through with identified concerns.
            from logic circuitry. In additioni the inspectors identified that the operators were unaware
'
            .the #13 emergency service water pump had been operating for two days. This oversight
However, we noted that some problems occurred during maintenance activities. One such
            existed through four shift turnovers between three operating crews. This raises concern                   i
,
            over the effectiveness and thoroughness of operator walkarounds and shift turnovers. Our
activity resulted in a loss of voltage to an essential electrical bus and starting of
            review of the circumstances leading to this event is not complete and will be discussed in
emergency diesel generators. Electricians failed to remove a temporarily-installed meter
            a future inspection report. We will contact you in the near future to schedule a
from logic circuitry. In additioni the inspectors identified that the operators were unaware
            management meeting to discuss these and other recent operation and surveillance issues.
.the #13 emergency service water pump had been operating for two days. This oversight
            A predecisional enforcement conference was conducted on March 5,1997, to discuss the                       '
existed through four shift turnovers between three operating crews. This raises concern
            apparent violation identified in inspection Report No. 50-263/96009 regarding an
i
i           inadequate safety evaluation related to ECCS pump configuration (EA 97-032). You will
over the effectiveness and thoroughness of operator walkarounds and shift turnovers. Our
            be informed of our decision regarding enforcement action via separate correspondence.
review of the circumstances leading to this event is not complete and will be discussed in
a future inspection report. We will contact you in the near future to schedule a
management meeting to discuss these and other recent operation and surveillance issues.
A predecisional enforcement conference was conducted on March 5,1997, to discuss the
'
apparent violation identified in inspection Report No. 50-263/96009 regarding an
i
inadequate safety evaluation related to ECCS pump configuration (EA 97-032). You will
be informed of our decision regarding enforcement action via separate correspondence.
!
!
:
:
                    200039                           ll[l[gglll[l[g
200039
                                        "
ll[l[gglll[l[g
        9705200167 970509
"
        PDR   ADOCK 05000263
9705200167 970509
        O                     PDR
PDR
                                                          _
ADOCK 05000263
O
PDR


i
i
'
'
  .
.
      M. Wadley                                                           -2-
M. Wadley
  .
-2-
      In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
.
      and its enclosures will be placed in the NRC Public Document Room.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
                                                                      Sincerely,
and its enclosures will be placed in the NRC Public Document Room.
                                                                                                                                              :
Sincerely,
                                                                                                                                              i
:
i
Is) 3. e. Gro6s &
'
'
                                                                        Is) 3. e. Gro6s
James L. Caldwell, Director
                                                                      James L. Caldwell, Director
-
                                                                                                                &                            -
Division of Reactor Projects
                                                                      Division of Reactor Projects
Docket No. 50 263
      Docket No. 50 263
License No. DPR-22
      License No. DPR-22
Enclosure:
      Enclosure:           Inspection Report
Inspection Report
                            No. 50-263/97003(DRP)
No. 50-263/97003(DRP)
      cc w/ encl:         Plant Manager, Monticello                                             s                                           !
cc w/ encl:
                          John W. Ferman, Ph.D.,
Plant Manager, Monticello
                            Nuclear Engineer, MPCA
s
l                         State Liaison Officer, State                                                                                       I
John W. Ferman, Ph.D.,
                            of Minnesota                                                                                                     l
Nuclear Engineer, MPCA
                                                                                                                                              i
l
    Distribution:
State Liaison Officer, State
    Docket File w/ encl                                                         DRP w/ encl
of Minnesota
    PUBLIC IE-01 w/enci                                                         Rill PRR w/enci                                             i
i
    OC/LFDCB w/ encl                                                             Project Manager, NRR w/enci                                 l
Distribution:
    SRI Monticello, w/ encl                                                     Prairie Island w/ encl
Docket File w/ encl
    A. B. Beach, w/enci                                                         Rill Enf. Coordinator, v,/ encl
DRP w/ encl
    Deputy RA, w/enci                                                           CAA1 w/enci (E-mail)
PUBLIC IE-01 w/enci
    TSS w/enci                                                                   DRS (2) w/enct
Rill PRR w/enci
                          SEE PREVIOUS CONCURRENCE 1
OC/LFDCB w/ encl
    DOCUMENT NAME: R :\l N S PR PT S\PO W E R S\M O NT\M O N 97003. D R P
Project Manager, NRR w/enci
    To receive e copy of th6e docununt. indicate in the tox *C' = Copy without attachment / enclosure *E" = Copy with attachment / enclosure
SRI Monticello, w/ encl
    "N* = No copy
Prairie Island w/ encl
      OFFICE         Rlli         } j'               Rill     Q           s    fill                         Rllig p
A. B. Beach, w/enci
      NAME           ESchw(bW:ho                     JJacobsori. }7 HClayton                                   JC W
Rill Enf. Coordinator, v,/ encl
      DATE           05/\ /9Vf 05f\/97V Q                                         05/ /97                     05/p /97
Deputy RA, w/enci
                                                        OFFICIAL RECORD COPY
CAA1 w/enci (E-mail)
TSS w/enci
DRS (2) w/enct
SEE PREVIOUS CONCURRENCE 1
DOCUMENT NAME: R :\\l N S PR PT S\\PO W E R S\\M O NT\\M O N 97003. D R P
To receive e copy of th6e docununt. indicate in the tox *C' = Copy without attachment / enclosure *E" = Copy with attachment / enclosure
"N* = No copy
OFFICE
Rlli
} j'
Rill
Q
fill
Rllig p
s
NAME
ESchw(bW:ho
JJacobsori. }7 HClayton
JC W
DATE
05/\\ /9Vf 05f\\/97V Q
05/ /97
05/p /97
OFFICIAL RECORD COPY
,
,
i
i
Line 113: Line 157:
!
!


                            .-.       .         - . _ _ _ . ._               -             . . . _ - - . --                   -           _   -. - _ .-
.-.
                          9                                                                                                                             j
.
                                                                                                                                                        I
- . _ _ _ . ._
                                                                    May 9, 1997                                                                         1
-
        .
. . . _ - - . --
4
-
            Mr. M. Wadley, Vice President
_
:
-.
        - Nuclear Generation                                                                                                                          !
- _
i           Northem States Power Company                                                                                                                 1
.-
i           414 Nicollet Mall                                                               '
9
,
j
            Minneapolis, MN 55401                                                                                                                       ,
I
                                                                                                                                                        <
May 9, 1997
1
.
4
Mr. M. Wadley, Vice President
Nuclear Generation
-
:
i
Northem States Power Company
1
i
414 Nicollet Mall
Minneapolis, MN 55401
'
,
,
i.
i.
I
<
            SUBJECT:               NRC INSPECTION REPORT NO. 50-263/97003(DRP)                                                                           ]
I
SUBJECT:
NRC INSPECTION REPORT NO. 50-263/97003(DRP)
]
1
1
!           Dear Mr. Wadley:
!
                                                                                                                                                        I
Dear Mr. Wadley:
            On April 11,1997, the NRC completed an inspection at your Monticello reactor facility.                                                       !
On April 11,1997, the NRC completed an inspection at your Monticello reactor facility.
l           The enclosed report presents the results of that inspection.                                                                                 l
l
                                                                                                                                                        i
The enclosed report presents the results of that inspection.
                                                                                                                                                        4
i
                                                                                                                                                        '
4
!            During the 7-week period covered by this inspection period, your conduct of activities at
!
4          the Monticello facility was acceptable. Recent Generation Quality Service audit findings
During the 7-week period covered by this inspection period, your conduct of activities at
i           demonstrated a good questioning attitude and follow through with identified concerns.
'
l           However, we noted that some problems occurred during maintenance activities in which a
the Monticello facility was acceptable. Recent Generation Quality Service audit findings
!           contributor was a lack of detailed work instructions. One such activity resulted in a loss
4
}           of voltage to an essential electrical bus. Electricians failed to remove a temporarily-
i
)           installed meter from logic circuitry. In addition, the inspectors identified that the operators
demonstrated a good questioning attitude and follow through with identified concerns.
            were unaware the #13 emergency service water pump had been operating for 2 days.
l
j           This oversight existed through four shift turnovers between three operating crews. This
However, we noted that some problems occurred during maintenance activities in which a
i           raises concern over the effectiveness and thoroughness of operator walk arounds and shift
!
contributor was a lack of detailed work instructions. One such activity resulted in a loss
}
of voltage to an essential electrical bus. Electricians failed to remove a temporarily-
)
installed meter from logic circuitry. In addition, the inspectors identified that the operators
were unaware the #13 emergency service water pump had been operating for 2 days.
j
This oversight existed through four shift turnovers between three operating crews. This
i
raises concern over the effectiveness and thoroughness of operator walk arounds and shift
turnovers. Our review of the circumstances leading to this event is not complete and will
l
2
2
            turnovers. Our review of the circumstances leading to this event is not complete and will                                                  l
'
                                                                                                                                                          '
4
4
          ' be discussed in a future inspection report. We will contact you in the near future to
' be discussed in a future inspection report. We will contact you in the near future to
i           schedule a management meeting regarding your conduct of operations.
i
schedule a management meeting regarding your conduct of operations.
!
!
s
s
;           in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
;
,            and its enclosures will be placed in the NRC Public Document Room.
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
                                                                                              Sincerely,
and its enclosures will be placed in the NRC Public Document Room.
,
Sincerely,
'
'
                                                                                                /s/ J. A. Grobe for
/s/ J. A. Grobe for
                                                                                              James L. Caldwell, Director
James L. Caldwell, Director
                                                                                              Division of Reactor Projects
Division of Reactor Projects
            Docket No. 50-263                                                                                                                           !
Docket No. 50-263
            License No. DPR-22                                                                                                                         l
License No. DPR-22
                                                                                                                                                        l
l
              Enclosure: Inspection Report No. 50-263/97003(DRP)                                                                                         l
l
            DOCUhENT NAhE: R:UNSPRPTSPOWERIAMONhMON97003.DfP                                                                                           I
Enclosure: Inspection Report No. 50-263/97003(DRP)
            To receive e copy of this doeurnent, indecote in the box 'C' r Copy ethout ettechlenal "E" = Copy wth attachtenci   *N' = No copy           i
DOCUhENT NAhE: R:UNSPRPTSPOWERIAMONhMON97003.DfP
              of90CE           Rill                             M                                   M
To receive e copy of this doeurnent, indecote in the box 'C' r Copy ethout ettechlenal "E" = Copy wth attachtenci
              mAME             soh m i.e                       u .6e.n                             C-
*N' = No copy
                                                                                                                                  d ( w b frC-
of90CE
              DATE             El       19 7                   5/       /97                       5/     19 7                       [[//p"[
Rill
                                                                            - ~~m
M
                                                                                                                                                          1
M
  - _ _
d ( w b frC-
mAME
soh m i.e
u .6e.n
C-
[[//p"[
DATE
El
19 7
5/
/97
5/
19 7
- ~~m
-
}}
}}

Latest revision as of 15:36, 11 December 2024

Forwards Insp Rept 50-263/97-03 on 970220-0411.No Violations Noted.Insp Revealed That Some Problems Occurred During Maint Activities Which Resulted in Loss of Voltage to Essential Electrical Bus & Starting of Emergency Diesel Generators
ML20141D659
Person / Time
Site: Monticello 
Issue date: 05/09/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20141D664 List:
References
50-263-97-03, 50-263-97-3, EA-97-032, EA-97-32, NUDOCS 9705200167
Download: ML20141D659 (3)


See also: IR 05000263/1997003

Text

{{#Wiki_filter:--. - .-. - -_-- .. .. . ._ - - . _ -. . . . . . - - - Mh i !- T&O/ ^ l < 7 i ' r May 9,1997 EA 97-032 Mr. M. Wadley, Vice President Nuclear Generation j Northern States Power Company i 414 Nicollet Mall Minneapolis, MN 55401 SUBJECT: NRC INSPECTION REPORT NO. 50-263/97003(DRP) Dear Mr. Wadley: On April 11,1997, the NRC completed an inspection at your Monticello reactor facility. The enclosed report presents the results of that inspection. During the seven week period covered by this inspection period, your conduct of activities at the Monticello facility was acceptable. Recent Generation Quality Service audit findings demonstrated a good questioning attitude and follow through with identified concerns. ' However, we noted that some problems occurred during maintenance activities. One such , activity resulted in a loss of voltage to an essential electrical bus and starting of emergency diesel generators. Electricians failed to remove a temporarily-installed meter from logic circuitry. In additioni the inspectors identified that the operators were unaware .the #13 emergency service water pump had been operating for two days. This oversight existed through four shift turnovers between three operating crews. This raises concern i over the effectiveness and thoroughness of operator walkarounds and shift turnovers. Our review of the circumstances leading to this event is not complete and will be discussed in a future inspection report. We will contact you in the near future to schedule a management meeting to discuss these and other recent operation and surveillance issues. A predecisional enforcement conference was conducted on March 5,1997, to discuss the ' apparent violation identified in inspection Report No. 50-263/96009 regarding an i inadequate safety evaluation related to ECCS pump configuration (EA 97-032). You will be informed of our decision regarding enforcement action via separate correspondence. !

200039 ll[l[gglll[l[g " 9705200167 970509 PDR ADOCK 05000263 O PDR

i ' . M. Wadley -2- . In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room. Sincerely,

i Is) 3. e. Gro6s & ' James L. Caldwell, Director - Division of Reactor Projects Docket No. 50 263 License No. DPR-22 Enclosure: Inspection Report No. 50-263/97003(DRP) cc w/ encl: Plant Manager, Monticello s John W. Ferman, Ph.D., Nuclear Engineer, MPCA l State Liaison Officer, State of Minnesota i Distribution: Docket File w/ encl DRP w/ encl PUBLIC IE-01 w/enci Rill PRR w/enci OC/LFDCB w/ encl Project Manager, NRR w/enci SRI Monticello, w/ encl Prairie Island w/ encl A. B. Beach, w/enci Rill Enf. Coordinator, v,/ encl Deputy RA, w/enci CAA1 w/enci (E-mail) TSS w/enci DRS (2) w/enct SEE PREVIOUS CONCURRENCE 1 DOCUMENT NAME: R :\\l N S PR PT S\\PO W E R S\\M O NT\\M O N 97003. D R P To receive e copy of th6e docununt. indicate in the tox *C' = Copy without attachment / enclosure *E" = Copy with attachment / enclosure "N* = No copy OFFICE Rlli } j' Rill Q fill Rllig p s NAME ESchw(bW:ho JJacobsori. }7 HClayton JC W DATE 05/\\ /9Vf 05f\\/97V Q 05/ /97 05/p /97 OFFICIAL RECORD COPY , i ! !

.-. . - . _ _ _ . ._ - . . . _ - - . -- - _ -. - _ .- 9 j I May 9, 1997 1 . 4 Mr. M. Wadley, Vice President Nuclear Generation -

i Northem States Power Company 1 i 414 Nicollet Mall Minneapolis, MN 55401 ' , , i. < I SUBJECT: NRC INSPECTION REPORT NO. 50-263/97003(DRP) ] 1 ! Dear Mr. Wadley: On April 11,1997, the NRC completed an inspection at your Monticello reactor facility. l The enclosed report presents the results of that inspection. i 4 ! During the 7-week period covered by this inspection period, your conduct of activities at ' the Monticello facility was acceptable. Recent Generation Quality Service audit findings 4 i demonstrated a good questioning attitude and follow through with identified concerns. l However, we noted that some problems occurred during maintenance activities in which a ! contributor was a lack of detailed work instructions. One such activity resulted in a loss } of voltage to an essential electrical bus. Electricians failed to remove a temporarily- ) installed meter from logic circuitry. In addition, the inspectors identified that the operators were unaware the #13 emergency service water pump had been operating for 2 days. j This oversight existed through four shift turnovers between three operating crews. This i raises concern over the effectiveness and thoroughness of operator walk arounds and shift turnovers. Our review of the circumstances leading to this event is not complete and will l 2 ' 4 ' be discussed in a future inspection report. We will contact you in the near future to i schedule a management meeting regarding your conduct of operations. ! s

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room. , Sincerely, ' /s/ J. A. Grobe for James L. Caldwell, Director Division of Reactor Projects Docket No. 50-263 License No. DPR-22 l l Enclosure: Inspection Report No. 50-263/97003(DRP) DOCUhENT NAhE: R:UNSPRPTSPOWERIAMONhMON97003.DfP To receive e copy of this doeurnent, indecote in the box 'C' r Copy ethout ettechlenal "E" = Copy wth attachtenci

  • N' = No copy

of90CE Rill M M d ( w b frC- mAME soh m i.e u .6e.n C- [[//p"[ DATE El 19 7 5/ /97 5/ 19 7 - ~~m - }}