Forwards Insp Rept 50-263/97-03 on 970220-0411.No Violations Noted.Insp Revealed That Some Problems Occurred During Maint Activities Which Resulted in Loss of Voltage to Essential Electrical Bus & Starting of Emergency Diesel Generators
ML20141D659
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/09/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20141D664 List:
References
50-263-97-03, 50-263-97-3, EA-97-032, EA-97-32, NUDOCS 9705200167
Download: ML20141D659 (3)


See also: IR 05000263/1997003

Text

{{#Wiki_filter:--. - .-. - -_-- .. .. . ._ - - . _ -. . . . . . - - - i

                                                                                                             Mh

!-

  ^
                                                                                                             T&O/

l <

  7
                                                                                                                       i
                                                                                                                        '
                                                                                                           r
                                                      May 9,1997
            EA 97-032
            Mr. M. Wadley, Vice President
            Nuclear Generation                                                                                         j
            Northern States Power Company                                                                              i
            414 Nicollet Mall
            Minneapolis, MN 55401
            SUBJECT:        NRC INSPECTION REPORT NO. 50-263/97003(DRP)
            Dear Mr. Wadley:
            On April 11,1997, the NRC completed an inspection at your Monticello reactor facility.
            The enclosed report presents the results of that inspection.
            During the seven week period covered by this inspection period, your conduct of activities                 !
            at the Monticello facility was acceptable. Recent Generation Quality Service audit findings                !
            demonstrated a good questioning attitude and follow through with identified concerns.                      '
            However, we noted that some problems occurred during maintenance activities. One such                      ,
            activity resulted in a loss of voltage to an essential electrical bus and starting of
            emergency diesel generators. Electricians failed to remove a temporarily-installed meter
            from logic circuitry. In additioni the inspectors identified that the operators were unaware
           .the #13 emergency service water pump had been operating for two days. This oversight
            existed through four shift turnovers between three operating crews. This raises concern                    i
            over the effectiveness and thoroughness of operator walkarounds and shift turnovers. Our
            review of the circumstances leading to this event is not complete and will be discussed in
            a future inspection report. We will contact you in the near future to schedule a
            management meeting to discuss these and other recent operation and surveillance issues.
            A predecisional enforcement conference was conducted on March 5,1997, to discuss the                       '
            apparent violation identified in inspection Report No. 50-263/96009 regarding an

i inadequate safety evaluation related to ECCS pump configuration (EA 97-032). You will

            be informed of our decision regarding enforcement action via separate correspondence.

!

                    200039                           ll[l[gglll[l[g
                                        "
       9705200167 970509
       PDR   ADOCK 05000263
       O                     PDR
                                                          _

i '

  .
     M. Wadley                                                           -2-
 .
     In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
     and its enclosures will be placed in the NRC Public Document Room.
                                                                      Sincerely,
                                                                                                                                             :
                                                                                                                                             i

'

                                                                       Is) 3. e. Gro6s
                                                                      James L. Caldwell, Director
                                                                                                               &                             -
                                                                      Division of Reactor Projects
     Docket No. 50 263
     License No. DPR-22
     Enclosure:           Inspection Report
                            No. 50-263/97003(DRP)
     cc w/ encl:          Plant Manager, Monticello                                              s                                            !
                          John W. Ferman, Ph.D.,
                            Nuclear Engineer, MPCA

l State Liaison Officer, State I

                            of Minnesota                                                                                                      l
                                                                                                                                              i
    Distribution:
    Docket File w/ encl                                                          DRP w/ encl
    PUBLIC IE-01 w/enci                                                          Rill PRR w/enci                                              i
    OC/LFDCB w/ encl                                                             Project Manager, NRR w/enci                                  l
    SRI Monticello, w/ encl                                                      Prairie Island w/ encl
    A. B. Beach, w/enci                                                          Rill Enf. Coordinator, v,/ encl
    Deputy RA, w/enci                                                            CAA1 w/enci (E-mail)
    TSS w/enci                                                                   DRS (2) w/enct
                          SEE PREVIOUS CONCURRENCE 1
    DOCUMENT NAME: R :\l N S PR PT S\PO W E R S\M O NT\M O N 97003. D R P
    To receive e copy of th6e docununt. indicate in the tox *C' = Copy without attachment / enclosure *E" = Copy with attachment / enclosure
    "N* = No copy
      OFFICE         Rlli          } j'               Rill      Q           s     fill                          Rllig p
      NAME           ESchw(bW:ho                      JJacobsori. }7 HClayton                                   JC W
      DATE           05/\ /9Vf 05f\/97V Q                                          05/ /97                      05/p /97
                                                       OFFICIAL RECORD COPY

, i ! !

                            .-.       .         - . _ _ _ . ._               -             . . . _ - - . --                   -           _   -. - _ .-
                          9                                                                                                                             j
                                                                                                                                                        I
                                                                    May 9, 1997                                                                         1
        .
4
           Mr. M. Wadley, Vice President
:
        -  Nuclear Generation                                                                                                                           !

i Northem States Power Company 1 i 414 Nicollet Mall '

,
           Minneapolis, MN 55401                                                                                                                        ,
                                                                                                                                                        <

i.

I
           SUBJECT:               NRC INSPECTION REPORT NO. 50-263/97003(DRP)                                                                           ]

1 ! Dear Mr. Wadley:

                                                                                                                                                        I
           On April 11,1997, the NRC completed an inspection at your Monticello reactor facility.                                                       !

l The enclosed report presents the results of that inspection. l

                                                                                                                                                        i
                                                                                                                                                        4
                                                                                                                                                        '

! During the 7-week period covered by this inspection period, your conduct of activities at 4 the Monticello facility was acceptable. Recent Generation Quality Service audit findings i demonstrated a good questioning attitude and follow through with identified concerns. l However, we noted that some problems occurred during maintenance activities in which a ! contributor was a lack of detailed work instructions. One such activity resulted in a loss

}           of voltage to an essential electrical bus. Electricians failed to remove a temporarily-

) installed meter from logic circuitry. In addition, the inspectors identified that the operators

            were unaware the #13 emergency service water pump had been operating for 2 days.

j This oversight existed through four shift turnovers between three operating crews. This i raises concern over the effectiveness and thoroughness of operator walk arounds and shift 2

            turnovers. Our review of the circumstances leading to this event is not complete and will                                                   l
                                                                                                                                                         '

4

          ' be discussed in a future inspection report. We will contact you in the near future to

i schedule a management meeting regarding your conduct of operations. ! s

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

, and its enclosures will be placed in the NRC Public Document Room.

                                                                                             Sincerely,

'

                                                                                               /s/ J. A. Grobe for
                                                                                             James L. Caldwell, Director
                                                                                             Division of Reactor Projects
            Docket No. 50-263                                                                                                                           !
            License No. DPR-22                                                                                                                          l
                                                                                                                                                        l
             Enclosure: Inspection Report No. 50-263/97003(DRP)                                                                                         l
            DOCUhENT NAhE: R:UNSPRPTSPOWERIAMONhMON97003.DfP                                                                                            I
            To receive e copy of this doeurnent, indecote in the box 'C' r Copy ethout ettechlenal "E" = Copy wth attachtenci   *N' = No copy            i
              of90CE            Rill                             M                                   M
              mAME              soh m i.e                        u .6e.n                             C-
                                                                                                                                  d ( w b frC-
              DATE              El       19 7                    5/       /97                        5/     19 7                        [[//p"[
                                                                            - ~~m
                                                                                                                                                         1
  - _ _

}}