ML20141M996: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:'
{{#Wiki_filter:'
DESIC17ATED 0"IGIliali certified By_     W,         ggg p FEB 2 01906 Docket No. 50-293 Boston Edison Company M/C Nuclear ATTN: Mr. William D. Harrington Senior Vice President, Nuclear 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:
DESIC17ATED 0"IGIliali certified By_
Your letter of December 19, 1985, transmitted Revision No.17 to the Pilgrim Station Modified Amended Security Plan. We have reviewed the revision and find that the changes have the potential for policy implications; therefore, the revision has been referred to our Headquarters staff for review. The Head-quarters staff will respond to you regarding this revision.
W, ggg p FEB 2 01906 Docket No. 50-293 Boston Edison Company M/C Nuclear ATTN: Mr. William D. Harrington Senior Vice President, Nuclear 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:
Your letter of December 19, 1985, transmitted Revision No.17 to the Pilgrim Station Modified Amended Security Plan. We have reviewed the revision and find that the changes have the potential for policy implications; therefore, the revision has been referred to our Headquarters staff for review.
The Head-quarters staff will respond to you regarding this revision.
In the interim, pending your receipt of the results of the NRC Headquarters review, you are to revert to the provisions of your previously approved plan in which you commit to meeting the intent of 10 CFR 73.2(f)(1) and (2).
In the interim, pending your receipt of the results of the NRC Headquarters review, you are to revert to the provisions of your previously approved plan in which you commit to meeting the intent of 10 CFR 73.2(f)(1) and (2).
The enclosure to the above referenced letter is being withheld from public disclosure since it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR 73.21.
The enclosure to the above referenced letter is being withheld from public disclosure since it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR 73.21.
Sincerely, original SignedRyg; Thomas T. Martin, Director Division of Radiation Safety and Safeguards cc:
Sincerely, original SignedRyg; Thomas T. Martin, Director Division of Radiation Safety and Safeguards cc:
(See Next Page) s 8603030326 860220 PDR   ADOCK 05000293                                                       i F                 PDR OFFICIAL RECORD COPY       OL PILGRIM REV - 0004.0.0 02/19/86 RCO }
(See Next Page) s 8603030326 860220 PDR ADOCK 05000293 i
F PDR OFFICIAL RECORD COPY OL PILGRIM REV - 0004.0.0 02/19/86 RCO }
1; O
1; O


Boston Edison Company M/C Nuclear                                                                                             2 Public Document Room (PDR)
Boston Edison Company M/C Nuclear 2
Public Document Room (PDR)
Local Public Document Room (LPDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
Nuclear Safety Information Center (NSIC)
Mr. A. Victor Morisi                                                                                                         Mr. Robert M. Hallisey, Director Boston Edison Company                                                                                                       Radiation Control Program 25 Braintree Hill Office Park                                                                                               Massachusetts Department of Public Rockdale Street                                                                                                                 Health Braint'ree, Massachusetts 02184                                                                                               150 Tremont Street Boston, Massachusetts 02111 Mr. Charles J. Mathis, Station Mgr.                                                                                           Resident Inspector Boston Edison Company                                                                                                         U. S. Nuclear Regulatory Commission RFD #1, Rocky Hill Road                                                                                                     P. O. Box 867 Plymouth, Massachusetts 02360                                                                                               Plymouth, Massachusetts 02360 Office of the Attorney General                                                                                               Mr. Edward R. MacCormack 1 Ashburton Place                                                                                                           Senior Regulatory Affairs and Programs 19th Floor                                                                                                                     Engineer Boston, Massachusetts 02108                                                                                                 Boston Edison Company 25 Braintree Hill Office Park Braintree, Massachusetts 02184 Office of the Commissioner                                                                                                   Mr. David F. Tarantino, Chairman Massachusetts Department of                                                                                                   Board of Selectmen Environmental Quality Engineering                                                                             11 Lincoln Street One Winter Street                                                                                                             Plymouth, Massachusetts 02360 Boston, Massachusetts 02108 l
Mr. A. Victor Morisi Mr. Robert M. Hallisey, Director Boston Edison Company Radiation Control Program 25 Braintree Hill Office Park Massachusetts Department of Public Rockdale Street Health Braint'ree, Massachusetts 02184 150 Tremont Street Boston, Massachusetts 02111 Mr. Charles J. Mathis, Station Mgr.
OFFICIAL RECORD COPY       OL PILGRIM REV - 0005.0.0 02/19/86
Resident Inspector Boston Edison Company U. S. Nuclear Regulatory Commission RFD #1, Rocky Hill Road P. O. Box 867 Plymouth, Massachusetts 02360 Plymouth, Massachusetts 02360 Office of the Attorney General Mr. Edward R. MacCormack 1 Ashburton Place Senior Regulatory Affairs and Programs 19th Floor Engineer Boston, Massachusetts 02108 Boston Edison Company 25 Braintree Hill Office Park Braintree, Massachusetts 02184 Office of the Commissioner Mr. David F. Tarantino, Chairman Massachusetts Department of Board of Selectmen Environmental Quality Engineering 11 Lincoln Street One Winter Street Plymouth, Massachusetts 02360 Boston, Massachusetts 02108 OFFICIAL RECORD COPY OL PILGRIM REV - 0005.0.0 02/19/86


4 Boston Edison Company M/C Nuclear                 3 bec:
4 Boston Edison Company M/C Nuclear 3
bec:
Director, SSPD/NRR Chief, SGRT/NMSS NRR Docket File Document Control Desk (Official Record Copy) RIDS Code RG01 RI Docket Room (w/ concurrences)
Director, SSPD/NRR Chief, SGRT/NMSS NRR Docket File Document Control Desk (Official Record Copy) RIDS Code RG01 RI Docket Room (w/ concurrences)
RI Licensing File (w/ concurrences)
RI Licensing File (w/ concurrences)
RI Safeguards File (w/ concurrences) f Kush       jd               - Ke N           Joyner j
RI Safeguards File (w/ concurrences) f Kush jd
tarostecki      artin 2/j9/86                     2/I9/86         2/&86           2Q/86           2/>/86 0FFICIAL RECORD COPY         OL PILGRIM REV - 0006.0.0 02/19/86 1
- Ke N Joyner tarostecki artin j
2/j9/86 2/I9/86 2/&86 2Q/86 2/>/86 0FFICIAL RECORD COPY OL PILGRIM REV - 0006.0.0 02/19/86 1
i
i
                        -----,4~         n       v   ,      ,    . g.-,----- , -    w     m.. - -
-----,4~
n v
g.-,-----
w m..
e e}}
e e}}

Latest revision as of 14:11, 11 December 2024

Advises That 851219 Rev 17 to Modified Amended Security Plan Has Potential for Policy Implications & Referred to Headquarters for Review.In Interim,Provisions of Previously Approved Plan Should Be Reverted to
ML20141M996
Person / Time
Site: Pilgrim
Issue date: 02/20/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
References
NUDOCS 8603030326
Download: ML20141M996 (3)


Text

'

DESIC17ATED 0"IGIliali certified By_

W, ggg p FEB 2 01906 Docket No. 50-293 Boston Edison Company M/C Nuclear ATTN: Mr. William D. Harrington Senior Vice President, Nuclear 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:

Your letter of December 19, 1985, transmitted Revision No.17 to the Pilgrim Station Modified Amended Security Plan. We have reviewed the revision and find that the changes have the potential for policy implications; therefore, the revision has been referred to our Headquarters staff for review.

The Head-quarters staff will respond to you regarding this revision.

In the interim, pending your receipt of the results of the NRC Headquarters review, you are to revert to the provisions of your previously approved plan in which you commit to meeting the intent of 10 CFR 73.2(f)(1) and (2).

The enclosure to the above referenced letter is being withheld from public disclosure since it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR 73.21.

Sincerely, original SignedRyg; Thomas T. Martin, Director Division of Radiation Safety and Safeguards cc:

(See Next Page) s 8603030326 860220 PDR ADOCK 05000293 i

F PDR OFFICIAL RECORD COPY OL PILGRIM REV - 0004.0.0 02/19/86 RCO }

1; O

Boston Edison Company M/C Nuclear 2

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Mr. A. Victor Morisi Mr. Robert M. Hallisey, Director Boston Edison Company Radiation Control Program 25 Braintree Hill Office Park Massachusetts Department of Public Rockdale Street Health Braint'ree, Massachusetts 02184 150 Tremont Street Boston, Massachusetts 02111 Mr. Charles J. Mathis, Station Mgr.

Resident Inspector Boston Edison Company U. S. Nuclear Regulatory Commission RFD #1, Rocky Hill Road P. O. Box 867 Plymouth, Massachusetts 02360 Plymouth, Massachusetts 02360 Office of the Attorney General Mr. Edward R. MacCormack 1 Ashburton Place Senior Regulatory Affairs and Programs 19th Floor Engineer Boston, Massachusetts 02108 Boston Edison Company 25 Braintree Hill Office Park Braintree, Massachusetts 02184 Office of the Commissioner Mr. David F. Tarantino, Chairman Massachusetts Department of Board of Selectmen Environmental Quality Engineering 11 Lincoln Street One Winter Street Plymouth, Massachusetts 02360 Boston, Massachusetts 02108 OFFICIAL RECORD COPY OL PILGRIM REV - 0005.0.0 02/19/86

4 Boston Edison Company M/C Nuclear 3

bec:

Director, SSPD/NRR Chief, SGRT/NMSS NRR Docket File Document Control Desk (Official Record Copy) RIDS Code RG01 RI Docket Room (w/ concurrences)

RI Licensing File (w/ concurrences)

RI Safeguards File (w/ concurrences) f Kush jd

- Ke N Joyner tarostecki artin j

2/j9/86 2/I9/86 2/&86 2Q/86 2/>/86 0FFICIAL RECORD COPY OL PILGRIM REV - 0006.0.0 02/19/86 1

i


,4~

n v

g.-,-----

w m..

e e