ML20149M178: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.   .
{{#Wiki_filter:.
    O~
.
  f
O~
                                                                                        k 3d
k 3d
                                          FEB 1 71988
f
          Docket Nos. 50-413, 50-414
FEB 1 71988
          License Nos. NPF-35, NPF-52
Docket Nos. 50-413, 50-414
          Duke Power Company
License Nos. NPF-35, NPF-52
          ATTN:   Mr. H. B. Tucker, Vice President
Duke Power Company
                  Nuclear Production Department
ATTN:
          422 South Church Street
Mr. H. B. Tucker, Vice President
          Charlotte, NC 28242
Nuclear Production Department
          Gentlemen:
422 South Church Street
          SUBJECT: NRC INSPECTION REPORT NOS. 50-413/88-01 AND 50-414/88-01
Charlotte, NC 28242
          This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Gentlemen:
          B. R. Crowley on January 5-7 and 19-22, 1988. The inspection included a review
SUBJECT: NRC INSPECTION REPORT NOS. 50-413/88-01 AND 50-414/88-01
          of activities authorized for your Catawba facility. At the conclusion of the
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
          inspection, the findings were discussed with those members of your staff
B. R. Crowley on January 5-7 and 19-22, 1988. The inspection included a review
          identified in the enclosed inspection report.
of activities authorized for your Catawba facility. At the conclusion of the
          Areas examined during the inspection are identified in the report. Within
inspection, the findings were discussed with those members of your staff
          these areas, the inspection consisted of selective examinations of procedures
identified in the enclosed inspection report.
          and representative records, interviews with personnel, and observation of
Areas examined during the inspection are identified in the report. Within
          activities in progress.
these areas, the inspection consisted of selective examinations of procedures
          Within the scope of the inspection, no violations or deviations were
and representative records, interviews with personnel, and observation of
          identified.
activities in progress.
          In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Within the scope of the inspection, no violations or deviations were
          Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
identified.
          will be placed in the NRC Public Document Room.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
          Should you have any questa is concei ning this letter, please contact us.
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
                                                    Sincerely,
will be placed in the NRC Public Document Room.
                                                      DRIGINAL SIGNFD Cy
Should you have any questa is concei ning this letter, please contact us.
                                                        ALAN R. HERDT
Sincerely,
                                                    Alan R. Herdt, Chief
DRIGINAL SIGNFD Cy
                                                    Engineering Branch
ALAN R. HERDT
                                                    Division of Reactor Safety
Alan R. Herdt, Chief
          Enclosure:
Engineering Branch
          NRC Inspection Report
Division of Reactor Safety
          cc w/ encl:
Enclosure:
          J. W. Hampton, Station Manager
NRC Inspection Report
          Senior Resident Inspector - McGuire
cc w/ encl:
          bec w/ encl:   (See page 2)                                                           !
J. W. Hampton, Station Manager
      8802250390 880217
Senior Resident Inspector - McGuire
      PDR   ADOCK 05000413
bec w/ encl:
      G                   PDR                                                             N\   l
(See page 2)
                                                                                          .IEC/
8802250390 880217
PDR
ADOCK 05000413
G
PDR
N\\
l
.IEC/


.     ,
.
  ,,
,
    27
27
                                                    FEB 1 7 1988
,,
        Duke Power Company             2
FEB 1 7 1988
        bec w/ encl:
Duke Power Company
        K. N. Jabbour, NRR
2
        NRC Resident Inspector
bec w/ encl:
        ORS Technical Assistant
K. N. Jabbour, NRR
        Document Control. Desk
NRC Resident Inspector
        State of South Carolina
ORS Technical Assistant
          [h                             RIpg
Document Control. Desk
        BRCrgwley:tm            !ake     TPeebles
State of South Carolina
                                          02/;(3/88              ;
[h
        02/5 /88               2/,o /88
RIpg
                                                                1
!ake
                                                                i
TPeebles
BRCrgwley:tm
02/5 /88
2/,o /88
02/;(3/88
i
}}
}}

Latest revision as of 08:39, 11 December 2024

Forwards Insp Repts 50-413/88-01 & 50-414/88-01 on 880105-07 & 19-22.No Violations or Deviations Noted
ML20149M178
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/17/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20149M180 List:
References
NUDOCS 8802250390
Download: ML20149M178 (2)


See also: IR 05000413/1988001

Text

.

.

O~

k 3d

f

FEB 1 71988

Docket Nos. 50-413, 50-414

License Nos. NPF-35, NPF-52

Duke Power Company

ATTN:

Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-413/88-01 AND 50-414/88-01

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

B. R. Crowley on January 5-7 and 19-22, 1988. The inspection included a review

of activities authorized for your Catawba facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questa is concei ning this letter, please contact us.

Sincerely,

DRIGINAL SIGNFD Cy

ALAN R. HERDT

Alan R. Herdt, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

cc w/ encl:

J. W. Hampton, Station Manager

Senior Resident Inspector - McGuire

bec w/ encl:

(See page 2)

8802250390 880217

PDR

ADOCK 05000413

G

PDR

N\\

l

.IEC/

.

,

27

,,

FEB 1 7 1988

Duke Power Company

2

bec w/ encl:

K. N. Jabbour, NRR

NRC Resident Inspector

ORS Technical Assistant

Document Control. Desk

State of South Carolina

[h

RIpg

!ake

TPeebles

BRCrgwley:tm

02/5 /88

2/,o /88

02/;(3/88

i