ML20151A932: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:i o
{{#Wiki_filter:i
o
,,.
,,.
..
..
o
o
                                                                06 JUL 1988
06 JUL 1988
        Docket No. 50-354
Docket No. 50-354
        Public Service Electric and Gas Company
Public Service Electric and Gas Company
        ATTN: Mr. S. E. Miltenberger
ATTN: Mr. S. E. Miltenberger
                Vice President and Chief Nuclear Officer
Vice President and Chief Nuclear Officer
        P. O. Box 236
P. O. Box 236
        Hancocks Bridge, NJ 08038
Hancocks Bridge, NJ 08038
        Gentlemen:
Gentlemen:
        Subject:   Inspection No. 50-354/88-16
Subject:
        This letter transmits the findings of the routine, resident safety inspection
Inspection No. 50-354/88-16
        conducted by Mr. G. Meyer and Mr. D. Allsopp conducted from April 26, 1988
This letter transmits the findings of the routine, resident safety inspection
        to May 31, 1988 at the Hope Creek Nuclear Generating Station. The findings
conducted by Mr. G. Meyer and Mr. D. Allsopp conducted from April 26, 1988
        were discussed with Mr. S. LaBruna of your staff.
to May 31, 1988 at the Hope Creek Nuclear Generating Station.
        Within the scope of this inspection, the inspectors did not find any
The findings
        violations. However, this inspection report documents six licensee identi-
were discussed with Mr. S. LaBruna of your staff.
        fied violations, and the previous resident inspection report documented two
Within the scope of this inspection, the inspectors did not find any
        licensee identified violations. Five of these violations occurred during the
violations. However, this inspection report documents six licensee identi-
        refueling outage and appear to be related to the outage being Hope Creek's
fied violations, and the previous resident inspection report documented two
        first refueling outage. As of the date of this letter, no additional
licensee identified violations.
        licensee identified violations have occurred following the reactor restart
Five of these violations occurred during the
        from the outage. Nonetheless, PSE&G management should ensure that the
refueling outage and appear to be related to the outage being Hope Creek's
        corrective actions associated with these violations are pursued vigorously
first refueling outage. As of the date of this letter, no additional
        to prevent future outage related violations and should continue to operate
licensee identified violations have occurred following the reactor restart
        the reactor such that additional violations are prevented.
from the outage. Nonetheless, PSE&G management should ensure that the
        No reply to this letter is required. We appreciate your cooperation.
corrective actions associated with these violations are pursued vigorously
                                                    Sincerely,
to prevent future outage related violations and should continue to operate
                                                                      Side By:
the reactor such that additional violations are prevented.
                                                    Edward C. Wenzinger, Chief
No reply to this letter is required. We appreciate your cooperation.
                                                    Projects Branch No. 2
Sincerely,
                                                    Division of Reactor Projects
Side By:
        Enclosure: NRC Inspection Report No. 50-354/88-16
Edward C. Wenzinger, Chief
                                    0FFICIAL RECORD COPY     IR HC 88-16 - 0001.0.0
Projects Branch No. 2
                                                              11/29/80       g
Division of Reactor Projects
      8807200168 880706                                                       L O j. t
Enclosure: NRC Inspection Report No. 50-354/88-16
      PDR     ADOCK 05000354
0FFICIAL RECORD COPY
      Q.             _ . . . PDC..__
IR HC 88-16 - 0001.0.0
11/29/80
g
8807200168 880706
L O j.
t
PDR
ADOCK 05000354
Q.
_ . .
. PDC..


                                                                      .   ..       ._ -
.
    . -
..
._
-
. -
,,.
,,.
'
'
        Public Service Electric and
Public Service Electric and
          Gas Company                         2               $$ JU[ j$$$
Gas Company
        cc w/ enc 1:
2
        S. LaBruna, General Manager, Hope Creek Operations
$$ JU[ j$$$
        B. A. Preston, Manager, Licensing and Regulation
cc w/ enc 1:
      -M. J. Wetterhahn, Esquire
S. LaBruna, General Manager, Hope Creek Operations
        R. Fryling, Esquire
B. A. Preston, Manager, Licensing and Regulation
        W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic
-M. J. Wetterhahn, Esquire
          Electric-
R. Fryling, Esquire
        Rebecca-A. Green, Bureau of Radiation Protection
W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic
        Public Document Room (POR)
Electric-
        Local Public Document Room (LPDR)
Rebecca-A. Green, Bureau of Radiation Protection
        Nuclear Safety Information Center (NSIC)                                           i
Public Document Room (POR)
        NRC Resident Inspector                                                             !
Local Public Document Room (LPDR)
        State of New Jersey                                                                 j
Nuclear Safety Information Center (NSIC)
                                                                                            l
NRC Resident Inspector
        bec w/ encl.                                                                         -
State of New Jersey
        Region I Docket Room (with concurrences)                                           l
j
        Management Assistant, DRMA (w/o encl)                                               l
bec w/ encl.
                                                                                            '
-
        DRP Section Chief
Region I Docket Room (with concurrences)
        Robert J. Bores, 0RSS
l
        George Rivenbark, NRR Project Manager                                               l
Management Assistant, DRMA (w/o encl)
        B. Clayton, EDO                                                                     l
'
        L. Rossbach, SRI, IP2                                                               I
DRP Section Chief
        R. Borchardt, SRI, Salem                                                           i
Robert J. Bores, 0RSS
                                                                                            1
George Rivenbark, NRR Project Manager
                                                                                            .
B. Clayton, EDO
                                                                                            !
L. Rossbach, SRI, IP2
            '
R. Borchardt, SRI, Salem
                                                      _\
i
            :   P                                 R> -
.
          . Meyer
'
                              .
_ \\
                                                        h
:
                            'P. Swetland         E     nzinger
P
        6     /88                                      88
R> -
                            6f/88                 /
h
                                  0FFICIAL RECORD COPY       IR HC 88-16 - 0002.0.0
.
                                                            11/29/80
. Meyer
                                                                                        ,
'P. Swetland
E
nzinger
6
/88
6f/88
/
88
0FFICIAL RECORD COPY
IR HC 88-16 - 0002.0.0
11/29/80
,
}}
}}

Latest revision as of 07:15, 11 December 2024

Forwards Safety Insp Rept 50-354/88-16 on 880426-0531.No Violations Noted.Insp Documents Six Licensee Identified Violations Re Plant First Refueling Outage
ML20151A932
Person / Time
Site: Hope Creek 
Issue date: 07/06/1988
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML20151A935 List:
References
NUDOCS 8807200168
Download: ML20151A932 (2)


See also: IR 05000354/1988016

Text

i

o

,,.

..

o

06 JUL 1988

Docket No. 50-354

Public Service Electric and Gas Company

ATTN: Mr. S. E. Miltenberger

Vice President and Chief Nuclear Officer

P. O. Box 236

Hancocks Bridge, NJ 08038

Gentlemen:

Subject:

Inspection No. 50-354/88-16

This letter transmits the findings of the routine, resident safety inspection

conducted by Mr. G. Meyer and Mr. D. Allsopp conducted from April 26, 1988

to May 31, 1988 at the Hope Creek Nuclear Generating Station.

The findings

were discussed with Mr. S. LaBruna of your staff.

Within the scope of this inspection, the inspectors did not find any

violations. However, this inspection report documents six licensee identi-

fied violations, and the previous resident inspection report documented two

licensee identified violations.

Five of these violations occurred during the

refueling outage and appear to be related to the outage being Hope Creek's

first refueling outage. As of the date of this letter, no additional

licensee identified violations have occurred following the reactor restart

from the outage. Nonetheless, PSE&G management should ensure that the

corrective actions associated with these violations are pursued vigorously

to prevent future outage related violations and should continue to operate

the reactor such that additional violations are prevented.

No reply to this letter is required. We appreciate your cooperation.

Sincerely,

Side By:

Edward C. Wenzinger, Chief

Projects Branch No. 2

Division of Reactor Projects

Enclosure: NRC Inspection Report No. 50-354/88-16

0FFICIAL RECORD COPY

IR HC 88-16 - 0001.0.0

11/29/80

g

8807200168 880706

L O j.

t

PDR

ADOCK 05000354

Q.

_ . .

. PDC..

.

..

._

-

. -

,,.

'

Public Service Electric and

Gas Company

2

$$ JU[ j$$$

cc w/ enc 1:

S. LaBruna, General Manager, Hope Creek Operations

B. A. Preston, Manager, Licensing and Regulation

-M. J. Wetterhahn, Esquire

R. Fryling, Esquire

W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic

Electric-

Rebecca-A. Green, Bureau of Radiation Protection

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

j

bec w/ encl.

-

Region I Docket Room (with concurrences)

l

Management Assistant, DRMA (w/o encl)

'

DRP Section Chief

Robert J. Bores, 0RSS

George Rivenbark, NRR Project Manager

B. Clayton, EDO

L. Rossbach, SRI, IP2

R. Borchardt, SRI, Salem

i

.

'

_ \\

P

R> -

h

.

. Meyer

'P. Swetland

E

nzinger

6

/88

6f/88

/

88

0FFICIAL RECORD COPY

IR HC 88-16 - 0002.0.0

11/29/80

,