ML20151N897: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ .       . _ _ _ _         _   _.     _ _ _ _ _     - -       . _ _ _ _ _ _ -
{{#Wiki_filter:_ _ _ _ _ _ _ .
        <.
. _ _ _ _
          %
_
    +.         .
_.
      -
_ _ _ _ _
                                                                  APR I 51988
-
              In-Reply Refer To:
-
            Docket: STN 50-482/88-09
. _ _ _ _ _ _ -
            Wolf Creek Nuclear Operating Corporation
<.
            ' ATTN: Bart D. Withers
%
                                  President and Chief Executive Officer
+ .
            P.O. Box 411
.
            Burlington, Kansas 66839
APR I 51988
            Gentlemen:
-
            This refers to the inspection conducted by Mr. R. E. Baer of this office during
In-Reply Refer To:
            -the period March 14-18, 1988, of activities authorized by NRC Operating
Docket: STN 50-482/88-09
            License NPF-42 for the Wolf Creek Generating Station, and to the discussion of
Wolf Creek Nuclear Operating Corporation
            our findings with you and other members of your staff at the conclusion of the
' ATTN: Bart D. Withers
            inspection.
President and Chief Executive Officer
            Areas examined during the inspection included solid radioactive waste,
P.O. Box 411
            transportation activities, and low-level radioactive waste storage facilities.
Burlington, Kansas 66839
            Within these areas, the inspection consisted of selective examination of
Gentlemen:
            procedures and representative records, interviews with personnel, and
This refers to the inspection conducted by Mr. R. E. Baer of this office during
            observations by the NRC inspector. The inspection findings are documented in
-the period March 14-18, 1988, of activities authorized by NRC Operating
            the enclosed inspection report.
License NPF-42 for the Wolf Creek Generating Station, and to the discussion of
            During this inspection, it was found that certain of your activities were in
our findings with you and other members of your staff at the conclusion of the
            violation of NRC requirements. Consequently, you are required to respond to
inspection.
            this violation, in writing, in accordance with the provisions of Section 2.201
Areas examined during the inspection included solid radioactive waste,
transportation activities, and low-level radioactive waste storage facilities.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspector. The inspection findings are documented in
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
l
l
            of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response-should be based on the specifics contained in the
'
'
            Regulations. Your response-should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
            Notice of Violation enclosed with this letter.
We have also' examined actions you have taken with regard to previously
            We have also' examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
            identified inspection findings. The status of these items is identified in
paragraph 2 of the. enclosed report.
            paragraph 2 of the. enclosed report.
1
1
,           The response directed by this letter and the accompanying Notice is not subject
,
l           to the clearance procedures of the Office of Management and Budget as required
The response directed by this letter and the accompanying Notice is not subject
l
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
'
'
            by the Paperwork Reduction Act of 1980, PL 96-511.
I
I
                                                                                              b
b
            RIV:FRPS:RkSB                           FRPS:RPSB                 RPSB     C   P/A               D:0RPS
RIV:FRPS:RkSB
            REBaer/tw                             BMurray           LAYandell           DDChamberlain         LJCallan sg
FRPS:RPSB
            f//p/88                                 /l[/88       fiL[/(l/88           4 'I3 /88             L/g/88
RPSB
      8804260038 880415
C
  i
P/A
      PDR
D:0RPS
      O
REBaer/tw
                    ADOCK 05000482
BMurray
                                        DCD
LAYandell
                                                                                                                        h
DDChamberlain
LJCallan
f//p/88
/l[/88
fiL[/(l/88
s g
4 'I3 /88
L/g/88
8804260038 880415
h
PDR
ADOCK 05000482
i
O
DCD


      .c     7
7''
                                                                    -
.c
7''                                          ,
7
                                                                                              3
,
        1                                                                ,
3
      .
-
1
,
.
,
.
Wolf Creek Nuclear
-2-
Operating Corporation
.
Should you have any questions concerning this _ inspection, we 'will be pleased to
' discuss them with you.
15?na EinedBy:
,
,
    .      Wolf Creek Nuclear                      -2-
L. J. CALLAN
              Operating Corporation      .
L. J. Callan, Director
          Should you have any questions concerning this _ inspection, we 'will be pleased to
Division of Reactor Projects
          ' discuss them with you.
Enclosures:
  ,
1.-
                                                        15?na EinedBy:
Appendix A - Notice of Violation
                                                        L. J. CALLAN
2.
                                                    L. J. Callan, Director
Appendix B - NRC Inspection Report
                                                    Division of Reactor Projects
50-482/88-09
          Enclosures:
cc w/ enclosures:
          1.- Appendix A - Notice of Violation
Wolf Creek Nuclear Operating Corporation
          2.   Appendix B - NRC Inspection Report
ATTN: Otto Maynard, Manager
                  50-482/88-09
of Licensing
          cc w/ enclosures:
P.O. Box 411
          Wolf Creek Nuclear Operating Corporation
Burlington, Kansas 66839
          ATTN: Otto Maynard, Manager
Wolf. Creek Nuclear Operating Corporation
                      of Licensing
ATTN: Gary Boyer, Plant Manager
          P.O. Box 411
P.O. Box 411
          Burlington, Kansas 66839
Burlington, Kansas 66839
          Wolf. Creek Nuclear Operating Corporation
Kansas Corporation Commission
          ATTN: Gary Boyer, Plant Manager
ATTN: . Robert D. Elliott, Chief Engineer
          P.O. Box 411
Fourth Floor, Docking State Office Building
          Burlington, Kansas 66839
Topeka, Kansas 66612-1571
          Kansas Corporation Commission
Kansas Radiation Control Program Director
          ATTN: . Robert D. Elliott, Chief Engineer
bectoDMB.(IE06)
          Fourth Floor, Docking State Office Building
bec distrib. by RIV:
          Topeka, Kansas 66612-1571
Myron Karman, ELD, MNBB (1)
          Kansas Radiation Control Program Director
*RRI
          bectoDMB.(IE06)
R. D. Martin, RA
          bec distrib. by RIV:
*SectionChief(DRP/A)
            Myron Karman, ELD, MNBB (1)
*DRP
          *RRI                                         R. D. Martin, RA
*RPSB-DRSS
          *SectionChief(DRP/A)                       *DRP
B. DeFayette, RIII
          *RPSB-DRSS                                   B. DeFayette, RIII
*RIV File
          *RIV File                                   Callaway, RIII
Callaway, RIII
          * MIS System                               *RSTS Operator
* MIS System
          * Project Engineer, DRP/A                   D. Powers
*RSTS Operator
            Lisa Shea,-RM/ALF                       *P. O'Connor, HRR Project Manager
* Project Engineer, DRP/A
          *DRS-                                     *TSS
D. Powers
          *R. E. Baer                               *B. Murray
Lisa Shea,-RM/ALF
            R. L. Bangart
*P. O'Connor, HRR Project Manager
          *w/766
*DRS-
*TSS
*R. E. Baer
*B. Murray
R. L. Bangart
*w/766
}}
}}

Latest revision as of 05:42, 11 December 2024

Forwards Insp Rept 50-482/88-09 on 880314-18 & Notice of Violation
ML20151N897
Person / Time
Site: Wolf Creek 
Issue date: 04/15/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20151N900 List:
References
NUDOCS 8804260038
Download: ML20151N897 (2)


See also: IR 05000482/1988009

Text

_ _ _ _ _ _ _ .

. _ _ _ _

_

_.

_ _ _ _ _

-

-

. _ _ _ _ _ _ -

<.

%

+ .

.

APR I 51988

-

In-Reply Refer To:

Docket: STN 50-482/88-09

Wolf Creek Nuclear Operating Corporation

' ATTN: Bart D. Withers

President and Chief Executive Officer

P.O. Box 411

Burlington, Kansas 66839

Gentlemen:

This refers to the inspection conducted by Mr. R. E. Baer of this office during

-the period March 14-18, 1988, of activities authorized by NRC Operating

License NPF-42 for the Wolf Creek Generating Station, and to the discussion of

our findings with you and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included solid radioactive waste,

transportation activities, and low-level radioactive waste storage facilities.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the NRC inspector. The inspection findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

l

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response-should be based on the specifics contained in the

'

Notice of Violation enclosed with this letter.

We have also' examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the. enclosed report.

1

,

The response directed by this letter and the accompanying Notice is not subject

l

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

'

I

b

RIV:FRPS:RkSB

FRPS:RPSB

RPSB

C

P/A

D:0RPS

REBaer/tw

BMurray

LAYandell

DDChamberlain

LJCallan

f//p/88

/l[/88

fiL[/(l/88

s g

4 'I3 /88

L/g/88

8804260038 880415

h

PDR

ADOCK 05000482

i

O

DCD

7

.c

7

,

3

-

1

,

.

,

.

Wolf Creek Nuclear

-2-

Operating Corporation

.

Should you have any questions concerning this _ inspection, we 'will be pleased to

' discuss them with you.

15?na EinedBy:

,

L. J. CALLAN

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1.-

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-482/88-09

cc w/ enclosures:

Wolf Creek Nuclear Operating Corporation

ATTN: Otto Maynard, Manager

of Licensing

P.O. Box 411

Burlington, Kansas 66839

Wolf. Creek Nuclear Operating Corporation

ATTN: Gary Boyer, Plant Manager

P.O. Box 411

Burlington, Kansas 66839

Kansas Corporation Commission

ATTN: . Robert D. Elliott, Chief Engineer

Fourth Floor, Docking State Office Building

Topeka, Kansas 66612-1571

Kansas Radiation Control Program Director

bectoDMB.(IE06)

bec distrib. by RIV:

Myron Karman, ELD, MNBB (1)

  • RRI

R. D. Martin, RA

  • SectionChief(DRP/A)
  • DRP
  • RPSB-DRSS

B. DeFayette, RIII

  • RIV File

Callaway, RIII

  • MIS System
  • RSTS Operator
  • Project Engineer, DRP/A

D. Powers

Lisa Shea,-RM/ALF

  • P. O'Connor, HRR Project Manager
  • DRS-
  • TSS
  • R. E. Baer
  • B. Murray

R. L. Bangart

  • w/766