ML20151N897
| ML20151N897 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 04/15/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20151N900 | List: |
| References | |
| NUDOCS 8804260038 | |
| Download: ML20151N897 (2) | |
See also: IR 05000482/1988009
Text
_ _ _ _ _ _ _ .
. _ _ _ _
_
_.
_ _ _ _ _
-
-
. _ _ _ _ _ _ -
<.
%
+ .
.
APR I 51988
-
In-Reply Refer To:
Docket: STN 50-482/88-09
Wolf Creek Nuclear Operating Corporation
' ATTN: Bart D. Withers
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
Gentlemen:
This refers to the inspection conducted by Mr. R. E. Baer of this office during
-the period March 14-18, 1988, of activities authorized by NRC Operating
License NPF-42 for the Wolf Creek Generating Station, and to the discussion of
our findings with you and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included solid radioactive waste,
transportation activities, and low-level radioactive waste storage facilities.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspector. The inspection findings are documented in
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
l
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response-should be based on the specifics contained in the
'
Notice of Violation enclosed with this letter.
We have also' examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the. enclosed report.
1
,
The response directed by this letter and the accompanying Notice is not subject
l
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
'
I
b
RIV:FRPS:RkSB
FRPS:RPSB
RPSB
C
P/A
D:0RPS
REBaer/tw
BMurray
LAYandell
DDChamberlain
LJCallan
f//p/88
/l[/88
fiL[/(l/88
s g
4 'I3 /88
L/g/88
8804260038 880415
h
ADOCK 05000482
i
O
7
.c
7
,
3
-
1
,
.
,
.
Wolf Creek Nuclear
-2-
Operating Corporation
.
Should you have any questions concerning this _ inspection, we 'will be pleased to
' discuss them with you.
15?na EinedBy:
,
L. J. CALLAN
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.-
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-482/88-09
cc w/ enclosures:
Wolf Creek Nuclear Operating Corporation
ATTN: Otto Maynard, Manager
of Licensing
P.O. Box 411
Burlington, Kansas 66839
Wolf. Creek Nuclear Operating Corporation
ATTN: Gary Boyer, Plant Manager
P.O. Box 411
Burlington, Kansas 66839
Kansas Corporation Commission
ATTN: . Robert D. Elliott, Chief Engineer
Fourth Floor, Docking State Office Building
Topeka, Kansas 66612-1571
Kansas Radiation Control Program Director
bectoDMB.(IE06)
bec distrib. by RIV:
Myron Karman, ELD, MNBB (1)
- RRI
R. D. Martin, RA
- SectionChief(DRP/A)
- DRP
- RPSB-DRSS
B. DeFayette, RIII
- RIV File
Callaway, RIII
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
D. Powers
Lisa Shea,-RM/ALF
- P. O'Connor, HRR Project Manager
- DRS-
- TSS
- R. E. Baer
- B. Murray
R. L. Bangart
- w/766