U-600502, Informs That Snubber Plan for First Refueling Outage Selected,Per Tech Spec Section 4.7.4.Snubbers to Be Tested in Accordance W/Section 4.7.4.e.1: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:c-U-600502 L30-88(05-12)-LP 1A.120 ILLINDIS POWER COMPANY                                                                       OO IP     CL INTCN PC%[R ST ATICN. P.o. BOE 678. CLINTON ILLINOIS 61727 UIC51]LON['
{{#Wiki_filter:c-U-600502 L30-88(05-12)-LP 1A.120 OO ILLINDIS POWER COMPANY IP CL INTCN PC%[R ST ATICN. P.o. BOE 678. CLINTON ILLINOIS 61727 UIC51]LON['
1 May 12, 1988                         a g- ~7 4>;]l Z 10CFR50.36                        -
14>; Z May 12, 1988 a g- ~7 ]l
                                                                                                          .h --
&)',u?Q}-
                                                                                    &)',u?Q}-
10CFR50.36
Docket No. 50-461
.h --
                                                                                                  "~~   Ng~
"~~ Ng~
                                                                                                        ~.       -
~.
titt W &
Docket No. 50-461 titt W &
Mr. A. B. Davis Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Mr. A. B. Davis Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137


Line 31: Line 31:


==Dear Mr. Davis:==
==Dear Mr. Davis:==
 
In accordance with the Clinton Power Station, Technical Specification section 4.7.4, a snubber plan for the first refueling outage has been selected.
In accordance with the Clinton Power Station, Technical Specification section 4.7.4, a snubber plan for the first refueling outage has been selected. Initially, 10% of each type of snubber will be tested. For each snubber that fails to meet the functional test acceptance criteria of section 4.7.4.e of the Technical Specifi:ations, an additional 10% of that type of snubber will be tested until no further failures are found or until all snubbers of that type are tested. This test plan is in accordance with section 4.7.4.e.1 of the Technical Specifications.
Initially, 10% of each type of snubber will be tested.
For each snubber that fails to meet the functional test acceptance criteria of section 4.7.4.e of the Technical Specifi:ations, an additional 10% of that type of snubber will be tested until no further failures are found or until all snubbers of that type are tested.
This test plan is in accordance with section 4.7.4.e.1 of the Technical Specifications.
If you have any questions on this, please contact me.
If you have any questions on this, please contact me.
Sincerely yours,
Sincerely yours, V '"f J
                                                    ,/      V '"f J
,/
F. A. Spangenberg. III Manager - Licensing and Safety DW/krm cc: Clinton Licensing Project Manager NRC i.esident Inspector U.S. Nuclear Regulatory Commission Document Control Desk                                 \
F. A. Spangenberg. III Manager - Licensing and Safety DW/krm cc:
Illinois Department of Nuclear Safety i O s
Clinton Licensing Project Manager NRC i.esident Inspector U.S. Nuclear Regulatory Commission Document Control Desk
Fil 8805240007 880512 PDR   ADOCK 05000461 P                   DCD}}
\\
Illinois Department of Nuclear Safety i
O Fil s
8805240007 880512 PDR ADOCK 05000461 P
DCD}}

Latest revision as of 00:56, 11 December 2024

Informs That Snubber Plan for First Refueling Outage Selected,Per Tech Spec Section 4.7.4.Snubbers to Be Tested in Accordance W/Section 4.7.4.e.1
ML20154F646
Person / Time
Site: Clinton 
Issue date: 05/12/1988
From: Spangenberg F
ILLINOIS POWER CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
U-600502, NUDOCS 8805240007
Download: ML20154F646 (1)


Text

c-U-600502 L30-88(05-12)-LP 1A.120 OO ILLINDIS POWER COMPANY IP CL INTCN PC%[R ST ATICN. P.o. BOE 678. CLINTON ILLINOIS 61727 UIC51]LON['

14>; Z May 12, 1988 a g- ~7 ]l

&)',u?Q}-

10CFR50.36

.h --

"~~ Ng~

~.

Docket No. 50-461 titt W &

Mr. A. B. Davis Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Clinton Power Station Snubber Sample Plan

)

Dear Mr. Davis:

In accordance with the Clinton Power Station, Technical Specification section 4.7.4, a snubber plan for the first refueling outage has been selected.

Initially, 10% of each type of snubber will be tested.

For each snubber that fails to meet the functional test acceptance criteria of section 4.7.4.e of the Technical Specifi:ations, an additional 10% of that type of snubber will be tested until no further failures are found or until all snubbers of that type are tested.

This test plan is in accordance with section 4.7.4.e.1 of the Technical Specifications.

If you have any questions on this, please contact me.

Sincerely yours, V '"f J

,/

F. A. Spangenberg. III Manager - Licensing and Safety DW/krm cc:

Clinton Licensing Project Manager NRC i.esident Inspector U.S. Nuclear Regulatory Commission Document Control Desk

\\

Illinois Department of Nuclear Safety i

O Fil s

8805240007 880512 PDR ADOCK 05000461 P

DCD