Informs That Snubber Plan for First Refueling Outage Selected,Per Tech Spec Section 4.7.4.Snubbers to Be Tested in Accordance W/Section 4.7.4.e.1
ML20154F646
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/12/1988
From: Spangenberg F
ILLINOIS POWER CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
U-600502, NUDOCS 8805240007
Download: ML20154F646 (1)


Text

c-U-600502 L30-88(05-12)-LP 1A.120 ILLINDIS POWER COMPANY OO IP CL INTCN PC%[R ST ATICN. P.o. BOE 678. CLINTON ILLINOIS 61727 UIC51]LON['

1 May 12, 1988 a g- ~7 4>;]l Z 10CFR50.36 -

.h --

&)',u?Q}-

Docket No. 50-461

"~~ Ng~

~. -

titt W &

Mr. A. B. Davis Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Clinton Power Station Snubber Sample Plan

)

Dear Mr. Davis:

In accordance with the Clinton Power Station, Technical Specification section 4.7.4, a snubber plan for the first refueling outage has been selected. Initially, 10% of each type of snubber will be tested. For each snubber that fails to meet the functional test acceptance criteria of section 4.7.4.e of the Technical Specifi:ations, an additional 10% of that type of snubber will be tested until no further failures are found or until all snubbers of that type are tested. This test plan is in accordance with section 4.7.4.e.1 of the Technical Specifications.

If you have any questions on this, please contact me.

Sincerely yours,

,/ V '"f J

F. A. Spangenberg. III Manager - Licensing and Safety DW/krm cc: Clinton Licensing Project Manager NRC i.esident Inspector U.S. Nuclear Regulatory Commission Document Control Desk \