ML20154Q022: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.                           .   -               ..                 -.   .   -     ..
{{#Wiki_filter:.
        s'
.
    .* .
-
..
-.
.
-
..
s'
.*
l
.
SEP 15 WBB
i
l
(
Ouxbury Library
(
ATTN: Ms. Janice lieubauer
!
,
'
147 St. George Street
[
Duxbury, Massachusetts 02332
l
Dear Ms. Neubauer:
l
This letter forwards a copy of the Nuclear Regulatory Commission's (NRC) Inte-
grated Assessment team Inspection (IATI) Report (No. 50-293/88-21), conducted
i
at the Pilgrim Nuclear Power Station (PNPS) from August 8 through 24, 1988; the
l
Systematic Assessment of Licensee Performance (SALP) Board Report (No. 50-293/
87-99), dated Jul> 27, 1988, covering the period February 1, 1987 through
May 15, 1988; and the transcripts from thre NRC's Advisory Committee on Reactor
i
Safeguards (ACRS) Subcommittee meeting held on August 26, 1988, at Memorial
'
Hall, Plymouth, Massachusetts, and the ACRS Full Committee meeting held on
l
l
                                                                  SEP 15 WBB
September 8, 19S8,
in Bethesda,
Maryland,
concerning
the
proposed plant
!
(
restart.
Please place this material with the copy of the PNPS Restart Plan and Self-
i
i
                                                                                                  l
Asstssment Report, which were previously provided, and make it available for
(          Ouxbury Library
i
public review.
Thank you for your continuing cooperation in this matter,
,
,
          ATTN: Ms. Janice lieubauer                                                            (
Sincerely,
'                                                                                                !
htCIN41. 310Nt0 BY
          147 St. George Street                                                                  [
Samuel J. Collins, Deputy Director
          Duxbury, Massachusetts 02332
l
l          Dear Ms. Neubauer:                                                                    l
Division of Reactor Projects
          This letter forwards a copy of the Nuclear Regulatory Commission's (NRC) Inte-        !
:
          grated Assessment team Inspection (IATI) Report (No. 50-293/88-21), conducted          i
Enclosures:
          at the Pilgrim Nuclear Power Station (PNPS) from August 8 through 24, 1988; the        l
!
          Systematic Assessment of Licensee Performance (SALP) Board Report (No. 50-293/
As stated
          87-99), dated Jul> 27, 1988, covering the period February 1, 1987 through
I
          May 15, 1988; and the transcripts from thre NRC's Advisory Committee on Reactor        i
cc w/o encis:
                                                                                                    '
l
          Safeguards (ACRS) Subcommittee meeting held on August 26, 1988, at Memorial
Public Document Room (POR)
          Hall, Plymouth, Massachusetts, and the ACRS Full Committee meeting held on            l
i
          September 8, 19S8, in Bethesda, Maryland, concerning the proposed plant                !
local Public Document Room (LPOR)
(          restart.
.
          Please place this material with the copy of the PNPS Restart Plan and Self-            i
.
          Asstssment Report, which were previously provided, and make it available for          i
l
          public review.
i
          Thank you for your continuing cooperation in this matter,
;
                                                                                                  ,
.
                                                      Sincerely,
OFFICIAL RECORD COPY
                                                                                                  (
LIBRARY OUXBURY - 0001.0.0
                                                      htCIN41. 310Nt0 BY
09/15/88
                                                      Samuel J. Collins, Deputy Director         l
# #/
                                                      Division of Reactor Projects
GG
                                                                                                    l
15
                                                                                                  :
gDR
          Enclosures:                                                                           !
ADOCK05gQ93
          As stated
es10030271
                                                                                                  !
C
                                                                                                  I
          cc w/o encis:                                                                         l
          Public Document Room (POR)                                                             i
          local Public Document Room (LPOR)                                                       !
                                                                                                  .
                                                                                                  .
                                                                                                  l
                                                                                                  i
                                                                                                    ;
                                                                                                    .
                                      OFFICIAL RECORD COPY       LIBRARY OUXBURY - 0001.0.0
                            15
                                                                  09/15/88                   # #/
      es10030271 GG
      gDR
              ADOCK05gQ93       C


  . .
s'
      s'    .
.
      .
. .
          Duxbury Library                         2
.
                                                                  SEP 151980
Duxbury Library
          bec w/o enc 15:
2
          L. T. Doerflein, ORP
SEP 151980
          H. J. DiDonato, DRP
bec w/o enc 15:
          4   T. Miller, SLO
L. T. Doerflein, ORP
H. J. DiDonato, DRP
4
T. Miller, SLO
-
-
            I
I
          R.:0RP                   RI:0RP               g):DRP
R.:0RP
          L0oerflein/mjd                                 %Tolli ns
RI:0RP
g):DRP
(j ./JWiggin s
L0oerflein/mjd
%Tolli ns
4
4
                              (j ./JWiggin
<
                                        <   s
9/is/88
          9/is/88                   9/l 5/88             9/15 /88
5
                                    0FFICIAL RECORD COPY LIBRARY DUXBURY - 0002.0.0
9/l /88
                                                          09/15/88
9/15 /88
0FFICIAL RECORD COPY
LIBRARY DUXBURY - 0002.0.0
09/15/88
,
,
. .
. . .
.
. .
.
.
.
.
}}
}}

Latest revision as of 23:30, 10 December 2024

Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24,SALP Rept 50-293/87-99 for 870201-880515 & ACRS Full Committee Meeting on 880908 in Bethesda,Md Re Proposed Plant Restart for Info.W/O Encls
ML20154Q022
Person / Time
Site: Pilgrim
Issue date: 09/15/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Neubauer J
DUXBURY, MA
References
NUDOCS 8810030271
Download: ML20154Q022 (2)


See also: IR 05000293/1988021

Text

.

.

-

..

-.

.

-

..

s'

.*

l

.

SEP 15 WBB

i

l

(

Ouxbury Library

(

ATTN: Ms. Janice lieubauer

!

,

'

147 St. George Street

[

Duxbury, Massachusetts 02332

l

Dear Ms. Neubauer:

l

This letter forwards a copy of the Nuclear Regulatory Commission's (NRC) Inte-

grated Assessment team Inspection (IATI) Report (No. 50-293/88-21), conducted

i

at the Pilgrim Nuclear Power Station (PNPS) from August 8 through 24, 1988; the

l

Systematic Assessment of Licensee Performance (SALP) Board Report (No. 50-293/

87-99), dated Jul> 27, 1988, covering the period February 1, 1987 through

May 15, 1988; and the transcripts from thre NRC's Advisory Committee on Reactor

i

Safeguards (ACRS) Subcommittee meeting held on August 26, 1988, at Memorial

'

Hall, Plymouth, Massachusetts, and the ACRS Full Committee meeting held on

l

September 8, 19S8,

in Bethesda,

Maryland,

concerning

the

proposed plant

!

(

restart.

Please place this material with the copy of the PNPS Restart Plan and Self-

i

Asstssment Report, which were previously provided, and make it available for

i

public review.

Thank you for your continuing cooperation in this matter,

,

Sincerely,

htCIN41. 310Nt0 BY

Samuel J. Collins, Deputy Director

l

Division of Reactor Projects

Enclosures:

!

As stated

I

cc w/o encis:

l

Public Document Room (POR)

i

local Public Document Room (LPOR)

.

.

l

i

.

OFFICIAL RECORD COPY

LIBRARY OUXBURY - 0001.0.0

09/15/88

  1. #/

GG

15

gDR

ADOCK05gQ93

es10030271

C

s'

.

. .

.

Duxbury Library

2

SEP 151980

bec w/o enc 15:

L. T. Doerflein, ORP

H. J. DiDonato, DRP

4

T. Miller, SLO

-

I

R.:0RP

RI:0RP

g):DRP

(j ./JWiggin s

L0oerflein/mjd

%Tolli ns

4

<

9/is/88

5

9/l /88

9/15 /88

0FFICIAL RECORD COPY

LIBRARY DUXBURY - 0002.0.0

09/15/88

,

. .

. . .

.

. .

.

.

.

.