| Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Peter Dietrich Senior Vice President and Chief Nuclear Officer DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.4153 Fax: 734.586.1431 Email: peter.dietrich@dteenergy.com June 23, 2020 NRC-20-0040 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Fermi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43 | | {{#Wiki_filter:}} |
| | |
| ==Subject:==
| |
| Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle
| |
| | |
| ==References:==
| |
| : 1) DTE Electric letter to NRC License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle NRC-19-0054, dated November 8, 2019 (ML19312A110)
| |
| : 2) NRC Letter to DTE Electric Fermi 2 - Audit Plan in Support of the Review of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle (EPID L-2019-LLA-0249), dated April 8, 2020 (ML20094G814)
| |
| In Reference 1, DTE Electric Company (DTE) submitted a license amendment request (LAR) to revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle. The NRC performed an audit in support of review of the LAR, per the audit plan in Reference 2. In an email from Mr. Surinder Arora to Mr. Derek Corrin dated June 2, 2020, the NRC sent DTE a request for report DTE-19001 Surveillance Historical Failure Analysis in Support of a 24 Month Fuel Cycle License Amendment Request, Revision 1, dated July 1st, 2019. This report was one of the documents reviewed by the NRC during the audit. The requested report is included in the Enclosure to this letter.
| |
| DTE has reviewed the information supporting a finding of No Significant Hazards Consideration and the Environmental Consideration provided to the NRC in Sections 5.3 and 6.0 of of the Reference 1 LAR. The reference information provided in this letter does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the reference information provided in this letter does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
| |
| | |
| USNRC NRC-20-0040 Page 2 No new commitments are being made in this submittal.
| |
| Should you have any questions or require additional information, please contact Ms. Margaret Offerle, Manager -Nuclear Licensing, at (734) 586-5076.
| |
| Sincerely, Peter D' Senior Vice Presi ent and Chief Nuclear Officer
| |
| | |
| ==Enclosure:==
| |
| DTE-19001 "Surveillance Historical Failure Analysis in Support of a 24 Month Fuel Cycle License Amendment Request" cc: NRC Project Manager NRC Resident Office Regional Administrator, Region III Michigan Department of Environment, Great Lakes, and Energy
| |
| | |
| Enclosure to NRC-20-0040 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 DTE-19001 Surveillance Historical Failure Analysis in Support of a 24 Month Fuel Cycle License Amendment Request
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 2 of 395 Engineering Report No. DTE-19001, Revision 1 Surveillance Historical Failure Analysis in Support of a 24 Month Fuel Cycle License Amendment Request Prepared for:
| |
| DTE Energy Fermi 2 Power Plant 6400 North Dixie Highway Newport, MI48166 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Co-Prepared By: i1~e./~ 7/1/2019 Brian E. Townsend
| |
| .A.~_~_ ~ &-'h-Co-Prepared By:__"'_~--..:;...._*_ _ _ __ _ _ _ 7/1/2019 Bruce L. Crabbs Reviewed BY:._-fJ7-~
| |
| ----_--, H-., d~ ,------,,-_ _~===-=-- 7/112019 James H. Osborne Approved BY: _~ _*_~*
| |
| _~ _ _ __ -- _ __ _ _ _ _ 7/1/2019 Kirk R., Melson
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 3 of 395 Engineering Report No. DTE-19001 Revision 1 TABLE OF CONTENTS 1 BACKGROUND 4 2 PURPOSE 4 3 DESIGN INPUTS 4 4 ASSUMPTIONS 5 5 METHODOLOGY 6 6 DETAILED DISCUSSION 7 7
| |
| | |
| ==SUMMARY==
| |
| OF RESULTS 9 8 CONCLUSION AND RECOMMENDATIONS 10 9 REFERENCES 10 10 ATTACHMENTS 10 Categorization Flow Chart (2 Pages Incl. cover) Technical Specification Surveillance Requirement Interval Extension/Justification Scope (100 Pages Incl. cover) Technical Specification Event Failure History Evaluation (270 Pages Incl. cover) Technical Specification Event "Unique Failures" (6 Pages Incl. cover) Technical Specification Event "Unique Failures" Evaluation (6 Pages Incl. cover)
| |
| Page 2 of 10
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 4 of 395 Engineering Report No. DTE-19001 Revision 1 RECORD OF REVISION Rev. Description of Changes Revision On Dated No. Page(s) 0 Original issue All 6/19/2019 1 Revised Event 0881 failure from Category D Unique Att. 3 Pages 146, 147 7/1/2019 Failures to Category B More Frequent Testing Att. 4, Pages 4 and 5, and Att. 5, Pages 4 and 5
| |
| Page 3 of 10
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 5 of 395 Engineering Report No. DTE-19001 Revision 1
| |
| | |
| ===1 Background===
| |
| DTE Energy Fermi 2 Power Plant is pursuing a fuel cycle extension from the current 18 months to 24 months, in accordance with the requirements of NRC Generic Letter 91-04 (Ref. 9.1.1). An essential part of this effort is to ensure that the surveillance interval requirements that are tied to the length of the plants nuclear fuel cycle are extended, as necessary, to accommodate the proposed fuel cycle. To verify that the reliability and availability of the components is unchanged by the change in fuel cycle, any failures associated with the performance of these Surveillance Requirements (SR) are evaluated, classified and justified to verify they will not impact plant safety.
| |
| The surveillance test history analysis is discussed in Generic Letter 91-04 (Ref. 9.1.1) as required to support the License Amendment Request (LAR) for transition to 24-month fuel cycles. Surveillance test analyses are performed on historical completed Events, as contained within the project scope.
| |
| 2 Purpose The purpose of this report is to provide a summary of the Technical Specification Surveillance Historical Failure Analysis performed in support of the 24 Month Fuel Cycle Extension Project to ensure that the availability and reliability of systems, components and functions will not be significantly reduced by repetitive or time-based failures.
| |
| The project scope includes an analysis for all Technical Specification (TS) related SRs, with 18-month surveillance intervals (or multiples thereof), tied to the length of the plant's nuclear fuel cycle. This includes both outage and non-outage surveillances. All TS SRs in scope were reviewed to determine which Events are used to satisfy the SR.
| |
| This resulted in scope as defined by DTE-18005, Rev 2, Attachments 2 and 3.
| |
| This Technical Specification Surveillance Historical Failure Analysis documents evaluations performed to identify historical failures, categorize the type of failures, and justify the acceptability of the surveillance interval extension with the existence of these identified failures. Specifically, the analysis, by evaluating each applicable TS SR, supports the conclusion that the impact on system availability and reliability, if any, will be small as a result of the change to a 24-month surveillance interval. This analysis, in combination with applicable Allowable Value and Nominal Trip Setpoint verifications and applicable UFSAR reviews, also verifies that the assumptions in the plant-licensing basis are maintained.
| |
| 3 Design Inputs 3.1 The 24 Month Project Team performed a review of all TS Surveillance Requirements (SRs) that would require a change in the performance frequency to support the change to a 24-month fuel cycle. The SRs and Events identified as within scope were documented in DTE-18005, Rev 2 Attachments 2 and 3.
| |
| All available performances of the applicable Events were collected from the site document control system (i.e., WebARMS). Each collected performance was reviewed to identify any failure of the procedure and then each failure was evaluated to determine if the failure resulted in a potential for the SR to not be met. Attachment 2 identifies the Events associated with the scoped Technical Specification SRs.
| |
| 3.2 Copies of the completed Events were obtained from WebARMS searches. These completed performances were used to provide the necessary failure information.
| |
| Page 4 of 10
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 6 of 395 Engineering Report No. DTE-19001 Revision 1 Where Event performances referred to a CARD (Condition Assessment Resolution Document) and/or Work Orders, these documents were also obtained from WebARMS searches, in order to provide the information necessary to categorize and assess consequences of the failures.
| |
| 3.3 Event 0350, Perform 24.630.01 Remote Shutdown Panel Control Circuit/Switch Test, Procedure 24.630.01, Rev 35 was revised and issued 11/16/2016. Procedure 24.630.01, Rev 34 included 9 separate sections, 5.1 through 5.9, which for purposes of performance were sectioned off into seven Sub-Events: 0350, 0350A, 0350B, 0350C, 0350D, 0350E and 0350F. Procedure 24.630.01, Rev 35 includes 5 separate sections, 5.1 through 5.5 and is performed by five Events: 0350, 0350A, 0350B, 0350C and 0350F. Event 0350 is at times completed by entire performance of 24.630.01 or a combination of sections (e.g. 5.1, 5.2, 5.3, etc.) of the surveillance to complete the entire surveillance performance.
| |
| Events 897, 3300, 3301, 3302, 3304, and 3307 series for Instrument Line Excess Flow Check Valve (EFCV) Functional performances are also, depending on scheduling, completed by a series of Sub-Events (A, B, C, etc.) in order to complete the entire required performance or completed entirely in one performance.
| |
| 3.4 As related to Event performances which included Acceptable Performance Tolerance (APT) range, position taken with regard to failure analysis is:
| |
| 3.4.1 If As Found data is NOT within APT range, then performance is considered to have failed and Description of Failure is documented.
| |
| 3.4.2 If As Found data is within APT range but NOT within the As Left Tolerance (ALT) range, then performance is NOT considered to have failed; no Description of Failure is documented.
| |
| 3.5 For Events reviewed associated with leakage detection, any leakage indicated during the Event performance is considered a Category A failure unless it exceeded allowances provided within the surveillance Acceptance Criteria. In this case, it is considered to be Category D.
| |
| 4 Assumptions To complete this analysis, the following assumption was made to clearly define the scope of the analysis and the methodology used to evaluate the surveillance test history. The generic assumption, with a bases statement to justify the assumption, is presented as follows:
| |
| 4.1 The review of the credited Event performances, within a time frame required for a minimum of five Event performances (18-month frequency), can be used to evaluate the Event test history and support the justification to extend the associated TS SR Frequency to 24 months (maximum of 30 months with the allowance of TS SR 3.0.2). Generally, only a review of the surveillance tests which implement the 18-month TS SRs is required.
| |
| Bases:
| |
| Five surveillance test performances (approximately seven years of history for 18-month frequency) provide an adequate performance history. As stated in the review methodology, the surveillance test history analysis is a qualitative review of the surveillance test performances to ensure there is no evidence of any repetitive Page 5 of 10
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 7 of 395 Engineering Report No. DTE-19001 Revision 1 failures associated with the surveillance requirement which would invalidate the conclusion that the impact on system availability, if any, will be small as a result of the change to a 24-month surveillance interval. The five performances ensure that approximately three 30-month surveillance periods are reviewed to identify any repetitive problems. It has been concluded, based on engineering judgment, that three 30-month periods provide adequate surveillance test history. The aforementioned amount of historical data has been proven to be acceptable by the United States Nuclear Regulatory Commission (USNRC) in previous nuclear plant (i.e., Perry Nuclear Plant, Hatch Nuclear Plant, DC Cook Nuclear Plant and Oconee Nuclear Station) license submittals for surveillance interval extensions.
| |
| 5 Methodology 5.1 Background/Overview of Methodology As stated in the Purpose section, this analysis (the scope of which is defined in Attachment 2) is being performed to confirm that the impact on system availability, if any, from the change to a 24-month surveillance interval will be small. To confirm this conclusion, it is necessary to demonstrate that the surveillance test history does not indicate a history of repetitive failures, which would go undetected if the current surveillance interval were extended to the proposed surveillance interval.
| |
| The purpose of surveillance testing is to verify that the tested TS function/feature will perform as assumed in the associated safety analysis. By periodically testing the TS function/feature, the availability of the associated function/feature is confirmed. As such, with the extension of TS SR intervals, a longer period of time will exist between performances of the surveillance testing. If a failure, which results in the loss of the associated function, should occur during the operating cycle which could only be detected by the testing associated with the operating cycle-based TS SRs, then the increase in the surveillance testing interval would result in a decrease in the associated Functions availability.
| |
| To ensure the acceptability of the change to a 24-month (from 18-month) surveillance interval, a two-step process was employed for TS SRs. The first step was a qualitative review of the associated TS SR. A qualitative evaluation of each TS SR was performed to document the acceptability of going to a TS SR Frequency of 24 months. These evaluations employ arguments similar to those suggested in Generic Letter 91-04 (Ref. 9.1.1), such as redundant channels and more frequent testing performed during the operating cycle. These qualitative evaluations should be applied in the Documentation of Change accompanying the TS change submittal.
| |
| The second step is the evaluation of the surveillance test history which is being performed in this analysis. This evaluation is being performed to confirm the general conclusion reached as part of step one. The results of each of the qualitative evaluations may be found in Attachments 3, 4 and 5 of this report and are also summarized in Section 7.
| |
| 5.2 Surveillance Test History Analysis Methodology As established in Section 5.1, the two-fold purpose of the analysis is: 1) to ensure that there is no evidence of repetitive surveillance test failures which would potentially result in a decrease in the system availability from the change to a 24-month surveillance interval, and; 2) to ensure that there is no evidence of repetitive surveillance test failures which would indicate that the current 18-month surveillance Page 6 of 10
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 8 of 395 Engineering Report No. DTE-19001 Revision 1 interval does not provide adequate system availability and reliability. To demonstrate this, a review of the surveillance test history has been performed. Only a review of the surveillance tests which implement the 18-month TS SRs is required.
| |
| Failures detected by more frequent surveillance tests are not being impacted by this change and will continue to detect failures which have been previously detected by these activities. To simplify the evaluations necessary for this analysis, surveillance test failures have been classified into categories which can, in most cases, be generically justified. The classification technique is graphically shown in Attachment 1, and each of the failure categories is described in Section 6.1. As is explained in Section 6.1, the failures in each of these categories can be demonstrated to not change the conclusion that the impact on system availability, if any, will be small as a result of the change to a 24-month surveillance test interval. The one exception to this conclusion is Category D Unique Failures.
| |
| To ensure that repetitive failures of similar components tested by different surveillance tests would be identified, a separate evaluation was performed of all the Category D failures. This evaluation, documented in Section 6.2, reviews the Category D failures from this analysis as a group to determine if there is any evidence of repetitive failures among similar plant components.
| |
| These two evaluations (failure categorization and review of unique failures) identify any repetitive failures which could potentially invalidate the conclusion that the impact on system availability, if any, will be small from the change to a 24-month surveillance test interval.
| |
| 5.3 Determination of Scope As stated in Section 2, the purpose of this analysis is to support the conclusion, for all TS SRs (as displayed in Attachment 2 of this analysis) which are being changed to a 24 month surveillance interval, that the impact on system availability and reliability, if any, will be small as a result in a change to the surveillance interval.
| |
| The total scope of the TS SRs requiring review, along with the applicable Events which satisfy those requirements, is identified in Attachment 2. Therefore, Attachment 2 provides the total scope of Events requiring review.
| |
| 6 Detailed Discussion 6.1 Surveillance Test History Categorization and Evaluation As stated in Section 5.3, the Events requiring review are identified in Attachment 2.
| |
| For each of the identified Events, all credited Event performances occurring over at least the past seven years which were available for review, have been retrieved and any identified failures have been evaluated and categorized into one of the five categories identified in Attachment 1. As stated in Section 5.2, the categories have been established to simplify the review process. In the following paragraphs, a basis is provided to justify why each of the failure categories does not impact the conclusion that the impact on system availability, if any, from a change to a 24-month surveillance test interval will be small.
| |
| CATEGORY A - NO LOSS OF DESIGN/SAFETY FUNCTION Bases:
| |
| A Category A failure is one in which there is no impact on the ability of the component and/or system to perform its specific design/safety function. A typical Page 7 of 10
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 9 of 395 Engineering Report No. DTE-19001 Revision 1 and common example of this type of failure is one where the surveillance requirement is to verify that a breaker trips on overcurrent. The test record verifies this action, but observes a failure of an indication of this trip. The indication is not the safety function being tested, but the breaker trip is. The Category A failure does not result in a loss of the design/safety function and therefore, does not affect the operability of the component or the ability of the equipment to perform its intended function. Category A failures are not considered significant failures relative to the other failure categories. If the failure of the surveillance test did not result in the failure of the associated component and/or system to perform its function, and the TS requirements were satisfied, then these failures have no impact on system availability. Therefore, these failures do not impact the conclusion that the impact on system availability, if any, from the change in the surveillance test interval is small.
| |
| CATEGORY B - MORE FREQUENT TESTING Bases:
| |
| A Category B failure is assigned to surveillance test failures which would be detected by the performance of other required testing or plant monitoring activities that are performed more frequently. An example of a Category B failure would be finding level in a tank below the required value during an 18-month surveillance, when a Channel Check or Operator Log procedure requires this level to be verified above the same or more conservative value on a more frequent basis (such as quarterly or daily). It is anticipated that the inadequate condition would be discovered during the performance of the surveillance performed more frequently than the 18-month surveillance. If the failure can be detected by a more frequently performed test or monitoring activity, the extension of the surveillance test interval will have no impact on system availability because the failure would be detected by the more frequently performed activity and would not go undetected for a longer period of time as a result of extending the current surveillance interval. Therefore, these failures do not impact the conclusion that the impact on system availability, if any, from the change in the surveillance test interval is small.
| |
| CATEGORY C - EVENT DRIVEN FAILURES Bases:
| |
| A Category C failure is assigned to surveillance test failures where the cause can be directly attributed to an associated event such as a preventative maintenance task or a modification. An example of a Category C failure would be a procedure deficiency in which the surveillance procedure was unable to be completed as written due to the implementation of a modification that may have altered the plant installed equipment but was not reflected in the surveillance procedure. Also, if the failure has been caused by an event such as a modification where the performance of the surveillance test will be required to demonstrate the operability/functionality of the system or component prior to declaring the associated system operable/functional, then this failure has no impact on the system availability.
| |
| Therefore, these failures do not impact the conclusion that the impact on system availability, if any, from the change in the surveillance test interval is small.
| |
| Page 8 of 10
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 10 of 395 Engineering Report No. DTE-19001 Revision 1 CATEGORY D - UNIQUE FAILURES Bases:
| |
| A Category D failure, or a unique failure, is a surveillance test failure that does not occur on a repetitive basis and is not associated with a time-based failure mechanism. If the failure was caused by a unique failure, then any subsequent failure which could occur would not result in a significant impact on system/component availability. That is to say that any subsequent failures would not be of the same type as previously experienced since the original failure, classified as a unique failure, would not occur on a repetitive basis or be associated with any time-based mechanism. This conclusion is based on the fact that generally all impacted systems are designed to be single failure proof and a unique failure of one of the associated systems/components will not prevent performance of the function. Therefore, these failures do not impact the conclusion that the impact on system availability, if any, from the change in the surveillance test interval is small.
| |
| CATEGORY E - ADDITIONAL EVALUATIONS Bases:
| |
| If the failure cannot be grouped in any of the previous categories, A through D, then it is assigned Category E and requires additional evaluations to determine if the extended surveillance can be justified. If the surveillance cannot be justified, then an evaluation is made to determine if the surveillance test can be performed at power.
| |
| All of the Events requiring review have been evaluated and any surveillance test failures were identified and categorized. Once this step was completed, a qualitative review of each surveillance test failure was performed and a determination was made as to whether the surveillance test history supports the change to a 24-month surveillance interval. Once all the associated Events were reviewed for a particular TS SR, if all these supported a change to a 24-month TS SR frequency, the associated TS SR was identified as acceptable for a change to a 24-month surveillance interval. This evaluation is documented in Attachment 3.
| |
| 6.2 Review of Unique Failures As stated in Section 5.2, a separate review of the Unique Failures from this analysis (documented in Attachment 4) was performed to ensure that no repetitive failures of similar components occurred under different Events. This review was completed by performing a review of all the Category D failures identified in this analysis as a group to determine if there was any indication of a repetitive failure mechanism or a time-based failure mechanism. Attachment 5 contains this evaluation for each Unique Failure with a summary of the conclusion for each failure.
| |
| 6.3 Additional Evaluations There were no failures identified in the analysis which have been classified as Category E failures.
| |
| 7 Summary of Results A Surveillance Failure Analysis was performed for the Surveillance Requirements and associated events listed in Attachment 2. The analysis of each event is documented in Attachment 3, and only 4 unique failures were observed over the study period, as Page 9 of 10
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 11 of 395 Engineering Report No. DTE-19001 Revision 1 summarized in Attachment 4. Analysis of these failures as documented in Attachment 5 concludes that none are of a repetitive nature which would preclude extension of the surveillance interval from 18 to 24 months. For each event analyzed in Attachment 3, it is concluded that the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval. Therefore, the Surveillance Failure Analysis supports the extension of frequency for each of the Surveillance Requirements listed in Attachment 2 from 18 to 24 months.
| |
| 8 Conclusion and Recommendations All DTE Energy Fermi 2 Power Plant TS SRs (under the scope of this analysis, as defined in DTE-18005, Rev 2 Attachment 2 and 3), Events and associated failures have been reviewed and found to support the general conclusions required by Generic Letter 91-04 (Ref. 9.1.1). There is no evidence of repetitive failures or failures with a time-based failure mechanism which would invalidate the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24-month surveillance test interval.
| |
| 9 References 9.1 Methodology References 9.1.1 NRC Generic Letter 91-04, "Changes in Technical Specification Surveillance Requirements to Accommodate a 24 Month Fuel Cycle," April 2, 1991 9.2 General References 9.2.1 Renewed Facility Operating License NPF-43, Technical Specifications for DTE Electric Company Fermi 2, Amendment No. 213 9.2.2 DTE-18005 Revision 2, 24-Month Surveillance Extension Project Scope Evaluation 10 Attachments
| |
| : 1. Categorization Flow Chart
| |
| : 2. Technical Specification Surveillance Requirement Interval Extension/Justification Scope
| |
| : 3. Technical Specification Event Failure History Evaluation
| |
| : 4. Technical Specification Event "Unique Failures"
| |
| : 5. Technical Specification Event "Unique Failures" Evaluation Page 10 of 10
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 12 of 395 Engineering Report No. DTE-19001 Revision 1 ATTACHMENT 1 CATEGORIZATION FLOW CHART (2 PAGES)
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 13 of 395 Engineering Report No. DTE-19001 Revision 1 ATTACHMENT 1 - CATEGORIZATION FLOW CHART Define the Surveillance Test Failure Category A Since the failure does not impact any Does safety function, the failure does not NO the failure degrade or invalidate the conclusion that the make inoperable a safety increased surveillance interval will have a function? small, if any, impact on system availability.
| |
| YES Category B Is the failure detectable Since the failure would be detected by a by a test, maintenance YES more frequent activity, there is no activity, or plant monitoring which potential impact from an increase to the is performed on a more frequent surveillance interval since the failure will basis than once per not go undetected for a longer period of surveillance time.
| |
| interval?
| |
| NO Category C Was the Since the failure was caused by a specific failure caused by a activity, which if performed requires the unique maintenance activity YES performance of the corresponding test, that was performed prior to the the failure does not invalidate the performance of the failed conclusion that the impact, if any, from surveillance the increased test interval on system test? availability is small.
| |
| NO Category D If the failure mechanism can be proven to Is the failure not be related to a time-based caused by a time-based NO degradation and unique, then the failure failure mechanism such as erosion, does not invalidate the conclusion that fatigue, wear, etc. or is it the increased operating cycle will have a not unique? small, if any, impact on system availability. This conclusion should be supported by an additional review of the YES surveillance test history.
| |
| Category E Perform additional evaluation to determine if the extended surveillance interval can be justified. If not, evaluate the possibility to perform the surveillance at power.
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 14 of 395 Engineering Report No. DTE-19001 Revision 1 ATTACHMENT 2 TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT INTERVAL EXTENSION/JUSTIFICATION SCOPE (100 PAGES)
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 15 of 395 ATTACHMENT 2 - FERMI 2 TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT INTERVAL EXTENSION SCOPE REQUIREMENT REQUIREMENT TITLE FREQ SR 3.1.7.8 Verify flow through one SLC subsystem from pump into reactor pressure vessel. IAW SFCP - 18 months on a STAGGERED TEST BASIS EVENTS: EVENT TITLE 0245 PERFORM 24.139.03 SEC-5.3,5.4 SLC LOOP A PUMP FLOW,MANUAL INITIATE & SQUIB FIRING 1245 PERFORM 24.139.03 SEC-5.3,5.4 SLC LOOP B PUMP FLOW,MANUAL INITIATE & SQUIB FIRING SR 3.1.7.9 Verify all piping between storage tank and explosive valve is unblocked. IAW SFCP - 18 months EVENTS: EVENT TITLE 0245 PERFORM 24.139.03 SEC-5.3,5.4 SLC LOOP A PUMP FLOW,MANUAL INITIATE & SQUIB FIRING 1245 PERFORM 24.139.03 SEC-5.3,5.4 SLC LOOP B PUMP FLOW,MANUAL INITIATE & SQUIB FIRING SR 3.1.8.2.a Verify each SDV vent and drain valve: a. Closes in 30 seconds after receipt of an actual or simulated scram signal; and IAW SFCP - 18 months EVENTS: EVENT TITLE 0227 PERFORM 24.106.06 SCRAM DISCHARGE VOL. VENT AND DRAIN VALVES SCRAM OPERABILITY SR 3.1.8.2.b Verify each SDV vent and drain valve: b. Opens when the actual or simulated scram signal is reset. IAW SFCP - 18 months EVENTS: EVENT TITLE 0227 PERFORM 24.106.06 SCRAM DISCHARGE VOL. VENT AND DRAIN VALVES SCRAM OPERABILITY SR 3.3.1.1.13-11 CHANNEL FUNCTIONAL TEST Reactor Protection System Instrumentation Reactor Mode Switch - Shutdown Position IAW SFCP - 18 months EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 2 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 16 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.1.1.14-3 CHANNEL CALIBRATION Reactor Protection System Instrumentation Reactor Vessel Steam Dome Pressure - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0701 PERFORM 44.010.005 RPS-RX STEAM DOME PRESS, TRIP SYS A, CHNL A1/A, XMTR CAL 0703 PERFORM 44.010.006 RPS-RX STEAM DOME PRESS, TRIP SYS B, CHNL B1/B, XMTR CAL 0704 PERFORM 44.010.007 RPS-RX STEAM DOME PRESS, TRIP SYS A, CHNL A2/C, XMTR CAL 0705 PERFORM 44.010.008 RPS-RX STEAM DOME PRESS, TRIP SYS B, CHNL B2/D, XMTR CAL 1701 PERFORM 44.010.005 RPS-RX STEAM DOME PRESS,TRIP SYS A,CHNL A1/A,MTU CAL/FUNC 1703 PERFORM 44.010.006 RPS-RX STEAM DOME PRESS,TRIP SYS B,CHNL B1/B,MTU CAL/FUNC 1704 PERFORM 44.010.007 RPS-RX STEAM DOME PRESS,TRIP SYS A,CHNL A2/C,MTU CAL/FUNC 1705 PERFORM 44.010.008 RPS-RX STEAM DOME PRESS,TRIP SYS B,CHNL B2/D,MTU CAL/FUNC SR 3.3.1.1.14-4 CHANNEL CALIBRATION Reactor Protection System Instrumentation Reactor Vessel Water Level - Low, Level 3 IAW SFCP - 18 months EVENTS: EVENT TITLE 0750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N080A, XMTR CAL 0751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N080B, XTMR CAL 0752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N080C, XMTR CAL 0753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N080D, XMTR CAL 1750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N680A MTU CAL/FUNC 1751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N680B MTU CAL/FUNC 1752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N680C MTU CAL/FUNC 1753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N680D MTU CAL/FUNC SR 3.3.1.1.14-5 CHANNEL CALIBRATION Reactor Protection System Instrumentation Main Steam isolation Valve - Closure IAW SFCP - 18 months EVENTS: EVENT TITLE 0517 PERFORM 44.010.062 RPS MSIV'S-INBOARD VALVE LIMIT SWITCH,DIV 1&2,CAL 0518 PERFORM 44.010.063 RPS MSIV-OUTBOARD VALVE LIMIT SWITCH,DIV 1&2,CAL DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 3 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 17 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.1.1.14-7 CHANNEL CALIBRATION Reactor Protection System Instrumentation Drywell Pressure - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW PRESSURE, C71N650C, CALIBRATION/FUNC 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW PRESSURE, C71N650D, CALIBRATION/FUNC SR 3.3.1.1.14-8.a CHANNEL CALIBRATION Reactor Protection System Instrumentation Scram Discharge Volume Water Level - High a. Level IAW SFCP - 18 months Transmitter EVENTS: EVENT TITLE 0523 PERFORM 44.010.075 RPS-SDV HIGH WTR LVL TRIP SYS A, CHANNEL A1/A CAL/FUNCT.
| |
| 0524 PERFORM 44.010.076 RPS-SDV HIGH WTR LVL TRIP SYS B, CHANNEL B1/B CAL/FUNCT.
| |
| 0525 PERFORM 44.010.077 RPS-SDV HIGH WTR LVL TRIP SYS A, CHANNEL A2/C CAL/FUNCT.
| |
| 0526 PERFORM 44.010.078 RPS-SDV HIGH WTR LVL TRIP SYS B, CHANNEL B2/D CAL/FUNCT.
| |
| SR 3.3.1.1.14-8.b CHANNEL CALIBRATION Reactor Protection System Instrumentation Scram Discharge Volume Water Level - High b. Float IAW SFCP - 18 months Switch EVENTS: EVENT TITLE 1070 PERFORM 44.010.045 RPS SDV HIGH WTR LVL TRIP SYS A, CH A1/A FLT SWITCH CAL/FUNCT 1071 PERFORM 44.010.046 RPS SDV HIGH WTR LVL TRIP SYS B, CH B1/B FLT SWITCH CAL/FUNCT 1072 PERFORM 44.010.047 RPS SDV HIGH WTR LVL TRIP SYS A, CH A2/C FLT SWITCH CAL/FUNCT 1073 PERFORM 44.010.048 RPS SDV HIGH WTR LVL TRIP SYS B, CH B2/D FLT SWITCH CAL/FUNCT SR 3.3.1.1.14-9 CHANNEL CALIBRATION Reactor Protection System Instrumentation Turbine Stop Valve - Closure IAW SFCP - 18 months EVENTS: EVENT TITLE 1051 PERFORM 44.010.064 RPS-TURBINE STOP VA. LIMIT SWITCH CLOSURE CALIBRATION SR 3.3.1.1.15-1.a LOGIC SYSTEM FUNCTIONAL TEST Reactor Protection System Instrumentation Intermediate Range Monitors a. Neutron IAW SFCP - 18 months Flux-High EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 4 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 18 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.1.1.15-1.b LOGIC SYSTEM FUNCTIONAL TEST Reactor Protection System Instrumentation Intermediate Range Monitors b. Inop IAW SFCP - 18 months EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL SR 3.3.1.1.15-3 LOGIC SYSTEM FUNCTIONAL TEST Reactor Protection System Instrumentation Reactor Vessel Steam Dome Pressure - IAW SFCP - 18 months High EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL 0701 PERFORM 44.010.005 RPS-RX STEAM DOME PRESS, TRIP SYS A, CHNL A1/A, XMTR CAL 0703 PERFORM 44.010.006 RPS-RX STEAM DOME PRESS, TRIP SYS B, CHNL B1/B, XMTR CAL 0704 PERFORM 44.010.007 RPS-RX STEAM DOME PRESS, TRIP SYS A, CHNL A2/C, XMTR CAL 0705 PERFORM 44.010.008 RPS-RX STEAM DOME PRESS, TRIP SYS B, CHNL B2/D, XMTR CAL 1701 PERFORM 44.010.005 RPS-RX STEAM DOME PRESS,TRIP SYS A,CHNL A1/A,MTU CAL/FUNC 1703 PERFORM 44.010.006 RPS-RX STEAM DOME PRESS,TRIP SYS B,CHNL B1/B,MTU CAL/FUNC 1704 PERFORM 44.010.007 RPS-RX STEAM DOME PRESS,TRIP SYS A,CHNL A2/C,MTU CAL/FUNC 1705 PERFORM 44.010.008 RPS-RX STEAM DOME PRESS,TRIP SYS B,CHNL B2/D,MTU CAL/FUNC SR 3.3.1.1.15-4 LOGIC SYSTEM FUNCTIONAL TEST Reactor Protection System Instrumentation Reactor Vessel Water Level - Low, Level 3 IAW SFCP - 18 months EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL 0750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N080A, XMTR CAL 0751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N080B, XTMR CAL 0752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N080C, XMTR CAL 0753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N080D, XMTR CAL 1750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N680A MTU CAL/FUNC 1751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N680B MTU CAL/FUNC 1752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N680C MTU CAL/FUNC 1753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N680D MTU CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 5 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 19 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.1.1.15-5 LOGIC SYSTEM FUNCTIONAL TEST Reactor Protection System Instrumentation Main Steam isolation Valve - Closure IAW SFCP - 18 months EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL SR 3.3.1.1.15-7 LOGIC SYSTEM FUNCTIONAL TEST Reactor Protection System Instrumentation Drywell Pressure - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW PRESSURE, C71N650C, CALIBRATION/FUNC 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW PRESSURE, C71N650D, CALIBRATION/FUNC 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL SR 3.3.1.1.15-8.a LOGIC SYSTEM FUNCTIONAL TEST Reactor Protection System Instrumentation Scram Discharge Volume Water Level - IAW SFCP - 18 months High a. Level Transmitter EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL 0523 PERFORM 44.010.075 RPS-SDV HIGH WTR LVL TRIP SYS A, CHANNEL A1/A CAL/FUNCT.
| |
| 0524 PERFORM 44.010.076 RPS-SDV HIGH WTR LVL TRIP SYS B, CHANNEL B1/B CAL/FUNCT.
| |
| 0525 PERFORM 44.010.077 RPS-SDV HIGH WTR LVL TRIP SYS A, CHANNEL A2/C CAL/FUNCT.
| |
| 0526 PERFORM 44.010.078 RPS-SDV HIGH WTR LVL TRIP SYS B, CHANNEL B2/D CAL/FUNCT.
| |
| SR 3.3.1.1.15-8.b LOGIC SYSTEM FUNCTIONAL TEST Reactor Protection System Instrumentation Scram Discharge Volume Water Level - IAW SFCP - 18 months High b. Float Switch EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL 1070 PERFORM 44.010.045 RPS SDV HIGH WTR LVL TRIP SYS A, CH A1/A FLT SWITCH CAL/FUNCT 1071 PERFORM 44.010.046 RPS SDV HIGH WTR LVL TRIP SYS B, CH B1/B FLT SWITCH CAL/FUNCT 1072 PERFORM 44.010.047 RPS SDV HIGH WTR LVL TRIP SYS A, CH A2/C FLT SWITCH CAL/FUNCT 1073 PERFORM 44.010.048 RPS SDV HIGH WTR LVL TRIP SYS B, CH B2/D FLT SWITCH CAL/FUNCT DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 6 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 20 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.1.1.15-9 LOGIC SYSTEM FUNCTIONAL TEST Reactor Protection System Instrumentation Turbine Stop Valve - Closure IAW SFCP - 18 months EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL 1167 PERFORM 44.010.067 RPS-TS A, CH A, TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC 1168 PERFORM 44.010.068 RPS-TS B, CHL B TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC 1169 PERFORM 44.010.069 RPS-TS A, CH C TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC 1170 PERFORM 44.010.070 RPS-TS B, CH D TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC SR 3.3.1.1.15-10 LOGIC SYSTEM FUNCTIONAL TEST Reactor Protection System Instrumentation Turbine Control Valve Fast Closure IAW SFCP - 18 months EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL 1167 PERFORM 44.010.067 RPS-TS A, CH A, TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC 1168 PERFORM 44.010.068 RPS-TS B, CHL B TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC 1169 PERFORM 44.010.069 RPS-TS A, CH C TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC 1170 PERFORM 44.010.070 RPS-TS B, CH D TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC SR 3.3.1.1.15-11 LOGIC SYSTEM FUNCTIONAL TEST Reactor Protection System Instrumentation Reactor Mode Switch - Shutdown Position IAW SFCP - 18 months EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL SR 3.3.1.1.15-12 LOGIC SYSTEM FUNCTIONAL TEST Reactor Protection System Instrumentation Manual Scram IAW SFCP - 18 months EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 7 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 21 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.1.1.16-9 Verify Turbine Stop Valve-Closure and Turbine Control Valve Fast Closure Functions are not bypassed when THERMAL IAW SFCP - 18 months POWER is > 29.5% RTP. Turbine Stop Valve - Closure EVENTS: EVENT TITLE 1167 PERFORM 44.010.067 RPS-TS A, CH A, TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC 1168 PERFORM 44.010.068 RPS-TS B, CHL B TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC 1169 PERFORM 44.010.069 RPS-TS A, CH C TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC 1170 PERFORM 44.010.070 RPS-TS B, CH D TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC SR 3.3.1.1.16-10 Verify Turbine Stop Valve-Closure and Turbine Control Valve Fast Closure Functions are not bypassed when THERMAL IAW SFCP - 18 months POWER is > 29.5% RTP. Turbine Control Valve Fast Closure EVENTS: EVENT TITLE 1167 PERFORM 44.010.067 RPS-TS A, CH A, TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC 1168 PERFORM 44.010.068 RPS-TS B, CHL B TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC 1169 PERFORM 44.010.069 RPS-TS A, CH C TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC 1170 PERFORM 44.010.070 RPS-TS B, CH D TURB STOP/CONTROL VLV TRIP BYPASS CAL/FUNC SR 3.3.1.1.17-2.e Note: Neutron detectors are excluded. Verify the RPS RESPONSE TIME is within limits. Average Power Range Monitors e. 2- IAW SFCP - 18 months on a out-of-4 Voter STAGGERED TEST BASIS EVENTS: EVENT TITLE 0729 PERFORM 44.010.136 APRM TWO-OUT-OF-FOUR RPS A1 RTT 0730 PERFORM 44.010.137 APRM TWO-OUT-OF-FOUR RPS B1 RTT 0731 PERFORM 44.010.138 APRM TWO-OUT-OF-FOUR RPS A2 RTT 0732 PERFORM 44.010.139 APRM TWO-OUT-OF-FOUR RPS B2 RTT SR 3.3.1.1.17-5 Note: Neutron detectors are excluded. Verify the RPS RESPONSE TIME is within limits. Main Steam isolation Valve - Closure IAW SFCP - 18 months on a STAGGERED TEST BASIS EVENTS: EVENT TITLE 0504 PERFORM 44.010.049 RPS-MSIV, TRIP SYS A CHANNEL A1,RTT 0505 PERFORM 44.010.050 RPS-MSIV, TRIP SYS B CHANNEL B1,RTT 0506 PERFORM 44.010.051 RPS-MSIV, TRIP SYS A CHANNEL A2,RTT 0507 PERFORM 44.010.052 RPS-MSIV, TRIP SYS B CHANNEL B2,RTT DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 8 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 22 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.1.1.17-9 Note: Neutron detectors are excluded. Verify the RPS RESPONSE TIME is within limits. Turbine Stop Valve - Closure IAW SFCP - 18 months on a STAGGERED TEST BASIS EVENTS: EVENT TITLE 0508 PERFORM 44.010.053 RPS-TURBINE STOP VALVE CLOSURE, TRIP SYS A,CHAN A1,RTT 0509 PERFORM 44.010.054 RPS-TURBINE STOP VALVE CLOSURE, TRIP SYS B, CHAN B1,RTT 0510 PERFORM 44.010.055 RPS-TURBINE STOP VALVE CLOSURE, TRIP SYS A, CHAN A2, RTT 0511 PERFORM 44.010.056 RPS-TURBINE STOP VALVE CLOSURE, TRIP SYS B, CHAN B2, RTT SR 3.3.1.1.17-10 Note: Neutron detectors are excluded. Verify the RPS RESPONSE TIME is within limits. Turbine Control Valve Fast Closure IAW SFCP - 18 months on a STAGGERED TEST BASIS EVENTS: EVENT TITLE 0512 PERFORM 44.010.057 RPS-TURBINE CONT VALVE FAST CLOSURE,TRIP SYS A,CH A1,RTT 0513 PERFORM 44.010.058 RPS-TURBINE CONT VALVE FAST CLOSURE,TRIP SYS B,CH B1,RTT 0514 PERFORM 44.010.059 RPS-TURBINE CONT VALVE FAST CLOSURE,TRIP SYS A,CH A2,RTT 0515 PERFORM 44.010.060 RPS-TURBINE CONT VALVE FAST CLOSURE,TRIP SYS B,CH B2,RTT SR 3.3.2.1.4-3 CHANNEL FUNCTIONAL TEST Control Rod Block Instrumentation Reactor Mode Switch - Shutdown Position IAW SFCP - 18 months EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL SR 3.3.2.2.3 CHANNEL CALIBRATION The Allowable Value shall be 219 inches. Feedwater and Main Turbine High Water Level Trip IAW SFCP - 18 months Instrumentation EVENTS: EVENT TITLE 0765 PERFORM 44.030.265 ECCS RX WTR LVL (ADS LVL3 & FW/MN TURB LVL8)D1,CH A,XMTR CAL 0766 PERFORM 44.030.266 ECCS RX WTR LVL (ADS LVL3 & FW/MN TURB LVL8)D2,CH B,XMTR CAL 0885 PERFORM 44.190.009 FEEDWTR/M. TURB TRIP SYS-RX WATER LVL 8,DIV 1,CHNL C,XMTR CAL 0886 PERFORM 44.190.010 FEEDWTR/M. TURB TRIP SYS-RX WATER LVL 8,DIV 2,CHNL D,XMTR CAL 1765 PERFORM 44.030.265 ECCS RX WTR LVL (ADS LVL3-FW/MN TURB LVL8)D1,CH A,MTU CAL/CF 1766 PERFORM 44.030.266 ECCS RX WTR LVL (ADS LVL3-FW/MN TURB LVL8)D2,CH B,MTU CAL/CF 1885 PERFORM 44.190.009 FEEDWTR/M. TURB TRIP SYS-RX WATER LVL 8,D1,CHNL C,MTU CAL/CF 1886 PERFORM 44.190.010 FEEDWTR/M. TURB TRIP SYS-RX WATER LVL 8,D2,CHNL D,MTU CAL/CF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 9 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 23 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.2.2.4 LOGIC SYSTEM FUNCTIONAL TEST including valve actuation. Feedwater and Main Turbine High Water Level Trip IAW SFCP - 18 months Instrumentation EVENTS: EVENT TITLE 0765 PERFORM 44.030.265 ECCS RX WTR LVL (ADS LVL3 & FW/MN TURB LVL8)D1,CH A,XMTR CAL 0766 PERFORM 44.030.266 ECCS RX WTR LVL (ADS LVL3 & FW/MN TURB LVL8)D2,CH B,XMTR CAL 0882 PERFORM 44.190.001 FEEDWTR/MAIN TURBINE TRIP SYSTEM-LOGIC FUNCTIONAL TEST-NEIL REQ'D 0885 PERFORM 44.190.009 FEEDWTR/M. TURB TRIP SYS-RX WATER LVL 8,DIV 1,CHNL C,XMTR CAL 0886 PERFORM 44.190.010 FEEDWTR/M. TURB TRIP SYS-RX WATER LVL 8,DIV 2,CHNL D,XMTR CAL 1765 PERFORM 44.030.265 ECCS RX WTR LVL (ADS LVL3-FW/MN TURB LVL8)D1,CH A,MTU CAL/CF 1766 PERFORM 44.030.266 ECCS RX WTR LVL (ADS LVL3-FW/MN TURB LVL8)D2,CH B,MTU CAL/CF 1885 PERFORM 44.190.009 FEEDWTR/M. TURB TRIP SYS-RX WATER LVL 8,D1,CHNL C,MTU CAL/CF 1886 PERFORM 44.190.010 FEEDWTR/M. TURB TRIP SYS-RX WATER LVL 8,D2,CHNL D,MTU CAL/CF SR 3.3.3.1.2-1 CHANNEL CALIBRATION Post Accident Monitoring Instrumentation Reactor Vessel Pressure IAW SFCP - 18 months EVENTS: EVENT TITLE 0850 PERFORM 44.120.001 ACCIDENT MONITORING RX PRESSURE,DIV 1, CHANNEL CALIBRATION 0851 PERFORM 44.120.002 ACCIDENT MONITORING RX PRESSURE,DIV 2, CHANNEL CALIBRATION SR 3.3.3.1.2-2 CHANNEL CALIBRATION Post Accident Monitoring Instrumentation Reactor Vessel Water Level - Fuel Zone IAW SFCP - 18 months EVENTS: EVENT TITLE 0801 PERFORM 44.030.082 ACCIDENT MONITOR RX WTR LEVEL,DIV 1, XMTR CAL 0802 PERFORM 44.030.083 ACCIDENT MONITOR RX WTR LEVEL,DIV 2, XMTR CAL 1801 PERFORM 44.030.082 ACCIDENT MONITOR RX WTR LEVEL,DIV 1, MTU CAL/FUNC 1802 PERFORM 44.030.083 ACCIDENT MONITOR RX WTR LEVEL,DIV 2, MTU CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 10 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 24 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.3.1.2-3 CHANNEL CALIBRATION Post Accident Monitoring Instrumentation Reactor Vessel Water Level - Wide Range IAW SFCP - 18 months EVENTS: EVENT TITLE 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0850 PERFORM 44.120.001 ACCIDENT MONITORING RX PRESSURE,DIV 1, CHANNEL CALIBRATION 0851 PERFORM 44.120.002 ACCIDENT MONITORING RX PRESSURE,DIV 2, CHANNEL CALIBRATION 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL SR 3.3.3.1.2-4 CHANNEL CALIBRATION Post Accident Monitoring Instrumentation Suppression Pool Water Level IAW SFCP - 18 months EVENTS: EVENT TITLE 0856 PERFORM 44.120.009 ACCIDENT MONITORING TORUS WTR LVL,DIV 1,CALIBRATION 0857 PERFORM 44.120.010 ACCIDENT MONITORING TORUS WTR LVL,DIV 2,CALIBRATION SR 3.3.3.1.2-5 CHANNEL CALIBRATION Post Accident Monitoring Instrumentation Suppression Pool Water Temperature IAW SFCP - 18 months EVENTS: EVENT TITLE 0854 PERFORM 44.120.007 ACCIDENT MONITORING DIV 1,TEMPERATURE RECORDER,CALIBRATION 0855 PERFORM 44.120.008 ACCIDENT MONITORING DIV 2,TEMPERATURE RECORDER,CALIBRATION SR 3.3.3.1.2-6 CHANNEL CALIBRATION Post Accident Monitoring InstrumentationDrywell Pressure - Wide Range IAW SFCP - 18 months EVENTS: EVENT TITLE 0852 PERFORM 44.120.005 ACCIDENT MONITORING DW PRESSURE,DIV 1, CHANNEL CALIBRATION 0853 PERFORM 44.120.006 ACCIDENT MONITORING DW PRESSURE,DIV 2,CHANNEL CALIBRATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 11 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 25 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.3.1.2-7 CHANNEL CALIBRATION Post Accident Monitoring Instrumentation Primary Containment High Range Radiation Monitor IAW SFCP - 18 months EVENTS: EVENT TITLE 0866 PERFORM 64.120.040 CONTAINMENT AREA HIGH RANGE RADIATION MONITOR DIV 1 ELEC CAL 0867 PERFORM 64.120.041 CONTAINMENT AREA HIGH RANGE RADIATION MONITOR DIV 2 ELEC CAL 3866 PERFORM 64.120.040 CONTAINMENT AREA HIGH RANGE RADIATION MONITOR DIV 1 RAD CAL 3867 PERFORM 64.120.041 CONTAINMENT AREA HIGH RANGE RADIATION MONITOR DIV 2 RAD CAL DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 12 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 26 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.3.1.2-8 CHANNEL CALIBRATION Post Accident Monitoring Instrumentation PCIV Position IAW SFCP - 18 months EVENTS: EVENT TITLE 0239 PERFORM 24.137.18 SEC-5.2 MS LINE DRN & DRN ISO VLV OP & LOC POSITION VERIF TEST 0244 PERFORM 24.138.02 SEC-5.2 RX RECIRC LOCAL VALVE POSITION VERIFICATION TEST 0248 PERFORM 24.144.01 SEC-5.2 TWMS VALVE OPERABILITY & POSITION VERIF. TEST 0255 PERFORM 24.202.05 SEC-5.2 & 5.3 HPCI LOCAL VALVE POS INDICATION VERIF & LSFT 0260 PERFORM 24.203.04 SEC-5.3 DIV.1 CSS LOCAL VALVE POSITION INDICATION VERIF.
| |
| 0265 PERFORM 24.204.05 SEC-5.1 DIV. 1 RHR LOCAL VALVE POSITION INDICATION & STROKE 0272 PERFORM 24.206.02 SEC-5.2 RCIC VAL POS INDICATION VERIF. / MANUAL INITIATE 0280 PERFORM 24.207.04 SEC-5.2 RBCCW/EECW DIV 1 VALVE POSTION INDICATION VERIF 0321 PERFORM 24.406.02 SEC-5.2 NITROGEN INERT VLV POS INDICATION VERIF MODE 4,5 0322 PERFORM 24.408.03 SEC-5.2 DIV 1 PRIMARY CONT MONT SYS VLV OP AND IND VERIF 0324 PERFORM 24.409.02 SEC-5.2 DIV.1 POST LOCA RECOMBINER LOCAL VALVE POSITION IND 0351 PERFORM 24.702.01 SEC-5.3 MISCELLANEOUS SYSTEMS LOCAL VALVE POSITION VERIF.
| |
| 0353 PERFORM 24.707.01 SEC-5.1 RWCU LOCAL VALVE POSITION VERIFICATION 1120 PERFORM 24.409.03 SEC-5.2 DIV.2 POST LOCA RECOMBINER LOCAL VALVE POSITION IND 1134 PERFORM 24.204.05 SEC-5.3 DIV. 2 RHR LOCAL VALVE POSITION INDICATION & STROKE 1135 PERFORM 24.204.08 NON-DIVISIONAL RHR VALVE POSITION & STROKE TIME TEST 1233 PERFORM 24.137.03 SEC-5.1 & 5.3 MSIV FAIL SAFE TEST / POSITION INDICATION 1260 PERFORM 24.203.04 SEC-5.4 DIV.2 CSS LOCAL VALVE POSITION INDICATION VERIF.
| |
| 1265 PERFORM 24.204.05 SEC-5.2 DIV 1 RHR LOCAL VALVE POSITION INDICATION VERIF.
| |
| 1266 PERFORM 24.204.05 SEC-5.4 DIV 2 RHR LOCAL VALVE POSITION INDICATION VERIF.
| |
| 1315 PERFORM 24.404.03 SEC-5.2 SGTS VALVE OPERABILITY & POSITION INDICATION VERIF.
| |
| 1321 PERFORM 24.406.02 SEC-5.1 NITROGEN INERT VLV POS INDICATION VERIF ANY MODE 2280 PERFORM 24.207.11 SEC-5.2 RBCCW/EECW DIV 2 VALVE POSITION INDICATION VERIF 2322 PERFORM 24.408.04 SEC-5.2 DIV 2 PRIMARY CONT MONT SYS VLV OP AND POS IND VERIF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 13 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 27 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.3.2.2 Verify each required control circuit and transfer switch is capable of performing the intended function. Remote Shutdown IAW SFCP - 18 months System EVENTS: EVENT TITLE 0350 PERFORM 24.630.01 REMOTE SHUTDOWN PANEL CONTROL CIRCUIT/SWITCH TEST 0350A PERFORM 24.630.01 Sec-5.1(SDC Vlv-E1150F008) & Sec-5.2(CRD) REMOTE S/D PNL CONTROL CIRCUIT/SW.
| |
| TEST 0350B PERFORM 24.630.01 Sec-5.4(RCIC Vlvs & SRVs) REMOTE S/D PNL CONTROL CIRCUIT/SW. TEST 0350C PERFORM 24.630.01 Sec-5.3, 5.4(Div 1-RHR,RHRSW,MDCT FAN) REMOTE S/D PNL CONTROL CIRCUIT/SW.
| |
| TEST 0350D PERFORM 24.630.01 (E1150F008 only) REMOTE S/D PANEL CONTROL CIRCUIT/SWITCH TEST 0350E PERFORM 24.630.01 (Sec-5.7-RX Recirc) REMOTE SHUTDOWN PANEL CONTROL CIRCUIT/SWITCH TEST 0350F PERFORM 24.630.01 Sec-5.3(E1150F009 & B3105F023A) REMOTE S/D PANEL CONTROL CIRCUIT/SWITCH TEST 1135 PERFORM 24.204.08 NON-DIVISIONAL RHR VALVE POSITION & STROKE TIME TEST 2244 PERFORM 24.321.03 DEDICATED SHUTDOWN(3L) H21P626 OPERABILITY - ONLINE 2809 PERFORM 44.060.002 RCIC SYSTEM LOGIC FUNCTIONAL TEST - ONLINE SR 3.3.3.2.3-1 CHANNEL CALIBRATION Remote Shutdown System Reactor Vessel Pressure IAW SFCP - 18 months EVENTS: EVENT TITLE 0845 PERFORM 44.110.001 REMOTE SHUTDOWN RX PRESS,DIV 1,CAL SR 3.3.3.2.3-2 CHANNEL CALIBRATION Remote Shutdown System Reactor Vessel Water Level IAW SFCP - 18 months EVENTS: EVENT TITLE 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL SR 3.3.3.2.3-3 CHANNEL CALIBRATION Remote Shutdown System Suppression Chamber Water Temperature IAW SFCP - 18 months EVENTS: EVENT TITLE 0849 PERFORM 44.110.009 REMOTE SHUTDOWN TORUS WATER TEMP,DIV 1,CALIBRATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 14 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 28 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.3.2.3-4 CHANNEL CALIBRATION Remote Shutdown System Drywell Pressure IAW SFCP - 18 months EVENTS: EVENT TITLE 0848 PERFORM 44.110.006 REMOTE SHUTDOWN DW PRESS,DIV 1,CHANNEL CALIBRATION SR 3.3.3.2.3-5 CHANNEL CALIBRATION Remote Shutdown System RHR Heat Exchanger Discharge Flow IAW SFCP - 18 months EVENTS: EVENT TITLE 0846 PERFORM 44.110.003 REMOTE SHUTDOWN RHR FLOW INDICATION,CAL SR 3.3.3.2.3-6 CHANNEL CALIBRATION Remote Shutdown System RCIC Flow IAW SFCP - 18 months EVENTS: EVENT TITLE 0847 PERFORM 44.110.004 REMOTE SHUTDOWN RCIC FLOW INDICATION,CAL SR 3.3.4.1.3.a CHANNEL CALIBRATION The Allowable Values shall be: a. Reactor Vessel Water Level-Low Low, Level 2: > 103.8 inches; IAW SFCP - 18 months and EVENTS: EVENT TITLE 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 15 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 29 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.4.1.3.b CHANNEL CALIBRATION The Allowable Values shall be: b. Reactor Vessel Pressure-High: < 1153 psig. IAW SFCP - 18 months EVENTS: EVENT TITLE 0803 PERFORM 44.040.005 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, CHL ''A'', XMTR CAL 0804 PERFORM 44.040.006 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''B'', XMTR CAL 0805 PERFORM 44.040.007 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, CHL ''C'', XMTR CAL 0806 PERFORM 44.040.008 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''D'', XMTR CAL 1803 PERFORM 44.040.005 ATWS/SRV LLS RX PRESS,DIV 1,CHNL A, MTU CAL/FUNC 1804 PERFORM 44.040.006 ATWS/SRV LLS RX PRESS,DIV 2,CHNL B, MTU CAL/FUNC 1805 PERFORM 44.040.007 ATWS/SRV LLS RX PRESS,DIV 1,CHNL C, MTU CAL/FUNC 1806 PERFORM 44.040.008 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''D'', MTU CAL/FUNC SR 3.3.4.1.4.a LOGIC SYSTEM FUNCTIONAL TEST including breaker actuation. a. Reactor Vessel Water Level-Low Low, Level 2 IAW SFCP - 18 months EVENTS: EVENT TITLE 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 0807 PERFORM 44.040.009 ATWS-SRV LOW LOW SET DIV 1 LOGIC FUNCTIONAL TEST 0808 PERFORM 44.040.010 ATWS-SRV LOW LOW SET DIV 2 LOGIC FUNCTIONAL TEST 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 16 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 30 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.4.1.4.b LOGIC SYSTEM FUNCTIONAL TEST including breaker actuation. b. Reactor Vessel Pressure-High IAW SFCP - 18 months EVENTS: EVENT TITLE 0803 PERFORM 44.040.005 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, CHL ''A'', XMTR CAL 0804 PERFORM 44.040.006 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''B'', XMTR CAL 0805 PERFORM 44.040.007 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, CHL ''C'', XMTR CAL 0806 PERFORM 44.040.008 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''D'', XMTR CAL 0807 PERFORM 44.040.009 ATWS-SRV LOW LOW SET DIV 1 LOGIC FUNCTIONAL TEST 0808 PERFORM 44.040.010 ATWS-SRV LOW LOW SET DIV 2 LOGIC FUNCTIONAL TEST 1803 PERFORM 44.040.005 ATWS/SRV LLS RX PRESS,DIV 1,CHNL A, MTU CAL/FUNC 1804 PERFORM 44.040.006 ATWS/SRV LLS RX PRESS,DIV 2,CHNL B, MTU CAL/FUNC 1805 PERFORM 44.040.007 ATWS/SRV LLS RX PRESS,DIV 1,CHNL C, MTU CAL/FUNC 1806 PERFORM 44.040.008 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''D'', MTU CAL/FUNC SR 3.3.5.1.4-1.a CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Core Spray System a. Reactor Vessel Water IAW SFCP - 18 months Level - Low Low Low Level 1 EVENTS: EVENT TITLE 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 17 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 31 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.4-1.b CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Core Spray System b. Drywell Pressure - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL A,CAL/FUNC 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL B,CAL/FUNC 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL C,CAL/FUNCT 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL D,CAL/FUNC SR 3.3.5.1.4-1.c CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Core Spray System c. Reactor Steam Dome IAW SFCP - 18 months Pressure - Low (Injection Permissive)
| |
| EVENTS: EVENT TITLE 0769 PERFORM 44.030.271 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL A,XMTR CAL 0770 PERFORM 44.030.272 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL B,XMTR CAL 0771 PERFORM 44.030.273 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL C,XMTR CAL 0772 PERFORM 44.030.274 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL D,XMTR CAL 1769 PERFORM 44.030.271 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL A,MTU CAL/FUNC 1770 PERFORM 44.030.272 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL B,MTU CAL/FUNC 1771 PERFORM 44.030.273 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL C,MTU CAL/FUNC 1772 PERFORM 44.030.274 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL D,MTU CAL/FUNC SR 3.3.5.1.4-2.a CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection (LPCI) System a. IAW SFCP - 18 months Reactor Vessel Water Level - Low Low Low Level 1 EVENTS: EVENT TITLE 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 18 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 32 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.4-2.b CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection (LPCI) System b. IAW SFCP - 18 months Drywell Pressure - High EVENTS: EVENT TITLE 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL A,CAL/FUNC 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL B,CAL/FUNC 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL C,CAL/FUNCT 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL D,CAL/FUNC SR 3.3.5.1.4-2.c CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection (LPCI) System c. IAW SFCP - 18 months Reactor Steam Dome Pressure - Low (Injection Permissive)
| |
| EVENTS: EVENT TITLE 0769 PERFORM 44.030.271 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL A,XMTR CAL 0770 PERFORM 44.030.272 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL B,XMTR CAL 0771 PERFORM 44.030.273 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL C,XMTR CAL 0772 PERFORM 44.030.274 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL D,XMTR CAL 1769 PERFORM 44.030.271 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL A,MTU CAL/FUNC 1770 PERFORM 44.030.272 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL B,MTU CAL/FUNC 1771 PERFORM 44.030.273 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL C,MTU CAL/FUNC 1772 PERFORM 44.030.274 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL D,MTU CAL/FUNC SR 3.3.5.1.4-2.d CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection (LPCI) System d. IAW SFCP - 18 months Reactor Vessel Water Level - Low Low Level 2 (Loop Select Logic)
| |
| EVENTS: EVENT TITLE 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 19 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 33 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.4-2.e CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection (LPCI) System e. IAW SFCP - 18 months Reactor Steam Dome Pressure - Low (Break Detection Logic)
| |
| EVENTS: EVENT TITLE 0773 PERFORM 44.030.283 ECCS RX STM DOME PRES RHR LOOP SLCT PERM,D1,CHL A, XMTR CAL 0774 PERFORM 44.030.284 ECCS RX STM DOME PRES RHR LOOP SLCT PERM,DIV 2,CH ''B'',XMTR CAL 0775 PERFORM 44.030.285 ECCS RX STM DOME PRES RHR LOOP SLCT PERM,DIV 1,CH ''C'',XMTR CAL 0776 PERFORM 44.030.286 ECCS RX STM DOME PRES RHR LOOP SLCT PERM,DIV 2,CH ''D'',XMTR CAL 1773 PERFORM 44.030.283 ECCS RX STM DOME PRES RHR LOOP SELECT,D1,CHL A,MTU-CAL/CF 1774 PERFORM 44.030.284 ECCS RX STM DOME PRES RHR LOOP SELECT,D2,CHL B,MTU-CAL/CF 1775 PERFORM 44.030.285 ECCS RX STM DOME PRES RHR LOOP SELECT,D1,CHL C,MTU-CAL/CF 1776 PERFORM 44.030.286 ECCS RX STM DOME PRES RHR LOOP SELECT,D2,CHL D,MTU-CAL/CF SR 3.3.5.1.4-2.f CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection (LPCI) System f. IAW SFCP - 18 months Riser Differential Pressure - High (Break Detection)
| |
| EVENTS: EVENT TITLE 0793 PERFORM 44.030.060 ECCS RX RECIRC RISER DP,DIV 1,CHNL A,CAL/FUNCTIONAL 0794 PERFORM 44.030.061 ECCS RX RECIRC RISER DP,DIV 2,CHNL B,CAL/FUNCTIONAL 0795 PERFORM 44.030.062 ECCS RX RECIRC RISER DP,DIV 1,CHNL C, CALIBRATION/FUNCTIONAL 0796 PERFORM 44.030.063 ECCS RX RECIRC RISER DP,DIV 2,CHNL D,CAL/FUNCTIONAL SR 3.3.5.1.4-2.g CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection (LPCI) System g. IAW SFCP - 18 months Recirculation Pump Differential Pressure - High (Break Detection)
| |
| EVENTS: EVENT TITLE 0797 PERFORM 44.030.072 ECCS RX RECIRC PUMP A DP, DIV 1, CHNL A, CALIBRATION/FUNCT 0798 PERFORM 44.030.073 ECCS RX RECIRC PUMP B DP, DIV 1, CHNL B, CALIBRATION/FUNCT 0799 PERFORM 44.030.074 ECCS RX RECIRC PUMP B DP, DIV 2, CHNL A, CALIBRATION/FUNCT 0800 PERFORM 44.030.075 ECCS RX RECIRC PUMP A DP, DIV 2, CHNL B, CALIBRATION/FUNCT 1797 PERFORM 44.030.076 ECCS RX RECIRC PUMP A DP, DIV 1, CH C, CALIBRATION/FUNCTIONAL 1798 PERFORM 44.030.077 ECCS RX RECIRC PUMP B DP, DIV 1, CH D, CALIBRATION/FUNCTIONAL 1799 PERFORM 44.030.078 ECCS RX RECIRC PUMP B DP, DIV 2, CHNL C, CALIBRATION/FUNCT 1800 PERFORM 44.030.079 ECCS RX RECIRC PUMP A DP, DIV 2, CH D, CALIBRATION/FUNCTIONAL DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 20 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 34 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.4-3.a CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation High Pressure Coolant Injection (HPCI) System a. IAW SFCP - 18 months Reactor Vessel Water Level Low Low, Level 2 EVENTS: EVENT TITLE 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION SR 3.3.5.1.4-3.b CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation High Pressure Coolant Injection (HPCI) System b. IAW SFCP - 18 months Drywell Pressure High EVENTS: EVENT TITLE 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL A,CAL/FUNC 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL B,CAL/FUNC 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL C,CAL/FUNCT 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL D,CAL/FUNC SR 3.3.5.1.4-3.c CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation High Pressure Coolant Injection (HPCI) System c. IAW SFCP - 18 months Reactor Vessel Water Level High, Level 8 EVENTS: EVENT TITLE 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 21 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 35 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.4-3.d CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation High Pressure Coolant Injection (HPCI) System d. IAW SFCP - 18 months Condensate Storage Tank Level Low EVENTS: EVENT TITLE 0645 PERFORM 44.030.400 ECCS HPCI/RCIC CST LEVEL, E41N061B, CALIBRATION/FUNCTIONAL 1645 PERFORM 44.030.401 ECCS HPCI/RCIC CST LEVEL, E41N061D, CALIBRATION/FUNCTIONAL SR 3.3.5.1.4-3.e CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation High Pressure Coolant Injection (HPCI) System e. IAW SFCP - 18 months Suppression Pool Water Level High EVENTS: EVENT TITLE 0646 PERFORM 44.030.156 ECCS HPCI TORUS LEVEL CALIBRATION - Div 1 areas 0646D2 PERFORM 44.030.156 ECCS HPCI TORUS LEVEL CALIBRATION - Div 2 area SR 3.3.5.1.4-4.a CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Automatic Depressurization System (ADS) Trip IAW SFCP - 18 months System A a. Reactor Vessel Water Level - Low Low Low, Level 1 EVENTS: EVENT TITLE 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL SR 3.3.5.1.4-4.b CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Automatic Depressurization System (ADS) Trip IAW SFCP - 18 months System A b. Drywell Pressure - High EVENTS: EVENT TITLE 0777 PERFORM 44.030.295 ECCS DW PRESSURE ADS ACTUATION,DIV 1,CHNL A,CALIBRATION/FUNC 0779 PERFORM 44.030.297 ECCS DW PRESSURE ADS ACTUATION,DIV 1,CHNL C,CALIBRATION/FUNC SR 3.3.5.1.4-4.d CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Automatic Depressurization System (ADS) Trip IAW SFCP - 18 months System A d. Reactor Vessel Water Level - Low, Level 3 (Confirmatory)
| |
| EVENTS: EVENT TITLE 0765 PERFORM 44.030.265 ECCS RX WTR LVL (ADS LVL3 & FW/MN TURB LVL8)D1,CH A,XMTR CAL 1765 PERFORM 44.030.265 ECCS RX WTR LVL (ADS LVL3-FW/MN TURB LVL8)D1,CH A,MTU CAL/CF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 22 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 36 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.4-4.e CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Automatic Depressurization System (ADS) Trip IAW SFCP - 18 months System A e. Core Spray Pump Discharge Pressure - High EVENTS: EVENT TITLE 0649 PERFORM 44.030.209 ECCS CSS PUMP C DISCH PRESS, TRIP SYS A, ADS PERMIT, CAL/FUNC 0651 PERFORM 44.030.211 ECCS CSS PUMP A DISCH PRESS, TRIP SYS A, ADS PERMIT,CAL/FUNC SR 3.3.5.1.4-4.f CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Automatic Depressurization System (ADS) Trip IAW SFCP - 18 months System A f. Low Pressure Coolant Injection Pump Discharge Pressure - High EVENTS: EVENT TITLE 0657 PERFORM 44.030.217 ECCS RHR PUMP A DISCH PRESS (ADS PERMIT) CAL/FUNC.
| |
| 0659 PERFORM 44.030.219 ECCS RHR PUMP C DISCH PRESS (ADS PERMIT) CAL/FUNC.
| |
| SR 3.3.5.1.4-5.a CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Automatic Depressurization System (ADS) Trip IAW SFCP - 18 months System B a. Reactor Vessel Water Level - Low Low Low, Level 1 EVENTS: EVENT TITLE 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION SR 3.3.5.1.4-5.b CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Automatic Depressurization System (ADS) Trip IAW SFCP - 18 months System B b. Drywell Pressure - High EVENTS: EVENT TITLE 0778 PERFORM 44.030.296 ECCS DW PRESSURE ADS ACTUATION,DIV 2,CHNL B,CALIBRATION/FUNC 0780 PERFORM 44.030.298 ECCS DW PRESSURE ADS ACTUATION,DIV 2,CHNL D,CALIBRATION/FUNC SR 3.3.5.1.4-5.d CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Automatic Depressurization System (ADS) Trip IAW SFCP - 18 months System B d. Reactor Vessel Water Level - Low, Level 3 (Confirmatory)
| |
| EVENTS: EVENT TITLE 0766 PERFORM 44.030.266 ECCS RX WTR LVL (ADS LVL3 & FW/MN TURB LVL8)D2,CH B,XMTR CAL 1766 PERFORM 44.030.266 ECCS RX WTR LVL (ADS LVL3-FW/MN TURB LVL8)D2,CH B,MTU CAL/CF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 23 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 37 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.4-5.e CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Automatic Depressurization System (ADS) Trip IAW SFCP - 18 months System B e. Core Spray Pump Discharge Pressure - High EVENTS: EVENT TITLE 0650 PERFORM 44.030.210 ECCS CSS PUMP D DISCH PRESS, TRIP SYS B, ADS PERMIT, CAL/FUNC 0652 PERFORM 44.030.212 ECCS CSS PUMP B DISCH PRESS, TRIP SYS B, (ADS PERMIT),CAL/FUNC SR 3.3.5.1.4-5.f CHANNEL CALIBRATION Emergency Core Cooling System Instrumentation Automatic Depressurization System (ADS) Trip IAW SFCP - 18 months System B f. Low Pressure Coolant Injection Pump Discharge Pressure - High EVENTS: EVENT TITLE 0658 PERFORM 44.030.218 ECCS RHR PUMP B DISCH PRESS (ADS PERMIT) CAL/FUNC.
| |
| 0670 PERFORM 44.030.220 ECCS RHR PUMP D DISCH PRESS(ADS PERMIT) DIV 2, CAL/FUNC.
| |
| DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 24 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 38 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-1.a LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Core Spray System a. Reactor Vessel IAW SFCP - 18 months Water Level - Low Low Low, Level 1 EVENTS: EVENT TITLE 0213 PERFORM 42.302.02 DIV 1 BUS 64B/11EA 4160V UNDERVOLTAGE LOGIC FUNCTIONAL 0257 PERFORM 24.203.02 SEC-5.3 DIVISION 1 CSS SIM AUTO ACT -E2150F005A ONLY 0258 PERFORM 24.203.03 SEC-5.3 DIVISION 2 CSS SIM AUTO ACT - E2150F005B ONLY 0281 PERFORM 24.307.01 SECT 5.2 EDG 11 ECCS START WITH LOSS OF OFFSITE POWER TEST 0282 PERFORM 24.307.02 SECT 5.2 EDG 12 ECCS START WITH LOSS OF OFFSITE POWER TEST 0283 PERFORM 24.307.03 SECT 5.2 EDG 13 ECCS START WITH LOSS OF OFFSITE POWER TEST 0284 PERFORM 24.307.04 SECT 5.2 EDG 14 ECCS START WITH LOSS OF OFFSITE POWER TEST 0640 PERFORM 44.030.001 ECCS - CORE SPRAY SYSTEM, DIV 1, LOGIC FUNCTIONAL TEST 0641 PERFORM 44.030.002 ECCS - CORE SPRAY SYSTEM, DIV 2, LOGIC FUNCTIONAL TEST 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1079 PERFORM 42.302.04 DIV 2 BUS 65E/13EC 4160V UNDERVOLTAGE LOGIC FUNCTIONAL 1087 PERFORM 42.302.05 DIV 1 BUS 64C/12EB 4160V UNDERVOLTAGE LOGIC FUNCTIONAL 1088 PERFORM 42.302.06 DIV 2 BUS 65F/14ED 4160V UNDERVOLTAGE LOGIC FUNCTIONAL 1290 PERFORM 42.307.01 DIV 1 EDG ECCS EMERG START CIRCUITS & AUTO TRIP/BYPASS,LF 1291 PERFORM 42.307.02 DIV 2 EDG ECCS EMERG START CIRCUITS & AUTO TRIP/BYPASS, LF 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION 2257 PERFORM 24.203.02 SEC-5.2 DIVISION 1 CSS SIMULATED AUTOMATIC ACTUATION TEST 2258 PERFORM 24.203.03 SEC-5.2 DIVISION 2 CSS SIMULATED AUTOMATIC ACTUATION TEST 2281 PERFORM 24.307.01 SECT 5.1 EDG 11 LOSS OF OFFSITE POWER TEST 2282 PERFORM 24.307.02 SECT 5.1 EDG 12 LOSS OF OFFSITE POWER TEST 2283 PERFORM 24.307.03 SECT 5.1 EDG 13 LOSS OF OFFSITE POWER TEST 2284 PERFORM 24.307.04 SECT 5.1 EDG 14 LOSS OF OFFSITE POWER TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 25 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 39 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-1.b LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Core Spray System b. Drywell IAW SFCP - 18 months Pressure - High EVENTS: EVENT TITLE 0213 PERFORM 42.302.02 DIV 1 BUS 64B/11EA 4160V UNDERVOLTAGE LOGIC FUNCTIONAL 0257 PERFORM 24.203.02 SEC-5.3 DIVISION 1 CSS SIM AUTO ACT -E2150F005A ONLY 0258 PERFORM 24.203.03 SEC-5.3 DIVISION 2 CSS SIM AUTO ACT - E2150F005B ONLY 0277 PERFORM 24.207.06 DIV. 1 EECW/EESW ACTUATION FUNCTIONAL TEST 0278 PERFORM 24.207.07 DIV. 2 EECW/EESW ACTUATION FUNCTIONAL TEST 0281 PERFORM 24.307.01 SECT 5.2 EDG 11 ECCS START WITH LOSS OF OFFSITE POWER TEST 0282 PERFORM 24.307.02 SECT 5.2 EDG 12 ECCS START WITH LOSS OF OFFSITE POWER TEST 0283 PERFORM 24.307.03 SECT 5.2 EDG 13 ECCS START WITH LOSS OF OFFSITE POWER TEST 0284 PERFORM 24.307.04 SECT 5.2 EDG 14 ECCS START WITH LOSS OF OFFSITE POWER TEST 0640 PERFORM 44.030.001 ECCS - CORE SPRAY SYSTEM, DIV 1, LOGIC FUNCTIONAL TEST 0641 PERFORM 44.030.002 ECCS - CORE SPRAY SYSTEM, DIV 2, LOGIC FUNCTIONAL TEST 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL A,CAL/FUNC 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL B,CAL/FUNC 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL C,CAL/FUNCT 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL D,CAL/FUNC 1079 PERFORM 42.302.04 DIV 2 BUS 65E/13EC 4160V UNDERVOLTAGE LOGIC FUNCTIONAL 1087 PERFORM 42.302.05 DIV 1 BUS 64C/12EB 4160V UNDERVOLTAGE LOGIC FUNCTIONAL 1088 PERFORM 42.302.06 DIV 2 BUS 65F/14ED 4160V UNDERVOLTAGE LOGIC FUNCTIONAL 1290 PERFORM 42.307.01 DIV 1 EDG ECCS EMERG START CIRCUITS & AUTO TRIP/BYPASS,LF 1291 PERFORM 42.307.02 DIV 2 EDG ECCS EMERG START CIRCUITS & AUTO TRIP/BYPASS, LF 2257 PERFORM 24.203.02 SEC-5.2 DIVISION 1 CSS SIMULATED AUTOMATIC ACTUATION TEST 2258 PERFORM 24.203.03 SEC-5.2 DIVISION 2 CSS SIMULATED AUTOMATIC ACTUATION TEST 2281 PERFORM 24.307.01 SECT 5.1 EDG 11 LOSS OF OFFSITE POWER TEST 2282 PERFORM 24.307.02 SECT 5.1 EDG 12 LOSS OF OFFSITE POWER TEST 2283 PERFORM 24.307.03 SECT 5.1 EDG 13 LOSS OF OFFSITE POWER TEST 2284 PERFORM 24.307.04 SECT 5.1 EDG 14 LOSS OF OFFSITE POWER TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 26 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 40 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-1.c LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Core Spray System c. Reactor Steam IAW SFCP - 18 months Dome Pressure - Low (Injection Permissive)
| |
| EVENTS: EVENT TITLE 0640 PERFORM 44.030.001 ECCS - CORE SPRAY SYSTEM, DIV 1, LOGIC FUNCTIONAL TEST 0641 PERFORM 44.030.002 ECCS - CORE SPRAY SYSTEM, DIV 2, LOGIC FUNCTIONAL TEST 0769 PERFORM 44.030.271 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL A,XMTR CAL 0770 PERFORM 44.030.272 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL B,XMTR CAL 0771 PERFORM 44.030.273 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL C,XMTR CAL 0772 PERFORM 44.030.274 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL D,XMTR CAL 1769 PERFORM 44.030.271 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL A,MTU CAL/FUNC 1770 PERFORM 44.030.272 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL B,MTU CAL/FUNC 1771 PERFORM 44.030.273 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL C,MTU CAL/FUNC 1772 PERFORM 44.030.274 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL D,MTU CAL/FUNC SR 3.3.5.1.5-2.a LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection IAW SFCP - 18 months (LPCI) System a. Reactor Vessel Water Level - Low Low Low, Level 1 EVENTS: EVENT TITLE 0263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACTUATION TEST & VALVE OPER TEST 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 0791 PERFORM 44.030.051 ECCS-RHR (LPCI MODE) DIV 1, LOGIC FUNCTIONAL TEST 0792 PERFORM 44.030.052 ECCS-RHR (LPCI MODE) DIV 2, LOGIC FUNCT TEST & VLV ACTUATION 1263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACT. TEST (RHR Pump's & Vlv's) 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 27 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 41 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-2.b LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection IAW SFCP - 18 months (LPCI) System b. Drywell Pressure - High EVENTS: EVENT TITLE 0263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACTUATION TEST & VALVE OPER TEST 0277 PERFORM 24.207.06 DIV. 1 EECW/EESW ACTUATION FUNCTIONAL TEST 0278 PERFORM 24.207.07 DIV. 2 EECW/EESW ACTUATION FUNCTIONAL TEST 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL A,CAL/FUNC 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL B,CAL/FUNC 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL C,CAL/FUNCT 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL D,CAL/FUNC 0791 PERFORM 44.030.051 ECCS-RHR (LPCI MODE) DIV 1, LOGIC FUNCTIONAL TEST 0792 PERFORM 44.030.052 ECCS-RHR (LPCI MODE) DIV 2, LOGIC FUNCT TEST & VLV ACTUATION 1263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACT. TEST (RHR Pump's & Vlv's)
| |
| SR 3.3.5.1.5-2.c LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection IAW SFCP - 18 months (LPCI) System c. Reactor Steam Dome Pressure - Low (Injection Permissive)
| |
| EVENTS: EVENT TITLE 0263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACTUATION TEST & VALVE OPER TEST 0769 PERFORM 44.030.271 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL A,XMTR CAL 0770 PERFORM 44.030.272 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL B,XMTR CAL 0771 PERFORM 44.030.273 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL C,XMTR CAL 0772 PERFORM 44.030.274 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL D,XMTR CAL 0791 PERFORM 44.030.051 ECCS-RHR (LPCI MODE) DIV 1, LOGIC FUNCTIONAL TEST 0792 PERFORM 44.030.052 ECCS-RHR (LPCI MODE) DIV 2, LOGIC FUNCT TEST & VLV ACTUATION 1263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACT. TEST (RHR Pump's & Vlv's) 1769 PERFORM 44.030.271 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL A,MTU CAL/FUNC 1770 PERFORM 44.030.272 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL B,MTU CAL/FUNC 1771 PERFORM 44.030.273 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL C,MTU CAL/FUNC 1772 PERFORM 44.030.274 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL D,MTU CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 28 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 42 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-2.d LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection IAW SFCP - 18 months (LPCI) System d. Reactor Vessel Water Level - Low Low, Level 2 (Loop Select Logic)
| |
| EVENTS: EVENT TITLE 0263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACTUATION TEST & VALVE OPER TEST 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 0791 PERFORM 44.030.051 ECCS-RHR (LPCI MODE) DIV 1, LOGIC FUNCTIONAL TEST 0792 PERFORM 44.030.052 ECCS-RHR (LPCI MODE) DIV 2, LOGIC FUNCT TEST & VLV ACTUATION 1263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACT. TEST (RHR Pump's & Vlv's) 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 29 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 43 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-2.e LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection IAW SFCP - 18 months (LPCI) System e. Reactor Steam Dome Pressure - Low (Break Detection Logic)
| |
| EVENTS: EVENT TITLE 0263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACTUATION TEST & VALVE OPER TEST 0773 PERFORM 44.030.283 ECCS RX STM DOME PRES RHR LOOP SLCT PERM,D1,CHL A, XMTR CAL 0774 PERFORM 44.030.284 ECCS RX STM DOME PRES RHR LOOP SLCT PERM,DIV 2,CH ''B'',XMTR CAL 0775 PERFORM 44.030.285 ECCS RX STM DOME PRES RHR LOOP SLCT PERM,DIV 1,CH ''C'',XMTR CAL 0776 PERFORM 44.030.286 ECCS RX STM DOME PRES RHR LOOP SLCT PERM,DIV 2,CH ''D'',XMTR CAL 0791 PERFORM 44.030.051 ECCS-RHR (LPCI MODE) DIV 1, LOGIC FUNCTIONAL TEST 0792 PERFORM 44.030.052 ECCS-RHR (LPCI MODE) DIV 2, LOGIC FUNCT TEST & VLV ACTUATION 1263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACT. TEST (RHR Pump's & Vlv's) 1773 PERFORM 44.030.283 ECCS RX STM DOME PRES RHR LOOP SELECT,D1,CHL A,MTU-CAL/CF 1774 PERFORM 44.030.284 ECCS RX STM DOME PRES RHR LOOP SELECT,D2,CHL B,MTU-CAL/CF 1775 PERFORM 44.030.285 ECCS RX STM DOME PRES RHR LOOP SELECT,D1,CHL C,MTU-CAL/CF 1776 PERFORM 44.030.286 ECCS RX STM DOME PRES RHR LOOP SELECT,D2,CHL D,MTU-CAL/CF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 30 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 44 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-2.f LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection IAW SFCP - 18 months (LPCI) System f. Riser Differential Pressure - High (Break Detection)
| |
| EVENTS: EVENT TITLE 0263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACTUATION TEST & VALVE OPER TEST 0777 PERFORM 44.030.295 ECCS DW PRESSURE ADS ACTUATION,DIV 1,CHNL A,CALIBRATION/FUNC 0778 PERFORM 44.030.296 ECCS DW PRESSURE ADS ACTUATION,DIV 2,CHNL B,CALIBRATION/FUNC 0779 PERFORM 44.030.297 ECCS DW PRESSURE ADS ACTUATION,DIV 1,CHNL C,CALIBRATION/FUNC 0780 PERFORM 44.030.298 ECCS DW PRESSURE ADS ACTUATION,DIV 2,CHNL D,CALIBRATION/FUNC 0791 PERFORM 44.030.051 ECCS-RHR (LPCI MODE) DIV 1, LOGIC FUNCTIONAL TEST 0792 PERFORM 44.030.052 ECCS-RHR (LPCI MODE) DIV 2, LOGIC FUNCT TEST & VLV ACTUATION 0793 PERFORM 44.030.060 ECCS RX RECIRC RISER DP,DIV 1,CHNL A,CAL/FUNCTIONAL 0794 PERFORM 44.030.061 ECCS RX RECIRC RISER DP,DIV 2,CHNL B,CAL/FUNCTIONAL 0795 PERFORM 44.030.062 ECCS RX RECIRC RISER DP,DIV 1,CHNL C, CALIBRATION/FUNCTIONAL 0796 PERFORM 44.030.063 ECCS RX RECIRC RISER DP,DIV 2,CHNL D,CAL/FUNCTIONAL 1263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACT. TEST (RHR Pump's & Vlv's)
| |
| DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 31 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 45 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-2.g LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection IAW SFCP - 18 months (LPCI) System g. Recirculation Pump Differential Pressure - High (Break Detection)
| |
| EVENTS: EVENT TITLE 0263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACTUATION TEST & VALVE OPER TEST 0791 PERFORM 44.030.051 ECCS-RHR (LPCI MODE) DIV 1, LOGIC FUNCTIONAL TEST 0792 PERFORM 44.030.052 ECCS-RHR (LPCI MODE) DIV 2, LOGIC FUNCT TEST & VLV ACTUATION 0797 PERFORM 44.030.072 ECCS RX RECIRC PUMP A DP, DIV 1, CHNL A, CALIBRATION/FUNCT 0798 PERFORM 44.030.073 ECCS RX RECIRC PUMP B DP, DIV 1, CHNL B, CALIBRATION/FUNCT 0799 PERFORM 44.030.074 ECCS RX RECIRC PUMP B DP, DIV 2, CHNL A, CALIBRATION/FUNCT 0800 PERFORM 44.030.075 ECCS RX RECIRC PUMP A DP, DIV 2, CHNL B, CALIBRATION/FUNCT 1263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACT. TEST (RHR Pump's & Vlv's) 1797 PERFORM 44.030.076 ECCS RX RECIRC PUMP A DP, DIV 1, CH C, CALIBRATION/FUNCTIONAL 1798 PERFORM 44.030.077 ECCS RX RECIRC PUMP B DP, DIV 1, CH D, CALIBRATION/FUNCTIONAL 1799 PERFORM 44.030.078 ECCS RX RECIRC PUMP B DP, DIV 2, CHNL C, CALIBRATION/FUNCT 1800 PERFORM 44.030.079 ECCS RX RECIRC PUMP A DP, DIV 2, CH D, CALIBRATION/FUNCTIONAL SR 3.3.5.1.5-3.a LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation High Pressure Coolant Injection IAW SFCP - 18 months (HPCI) System a. Reactor Vessel Water Level - Low Low, Level 2 EVENTS: EVENT TITLE 0253 PERFORM 24.202.04 HPCI OFFLINE AUTO INITIATION AND TIME RESPONSE TEST 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1100 PERFORM 24.202.08 SEC-5.1 (Wtr Lvl) HPCI RTT & PUMP OPERABILITY AT 1025 PSIG 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION 2100 PERFORM 24.202.08 SEC-5.2 (Dw Press) HPCI LSFT & PUMP OPERABILITY AT 1025 PSIG DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 32 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 46 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-3.b LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation High Pressure Coolant Injection IAW SFCP - 18 months (HPCI) System b. Drywell Pressure - High EVENTS: EVENT TITLE 0253 PERFORM 24.202.04 HPCI OFFLINE AUTO INITIATION AND TIME RESPONSE TEST 0277 PERFORM 24.207.06 DIV. 1 EECW/EESW ACTUATION FUNCTIONAL TEST 0278 PERFORM 24.207.07 DIV. 2 EECW/EESW ACTUATION FUNCTIONAL TEST 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL A,CAL/FUNC 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL B,CAL/FUNC 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL C,CAL/FUNCT 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL D,CAL/FUNC 1100 PERFORM 24.202.08 SEC-5.1 (Wtr Lvl) HPCI RTT & PUMP OPERABILITY AT 1025 PSIG 2100 PERFORM 24.202.08 SEC-5.2 (Dw Press) HPCI LSFT & PUMP OPERABILITY AT 1025 PSIG SR 3.3.5.1.5-3.c LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation High Pressure Coolant Injection IAW SFCP - 18 months (HPCI) System c. Reactor Vessel Water Level High, Level 8 EVENTS: EVENT TITLE 0253 PERFORM 24.202.04 HPCI OFFLINE AUTO INITIATION AND TIME RESPONSE TEST 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 33 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 47 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-3.d LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation High Pressure Coolant Injection IAW SFCP - 18 months (HPCI) System d. Condensate Storage Tank Level Low EVENTS: EVENT TITLE 0645 PERFORM 44.030.400 ECCS HPCI/RCIC CST LEVEL, E41N061B, CALIBRATION/FUNCTIONAL 1645 PERFORM 44.030.401 ECCS HPCI/RCIC CST LEVEL, E41N061D, CALIBRATION/FUNCTIONAL 1646 PERFORM 44.030.402 HPCI SYSTEM CST/TORUS VALVES INTERLOCK TEST SR 3.3.5.1.5-3.e LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation High Pressure Coolant Injection IAW SFCP - 18 months (HPCI) System e. Suppression Pool Water Level High EVENTS: EVENT TITLE 0646 PERFORM 44.030.156 ECCS HPCI TORUS LEVEL CALIBRATION - Div 1 areas 0646D2 PERFORM 44.030.156 ECCS HPCI TORUS LEVEL CALIBRATION - Div 2 area 1646 PERFORM 44.030.402 HPCI SYSTEM CST/TORUS VALVES INTERLOCK TEST SR 3.3.5.1.5-4.a LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System A a. Reactor Vessel Water Level - Low Low Low, Level 1 EVENTS: EVENT TITLE 0647 PERFORM 44.030.201 ECCS - ADS,TRIP SYS A LOGIC FUNCTIONAL TEST 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 34 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 48 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-4.b LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System A b. Drywell Pressure - High EVENTS: EVENT TITLE 0277 PERFORM 24.207.06 DIV. 1 EECW/EESW ACTUATION FUNCTIONAL TEST 0278 PERFORM 24.207.07 DIV. 2 EECW/EESW ACTUATION FUNCTIONAL TEST 0647 PERFORM 44.030.201 ECCS - ADS,TRIP SYS A LOGIC FUNCTIONAL TEST 0777 PERFORM 44.030.295 ECCS DW PRESSURE ADS ACTUATION,DIV 1,CHNL A,CALIBRATION/FUNC 0779 PERFORM 44.030.297 ECCS DW PRESSURE ADS ACTUATION,DIV 1,CHNL C,CALIBRATION/FUNC 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.5-4.c LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System A c. Automatic Depressurization System Initiation Timer EVENTS: EVENT TITLE 0647 PERFORM 44.030.201 ECCS - ADS,TRIP SYS A LOGIC FUNCTIONAL TEST 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.5-4.d LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System A d. Reactor Vessel Level - Low, Level 3 (Confirmatory)
| |
| EVENTS: EVENT TITLE 0647 PERFORM 44.030.201 ECCS - ADS,TRIP SYS A LOGIC FUNCTIONAL TEST 0765 PERFORM 44.030.265 ECCS RX WTR LVL (ADS LVL3 & FW/MN TURB LVL8)D1,CH A,XMTR CAL 1765 PERFORM 44.030.265 ECCS RX WTR LVL (ADS LVL3-FW/MN TURB LVL8)D1,CH A,MTU CAL/CF 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 35 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 49 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-4.e LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System A e. Core Spray Pump Discharge Pressure - High EVENTS: EVENT TITLE 0647 PERFORM 44.030.201 ECCS - ADS,TRIP SYS A LOGIC FUNCTIONAL TEST 0649 PERFORM 44.030.209 ECCS CSS PUMP C DISCH PRESS, TRIP SYS A, ADS PERMIT, CAL/FUNC 0651 PERFORM 44.030.211 ECCS CSS PUMP A DISCH PRESS, TRIP SYS A, ADS PERMIT,CAL/FUNC 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.5-4.f LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System A f. Low Pressure Coolant Injection Pump Discharge Pressure - High EVENTS: EVENT TITLE 0647 PERFORM 44.030.201 ECCS - ADS,TRIP SYS A LOGIC FUNCTIONAL TEST 0657 PERFORM 44.030.217 ECCS RHR PUMP A DISCH PRESS (ADS PERMIT) CAL/FUNC.
| |
| 0659 PERFORM 44.030.219 ECCS RHR PUMP C DISCH PRESS (ADS PERMIT) CAL/FUNC.
| |
| 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.5-4.g LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System A g. Drywell Pressure - High Bypass EVENTS: EVENT TITLE 0647 PERFORM 44.030.201 ECCS - ADS,TRIP SYS A LOGIC FUNCTIONAL TEST 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.5-4.h LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System A h. Manual Inhibit EVENTS: EVENT TITLE 0647 PERFORM 44.030.201 ECCS - ADS,TRIP SYS A LOGIC FUNCTIONAL TEST 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 36 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 50 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-5.a LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System B a. Reactor Vessel Water Level - Low Low Low, Level 1 EVENTS: EVENT TITLE 0648 PERFORM 44.030.202 ECCS - ADS,TRIP SYS B LOGIC FUNCTIONAL TEST 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.5-5.b LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System B b. Drywell Pressure - High EVENTS: EVENT TITLE 0277 PERFORM 24.207.06 DIV. 1 EECW/EESW ACTUATION FUNCTIONAL TEST 0278 PERFORM 24.207.07 DIV. 2 EECW/EESW ACTUATION FUNCTIONAL TEST 0648 PERFORM 44.030.202 ECCS - ADS,TRIP SYS B LOGIC FUNCTIONAL TEST 0778 PERFORM 44.030.296 ECCS DW PRESSURE ADS ACTUATION,DIV 2,CHNL B,CALIBRATION/FUNC 0780 PERFORM 44.030.298 ECCS DW PRESSURE ADS ACTUATION,DIV 2,CHNL D,CALIBRATION/FUNC 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.5-5.c LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System B c. Automatic Depressurization System Initiation Timer EVENTS: EVENT TITLE 0648 PERFORM 44.030.202 ECCS - ADS,TRIP SYS B LOGIC FUNCTIONAL TEST 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 37 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 51 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-5.d LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System B d. Reactor Vessel Level - Low, Level 3 (Confirmatory)
| |
| EVENTS: EVENT TITLE 0648 PERFORM 44.030.202 ECCS - ADS,TRIP SYS B LOGIC FUNCTIONAL TEST 0766 PERFORM 44.030.266 ECCS RX WTR LVL (ADS LVL3 & FW/MN TURB LVL8)D2,CH B,XMTR CAL 1766 PERFORM 44.030.266 ECCS RX WTR LVL (ADS LVL3-FW/MN TURB LVL8)D2,CH B,MTU CAL/CF 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.5-5.e LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System B e. Core Spray Pump Discharge Pressure - High EVENTS: EVENT TITLE 0648 PERFORM 44.030.202 ECCS - ADS,TRIP SYS B LOGIC FUNCTIONAL TEST 0650 PERFORM 44.030.210 ECCS CSS PUMP D DISCH PRESS, TRIP SYS B, ADS PERMIT, CAL/FUNC 0652 PERFORM 44.030.212 ECCS CSS PUMP B DISCH PRESS, TRIP SYS B, (ADS PERMIT),CAL/FUNC 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.5-5.f LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System B f. Low Pressure Coolant Injection Pump Discharge Pressure - High EVENTS: EVENT TITLE 0648 PERFORM 44.030.202 ECCS - ADS,TRIP SYS B LOGIC FUNCTIONAL TEST 0658 PERFORM 44.030.218 ECCS RHR PUMP B DISCH PRESS (ADS PERMIT) CAL/FUNC.
| |
| 0670 PERFORM 44.030.220 ECCS RHR PUMP D DISCH PRESS(ADS PERMIT) DIV 2, CAL/FUNC.
| |
| 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 38 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 52 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.5-5.g LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System B g. Drywell Pressure - High Bypass EVENTS: EVENT TITLE 0648 PERFORM 44.030.202 ECCS - ADS,TRIP SYS B LOGIC FUNCTIONAL TEST 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.5-5.h LOGIC SYSTEM FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System IAW SFCP - 18 months (ADS) Trip System B h. Manual Inhibit EVENTS: EVENT TITLE 0648 PERFORM 44.030.202 ECCS - ADS,TRIP SYS B LOGIC FUNCTIONAL TEST 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.6-1.d CHANNEL FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Core Spray System d. Manual Initiation IAW SFCP - 18 months EVENTS: EVENT TITLE 0260 PERFORM 24.203.04 SEC-5.3 DIV.1 CSS LOCAL VALVE POSITION INDICATION VERIF.
| |
| 1260 PERFORM 24.203.04 SEC-5.4 DIV.2 CSS LOCAL VALVE POSITION INDICATION VERIF.
| |
| 2257 PERFORM 24.203.02 SEC-5.2 DIVISION 1 CSS SIMULATED AUTOMATIC ACTUATION TEST 2258 PERFORM 24.203.03 SEC-5.2 DIVISION 2 CSS SIMULATED AUTOMATIC ACTUATION TEST 3293 PERFORM 43.401.711 DIV 1 CORE SPRAY INJECTION CHECK VALVE EXERCISE TEST 3294 PERFORM 43.401.712 DIV 2 CORE SPRAY INJECTION CHECK VALVE EXERCISE TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 39 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 53 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.1.6-2.h CHANNEL FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Low Pressure Coolant Injection (LPCI) IAW SFCP - 18 months System h. Manual Initiation EVENTS: EVENT TITLE 0244 PERFORM 24.138.02 SEC-5.2 RX RECIRC LOCAL VALVE POSITION VERIFICATION TEST 0265 PERFORM 24.204.05 SEC-5.1 DIV. 1 RHR LOCAL VALVE POSITION INDICATION & STROKE 1134 PERFORM 24.204.05 SEC-5.3 DIV. 2 RHR LOCAL VALVE POSITION INDICATION & STROKE 1135 PERFORM 24.204.08 NON-DIVISIONAL RHR VALVE POSITION & STROKE TIME TEST 1265 PERFORM 24.204.05 SEC-5.2 DIV 1 RHR LOCAL VALVE POSITION INDICATION VERIF.
| |
| 1266 PERFORM 24.204.05 SEC-5.4 DIV 2 RHR LOCAL VALVE POSITION INDICATION VERIF.
| |
| SR 3.3.5.1.6-3.f CHANNEL FUNCTIONAL TEST Emergency Core Cooling System Instrumentation High Pressure Coolant Injection (HPCI) IAW SFCP - 18 months System f. Manual Initiation EVENTS: EVENT TITLE 0255 PERFORM 24.202.05 SEC-5.2 & 5.3 HPCI LOCAL VALVE POS INDICATION VERIF & LSFT SR 3.3.5.1.6-4.i CHANNEL FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System (ADS) IAW SFCP - 18 months Trip System A i. Manual Initiation EVENTS: EVENT TITLE 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.6-5.i CHANNEL FUNCTIONAL TEST Emergency Core Cooling System Instrumentation Automatic Depressurization System (ADS) IAW SFCP - 18 months Trip System B i. Manual Initiation EVENTS: EVENT TITLE 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 40 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 54 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.2.4-1 CHANNEL CALIBRATION Reactor Core Isolation Cooling System Instrumentation 1. Reactor Vessel Water Level Low Low, IAW SFCP - 18 months Level 2 EVENTS: EVENT TITLE 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION SR 3.3.5.2.4-2 CHANNEL CALIBRATION Reactor Core Isolation Cooling System Instrumentation 2. Reactor Vessel Water Level High, IAW SFCP - 18 months Level 8 EVENTS: EVENT TITLE 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL SR 3.3.5.2.4-3 CHANNEL CALIBRATION Reactor Core Isolation Cooling System Instrumentation 3. Condensate Storage Tank Level Low IAW SFCP - 18 months EVENTS: EVENT TITLE 0645 PERFORM 44.030.400 ECCS HPCI/RCIC CST LEVEL, E41N061B, CALIBRATION/FUNCTIONAL 1645 PERFORM 44.030.401 ECCS HPCI/RCIC CST LEVEL, E41N061D, CALIBRATION/FUNCTIONAL DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 41 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 55 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.2.5-1 LOGIC SYSTEM FUNCTIONAL TEST Reactor Core Isolation Cooling System Instrumentation 1. Reactor Vessel Water IAW SFCP - 18 months Level Low Low, Level 2 EVENTS: EVENT TITLE 0272 PERFORM 24.206.02 SEC-5.2 RCIC VAL POS INDICATION VERIF. / MANUAL INITIATE 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION 2809 PERFORM 44.060.002 RCIC SYSTEM LOGIC FUNCTIONAL TEST - ONLINE SR 3.3.5.2.5-2 LOGIC SYSTEM FUNCTIONAL TEST Reactor Core Isolation Cooling System Instrumentation 2. Reactor Vessel Water IAW SFCP - 18 months Level High, Level 8 EVENTS: EVENT TITLE 0272 PERFORM 24.206.02 SEC-5.2 RCIC VAL POS INDICATION VERIF. / MANUAL INITIATE 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 2809 PERFORM 44.060.002 RCIC SYSTEM LOGIC FUNCTIONAL TEST - ONLINE SR 3.3.5.2.5-3 LOGIC SYSTEM FUNCTIONAL TEST Reactor Core Isolation Cooling System Instrumentation 3. Condensate Storage Tank IAW SFCP - 18 months Level Low EVENTS: EVENT TITLE 0272 PERFORM 24.206.02 SEC-5.2 RCIC VAL POS INDICATION VERIF. / MANUAL INITIATE 0645 PERFORM 44.030.400 ECCS HPCI/RCIC CST LEVEL, E41N061B, CALIBRATION/FUNCTIONAL 1645 PERFORM 44.030.401 ECCS HPCI/RCIC CST LEVEL, E41N061D, CALIBRATION/FUNCTIONAL 2809 PERFORM 44.060.002 RCIC SYSTEM LOGIC FUNCTIONAL TEST - ONLINE DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 42 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 56 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.5.2.6-4 CHANNEL FUNCTIONAL TEST Reactor Core Isolation Cooling System Instrumentation 4. Manual Initiation IAW SFCP - 18 months EVENTS: EVENT TITLE 0272 PERFORM 24.206.02 SEC-5.2 RCIC VAL POS INDICATION VERIF. / MANUAL INITIATE SR 3.3.5.3.3-1.b CHANNEL FUNCTIONAL TEST RPV Water Inventory Control Instrumentation Core Spray System b. Manual Initiation IAW SFCP - 18 months EVENTS: EVENT TITLE 0260 PERFORM 24.203.04 SEC-5.3 DIV.1 CSS LOCAL VALVE POSITION INDICATION VERIF.
| |
| 1260 PERFORM 24.203.04 SEC-5.4 DIV.2 CSS LOCAL VALVE POSITION INDICATION VERIF.
| |
| 2257 PERFORM 24.203.02 SEC-5.2 DIVISION 1 CSS SIMULATED AUTOMATIC ACTUATION TEST 2258 PERFORM 24.203.03 SEC-5.2 DIVISION 2 CSS SIMULATED AUTOMATIC ACTUATION TEST 3293 PERFORM 43.401.711 DIV 1 CORE SPRAY INJECTION CHECK VALVE EXERCISE TEST 3294 PERFORM 43.401.712 DIV 2 CORE SPRAY INJECTION CHECK VALVE EXERCISE TEST SR 3.3.5.3.3-2.b CHANNEL FUNCTIONAL TEST RPV Water Inventory Control Instrumentation Low Pressure Coolant Injection (LPCI) System IAW SFCP - 18 months
| |
| : b. Manual Initiation.
| |
| EVENTS: EVENT TITLE 0265 PERFORM 24.204.05 SEC-5.1 DIV. 1 RHR LOCAL VALVE POSITION INDICATION & STROKE 1134 PERFORM 24.204.05 SEC-5.3 DIV. 2 RHR LOCAL VALVE POSITION INDICATION & STROKE 1135 PERFORM 24.204.08 NON-DIVISIONAL RHR VALVE POSITION & STROKE TIME TEST 1265 PERFORM 24.204.05 SEC-5.2 DIV 1 RHR LOCAL VALVE POSITION INDICATION VERIF.
| |
| 1266 PERFORM 24.204.05 SEC-5.4 DIV 2 RHR LOCAL VALVE POSITION INDICATION VERIF.
| |
| DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 43 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 57 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.4-1.a CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Main Steam Line Isolation a. Reactor Vessel Water IAW SFCP - 18 months Level - Low Low Low, Level 1 EVENTS: EVENT TITLE 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC SR 3.3.6.1.4-1.b CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Main Steam Line Isolation b. Main Steam line IAW SFCP - 18 Months Pressure - Low EVENTS: EVENT TITLE 0600 PERFORM 44.020.027 NS4 MAIN STEAM LINE PRESSURE, TRIP SYS A, CH A, CAL/FUNC 0601 PERFORM 44.020.028 NS4 MAIN STEAM LINE PRESSURE,TRIP SYS B, CH B, CAL/FUNC 0602 PERFORM 44.020.029 NS4 MAIN STEAM LINE PRESSURE,TRIP SYS A, CHNL C,CAL/FUNC 0603 PERFORM 44.020.030 NS4 MAIN STEAM LINE PRESSURE, TRIP SYS B, CH D, CAL/FUNC SR 3.3.6.1.4-1.d CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Main Steam Line Isolation d. Condenser Pressure - IAW SFCP - 18 months High EVENTS: EVENT TITLE 0632 PERFORM 44.020.063 NS4 CONDENSER PRESS TRIP SYSTEM A, CHANNEL A, CAL/FUNCT 0633 PERFORM 44.020.064 NS4 CONDENSER PRESS TRIP SYSTEM B, CHANNEL B, CAL/FUNC 0634 PERFORM 44.020.065 NS4 CONDENSER PRESS TRIP SYSTEM A, CHANNEL C, CAL/FUNCT 0635 PERFORM 44.020.066 NS4 CONDENSER PRESS TRIP SYSTEM B, CHANNEL D, CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 44 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 58 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.4-1.e CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Main Steam Line Isolation e. Main Steam Tunnel IAW SFCP - 18 months Temperature - High EVENTS: EVENT TITLE 0628 PERFORM 44.020.416 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N612A,CAL/FUNC 0629 PERFORM 44.020.420 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N612B,CAL/FUNC 0630 PERFORM 44.020.424 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N612C,CAL/FUNC 0631 PERFORM 44.020.428 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N612D,CAL/FUNC 1628 PERFORM 44.020.417 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N613A,CAL/FUNC 1629 PERFORM 44.020.421 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N613B,CAL/FUNC 1630 PERFORM 44.020.422 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N614B,CAL/FUNC 1631 PERFORM 44.020.423 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N615B,CAL/FUNC 1728 PERFORM 44.020.418 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N614A,CAL/FUNC 1730 PERFORM 44.020.425 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N613C,CAL/FUNC 1731 PERFORM 44.020.426 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N614C,CAL/FUNC 1732 PERFORM 44.020.427 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N615C,CAL/FUNC 1828 PERFORM 44.020.419 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N615A,CAL/FUNC 1831 PERFORM 44.020.429 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N613D,CAL/FUNC 1832 PERFORM 44.020.430 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N614D,CAL/FUNC 1833 PERFORM 44.020.431 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N615D,CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 45 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 59 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.4-1.g CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Main Steam Line Isolation g. Turbine Building Area IAW SFCP - 18 months Temperature - High EVENTS: EVENT TITLE 0636 PERFORM 44.020.432 NS4 TB AREA TEMP, TRIP SYS A, CH A, B21N616A, CAL/FUNC 0637 PERFORM 44.020.434 NS4 TB AREA TEMP, TRIP SYS B, CH B, B21N616B, CAL/FUNC 0638 PERFORM 44.020.436 NS4 TB AREA TEMP, TRIP SYS A, CH C, B21N616C, CAL/FUNC 0639 PERFORM 44.020.438 NS4 TB AREA TEMP, TRIP SYS B, CH D, B21N616D, CAL/FUNC 1636 PERFORM 44.020.433 NS4 TB AREA TEMP, TRIP SYS A, CH A, B21N617A, CAL/FUNC 1637 PERFORM 44.020.435 NS4 TB AREA TEMP, TRIP SYS B, CH B, B21N617B, CAL/FUNC 1638 PERFORM 44.020.437 NS4 TB AREA TEMP, TRIP SYS A, CH C, B21N617C, CAL/FUNC 1639 PERFORM 44.020.439 NS4 TB AREA TEMP TRIP SYS B, CH D, B21N617D, CAL/FUNC SR 3.3.6.1.4-2.a CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Primary Containment Isolation a. Reactor Vessel IAW SFCP - 18 months Water Level Low, Level 3 EVENTS: EVENT TITLE 0750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N080A, XMTR CAL 0751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N080B, XTMR CAL 0752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N080C, XMTR CAL 0753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N080D, XMTR CAL 1750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N680A MTU CAL/FUNC 1751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N680B MTU CAL/FUNC 1752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N680C MTU CAL/FUNC 1753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N680D MTU CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 46 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 60 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.4-2.b CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Primary Containment Isolation b. Reactor Vessel IAW SFCP - 18 months Water Level - Low, Level 2 EVENTS: EVENT TITLE 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC SR 3.3.6.1.4-2.c CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Primary Containment Isolation c. Drywell Pressure - IAW SFCP - 18 months High EVENTS: EVENT TITLE 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW PRESSURE, C71N650C, CALIBRATION/FUNC 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW PRESSURE, C71N650D, CALIBRATION/FUNC 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL A,CAL/FUNC 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL B,CAL/FUNC 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL C,CAL/FUNCT 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL D,CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 47 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 61 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.4-2.d CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Primary Containment Isolation d. Main Steam Line IAW SFCP - 18 months Radiation - High EVENTS: EVENT TITLE 0761 PERFORM 64.080.029, MAIN STEAM LINE RADIATION MONITOR CHANNEL A CALIBRATION - LICENSE RENEWAL REQD 0762 PERFORM 64.080.030, MAIN STEAM LINE RADIATION MONITOR CHANNEL B CALIBRATION - LICENSE RENEWAL REQD 0763 PERFORM 64.080.031, MAIN STEAM LINE RADIATION MONITOR CHANNEL C CALIBRATION - LICENSE RENEWAL REQD 0764 PERFORM 64.080.032, MAIN STEAM LINE RADIATION MONITOR CHANNEL D CALIBRATION - LICENSE RENEWAL REQD 1068 PERFORM 64.080.033 MAIN STEAM LINE RADIATION DETECTOR D11N600E CALIBRATION WITH CHANNEL A (was 64.010.033) 1069 PERFORM 64.080.034 MAIN STEAM LINE RADIATION DETECTOR D11N600F CALIBRATION WITH CHANNEL C (was 64.010.034) 2068 PERFORM 64.080.033 MAIN STEAM LINE RADIATION DETECTOR D11N600E CALIBRATION WITH CHANNEL B 2069 PERFORM 64.080.034 MAIN STEAM LINE RADIATION DETECTOR D11N600F CALIBRATION WITH CHANNEL D SR 3.3.6.1.4-3.a CHANNEL CALIBRATION Primary Containment Isolation Instrumentation High Pressure Coolant Injection (HPCI) System IAW SFCP - 18 months Isolation a. HPCI Steam Line Flow - High EVENTS: EVENT TITLE 0560 PERFORM 44.020.203 NS4 HPCI STEAM LINE FLOW, TRIP SYS A, CAL/FUNCTIONAL 0561 PERFORM 44.020.204 NS4 HPCI STEAM LINE FLOW, TRIP SYS B, CAL/FUNCTIONAL SR 3.3.6.1.4-3.b CHANNEL CALIBRATION Primary Containment Isolation Instrumentation High Pressure Coolant Injection (HPCI) System IAW SFCP - 18 months Isolation b. HPCI Steam Supply Line Pressure - Low EVENTS: EVENT TITLE 0563 PERFORM 44.020.211 NS4 HPCI STEAM LINE PRESSURE,TRIP SYS A,CHANNEL A,CAL/FUNC.
| |
| 0564 PERFORM 44.020.212 NS4 HPCI STEAM LINE PRESSURE,TRIP SYS B,CHANNEL B,CAL/FUNC.
| |
| 0565 PERFORM 44.020.213 NS4 HPCI STEAM LINE PRESSURE,TRIP SYS A,CHANNEL C,CAL/FUNC.
| |
| 0566 PERFORM 44.020.214 NS4 HPCI STEAM LINE PRESSURE, TRIP SYS B, CH D, CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 48 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 62 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.4-3.c CHANNEL CALIBRATION Primary Containment Isolation Instrumentation High Pressure Coolant Injection (HPCI) System IAW SFCP - 18 months Isolation c. HPCI Turbine Exhaust Diaphragm Pressure - High EVENTS: EVENT TITLE 0572 PERFORM 44.020.223 NS4 HPCI TURB EXHAUST DIAPHRAGM PRESS,TRIP SYS A,CH A,CAL/FUNC 0573 PERFORM 44.020.224 NS4 HPCI TURB EXHAUST DIAPHRAGM PRESS,D2,CHL''B'', CAL. / FUNC.
| |
| 0574 PERFORM 44.020.225 NS4 HPCI TURB EXHAUST DIAPHRAGM PRESS,TRIP SYS A,CH C,CAL/FUNC 0575 PERFORM 44.020.226 NS4 HPCI TURB EXHAUST DIAPHRAGM PRESS,D2,CHL''D'', CAL. / FUNC.
| |
| SR 3.3.6.1.4-3.d CHANNEL CALIBRATION Primary Containment Isolation Instrumentation High Pressure Coolant Injection (HPCI) System IAW SFCP - 18 months Isolation d. HPCI Equipment Room Temperature - High EVENTS: EVENT TITLE 0578 PERFORM 44.020.229 NS4 HPCI/RCIC ROOMS AREA TEMP,CHNL A, CALIBRATION / FUNC.
| |
| 0579 PERFORM 44.020.230 NS4 HPCI/RCIC ROOMS AREA TEMP,CHNL B, CALIBRATION / FUNC.
| |
| SR 3.3.6.1.4-3.e CHANNEL CALIBRATION Primary Containment Isolation Instrumentation High Pressure Coolant Injection (HPCI) System IAW SFCP - 18 months Isolation e. Drywell Pressure-High EVENTS: EVENT TITLE 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL A,CAL/FUNC 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL B,CAL/FUNC 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL C,CAL/FUNCT 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL D,CAL/FUNC SR 3.3.6.1.4-4.a CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Reactor Core Isolation Cooling (RCIC) System IAW SFCP - 18 months Isolation a. RCIC Steam Line Flow - High EVENTS: EVENT TITLE 0582 PERFORM 44.020.233 NS4 RCIC STEAM LINE FLOW, TRIP SYS A, CAL/FUNCT 0583 PERFORM 44.020.234 NS4 RCIC STEAM LINE FLOW, TRIP SYS B, CALIBRATION/FUNCTIONAL DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 49 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 63 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.4-4.b CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Reactor Core Isolation Cooling (RCIC) System IAW SFCP - 18 months Isolation b. RCIC Steam Supply Line Pressure - Low EVENTS: EVENT TITLE 0584 PERFORM 44.020.239 NS4 RCIC STEAM LINE PRESSURE,DIV 1,CHNL A,CALIBRATION/FUNC.
| |
| 0585 PERFORM 44.020.240 NS4 RCIC STEAM LINE PRESSURE,DIV 2,CHNL B,CALIBRATION/FUNC.
| |
| 0586 PERFORM 44.020.241 NS4 RCIC STEAM LINE PRESSURE,DIV 1,CHNL C,CALIBRATION/FUNC.
| |
| 0587 PERFORM 44.020.242 NS4 RCIC STEAM LINE PRESSURE,DIV 2,CHNL D,CALIBRATION/FUNC.
| |
| SR 3.3.6.1.4-4.c CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Reactor Core Isolation Cooling (RCIC) System IAW SFCP - 18 months Isolation c. RCIC Turbine Exhaust Diaphragm Pressure - High EVENTS: EVENT TITLE 0588 PERFORM 44.020.247 NS4 RCIC TURBINE EXH DIA PRESS,D1,CHNL A,CALIBRATION/FUNC 0589 PERFORM 44.020.248 NS4 RCIC TURBINE EXH DIA PRESS,D2,CHNL B,CALIBRATION/FUNC 0590 PERFORM 44.020.249 NS4 RCIC TURBINE EXH DIA PRESS,D1,CHNL C,CALIBRATION/FUNC 0591 PERFORM 44.020.250 NS4 RCIC TURBINE EXH DIA PRESS,D2,CHNL D CALIBRATION/FUNC SR 3.3.6.1.4-4.d CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Reactor Core Isolation Cooling (RCIC) System IAW SFCP - 18 months Isolation d. RCIC Equipment Room Temperature - High EVENTS: EVENT TITLE 0578 PERFORM 44.020.229 NS4 HPCI/RCIC ROOMS AREA TEMP,CHNL A, CALIBRATION / FUNC.
| |
| 0579 PERFORM 44.020.230 NS4 HPCI/RCIC ROOMS AREA TEMP,CHNL B, CALIBRATION / FUNC.
| |
| SR 3.3.6.1.4-4.e CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Reactor Core Isolation Cooling (RCIC) System IAW SFCP - 18 months Isolation e. Drywell Pressure - High EVENTS: EVENT TITLE 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL A,CAL/FUNC 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL B,CAL/FUNC 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL C,CAL/FUNCT 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL D,CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 50 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 64 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.4-5.a CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Reactor Water Cleanup (RWCU) System Isolation a. IAW SFCP - 18 months Differential Flow - High EVENTS: EVENT TITLE 0548 PERFORM 44.020.152 NS4 REACTOR WATER CLEANUP DIFFERENTIAL FLOW CAL./FUNC.
| |
| SR 3.3.6.1.4-5.b CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Reactor Water Cleanup (RWCU) System Isolation b. IAW SFCP - 18 months Area Temperature - High EVENTS: EVENT TITLE 0551 PERFORM 44.020.158 NS4 RWCU AREA TEMP, DIV 1, CAL/FUNCTIONAL 0552 PERFORM 44.020.159 NS4 RWCU AREA NRHX DISCHARGE TEMPERATURE, DIV 2,CAL/FUNC.
| |
| SR 3.3.6.1.4-5.c CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Reactor Water Cleanup (RWCU) System Isolation c. IAW SFCP - 18 months Area Ventilation Differential Temperature - High EVENTS: EVENT TITLE 1551 PERFORM 44.020.160 NS4 RWCU AREA DIFFERENTIAL TEMPERATURE DIV 1, CAL/FUNC 1552 PERFORM 44.020.161 NS4 RWCU AREA DIFFERENTIAL TEMP, DIV 2, CAL/FUNCTIONAL SR 3.3.6.1.4-5.e CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Reactor Water Cleanup (RWCU) System Isolation e. IAW SFCP - 18 months Reactor Vessel Water Level - Low Low, Level 2 EVENTS: EVENT TITLE 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 51 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 65 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.4-6.a CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Shutdown Cooling System Isolation a. Reactor IAW SFCP - 18 months Steam Dome Pressure - High EVENTS: EVENT TITLE 0606 PERFORM 44.020.303 NS4 RX PRESS SDC CUT- IN PERMIS,D1,CAL/FUNC**ISOLATES SDC-F009 0607 PERFORM 44.020.304 NS4 RX PRESS SDC CUT- IN PERMIS,D2,CAL/FUNC**ISOLATES SDC-F008 SR 3.3.6.1.4-6.b CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Shutdown Cooling System Isolation b. Reactor IAW SFCP - 18 months Vessel Water Level Low, Level 3 EVENTS: EVENT TITLE 0750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N080A, XMTR CAL 0751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N080B, XTMR CAL 0752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N080C, XMTR CAL 0753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N080D, XMTR CAL 1750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N680A MTU CAL/FUNC 1751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N680B MTU CAL/FUNC 1752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N680C MTU CAL/FUNC 1753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N680D MTU CAL/FUNC SR 3.3.6.1.4-7.a CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Traversing In-core Probe Isolation a. Reactor Vessel IAW SFCP - 18 months Water Level - Low, Level 3 EVENTS: EVENT TITLE 0750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N080A, XMTR CAL 0751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N080B, XTMR CAL 0752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N080C, XMTR CAL 0753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N080D, XMTR CAL 1750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N680A MTU CAL/FUNC 1751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N680B MTU CAL/FUNC 1752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N680C MTU CAL/FUNC 1753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N680D MTU CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 52 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 66 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.4-7.b CHANNEL CALIBRATION Primary Containment Isolation Instrumentation Traversing In-core Probe Isolation b. Drywell IAW SFCP - 18 Months Pressure - High EVENTS: EVENT TITLE 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC SR 3.3.6.1.5-1.a LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Main Steam Line Isolation a. Reactor IAW SFCP - 18 months Vessel Water Level -Low Low Low, Level 1 EVENTS: EVENT TITLE 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC 2528 PERFORM 44.020.001 SECT 6.3 NSSS MSIV DRNS/ RECIRC SAMPLE INBD VLV'S LOGIC SYS FUNC 2529 PERFORM 44.020.001 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 1 LOGIC SYSTEM FUNCTIONAL 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3529 PERFORM 44.020.002 NSSSS MSIV DRN/ RECIRC SAMPLE OTBD VLV'S LOGIC SYS FUNC 3530 PERFORM 44.020.002 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 2 LOGIC SYSTEM FUNCTIONAL 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 53 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 67 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-1.b LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Main Steam Line Isolation b. Main Steam IAW SFCP - 18 Months line Pressure - Low EVENTS: EVENT TITLE 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL 0600 PERFORM 44.020.027 NS4 MAIN STEAM LINE PRESSURE, TRIP SYS A, CH A, CAL/FUNC 0601 PERFORM 44.020.028 NS4 MAIN STEAM LINE PRESSURE,TRIP SYS B, CH B, CAL/FUNC 0602 PERFORM 44.020.029 NS4 MAIN STEAM LINE PRESSURE,TRIP SYS A, CHNL C,CAL/FUNC 0603 PERFORM 44.020.030 NS4 MAIN STEAM LINE PRESSURE, TRIP SYS B, CH D, CAL/FUNC 2528 PERFORM 44.020.001 SECT 6.3 NSSS MSIV DRNS/ RECIRC SAMPLE INBD VLV'S LOGIC SYS FUNC 2529 PERFORM 44.020.001 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 1 LOGIC SYSTEM FUNCTIONAL 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3529 PERFORM 44.020.002 NSSSS MSIV DRN/ RECIRC SAMPLE OTBD VLV'S LOGIC SYS FUNC 3530 PERFORM 44.020.002 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 2 LOGIC SYSTEM FUNCTIONAL 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF SR 3.3.6.1.5-1.d LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Main Steam Line Isolation d. Condenser IAW SFCP - 18 months Pressure - High EVENTS: EVENT TITLE 0632 PERFORM 44.020.063 NS4 CONDENSER PRESS TRIP SYSTEM A, CHANNEL A, CAL/FUNCT 0633 PERFORM 44.020.064 NS4 CONDENSER PRESS TRIP SYSTEM B, CHANNEL B, CAL/FUNC 0634 PERFORM 44.020.065 NS4 CONDENSER PRESS TRIP SYSTEM A, CHANNEL C, CAL/FUNCT 0635 PERFORM 44.020.066 NS4 CONDENSER PRESS TRIP SYSTEM B, CHANNEL D, CAL/FUNC 2528 PERFORM 44.020.001 SECT 6.3 NSSS MSIV DRNS/ RECIRC SAMPLE INBD VLV'S LOGIC SYS FUNC 2529 PERFORM 44.020.001 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 1 LOGIC SYSTEM FUNCTIONAL 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3529 PERFORM 44.020.002 NSSSS MSIV DRN/ RECIRC SAMPLE OTBD VLV'S LOGIC SYS FUNC 3530 PERFORM 44.020.002 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 2 LOGIC SYSTEM FUNCTIONAL 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 54 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 68 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-1.e LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Main Steam Line Isolation e. Main Steam IAW SFCP - 18 months Tunnel Temperature - High EVENTS: EVENT TITLE 0628 PERFORM 44.020.416 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N612A,CAL/FUNC 0629 PERFORM 44.020.420 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N612B,CAL/FUNC 0630 PERFORM 44.020.424 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N612C,CAL/FUNC 0631 PERFORM 44.020.428 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N612D,CAL/FUNC 1628 PERFORM 44.020.417 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N613A,CAL/FUNC 1629 PERFORM 44.020.421 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N613B,CAL/FUNC 1630 PERFORM 44.020.422 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N614B,CAL/FUNC 1631 PERFORM 44.020.423 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N615B,CAL/FUNC 1728 PERFORM 44.020.418 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N614A,CAL/FUNC 1730 PERFORM 44.020.425 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N613C,CAL/FUNC 1731 PERFORM 44.020.426 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N614C,CAL/FUNC 1732 PERFORM 44.020.427 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N615C,CAL/FUNC 1828 PERFORM 44.020.419 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N615A,CAL/FUNC 1831 PERFORM 44.020.429 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N613D,CAL/FUNC 1832 PERFORM 44.020.430 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N614D,CAL/FUNC 1833 PERFORM 44.020.431 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N615D,CAL/FUNC 2528 PERFORM 44.020.001 SECT 6.3 NSSS MSIV DRNS/ RECIRC SAMPLE INBD VLV'S LOGIC SYS FUNC 2529 PERFORM 44.020.001 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 1 LOGIC SYSTEM FUNCTIONAL 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3529 PERFORM 44.020.002 NSSSS MSIV DRN/ RECIRC SAMPLE OTBD VLV'S LOGIC SYS FUNC 3530 PERFORM 44.020.002 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 2 LOGIC SYSTEM FUNCTIONAL 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 55 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 69 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-1.g LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Main Steam Line Isolation g. Turbine IAW SFCP - 18 months Building Area Temperature - High EVENTS: EVENT TITLE 0636 PERFORM 44.020.432 NS4 TB AREA TEMP, TRIP SYS A, CH A, B21N616A, CAL/FUNC 0637 PERFORM 44.020.434 NS4 TB AREA TEMP, TRIP SYS B, CH B, B21N616B, CAL/FUNC 0638 PERFORM 44.020.436 NS4 TB AREA TEMP, TRIP SYS A, CH C, B21N616C, CAL/FUNC 0639 PERFORM 44.020.438 NS4 TB AREA TEMP, TRIP SYS B, CH D, B21N616D, CAL/FUNC 1636 PERFORM 44.020.433 NS4 TB AREA TEMP, TRIP SYS A, CH A, B21N617A, CAL/FUNC 1637 PERFORM 44.020.435 NS4 TB AREA TEMP, TRIP SYS B, CH B, B21N617B, CAL/FUNC 1638 PERFORM 44.020.437 NS4 TB AREA TEMP, TRIP SYS A, CH C, B21N617C, CAL/FUNC 1639 PERFORM 44.020.439 NS4 TB AREA TEMP TRIP SYS B, CH D, B21N617D, CAL/FUNC 2528 PERFORM 44.020.001 SECT 6.3 NSSS MSIV DRNS/ RECIRC SAMPLE INBD VLV'S LOGIC SYS FUNC 2529 PERFORM 44.020.001 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 1 LOGIC SYSTEM FUNCTIONAL 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3529 PERFORM 44.020.002 NSSSS MSIV DRN/ RECIRC SAMPLE OTBD VLV'S LOGIC SYS FUNC 3530 PERFORM 44.020.002 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 2 LOGIC SYSTEM FUNCTIONAL 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 56 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 70 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-2.a LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Primary Containment Isolation a. Reactor IAW SFCP - 18 months Vessel Water Level Low, Level 3 EVENTS: EVENT TITLE 0239 PERFORM 24.137.18 SEC-5.2 MS LINE DRN & DRN ISO VLV OP & LOC POSITION VERIF TEST 0750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N080A, XMTR CAL 0751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N080B, XTMR CAL 0752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N080C, XMTR CAL 0753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N080D, XMTR CAL 1750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N680A MTU CAL/FUNC 1751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N680B MTU CAL/FUNC 1752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N680C MTU CAL/FUNC 1753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N680D MTU CAL/FUNC 2528 PERFORM 44.020.001 SECT 6.3 NSSS MSIV DRNS/ RECIRC SAMPLE INBD VLV'S LOGIC SYS FUNC 2529 PERFORM 44.020.001 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 1 LOGIC SYSTEM FUNCTIONAL 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3529 PERFORM 44.020.002 NSSSS MSIV DRN/ RECIRC SAMPLE OTBD VLV'S LOGIC SYS FUNC 3530 PERFORM 44.020.002 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 2 LOGIC SYSTEM FUNCTIONAL 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 57 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 71 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-2.b LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Primary Containment Isolation b. Reactor IAW SFCP - 18 months Vessel Water Level - Low, Level 2 EVENTS: EVENT TITLE 0239 PERFORM 24.137.18 SEC-5.2 MS LINE DRN & DRN ISO VLV OP & LOC POSITION VERIF TEST 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC 2528 PERFORM 44.020.001 SECT 6.3 NSSS MSIV DRNS/ RECIRC SAMPLE INBD VLV'S LOGIC SYS FUNC 2529 PERFORM 44.020.001 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 1 LOGIC SYSTEM FUNCTIONAL 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3529 PERFORM 44.020.002 NSSSS MSIV DRN/ RECIRC SAMPLE OTBD VLV'S LOGIC SYS FUNC 3530 PERFORM 44.020.002 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 2 LOGIC SYSTEM FUNCTIONAL 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 58 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 72 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-2.c LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Primary Containment Isolation c. Drywell IAW SFCP - 18 months Pressure - High EVENTS: EVENT TITLE 0239 PERFORM 24.137.18 SEC-5.2 MS LINE DRN & DRN ISO VLV OP & LOC POSITION VERIF TEST 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW PRESSURE, C71N650C, CALIBRATION/FUNC 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW PRESSURE, C71N650D, CALIBRATION/FUNC 2528 PERFORM 44.020.001 SECT 6.3 NSSS MSIV DRNS/ RECIRC SAMPLE INBD VLV'S LOGIC SYS FUNC 2529 PERFORM 44.020.001 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 1 LOGIC SYSTEM FUNCTIONAL 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3529 PERFORM 44.020.002 NSSSS MSIV DRN/ RECIRC SAMPLE OTBD VLV'S LOGIC SYS FUNC 3530 PERFORM 44.020.002 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 2 LOGIC SYSTEM FUNCTIONAL 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 59 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 73 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-2.d LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Primary Containment Isolation d. Main IAW SFCP - 18 months Steam Line Radiation - High EVENTS: EVENT TITLE 0239 PERFORM 24.137.18 SEC-5.2 MS LINE DRN & DRN ISO VLV OP & LOC POSITION VERIF TEST 0761 PERFORM 64.080.029, MAIN STEAM LINE RADIATION MONITOR CHANNEL A CALIBRATION - LICENSE RENEWAL REQD 0762 PERFORM 64.080.030, MAIN STEAM LINE RADIATION MONITOR CHANNEL B CALIBRATION - LICENSE RENEWAL REQD 0763 PERFORM 64.080.031, MAIN STEAM LINE RADIATION MONITOR CHANNEL C CALIBRATION - LICENSE RENEWAL REQD 0764 PERFORM 64.080.032, MAIN STEAM LINE RADIATION MONITOR CHANNEL D CALIBRATION - LICENSE RENEWAL REQD 1068 PERFORM 64.080.033 MAIN STEAM LINE RADIATION DETECTOR D11N600E CALIBRATION WITH CHANNEL A (was 64.010.033) 1069 PERFORM 64.080.034 MAIN STEAM LINE RADIATION DETECTOR D11N600F CALIBRATION WITH CHANNEL C (was 64.010.034) 2068 PERFORM 64.080.033 MAIN STEAM LINE RADIATION DETECTOR D11N600E CALIBRATION WITH CHANNEL B 2069 PERFORM 64.080.034 MAIN STEAM LINE RADIATION DETECTOR D11N600F CALIBRATION WITH CHANNEL D 2528 PERFORM 44.020.001 SECT 6.3 NSSS MSIV DRNS/ RECIRC SAMPLE INBD VLV'S LOGIC SYS FUNC 2529 PERFORM 44.020.001 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 1 LOGIC SYSTEM FUNCTIONAL 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3529 PERFORM 44.020.002 NSSSS MSIV DRN/ RECIRC SAMPLE OTBD VLV'S LOGIC SYS FUNC 3530 PERFORM 44.020.002 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 2 LOGIC SYSTEM FUNCTIONAL 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF SR 3.3.6.1.5-3.a LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation High Pressure Coolant Injection (HPCI) IAW SFCP - 18 months System Isolation a. HPCI Steam Line Flow - High EVENTS: EVENT TITLE 0255 PERFORM 24.202.05 SEC-5.2 & 5.3 HPCI LOCAL VALVE POS INDICATION VERIF & LSFT 0560 PERFORM 44.020.203 NS4 HPCI STEAM LINE FLOW, TRIP SYS A, CAL/FUNCTIONAL 0561 PERFORM 44.020.204 NS4 HPCI STEAM LINE FLOW, TRIP SYS B, CAL/FUNCTIONAL 1644 PERFORM 44.030.152 ONLINE - HPCI SYSTEM LOGIC FUNCTIONAL TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 60 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 74 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-3.b LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation High Pressure Coolant Injection (HPCI) IAW SFCP - 18 months System Isolation b. HPCI Steam Supply Line Pressure - Low EVENTS: EVENT TITLE 0255 PERFORM 24.202.05 SEC-5.2 & 5.3 HPCI LOCAL VALVE POS INDICATION VERIF & LSFT 0563 PERFORM 44.020.211 NS4 HPCI STEAM LINE PRESSURE,TRIP SYS A,CHANNEL A,CAL/FUNC.
| |
| 0564 PERFORM 44.020.212 NS4 HPCI STEAM LINE PRESSURE,TRIP SYS B,CHANNEL B,CAL/FUNC.
| |
| 0565 PERFORM 44.020.213 NS4 HPCI STEAM LINE PRESSURE,TRIP SYS A,CHANNEL C,CAL/FUNC.
| |
| 0566 PERFORM 44.020.214 NS4 HPCI STEAM LINE PRESSURE, TRIP SYS B, CH D, CAL/FUNC 1644 PERFORM 44.030.152 ONLINE - HPCI SYSTEM LOGIC FUNCTIONAL TEST SR 3.3.6.1.5-3.c LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation High Pressure Coolant Injection (HPCI) IAW SFCP - 18 months System Isolation c. HPCI Turbine Exhaust Diaphragm Pressure - High EVENTS: EVENT TITLE 0255 PERFORM 24.202.05 SEC-5.2 & 5.3 HPCI LOCAL VALVE POS INDICATION VERIF & LSFT 0572 PERFORM 44.020.223 NS4 HPCI TURB EXHAUST DIAPHRAGM PRESS,TRIP SYS A,CH A,CAL/FUNC 0573 PERFORM 44.020.224 NS4 HPCI TURB EXHAUST DIAPHRAGM PRESS,D2,CHL''B'', CAL. / FUNC.
| |
| 0574 PERFORM 44.020.225 NS4 HPCI TURB EXHAUST DIAPHRAGM PRESS,TRIP SYS A,CH C,CAL/FUNC 0575 PERFORM 44.020.226 NS4 HPCI TURB EXHAUST DIAPHRAGM PRESS,D2,CHL''D'', CAL. / FUNC.
| |
| 1644 PERFORM 44.030.152 ONLINE - HPCI SYSTEM LOGIC FUNCTIONAL TEST SR 3.3.6.1.5-3.d LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation High Pressure Coolant Injection (HPCI) IAW SFCP - 18 months System Isolation d. HPCI Equipment Room Temperature - High EVENTS: EVENT TITLE 0255 PERFORM 24.202.05 SEC-5.2 & 5.3 HPCI LOCAL VALVE POS INDICATION VERIF & LSFT 0578 PERFORM 44.020.229 NS4 HPCI/RCIC ROOMS AREA TEMP,CHNL A, CALIBRATION / FUNC.
| |
| 0579 PERFORM 44.020.230 NS4 HPCI/RCIC ROOMS AREA TEMP,CHNL B, CALIBRATION / FUNC.
| |
| 1644 PERFORM 44.030.152 ONLINE - HPCI SYSTEM LOGIC FUNCTIONAL TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 61 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 75 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-3.e LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation High Pressure Coolant Injection (HPCI) IAW SFCP - 18 months System Isolation e. Drywell Pressure-High EVENTS: EVENT TITLE 1644 PERFORM 44.030.152 ONLINE - HPCI SYSTEM LOGIC FUNCTIONAL TEST SR 3.3.6.1.5-4.a LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Reactor Core Isolation Cooling (RCIC) IAW SFCP - 18 months System Isolation a. RCIC Steam Line Flow - High EVENTS: EVENT TITLE 0582 PERFORM 44.020.233 NS4 RCIC STEAM LINE FLOW, TRIP SYS A, CAL/FUNCT 0583 PERFORM 44.020.234 NS4 RCIC STEAM LINE FLOW, TRIP SYS B, CALIBRATION/FUNCTIONAL 2809 PERFORM 44.060.002 RCIC SYSTEM LOGIC FUNCTIONAL TEST - ONLINE SR 3.3.6.1.5-4.b LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Reactor Core Isolation Cooling (RCIC) IAW SFCP - 18 months System Isolation b. RCIC Steam Supply Line Pressure - Low EVENTS: EVENT TITLE 0584 PERFORM 44.020.239 NS4 RCIC STEAM LINE PRESSURE,DIV 1,CHNL A,CALIBRATION/FUNC.
| |
| 0585 PERFORM 44.020.240 NS4 RCIC STEAM LINE PRESSURE,DIV 2,CHNL B,CALIBRATION/FUNC.
| |
| 0586 PERFORM 44.020.241 NS4 RCIC STEAM LINE PRESSURE,DIV 1,CHNL C,CALIBRATION/FUNC.
| |
| 0587 PERFORM 44.020.242 NS4 RCIC STEAM LINE PRESSURE,DIV 2,CHNL D,CALIBRATION/FUNC.
| |
| 2809 PERFORM 44.060.002 RCIC SYSTEM LOGIC FUNCTIONAL TEST - ONLINE SR 3.3.6.1.5-4.c LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Reactor Core Isolation Cooling (RCIC) IAW SFCP - 18 months System Isolation c. RCIC Turbine Exhaust Diaphragm Pressure - High EVENTS: EVENT TITLE 0588 PERFORM 44.020.247 NS4 RCIC TURBINE EXH DIA PRESS,D1,CHNL A,CALIBRATION/FUNC 0589 PERFORM 44.020.248 NS4 RCIC TURBINE EXH DIA PRESS,D2,CHNL B,CALIBRATION/FUNC 0590 PERFORM 44.020.249 NS4 RCIC TURBINE EXH DIA PRESS,D1,CHNL C,CALIBRATION/FUNC 0591 PERFORM 44.020.250 NS4 RCIC TURBINE EXH DIA PRESS,D2,CHNL D CALIBRATION/FUNC 2809 PERFORM 44.060.002 RCIC SYSTEM LOGIC FUNCTIONAL TEST - ONLINE DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 62 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 76 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-4.d LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Reactor Core Isolation Cooling (RCIC) IAW SFCP - 18 months System Isolation d. RCIC Equipment Room Temperature - High EVENTS: EVENT TITLE 0578 PERFORM 44.020.229 NS4 HPCI/RCIC ROOMS AREA TEMP,CHNL A, CALIBRATION / FUNC.
| |
| 0579 PERFORM 44.020.230 NS4 HPCI/RCIC ROOMS AREA TEMP,CHNL B, CALIBRATION / FUNC.
| |
| 2809 PERFORM 44.060.002 RCIC SYSTEM LOGIC FUNCTIONAL TEST - ONLINE SR 3.3.6.1.5-4.e LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Reactor Core Isolation Cooling (RCIC) IAW SFCP - 18 months System Isolation e. Drywell Pressure - High EVENTS: EVENT TITLE 2809 PERFORM 44.060.002 RCIC SYSTEM LOGIC FUNCTIONAL TEST - ONLINE SR 3.3.6.1.5-5.a LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Reactor Water Cleanup (RWCU) System IAW SFCP - 18 months Isolation a. Differential Flow - High EVENTS: EVENT TITLE 0353 PERFORM 24.707.01 SEC-5.1 RWCU LOCAL VALVE POSITION VERIFICATION 0527 PERFORM 44.020.501 RWCU NSSSS- INBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 0528 PERFORM 44.020.601 RWCU NSSSS- OTBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 0548 PERFORM 44.020.152 NS4 REACTOR WATER CLEANUP DIFFERENTIAL FLOW CAL./FUNC.
| |
| SR 3.3.6.1.5-5.b LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Reactor Water Cleanup (RWCU) System IAW SFCP - 18 months Isolation b. Area Temperature - High EVENTS: EVENT TITLE 0353 PERFORM 24.707.01 SEC-5.1 RWCU LOCAL VALVE POSITION VERIFICATION 0527 PERFORM 44.020.501 RWCU NSSSS- INBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 0528 PERFORM 44.020.601 RWCU NSSSS- OTBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 0551 PERFORM 44.020.158 NS4 RWCU AREA TEMP, DIV 1, CAL/FUNCTIONAL 0552 PERFORM 44.020.159 NS4 RWCU AREA NRHX DISCHARGE TEMPERATURE, DIV 2,CAL/FUNC.
| |
| DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 63 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 77 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-5.c LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Reactor Water Cleanup (RWCU) System IAW SFCP - 18 months Isolation c. Area Ventilation Differential Temperature - High EVENTS: EVENT TITLE 0353 PERFORM 24.707.01 SEC-5.1 RWCU LOCAL VALVE POSITION VERIFICATION 0527 PERFORM 44.020.501 RWCU NSSSS- INBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 0528 PERFORM 44.020.601 RWCU NSSSS- OTBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 1551 PERFORM 44.020.160 NS4 RWCU AREA DIFFERENTIAL TEMPERATURE DIV 1, CAL/FUNC 1552 PERFORM 44.020.161 NS4 RWCU AREA DIFFERENTIAL TEMP, DIV 2, CAL/FUNCTIONAL SR 3.3.6.1.5-5.d LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Reactor Water Cleanup (RWCU) System IAW SFCP - 18 months Isolation d. SLC System Initiation EVENTS: EVENT TITLE 0353 PERFORM 24.707.01 SEC-5.1 RWCU LOCAL VALVE POSITION VERIFICATION 0527 PERFORM 44.020.501 RWCU NSSSS- INBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 0528 PERFORM 44.020.601 RWCU NSSSS- OTBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 1345 PERFORM 24.139.03 SEC-5.1 SLC - RWCU ISOLATION FUNCTIONAL TEST SR 3.3.6.1.5-5.e LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Reactor Water Cleanup (RWCU) System IAW SFCP - 18 months Isolation e. Reactor Vessel Water Level - Low Low, Level 2 EVENTS: EVENT TITLE 0353 PERFORM 24.707.01 SEC-5.1 RWCU LOCAL VALVE POSITION VERIFICATION 0527 PERFORM 44.020.501 RWCU NSSSS- INBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 0528 PERFORM 44.020.601 RWCU NSSSS- OTBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 64 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 78 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-6.a LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Shutdown Cooling System Isolation a. IAW SFCP - 18 months Reactor Steam Dome Pressure - High EVENTS: EVENT TITLE 0606 PERFORM 44.020.303 NS4 RX PRESS SDC CUT- IN PERMIS,D1,CAL/FUNC**ISOLATES SDC-F009 0607 PERFORM 44.020.304 NS4 RX PRESS SDC CUT- IN PERMIS,D2,CAL/FUNC**ISOLATES SDC-F008 2527 PERFORM 44.020.502 INBD SDC-HEAD SPRAY AUTO ISOLATION LOGIC FUNCTIONAL 3528 PERFORM 44.020.602 OTBD SDC - HEAD SPRAY AUTO ISOLATION LOGIC FUNCTIONAL SR 3.3.6.1.5-6.b LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Shutdown Cooling System Isolation b. IAW SFCP - 18 months Reactor Vessel Water Level - Low, Level 3 EVENTS: EVENT TITLE 0750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N080A, XMTR CAL 0751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N080B, XTMR CAL 0752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N080C, XMTR CAL 0753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N080D, XMTR CAL 1750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N680A MTU CAL/FUNC 1751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N680B MTU CAL/FUNC 1752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N680C MTU CAL/FUNC 1753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N680D MTU CAL/FUNC 2527 PERFORM 44.020.502 INBD SDC-HEAD SPRAY AUTO ISOLATION LOGIC FUNCTIONAL 3528 PERFORM 44.020.602 OTBD SDC - HEAD SPRAY AUTO ISOLATION LOGIC FUNCTIONAL DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 65 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 79 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.5-7.a LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Traversing In-core Probe Isolation a. IAW SFCP - 18 months Reactor Vessel Water Level - Low, Level 3 EVENTS: EVENT TITLE 0750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N080A, XMTR CAL 0751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N080B, XTMR CAL 0752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N080C, XMTR CAL 0753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N080D, XMTR CAL 1750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N680A MTU CAL/FUNC 1751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N680B MTU CAL/FUNC 1752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N680C MTU CAL/FUNC 1753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N680D MTU CAL/FUNC 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF SR 3.3.6.1.5-7.b LOGIC SYSTEM FUNCTIONAL TEST Primary Containment Isolation Instrumentation Traversing In-core Probe Isolation b. IAW SFCP - 18 months Drywell Pressure - High EVENTS: EVENT TITLE 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 66 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 80 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.6-2.e CHANNEL FUNCTIONAL TEST Primary Containment Isolation Instrumentation Primary Containment Isolation d. Manual IAW SFCP - 18 months Initiation EVENTS: EVENT TITLE 0239 PERFORM 24.137.18 SEC-5.2 MS LINE DRN & DRN ISO VLV OP & LOC POSITION VERIF TEST 0244 PERFORM 24.138.02 SEC-5.2 RX RECIRC LOCAL VALVE POSITION VERIFICATION TEST 0248 PERFORM 24.144.01 SEC-5.2 TWMS VALVE OPERABILITY & POSITION VERIF. TEST 0265 PERFORM 24.204.05 SEC-5.1 DIV. 1 RHR LOCAL VALVE POSITION INDICATION & STROKE 0321 PERFORM 24.406.02 SEC-5.2 NITROGEN INERT VLV POS INDICATION VERIF MODE 4,5 0322 PERFORM 24.408.03 SEC-5.2 DIV 1 PRIMARY CONT MONT SYS VLV OP AND IND VERIF 0351 PERFORM 24.702.01 SEC-5.3 MISCELLANEOUS SYSTEMS LOCAL VALVE POSITION VERIF.
| |
| 1134 PERFORM 24.204.05 SEC-5.3 DIV. 2 RHR LOCAL VALVE POSITION INDICATION & STROKE 1135 PERFORM 24.204.08 NON-DIVISIONAL RHR VALVE POSITION & STROKE TIME TEST 1265 PERFORM 24.204.05 SEC-5.2 DIV 1 RHR LOCAL VALVE POSITION INDICATION VERIF.
| |
| 1266 PERFORM 24.204.05 SEC-5.4 DIV 2 RHR LOCAL VALVE POSITION INDICATION VERIF.
| |
| 1315 PERFORM 24.404.03 SEC-5.2 SGTS VALVE OPERABILITY & POSITION INDICATION VERIF.
| |
| 1321 PERFORM 24.406.02 SEC-5.1 NITROGEN INERT VLV POS INDICATION VERIF ANY MODE SR 3.3.6.1.6-3.f CHANNEL FUNCTIONAL TEST Primary Containment Isolation Instrumentation High Pressure Coolant Injection (HPCI) System IAW SFCP - 18 months Isolation f. Manual Initiation EVENTS: EVENT TITLE 0255 PERFORM 24.202.05 SEC-5.2 & 5.3 HPCI LOCAL VALVE POS INDICATION VERIF & LSFT SR 3.3.6.1.6-4.f CHANNEL FUNCTIONAL TEST Primary Containment Isolation Instrumentation Reactor Core Isolation Cooling (RCIC) System IAW SFCP - 18 months Isolation f. Manual Initiation EVENTS: EVENT TITLE 0272 PERFORM 24.206.02 SEC-5.2 RCIC VAL POS INDICATION VERIF. / MANUAL INITIATE SR 3.3.6.1.6-5.f CHANNEL FUNCTIONAL TEST Primary Containment Isolation Instrumentation Reactor Water Cleanup (RWCU) System IAW SFCP - 18 months Isolation f. Manual Initiation EVENTS: EVENT TITLE 0353 PERFORM 24.707.01 SEC-5.1 RWCU LOCAL VALVE POSITION VERIFICATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 67 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 81 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.1.6-6.c CHANNEL FUNCTIONAL TEST Primary Containment Isolation Instrumentation Shutdown Cooling System Isolation c. Manual IAW SFCP - 18 months Initiation EVENTS: EVENT TITLE 0265 PERFORM 24.204.05 SEC-5.1 DIV. 1 RHR LOCAL VALVE POSITION INDICATION & STROKE 1134 PERFORM 24.204.05 SEC-5.3 DIV. 2 RHR LOCAL VALVE POSITION INDICATION & STROKE 1135 PERFORM 24.204.08 NON-DIVISIONAL RHR VALVE POSITION & STROKE TIME TEST 1265 PERFORM 24.204.05 SEC-5.2 DIV 1 RHR LOCAL VALVE POSITION INDICATION VERIF.
| |
| 1266 PERFORM 24.204.05 SEC-5.4 DIV 2 RHR LOCAL VALVE POSITION INDICATION VERIF.
| |
| SR 3.3.6.1.7-1.a Verify the Main Steam Line Isolation Instrumentation DC Output Relays response time allows the overall ISOLATION SYSTEM IAW SFCP - 18 months on a RESPONSE TIME to remain within limits. Main Steam Line Isolation a. Reactor Vessel Water Level - Low Low Low, Level 1 STAGGERED TEST BASIS EVENTS: EVENT TITLE 1540 PERFORM 44.020.011 PHASE 2 RX LOW WATER LEVEL 1, TRIP SYS A, CHANNEL A, RTT 2540 PERFORM 44.020.011 PHASE 3 RX LOW WATER LEVEL 1, TRIP SYS A, CHANNEL A, RTT SR 3.3.6.1.7-1.c Verify the Main Steam Line Isolation Instrumentation DC Output Relays response time allows the overall ISOLATION SYSTEM IAW SFCP - 18 months on a RESPONSE TIME to remain within limits. Main Steam Line Isolation c. Main Steam Line Flow - High STAGGERED TEST BASIS EVENTS: EVENT TITLE 1623 PERFORM 44.020.046 PHASE 2 MAIN STEAM LINE FLOW, DIV 2, CHANNEL D, RTT 2623 PERFORM 44.020.046 PHASE 3 MAIN STEAM LINE FLOW, DIV 2, CHANNEL D, RTT SR 3.3.6.2.4-1 CHANNEL CALIBRATION Secondary Containment Isolation Instrumentation Reactor Vessel Water Level - Low Low, Level 2 IAW SFCP - 18 months EVENTS: EVENT TITLE 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 68 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 82 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.2.4-2 CHANNEL CALIBRATION Secondary Containment Isolation Instrumentation Drywell Pressure - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW PRESSURE, C71N650C, CALIBRATION/FUNC 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW PRESSURE, C71N650D, CALIBRATION/FUNC SR 3.3.6.2.4-3 CHANNEL CALIBRATION Secondary Containment Isolation Instrumentation Fuel Pool Ventilation Exhaust Radiation - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0535 PERFORM 64.020.105 FUEL POOL VENT EXH RAD MON,DIV 1,CHL A,RADIOLOGICAL CAL 0536 PERFORM 64.020.106 FUEL POOL VENT EXH RAD MON, DIV 2, CH B, RADIOLOGICAL CAL 0537 PERFORM 64.020.107 FUEL POOL VENT EXH RAD MON, DIV 1, CH C, RADIOLOGICAL CAL 0538 PERFORM 64.020.108 FUEL POOL VENT EXH RAD MON, DIV 2, CH D, RADIOLOGICAL CAL SR 3.3.6.2.5-1 LOGIC SYSTEM FUNCTIONAL TEST Secondary Containment Isolation Instrumentation Reactor Vessel Water Level - Low IAW SFCP - 18 months Low, Level 2 EVENTS: EVENT TITLE 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 69 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 83 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.2.5-2 LOGIC SYSTEM FUNCTIONAL TEST Secondary Containment Isolation Instrumentation Drywell Pressure - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW PRESSURE, C71N650C, CALIBRATION/FUNC 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW PRESSURE, C71N650D, CALIBRATION/FUNC 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF SR 3.3.6.2.5-3 LOGIC SYSTEM FUNCTIONAL TEST Secondary Containment Isolation Instrumentation Fuel Pool Ventilation Exhaust IAW SFCP - 18 months Radiation - High EVENTS: EVENT TITLE 0535 PERFORM 64.020.105 FUEL POOL VENT EXH RAD MON,DIV 1,CHL A,RADIOLOGICAL CAL 0536 PERFORM 64.020.106 FUEL POOL VENT EXH RAD MON, DIV 2, CH B, RADIOLOGICAL CAL 0537 PERFORM 64.020.107 FUEL POOL VENT EXH RAD MON, DIV 1, CH C, RADIOLOGICAL CAL 0538 PERFORM 64.020.108 FUEL POOL VENT EXH RAD MON, DIV 2, CH D, RADIOLOGICAL CAL 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF SR 3.3.6.2.5-4 LOGIC SYSTEM FUNCTIONAL TEST Secondary Containment Isolation Instrumentation Manual Initiation IAW SFCP - 18 months EVENTS: EVENT TITLE 0314 PERFORM 24.404.02 SEC-5.3 DIV. 1 SGTS RUN/AUTO INITIATE/POSITION IND.
| |
| 1142 PERFORM 24.404.04 SEC-5.3 DIV.2 SGTS RUN/AUTO INITIATE/POSITION IND.
| |
| 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 70 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 84 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.3.3-1 CHANNEL CALIBRATION Low-Low Set Instrumentation Reactor Steam Dome Pressure - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0803 PERFORM 44.040.005 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, CHL ''A'', XMTR CAL 0804 PERFORM 44.040.006 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''B'', XMTR CAL 1803 PERFORM 44.040.005 ATWS/SRV LLS RX PRESS,DIV 1,CHNL A, MTU CAL/FUNC 1804 PERFORM 44.040.006 ATWS/SRV LLS RX PRESS,DIV 2,CHNL B, MTU CAL/FUNC SR 3.3.6.3.3-2 CHANNEL CALIBRATION Low-Low Set Instrumentation Low-Low Set Pressure Setpoints IAW SFCP - 18 months EVENTS: EVENT TITLE 0803 PERFORM 44.040.005 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, CHL ''A'', XMTR CAL 0804 PERFORM 44.040.006 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''B'', XMTR CAL 0805 PERFORM 44.040.007 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, CHL ''C'', XMTR CAL 0806 PERFORM 44.040.008 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''D'', XMTR CAL 1803 PERFORM 44.040.005 ATWS/SRV LLS RX PRESS,DIV 1,CHNL A, MTU CAL/FUNC 1804 PERFORM 44.040.006 ATWS/SRV LLS RX PRESS,DIV 2,CHNL B, MTU CAL/FUNC 1805 PERFORM 44.040.007 ATWS/SRV LLS RX PRESS,DIV 1,CHNL C, MTU CAL/FUNC 1806 PERFORM 44.040.008 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''D'', MTU CAL/FUNC SR 3.3.6.3.3-3 CHANNEL CALIBRATION Low-Low Set Instrumentation Tailpipe Pressure Switch IAW SFCP - 18 months EVENTS: EVENT TITLE 0889 PERFORM 44.210.003 SRV TAIL PIPE PRES INSTRUMENTATION CALIBRATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 71 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 85 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.3.4-1 LOGIC SYSTEM FUNCTIONAL TEST Low-Low Set Instrumentation Reactor Steam Dome Pressure - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0803 PERFORM 44.040.005 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, CHL ''A'', XMTR CAL 0804 PERFORM 44.040.006 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''B'', XMTR CAL 0807 PERFORM 44.040.009 ATWS-SRV LOW LOW SET DIV 1 LOGIC FUNCTIONAL TEST 0808 PERFORM 44.040.010 ATWS-SRV LOW LOW SET DIV 2 LOGIC FUNCTIONAL TEST 1082 PERFORM 44.210.004 SRV LO LO SET, SRV POSITION MONITOR FUNCTIONAL TEST 1803 PERFORM 44.040.005 ATWS/SRV LLS RX PRESS,DIV 1,CHNL A, MTU CAL/FUNC 1804 PERFORM 44.040.006 ATWS/SRV LLS RX PRESS,DIV 2,CHNL B, MTU CAL/FUNC 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.6.3.4-2 LOGIC SYSTEM FUNCTIONAL TEST Low-Low Set Instrumentation Low-Low Set Pressure Setpoints IAW SFCP - 18 months EVENTS: EVENT TITLE 0803 PERFORM 44.040.005 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, CHL ''A'', XMTR CAL 0804 PERFORM 44.040.006 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''B'', XMTR CAL 0805 PERFORM 44.040.007 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, CHL ''C'', XMTR CAL 0806 PERFORM 44.040.008 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''D'', XMTR CAL 0807 PERFORM 44.040.009 ATWS-SRV LOW LOW SET DIV 1 LOGIC FUNCTIONAL TEST 0808 PERFORM 44.040.010 ATWS-SRV LOW LOW SET DIV 2 LOGIC FUNCTIONAL TEST 1082 PERFORM 44.210.004 SRV LO LO SET, SRV POSITION MONITOR FUNCTIONAL TEST 1803 PERFORM 44.040.005 ATWS/SRV LLS RX PRESS,DIV 1,CHNL A, MTU CAL/FUNC 1804 PERFORM 44.040.006 ATWS/SRV LLS RX PRESS,DIV 2,CHNL B, MTU CAL/FUNC 1805 PERFORM 44.040.007 ATWS/SRV LLS RX PRESS,DIV 1,CHNL C, MTU CAL/FUNC 1806 PERFORM 44.040.008 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''D'', MTU CAL/FUNC 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 72 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 86 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.6.3.4-3 LOGIC SYSTEM FUNCTIONAL TEST Low-Low Set Instrumentation Tailpipe Pressure Switch IAW SFCP - 18 months EVENTS: EVENT TITLE 0807 PERFORM 44.040.009 ATWS-SRV LOW LOW SET DIV 1 LOGIC FUNCTIONAL TEST 0808 PERFORM 44.040.010 ATWS-SRV LOW LOW SET DIV 2 LOGIC FUNCTIONAL TEST 0889 PERFORM 44.210.003 SRV TAIL PIPE PRES INSTRUMENTATION CALIBRATION 1082 PERFORM 44.210.004 SRV LO LO SET, SRV POSITION MONITOR FUNCTIONAL TEST 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.7.1.5-1 CHANNEL CALIBRATION Control Room Emergency Filtration System Instrumentation Reactor Vessel Water Level - Low Low, IAW SFCP - 18 months Level 2 EVENTS: EVENT TITLE 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC SR 3.3.7.1.5-2 CHANNEL CALIBRATION Control Room Emergency Filtration System Instrumentation Drywell Pressure - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW PRESSURE, C71N650C, CALIBRATION/FUNC 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW PRESSURE, C71N650D, CALIBRATION/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 73 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 87 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.7.1.5-3 CHANNEL CALIBRATION Control Room Emergency Filtration System Instrumentation Fuel Pool Ventilation Exhaust IAW SFCP - 18 months Radiation - High EVENTS: EVENT TITLE 0535 PERFORM 64.020.105 FUEL POOL VENT EXH RAD MON,DIV 1,CHL A,RADIOLOGICAL CAL 0536 PERFORM 64.020.106 FUEL POOL VENT EXH RAD MON, DIV 2, CH B, RADIOLOGICAL CAL 0537 PERFORM 64.020.107 FUEL POOL VENT EXH RAD MON, DIV 1, CH C, RADIOLOGICAL CAL 0538 PERFORM 64.020.108 FUEL POOL VENT EXH RAD MON, DIV 2, CH D, RADIOLOGICAL CAL SR 3.3.7.1.5-4 CHANNEL CALIBRATION Control Room Emergency Filtration System Instrumentation Control Center Normal Makeup Air IAW SFCP - 18 months Radiation - High EVENTS: EVENT TITLE 0836 PERFORM 64.080.403 CONTROL CENTER MAKEUP AIR MNFLD RAD MON,D1,CAL 0837 PERFORM 64.080.404 CONTROL CENTER MAKEUP AIR MNFLD RAD MON,D2,CAL SR 3.3.7.1.6-1 LOGIC SYSTEM FUNCTIONAL TEST Control Room Emergency Filtration System Instrumentation Reactor Vessel Water IAW SFCP - 18 months Level - Low Low, Level 2 EVENTS: EVENT TITLE 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 1111 PERFORM 24.413.05 DIV 2 CR EMRG FILTER AUTO TRANSFER TEST 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 74 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 88 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.7.1.6-2 LOGIC SYSTEM FUNCTIONAL TEST Control Room Emergency Filtration System Instrumentation Drywell Pressure - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW PRESSURE, C71N650C, CALIBRATION/FUNC 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW PRESSURE, C71N650D, CALIBRATION/FUNC 1111 PERFORM 24.413.05 DIV 2 CR EMRG FILTER AUTO TRANSFER TEST 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF SR 3.3.7.1.6-3 LOGIC SYSTEM FUNCTIONAL TEST Control Room Emergency Filtration System Instrumentation Fuel Pool Ventilation IAW SFCP - 18 months Exhaust Radiation - High EVENTS: EVENT TITLE 0535 PERFORM 64.020.105 FUEL POOL VENT EXH RAD MON,DIV 1,CHL A,RADIOLOGICAL CAL 0536 PERFORM 64.020.106 FUEL POOL VENT EXH RAD MON, DIV 2, CH B, RADIOLOGICAL CAL 0537 PERFORM 64.020.107 FUEL POOL VENT EXH RAD MON, DIV 1, CH C, RADIOLOGICAL CAL 0538 PERFORM 64.020.108 FUEL POOL VENT EXH RAD MON, DIV 2, CH D, RADIOLOGICAL CAL 1111 PERFORM 24.413.05 DIV 2 CR EMRG FILTER AUTO TRANSFER TEST 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 75 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 89 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.7.2.3 CHANNEL CALIBRATION Mechanical Vacuum Pump (MVP) Trip Instrumentation Main Steam Line Radiation - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0761 PERFORM 64.080.029, MAIN STEAM LINE RADIATION MONITOR CHANNEL A CALIBRATION - LICENSE RENEWAL REQD 0762 PERFORM 64.080.030, MAIN STEAM LINE RADIATION MONITOR CHANNEL B CALIBRATION - LICENSE RENEWAL REQD 0763 PERFORM 64.080.031, MAIN STEAM LINE RADIATION MONITOR CHANNEL C CALIBRATION - LICENSE RENEWAL REQD 0764 PERFORM 64.080.032, MAIN STEAM LINE RADIATION MONITOR CHANNEL D CALIBRATION - LICENSE RENEWAL REQD 1068 PERFORM 64.080.033 MAIN STEAM LINE RADIATION DETECTOR D11N600E CALIBRATION WITH CHANNEL A (was 64.010.033) 1069 PERFORM 64.080.034 MAIN STEAM LINE RADIATION DETECTOR D11N600F CALIBRATION WITH CHANNEL C (was 64.010.034) 2068 PERFORM 64.080.033 MAIN STEAM LINE RADIATION DETECTOR D11N600E CALIBRATION WITH CHANNEL B 2069 PERFORM 64.080.034 MAIN STEAM LINE RADIATION DETECTOR D11N600F CALIBRATION WITH CHANNEL D SR 3.3.7.2.4 LOGIC SYSTEM FUNCTIONAL TEST Mechanical Vacuum Pump (MVP) Trip Instrumentation Main Steam Line Radiation - IAW SFCP - 18 months High EVENTS: EVENT TITLE 0204 PERFORM 44.080.605 EAST AND WEST GLAND SEAL EXHAUSTER/MECHANICAL VACUUM PUMP DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 76 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 90 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.7.3.3 CHANNEL CALIBRATION Gland Seal Exhauster (GSE) Trip Instrumentation Main Steam Line Radiation - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0761 PERFORM 64.080.029, MAIN STEAM LINE RADIATION MONITOR CHANNEL A CALIBRATION - LICENSE RENEWAL REQD 0762 PERFORM 64.080.030, MAIN STEAM LINE RADIATION MONITOR CHANNEL B CALIBRATION - LICENSE RENEWAL REQD 0763 PERFORM 64.080.031, MAIN STEAM LINE RADIATION MONITOR CHANNEL C CALIBRATION - LICENSE RENEWAL REQD 0764 PERFORM 64.080.032, MAIN STEAM LINE RADIATION MONITOR CHANNEL D CALIBRATION - LICENSE RENEWAL REQD 1068 PERFORM 64.080.033 MAIN STEAM LINE RADIATION DETECTOR D11N600E CALIBRATION WITH CHANNEL A (was 64.010.033) 1069 PERFORM 64.080.034 MAIN STEAM LINE RADIATION DETECTOR D11N600F CALIBRATION WITH CHANNEL C (was 64.010.034) 2068 PERFORM 64.080.033 MAIN STEAM LINE RADIATION DETECTOR D11N600E CALIBRATION WITH CHANNEL B 2069 PERFORM 64.080.034 MAIN STEAM LINE RADIATION DETECTOR D11N600F CALIBRATION WITH CHANNEL D SR 3.3.7.3.4 LOGIC SYSTEM FUNCTIONAL TEST Gland Seal Exhauster (GSE) Trip Instrumentation Main Steam Line Radiation - High IAW SFCP - 18 months EVENTS: EVENT TITLE 0204 PERFORM 44.080.605 EAST AND WEST GLAND SEAL EXHAUSTER/MECHANICAL VACUUM PUMP SR 3.3.8.2.2.a CHANNEL CALIBRATION The Allowable Values shall be: a. Overvoltage 132 V. IAW SFCP - 18 months EVENTS: EVENT TITLE 2272 PERFORM 42.610.02 Div 1, NORMAL FEED, EPA's A & C, CAL/FUNCTIONAL 2274 PERFORM 42.610.04 Div 2, NORMAL FEED, EPA's B & D, CAL/FUNCTIONAL 2295 PERFORM 42.610.01 Div 1, ALTERNATE FEED, EPA's E & G, CAL/FUNC 2297 PERFORM 42.610.03 Div 2, ALTERNATE FEED, EPA's F & H, CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 77 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 91 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.3.8.2.2.b CHANNEL CALIBRATION The Allowable Values shall be: b. Undervoltage 108 V. IAW SFCP - 18 months EVENTS: EVENT TITLE 2272 PERFORM 42.610.02 Div 1, NORMAL FEED, EPA's A & C, CAL/FUNCTIONAL 2274 PERFORM 42.610.04 Div 2, NORMAL FEED, EPA's B & D, CAL/FUNCTIONAL 2295 PERFORM 42.610.01 Div 1, ALTERNATE FEED, EPA's E & G, CAL/FUNC 2297 PERFORM 42.610.03 Div 2, ALTERNATE FEED, EPA's F & H, CAL/FUNC SR 3.3.8.2.2.c CHANNEL CALIBRATION The Allowable Values shall be: c. Underfrequency 57 Hz. IAW SFCP - 18 months EVENTS: EVENT TITLE 2272 PERFORM 42.610.02 Div 1, NORMAL FEED, EPA's A & C, CAL/FUNCTIONAL 2274 PERFORM 42.610.04 Div 2, NORMAL FEED, EPA's B & D, CAL/FUNCTIONAL 2295 PERFORM 42.610.01 Div 1, ALTERNATE FEED, EPA's E & G, CAL/FUNC 2297 PERFORM 42.610.03 Div 2, ALTERNATE FEED, EPA's F & H, CAL/FUNC SR 3.3.8.2.3 Perform a system functional test. IAW SFCP - 18 months EVENTS: EVENT TITLE 2272 PERFORM 42.610.02 Div 1, NORMAL FEED, EPA's A & C, CAL/FUNCTIONAL 2274 PERFORM 42.610.04 Div 2, NORMAL FEED, EPA's B & D, CAL/FUNCTIONAL 2295 PERFORM 42.610.01 Div 1, ALTERNATE FEED, EPA's E & G, CAL/FUNC 2297 PERFORM 42.610.03 Div 2, ALTERNATE FEED, EPA's F & H, CAL/FUNC SR 3.4.3.2 Verify each required SRV is capable of being opened. IAW SFCP - 18 months EVENTS: EVENT TITLE 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 78 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 92 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.4.6.3 Perform a CHANNEL CALIBRATION of required leakage detection instrumentation. IAW SFCP - 18 months EVENTS: EVENT TITLE 0868 PERFORM 44.120.050 DW FLOOR DRN SUMP LVL CAL (TRANSMITTERS PORTION) 0888 PERFORM 44.210.002 DRYWELL SUMP LEVEL CHANNEL CALIBRATION 0890 PERFORM 64.210.031 PRIMARY CONTAINMENT ATMOSPHERE RADIATION MONITOR CALIBRATION 1868 PERFORM 44.120.050 DW FLOOR DRN SUMP LVL CAL (ALARM,LOGIC & INDICATION) 3887 PERFORM 44.210.006 DRYWELL SUMP FLOW CHANNEL CALIBRATION/FUNCTIONAL SR 3.5.1.7 Verify each recirculation pump discharge valve cycles through one complete cycle of full travel or is de-energized in the closed IAW SFCP - 18 months position.
| |
| EVENTS: EVENT TITLE 0244 PERFORM 24.138.02 SEC-5.2 RX RECIRC LOCAL VALVE POSITION VERIFICATION TEST SR 3.5.1.10 Verify, with reactor pressure 215 psig, the HPCI pump can develop a flow rate 5000 gpm against a system head IAW SFCP - 18 months corresponding to reactor pressure.
| |
| EVENTS: EVENT TITLE 0250 PERFORM 24.202.02 HPCI FLOW RATE TEST AT 165 PSIG DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 79 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 93 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.5.1.11 Verify each ECCS injection/spray subsystem actuates on an actual or simulated automatic initiation signal. IAW SFCP - 18 months EVENTS: EVENT TITLE 0253 PERFORM 24.202.04 HPCI OFFLINE AUTO INITIATION AND TIME RESPONSE TEST 0257 PERFORM 24.203.02 SEC-5.3 DIVISION 1 CSS SIM AUTO ACT -E2150F005A ONLY 0258 PERFORM 24.203.03 SEC-5.3 DIVISION 2 CSS SIM AUTO ACT - E2150F005B ONLY 0263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACTUATION TEST & VALVE OPER TEST 0281 PERFORM 24.307.01 SECT 5.2 EDG 11 ECCS START WITH LOSS OF OFFSITE POWER TEST 0282 PERFORM 24.307.02 SECT 5.2 EDG 12 ECCS START WITH LOSS OF OFFSITE POWER TEST 0283 PERFORM 24.307.03 SECT 5.2 EDG 13 ECCS START WITH LOSS OF OFFSITE POWER TEST 0284 PERFORM 24.307.04 SECT 5.2 EDG 14 ECCS START WITH LOSS OF OFFSITE POWER TEST 0640 PERFORM 44.030.001 ECCS - CORE SPRAY SYSTEM, DIV 1, LOGIC FUNCTIONAL TEST 0641 PERFORM 44.030.002 ECCS - CORE SPRAY SYSTEM, DIV 2, LOGIC FUNCTIONAL TEST 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 0769 PERFORM 44.030.271 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL A,XMTR CAL 0770 PERFORM 44.030.272 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL B,XMTR CAL 0771 PERFORM 44.030.273 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL C,XMTR CAL 0772 PERFORM 44.030.274 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL D,XMTR CAL 0773 PERFORM 44.030.283 ECCS RX STM DOME PRES RHR LOOP SLCT PERM,D1,CHL A, XMTR CAL 0774 PERFORM 44.030.284 ECCS RX STM DOME PRES RHR LOOP SLCT PERM,DIV 2,CH ''B'',XMTR CAL 0775 PERFORM 44.030.285 ECCS RX STM DOME PRES RHR LOOP SLCT PERM,DIV 1,CH ''C'',XMTR CAL 0776 PERFORM 44.030.286 ECCS RX STM DOME PRES RHR LOOP SLCT PERM,DIV 2,CH ''D'',XMTR CAL 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL A,CAL/FUNC 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL B,CAL/FUNC 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL C,CAL/FUNCT 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL D,CAL/FUNC 0791 PERFORM 44.030.051 ECCS-RHR (LPCI MODE) DIV 1, LOGIC FUNCTIONAL TEST 0792 PERFORM 44.030.052 ECCS-RHR (LPCI MODE) DIV 2, LOGIC FUNCT TEST & VLV ACTUATION DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 80 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 94 of 395 REQUIREMENT REQUIREMENT TITLE FREQ 0793 PERFORM 44.030.060 ECCS RX RECIRC RISER DP,DIV 1,CHNL A,CAL/FUNCTIONAL 0794 PERFORM 44.030.061 ECCS RX RECIRC RISER DP,DIV 2,CHNL B,CAL/FUNCTIONAL 0795 PERFORM 44.030.062 ECCS RX RECIRC RISER DP,DIV 1,CHNL C, CALIBRATION/FUNCTIONAL 0796 PERFORM 44.030.063 ECCS RX RECIRC RISER DP,DIV 2,CHNL D,CAL/FUNCTIONAL 0797 PERFORM 44.030.072 ECCS RX RECIRC PUMP A DP, DIV 1, CHNL A, CALIBRATION/FUNCT 0798 PERFORM 44.030.073 ECCS RX RECIRC PUMP B DP, DIV 1, CHNL B, CALIBRATION/FUNCT 0799 PERFORM 44.030.074 ECCS RX RECIRC PUMP B DP, DIV 2, CHNL A, CALIBRATION/FUNCT 0800 PERFORM 44.030.075 ECCS RX RECIRC PUMP A DP, DIV 2, CHNL B, CALIBRATION/FUNCT 0807 PERFORM 44.040.009 ATWS-SRV LOW LOW SET DIV 1 LOGIC FUNCTIONAL TEST 1100 PERFORM 24.202.08 SEC-5.1 (Wtr Lvl) HPCI RTT & PUMP OPERABILITY AT 1025 PSIG 1263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACT. TEST (RHR Pump's & Vlv's) 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION 1769 PERFORM 44.030.271 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL A,MTU CAL/FUNC 1770 PERFORM 44.030.272 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL B,MTU CAL/FUNC 1771 PERFORM 44.030.273 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 1,CHNL C,MTU CAL/FUNC 1772 PERFORM 44.030.274 ECCS RX STM DOME PRES RHR/CSS INJECT,DIV 2,CHNL D,MTU CAL/FUNC 1773 PERFORM 44.030.283 ECCS RX STM DOME PRES RHR LOOP SELECT,D1,CHL A,MTU-CAL/CF 1774 PERFORM 44.030.284 ECCS RX STM DOME PRES RHR LOOP SELECT,D2,CHL B,MTU-CAL/CF 1775 PERFORM 44.030.285 ECCS RX STM DOME PRES RHR LOOP SELECT,D1,CHL C,MTU-CAL/CF 1776 PERFORM 44.030.286 ECCS RX STM DOME PRES RHR LOOP SELECT,D2,CHL D,MTU-CAL/CF 1797 PERFORM 44.030.076 ECCS RX RECIRC PUMP A DP, DIV 1, CH C, CALIBRATION/FUNCTIONAL 1798 PERFORM 44.030.077 ECCS RX RECIRC PUMP B DP, DIV 1, CH D, CALIBRATION/FUNCTIONAL 1799 PERFORM 44.030.078 ECCS RX RECIRC PUMP B DP, DIV 2, CHNL C, CALIBRATION/FUNCT 1800 PERFORM 44.030.079 ECCS RX RECIRC PUMP A DP, DIV 2, CH D, CALIBRATION/FUNCTIONAL 2100 PERFORM 24.202.08 SEC-5.2 (Dw Press) HPCI LSFT & PUMP OPERABILITY AT 1025 PSIG 2257 PERFORM 24.203.02 SEC-5.2 DIVISION 1 CSS SIMULATED AUTOMATIC ACTUATION TEST 2258 PERFORM 24.203.03 SEC-5.2 DIVISION 2 CSS SIMULATED AUTOMATIC ACTUATION TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 81 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 95 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.5.1.12 Verify the ADS actuates on an actual or simulated automatic initiation signal. IAW SFCP - 18 months EVENTS: EVENT TITLE 0647 PERFORM 44.030.201 ECCS - ADS,TRIP SYS A LOGIC FUNCTIONAL TEST 0648 PERFORM 44.030.202 ECCS - ADS,TRIP SYS B LOGIC FUNCTIONAL TEST 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 0765 PERFORM 44.030.265 ECCS RX WTR LVL (ADS LVL3 & FW/MN TURB LVL8)D1,CH A,XMTR CAL 0766 PERFORM 44.030.266 ECCS RX WTR LVL (ADS LVL3 & FW/MN TURB LVL8)D2,CH B,XMTR CAL 0777 PERFORM 44.030.295 ECCS DW PRESSURE ADS ACTUATION,DIV 1,CHNL A,CALIBRATION/FUNC 0778 PERFORM 44.030.296 ECCS DW PRESSURE ADS ACTUATION,DIV 2,CHNL B,CALIBRATION/FUNC 0779 PERFORM 44.030.297 ECCS DW PRESSURE ADS ACTUATION,DIV 1,CHNL C,CALIBRATION/FUNC 0780 PERFORM 44.030.298 ECCS DW PRESSURE ADS ACTUATION,DIV 2,CHNL D,CALIBRATION/FUNC 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION 1765 PERFORM 44.030.265 ECCS RX WTR LVL (ADS LVL3-FW/MN TURB LVL8)D1,CH A,MTU CAL/CF 1766 PERFORM 44.030.266 ECCS RX WTR LVL (ADS LVL3-FW/MN TURB LVL8)D2,CH B,MTU CAL/CF SR 3.5.1.13 Verify each ADS valve is capable of being opened. IAW SFCP - 18 months EVENTS: EVENT TITLE 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 82 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 96 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.5.1.14 Verify ECCS RESPONSE TIME is within limits. IAW SFCP - 18 months EVENTS: EVENT TITLE 0253 PERFORM 24.202.04 HPCI OFFLINE AUTO INITIATION AND TIME RESPONSE TEST 0257 PERFORM 24.203.02 SEC-5.3 DIVISION 1 CSS SIM AUTO ACT -E2150F005A ONLY 0258 PERFORM 24.203.03 SEC-5.3 DIVISION 2 CSS SIM AUTO ACT - E2150F005B ONLY 0263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACTUATION TEST & VALVE OPER TEST 0265 PERFORM 24.204.05 SEC-5.1 DIV. 1 RHR LOCAL VALVE POSITION INDICATION & STROKE 1100 PERFORM 24.202.08 SEC-5.1 (Wtr Lvl) HPCI RTT & PUMP OPERABILITY AT 1025 PSIG 1134 PERFORM 24.204.05 SEC-5.3 DIV. 2 RHR LOCAL VALVE POSITION INDICATION & STROKE 2257 PERFORM 24.203.02 SEC-5.2 DIVISION 1 CSS SIMULATED AUTOMATIC ACTUATION TEST 2258 PERFORM 24.203.03 SEC-5.2 DIVISION 2 CSS SIMULATED AUTOMATIC ACTUATION TEST 2263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACT. TEST (Recirc Vlv's)
| |
| SR 3.5.2.8 Verify each valve credited for automatically isolating a penetration flow path actuates to the isolation position on an actual or IAW SFCP - 18 months simulated isolation signal.
| |
| EVENTS: EVENT TITLE 0353 PERFORM 24.707.01 SEC-5.1 RWCU LOCAL VALVE POSITION VERIFICATION 0511 PERFORM 44.010.056 RPS-TURBINE STOP VALVE CLOSURE, TRIP SYS B, CHAN B2, RTT 0527 PERFORM 44.020.501 RWCU NSSSS- INBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 0528 PERFORM 44.020.601 RWCU NSSSS- OTBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 0548 PERFORM 44.020.152 NS4 REACTOR WATER CLEANUP DIFFERENTIAL FLOW CAL./FUNC.
| |
| 0552 PERFORM 44.020.159 NS4 RWCU AREA NRHX DISCHARGE TEMPERATURE, DIV 2,CAL/FUNC.
| |
| 0791 PERFORM 44.030.051 ECCS-RHR (LPCI MODE) DIV 1, LOGIC FUNCTIONAL TEST 0792 PERFORM 44.030.052 ECCS-RHR (LPCI MODE) DIV 2, LOGIC FUNCT TEST & VLV ACTUATION 1135 PERFORM 24.204.08 NON-DIVISIONAL RHR VALVE POSITION & STROKE TIME TEST 2527 PERFORM 44.020.502 INBD SDC-HEAD SPRAY AUTO ISOLATION LOGIC FUNCTIONAL 2528 PERFORM 44.020.001 SECT 6.3 NSSS MSIV DRNS/ RECIRC SAMPLE INBD VLV'S LOGIC SYS FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 83 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 97 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.5.2.9 Verify the required ECCS injection/spray subsystem can be manually operated. IAW SFCP - 18 months EVENTS: EVENT TITLE 0257 PERFORM 24.203.02 SEC-5.3 DIVISION 1 CSS SIM AUTO ACT -E2150F005A ONLY 0258 PERFORM 24.203.03 SEC-5.3 DIVISION 2 CSS SIM AUTO ACT - E2150F005B ONLY 0260 PERFORM 24.203.04 SEC-5.3 DIV.1 CSS LOCAL VALVE POSITION INDICATION VERIF.
| |
| 0265 PERFORM 24.204.05 SEC-5.1 DIV. 1 RHR LOCAL VALVE POSITION INDICATION & STROKE 1134 PERFORM 24.204.05 SEC-5.3 DIV. 2 RHR LOCAL VALVE POSITION INDICATION & STROKE 1260 PERFORM 24.203.04 SEC-5.4 DIV.2 CSS LOCAL VALVE POSITION INDICATION VERIF.
| |
| 1265 PERFORM 24.204.05 SEC-5.2 DIV 1 RHR LOCAL VALVE POSITION INDICATION VERIF.
| |
| 1266 PERFORM 24.204.05 SEC-5.4 DIV 2 RHR LOCAL VALVE POSITION INDICATION VERIF.
| |
| 2257 PERFORM 24.203.02 SEC-5.2 DIVISION 1 CSS SIMULATED AUTOMATIC ACTUATION TEST 2258 PERFORM 24.203.03 SEC-5.2 DIVISION 2 CSS SIMULATED AUTOMATIC ACTUATION TEST SR 3.5.3.4 Verify, with reactor pressure 200 psig, the RCIC pump can develop a flow rate 600 gpm against a system head IAW SFCP - 18 months corresponding to reactor pressure.
| |
| EVENTS: EVENT TITLE 0271 PERFORM 24.206.04 SEC-5.1 RCIC SYSTEM FLOW TEST AT 150 PSIG 0274 PERFORM 24.206.04 SEC-5.2 RCIC SYSTEM AUTOMATIC ACTUATION TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 84 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 98 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.5.3.5 Verify the RCIC System actuates on an actual or simulated automatic initiation signal. IAW SFCP - 18 months EVENTS: EVENT TITLE 0272 PERFORM 24.206.02 SEC-5.2 RCIC VAL POS INDICATION VERIF. / MANUAL INITIATE 0274 PERFORM 24.206.04 SEC-5.2 RCIC SYSTEM AUTOMATIC ACTUATION TEST 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION 2809 PERFORM 44.060.002 RCIC SYSTEM LOGIC FUNCTIONAL TEST - ONLINE SR 3.6.1.1.2 Verify drywell to suppression chamber differential pressure does not decrease at a rate > 0.2 inch water gauge per minute IAW SFCP - 18 months tested over a 10 minute period at an initial differential pressure of 1 psid.
| |
| EVENTS: EVENT TITLE 0311 PERFORM 24.402.06 DRYWELL TO TORUS BYPASS LEAK TEST (AS FOUND) 1311 PERFORM 24.402.06 DRYWELL TO TORUS BYPASS LEAK TEST (AS LEFT)
| |
| DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 85 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 99 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.6.1.3.8 Verify each automatic PCIV actuates to the isolation position on an actual or simulated isolation signal. IAW SFCP - 18 months EVENTS: EVENT TITLE 0239 PERFORM 24.137.18 SEC-5.2 MS LINE DRN & DRN ISO VLV OP & LOC POSITION VERIF TEST 0255 PERFORM 24.202.05 SEC-5.2 & 5.3 HPCI LOCAL VALVE POS INDICATION VERIF & LSFT 0353 PERFORM 24.707.01 SEC-5.1 RWCU LOCAL VALVE POSITION VERIFICATION 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW PRESSURE, C71N650C, CALIBRATION/FUNC 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW PRESSURE, C71N650D, CALIBRATION/FUNC 0527 PERFORM 44.020.501 RWCU NSSSS- INBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 0528 PERFORM 44.020.601 RWCU NSSSS- OTBD ISOLATION VALVE LOGIC SYSTEM FUNCTIONAL 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 0560 PERFORM 44.020.203 NS4 HPCI STEAM LINE FLOW, TRIP SYS A, CAL/FUNCTIONAL 0561 PERFORM 44.020.204 NS4 HPCI STEAM LINE FLOW, TRIP SYS B, CAL/FUNCTIONAL 0582 PERFORM 44.020.233 NS4 RCIC STEAM LINE FLOW, TRIP SYS A, CAL/FUNCT 0583 PERFORM 44.020.234 NS4 RCIC STEAM LINE FLOW, TRIP SYS B, CALIBRATION/FUNCTIONAL 0600 PERFORM 44.020.027 NS4 MAIN STEAM LINE PRESSURE, TRIP SYS A, CH A, CAL/FUNC 0601 PERFORM 44.020.028 NS4 MAIN STEAM LINE PRESSURE,TRIP SYS B, CH B, CAL/FUNC 0602 PERFORM 44.020.029 NS4 MAIN STEAM LINE PRESSURE,TRIP SYS A, CHNL C,CAL/FUNC 0603 PERFORM 44.020.030 NS4 MAIN STEAM LINE PRESSURE, TRIP SYS B, CH D, CAL/FUNC 0628 PERFORM 44.020.416 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N612A,CAL/FUNC 0629 PERFORM 44.020.420 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N612B,CAL/FUNC 0630 PERFORM 44.020.424 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N612C,CAL/FUNC 0631 PERFORM 44.020.428 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N612D,CAL/FUNC 0632 PERFORM 44.020.063 NS4 CONDENSER PRESS TRIP SYSTEM A, CHANNEL A, CAL/FUNCT 0633 PERFORM 44.020.064 NS4 CONDENSER PRESS TRIP SYSTEM B, CHANNEL B, CAL/FUNC 0634 PERFORM 44.020.065 NS4 CONDENSER PRESS TRIP SYSTEM A, CHANNEL C, CAL/FUNCT DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 86 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 100 of 395 REQUIREMENT REQUIREMENT TITLE FREQ 0635 PERFORM 44.020.066 NS4 CONDENSER PRESS TRIP SYSTEM B, CHANNEL D, CAL/FUNC 0636 PERFORM 44.020.432 NS4 TB AREA TEMP, TRIP SYS A, CH A, B21N616A, CAL/FUNC 0637 PERFORM 44.020.434 NS4 TB AREA TEMP, TRIP SYS B, CH B, B21N616B, CAL/FUNC 0638 PERFORM 44.020.436 NS4 TB AREA TEMP, TRIP SYS A, CH C, B21N616C, CAL/FUNC 0639 PERFORM 44.020.438 NS4 TB AREA TEMP, TRIP SYS B, CH D, B21N616D, CAL/FUNC 0640 PERFORM 44.030.001 ECCS - CORE SPRAY SYSTEM, DIV 1, LOGIC FUNCTIONAL TEST 0641 PERFORM 44.030.002 ECCS - CORE SPRAY SYSTEM, DIV 2, LOGIC FUNCTIONAL TEST 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, XMTR CALIBRATION 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR CALIBRATION 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR CALIBRATION 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR CALIBRATION 0750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N080A, XMTR CAL 0751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N080B, XTMR CAL 0752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N080C, XMTR CAL 0753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N080D, XMTR CAL 0761 PERFORM 64.080.029, MAIN STEAM LINE RADIATION MONITOR CHANNEL A CALIBRATION - LICENSE RENEWAL REQD 0762 PERFORM 64.080.030, MAIN STEAM LINE RADIATION MONITOR CHANNEL B CALIBRATION - LICENSE RENEWAL REQD 0763 PERFORM 64.080.031, MAIN STEAM LINE RADIATION MONITOR CHANNEL C CALIBRATION - LICENSE RENEWAL REQD 0764 PERFORM 64.080.032, MAIN STEAM LINE RADIATION MONITOR CHANNEL D CALIBRATION - LICENSE RENEWAL REQD 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL A,CAL/FUNC 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL B,CAL/FUNC 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL C,CAL/FUNCT 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL D,CAL/FUNC 1068 PERFORM 64.080.033 MAIN STEAM LINE RADIATION DETECTOR D11N600E CALIBRATION WITH CHANNEL A (was 64.010.033) 1069 PERFORM 64.080.034 MAIN STEAM LINE RADIATION DETECTOR D11N600F CALIBRATION WITH CHANNEL C (was 64.010.034) 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 87 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 101 of 395 REQUIREMENT REQUIREMENT TITLE FREQ 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC 1628 PERFORM 44.020.417 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N613A,CAL/FUNC 1629 PERFORM 44.020.421 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N613B,CAL/FUNC 1630 PERFORM 44.020.422 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N614B,CAL/FUNC 1631 PERFORM 44.020.423 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N615B,CAL/FUNC 1636 PERFORM 44.020.433 NS4 TB AREA TEMP, TRIP SYS A, CH A, B21N617A, CAL/FUNC 1637 PERFORM 44.020.435 NS4 TB AREA TEMP, TRIP SYS B, CH B, B21N617B, CAL/FUNC 1638 PERFORM 44.020.437 NS4 TB AREA TEMP, TRIP SYS A, CH C, B21N617C, CAL/FUNC 1639 PERFORM 44.020.439 NS4 TB AREA TEMP TRIP SYS B, CH D, B21N617D, CAL/FUNC 1644 PERFORM 44.030.152 ONLINE - HPCI SYSTEM LOGIC FUNCTIONAL TEST 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU CAL 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU CAL 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU CAL 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU CALIBRATION 1728 PERFORM 44.020.418 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N614A,CAL/FUNC 1730 PERFORM 44.020.425 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N613C,CAL/FUNC 1731 PERFORM 44.020.426 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N614C,CAL/FUNC 1732 PERFORM 44.020.427 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N615C,CAL/FUNC 1750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR LVL 3, B21N680A MTU CAL/FUNC 1751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR LVL 3, B21N680B MTU CAL/FUNC 1752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR LVL 3, B21N680C MTU CAL/FUNC 1753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR LVL 3, B21N680D MTU CAL/FUNC 1828 PERFORM 44.020.419 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS A,B21N615A,CAL/FUNC 1831 PERFORM 44.020.429 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N613D,CAL/FUNC 1832 PERFORM 44.020.430 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N614D,CAL/FUNC 1833 PERFORM 44.020.431 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SYS B,B21N615D,CAL/FUNC 2068 PERFORM 64.080.033 MAIN STEAM LINE RADIATION DETECTOR D11N600E CALIBRATION WITH CHANNEL B 2069 PERFORM 64.080.034 MAIN STEAM LINE RADIATION DETECTOR D11N600F CALIBRATION WITH CHANNEL D 2527 PERFORM 44.020.502 INBD SDC-HEAD SPRAY AUTO ISOLATION LOGIC FUNCTIONAL 2528 PERFORM 44.020.001 SECT 6.3 NSSS MSIV DRNS/ RECIRC SAMPLE INBD VLV'S LOGIC SYS FUNC DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 88 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 102 of 395 REQUIREMENT REQUIREMENT TITLE FREQ 2529 PERFORM 44.020.001 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 1 LOGIC SYSTEM FUNCTIONAL 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 2809 PERFORM 44.060.002 RCIC SYSTEM LOGIC FUNCTIONAL TEST - ONLINE 3528 PERFORM 44.020.602 OTBD SDC - HEAD SPRAY AUTO ISOLATION LOGIC FUNCTIONAL 3529 PERFORM 44.020.002 NSSSS MSIV DRN/ RECIRC SAMPLE OTBD VLV'S LOGIC SYS FUNC 3530 PERFORM 44.020.002 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 2 LOGIC SYSTEM FUNCTIONAL 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3730 PERFORM 44.020.604 NS4 DIV 1 TIP ISO VALVES LOGIC FUNCTIONAL DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 89 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 103 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.6.1.3.9 Verify a representative sample of reactor instrumentation line EFCVs actuates on a simulated instrument line break to restrict IAW SFCP - 18 Months flow.
| |
| EVENTS: EVENT TITLE 0897 PERFORM 44.220.115 SECT. 6.1 (H21P004) GROUP 1 INSTRUMENT LINE EXCESS FLOW CHECK VALVE FUNCTIONAL 0897A PERFORM 44.220.115 SECT. 6.2 (H21P009) GROUP 1 INSTRUMENT LINE EXCESS FLOW CHECK VALVE FUNCTIONAL 0897B PERFORM 44.220.115 SECT. 6.3 (H21P015) GROUP 1 INSTRUMENT LINE EXCESS FLOW CHECK VALVE FUNCTIONAL 0897C PERFORM 44.220.115 SECT. 6.4 (H21P036) GROUP 1 INSTRUMENT LINE EXCESS FLOW CHECK VALVE FUNCTIONAL 3300 PERFORM 44.220.110 SECT. 6.1 (H21P015) GRP 2 INST LINES EFCV'S, FUNCTIONAL TEST 3300A PERFORM 44.220.110 SECT. 6.2 (H21P025) GRP 2 INST LINES EFCV'S, FUNCTIONAL TEST 3300B PERFORM 44.220.110 SECT. 6.3 (H21P009) GRP 2 INST LINES EFCV'S, FUNCTIONAL TEST 3300C PERFORM 44.220.110 SECT. 6.4 (H21P006) GRP 2 INST LINES EFCV'S, FUNCTIONAL TEST 3300D PERFORM 44.220.110 SECT. 6.5 (H21P022) GRP 2 INST LINES EFCV'S, FUNCTIONAL TEST 3300E PERFORM 44.220.110 SECT. 6.6 (H21P421A) GRP 2 -N21F539B only 3301 PERFORM 44.220.112 SECT. 6.1 (H21P009) GROUP 4 INST LINES EFCV'S, FUNCTIONAL TEST 3301A PERFORM 44.220.112 SECT. 6.6 (B21F517B only) GROUP 4 INST LINES EFCV'S, FUNCTIONAL TEST 3301B PERFORM 44.220.112 SECT. 6.2 (H21P015) GROUP 4 INST LINES EFCV'S, FUNCTIONAL TEST 3301C PERFORM 44.220.112 SECT. 6.3 (H21P016) GROUP 4 INST LINES EFCV'S, FUNCTIONAL TEST 3301D PERFORM 44.220.112 SECT. 6.4 (H21P035) GROUP 4 INST LINES EFCV'S, FUNCTIONAL TEST 3301E PERFORM 44.220.112 SECT. 6.5 (H21P421B) GROUP 4 INST LINES EFCV'S, FUNCTIONAL TEST 3302 PERFORM 44.220.113 (Sec-6.1-H21P006)GRP 5 INSTRUMENT LINE EXCESS FLOW CHECK VALVE FUNCTIONAL 3302A PERFORM 44.220.113 (Sec-6.2-H21P009)GRP 5 INSTRUMENT LINE EXCESS FLOW CHECK VALVE FUNCTIONAL 3302B PERFORM 44.220.113 (Sec-6.3-H21P025)GRP 5 INSTRUMENT LINE EXCESS FLOW CHECK VALVE FUNCTIONAL 3304 PERFORM 44.220.111 SECT. 6.1 (H21P005) GROUP 3 INST LINES EFCV'S, FUNCTIONAL TEST 3304A PERFORM 44.220.111 SECT. 6.2 (H21P010) GROUP 3 INST LINES EFCV'S, FUNCTIONAL TEST 3304B PERFORM 44.220.111 SECT. 6.3 (H21P038) GROUP 3 INST LINES EFCV'S, FUNCTIONAL TEST 3307 PERFORM 44.220.114 SECT. 6.1 (H21P010) GROUP 6 INSTRUMENT LINE EXCESS FLOW CHECK VALVE FUNCTIONAL 3307A PERFORM 44.220.114 SECT. 6.2 (H21P022) GROUP 6 INSTRUMENT LINE EXCESS FLOW CHECK VALVE FUNCTIONAL DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 90 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 104 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.6.1.3.10 Remove and test the explosive squib from each shear isolation valve of the TIP System. IAW SFCP - 18 months on a STAGGERED TEST BASIS EVENTS: EVENT TITLE 0981 PERFORM 43.606.001 TRAVERSING IN-CORE PROBE SHEAR VALVE 'A' EXPLOSIVE CHARGE 1981 PERFORM 43.606.001 TRAVERSING IN-CORE PROBE SHEAR VALVE 'B' EXPLOSIVE CHARGE 1982 PERFORM 43.606.001 TRAVERSING IN-CORE PROBE SHEAR VALVE 'C' EXPLOSIVE CHARGE 1983 PERFORM 43.606.001 TRAVERSING IN-CORE PROBE SHEAR VALVE 'D' EXPLOSIVE CHARGE 1984 PERFORM 43.606.001 TRAVERSING IN-CORE PROBE SHEAR VALVE 'E' EXPLOSIVE CHARGE SR 3.6.1.6.1 Verify each LLS valve is capable of being opened. IAW SFCP - 18 months EVENTS: EVENT TITLE 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.6.1.6.2 Verify the LLS System actuates on an actual or simulated automatic initiation signal. IAW SFCP - 18 months EVENTS: EVENT TITLE 0803 PERFORM 44.040.005 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, CHL ''A'', XMTR CAL 0804 PERFORM 44.040.006 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''B'', XMTR CAL 0805 PERFORM 44.040.007 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, CHL ''C'', XMTR CAL 0806 PERFORM 44.040.008 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''D'', XMTR CAL 0807 PERFORM 44.040.009 ATWS-SRV LOW LOW SET DIV 1 LOGIC FUNCTIONAL TEST 0808 PERFORM 44.040.010 ATWS-SRV LOW LOW SET DIV 2 LOGIC FUNCTIONAL TEST 0889 PERFORM 44.210.003 SRV TAIL PIPE PRES INSTRUMENTATION CALIBRATION 1082 PERFORM 44.210.004 SRV LO LO SET, SRV POSITION MONITOR FUNCTIONAL TEST 1803 PERFORM 44.040.005 ATWS/SRV LLS RX PRESS,DIV 1,CHNL A, MTU CAL/FUNC 1804 PERFORM 44.040.006 ATWS/SRV LLS RX PRESS,DIV 2,CHNL B, MTU CAL/FUNC 1805 PERFORM 44.040.007 ATWS/SRV LLS RX PRESS,DIV 1,CHNL C, MTU CAL/FUNC 1806 PERFORM 44.040.008 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, CHL ''D'', MTU CAL/FUNC 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 91 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 105 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.6.1.7.3 Verify the opening setpoint of each vacuum breaker is 0.5 psid. IAW SFCP - 18 months EVENTS: EVENT TITLE 0905 PERFORM 44.220.204 TORUS TO RX BLDG VACUUM BREAKER VALVE POS INDICATION CAL SR 3.6.1.8.3 Verify the opening setpoint of each vacuum breaker is 0.5 psid. IAW SFCP - 18 months EVENTS: EVENT TITLE 0904 PERFORM 44.220.203 TORUS TO DRYWELL VACUUM BREAKER VALVE POS INDICATION CAL SR 3.6.4.1.5 Verify each standby gas treatment (SGT) subsystem will draw down the secondary containment to 0.25 inch of vacuum water IAW SFCP - 18 months on a gauge in 12 minutes. STAGGERED TEST BASIS EVENTS: EVENT TITLE 0317 PERFORM 24.405.03 SECONDARY CONTAINMENT INTEGRITY TEST (USING DIV 1 SGTS) 1317 PERFORM 24.405.03 SECONDARY CONTAINMENT INTEGRITY TEST (USING DIV 2 SGTS)
| |
| SR 3.6.4.1.6 Verify each SGT subsystem can maintain 0.25 inch of vacuum water gauge in the secondary containment for 1 hour at a flow IAW SFCP - 18 months on a rate 3000 cfm. STAGGERED TEST BASIS EVENTS: EVENT TITLE 0317 PERFORM 24.405.03 SECONDARY CONTAINMENT INTEGRITY TEST (USING DIV 1 SGTS) 1317 PERFORM 24.405.03 SECONDARY CONTAINMENT INTEGRITY TEST (USING DIV 2 SGTS)
| |
| SR 3.6.4.2.3 Verify each automatic SCIV actuates to the isolation position on an actual or simulated actuation signal. IAW SFCP - 18 months EVENTS: EVENT TITLE 0314 PERFORM 24.404.02 SEC-5.3 DIV. 1 SGTS RUN/AUTO INITIATE/POSITION IND.
| |
| 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW PRESSURE, C71N650C, CALIBRATION/FUNC 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW PRESSURE, C71N650D, CALIBRATION/FUNC 1142 PERFORM 24.404.04 SEC-5.3 DIV.2 SGTS RUN/AUTO INITIATE/POSITION IND.
| |
| 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 92 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 106 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.6.4.3.3 Verify each SGT subsystem actuates on an actual or simulated initiation signal. IAW SFCP - 18 months EVENTS: EVENT TITLE 0314 PERFORM 24.404.02 SEC-5.3 DIV. 1 SGTS RUN/AUTO INITIATE/POSITION IND.
| |
| 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW PRESSURE, C71N650C, CALIBRATION/FUNC 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW PRESSURE, C71N650D, CALIBRATION/FUNC 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 1142 PERFORM 24.404.04 SEC-5.3 DIV.2 SGTS RUN/AUTO INITIATE/POSITION IND.
| |
| 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF SR 3.6.4.3.4 Verify each SGT filter cooler bypass damper can be opened and the fan started. IAW SFCP - 18 months EVENTS: EVENT TITLE 0314 PERFORM 24.404.02 SEC-5.3 DIV. 1 SGTS RUN/AUTO INITIATE/POSITION IND.
| |
| 1142 PERFORM 24.404.04 SEC-5.3 DIV.2 SGTS RUN/AUTO INITIATE/POSITION IND.
| |
| DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 93 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 107 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.7.2.5 Verify each EECW/EESW subsystem actuates on an actual or simulated initiation signal. IAW SFCP - 18 months EVENTS: EVENT TITLE 0277 PERFORM 24.207.06 DIV. 1 EECW/EESW ACTUATION FUNCTIONAL TEST 0278 PERFORM 24.207.07 DIV. 2 EECW/EESW ACTUATION FUNCTIONAL TEST 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL A,CAL/FUNC 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL B,CAL/FUNC 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 1,CHNL C,CAL/FUNCT 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI ACTUATE,DIV 2,CHNL D,CAL/FUNC SR 3.7.3.3 Verify each CREF subsystem actuates on an actual or simulated initiation signal. IAW SFCP - 18 months EVENTS: EVENT TITLE 0327 PERFORM 24.413.04 DIV 1 CR EMRG FILTER AUTO TRANSFER TEST 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW PRESSURE, C71N650A, CALIBRATION/FUNC 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW PRESSURE, C71N650B, CALIBRATION/FUNC 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW PRESSURE, C71N650C, CALIBRATION/FUNC 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW PRESSURE, C71N650D, CALIBRATION/FUNC 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL A,XMTR CAL 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL B,XMTR CAL 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHNL C,XMTR CAL 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHNL D,XMTR CAL 1111 PERFORM 24.413.05 DIV 2 CR EMRG FILTER AUTO TRANSFER TEST 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL A,MTU CAL/FUNC 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL B,MTU CAL/FUNC 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS A,CHL C,MTU CAL/FUNC 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SYS B,CHL D,MTU CAL/FUNC 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SUMP & DRN, CCHVAC LF DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 94 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 108 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.7.6.3 Perform a system functional test. IAW SFCP - 18 months EVENTS: EVENT TITLE 0881 PERFORM 44.180.005 MAIN TURBINE BYPASS SYSTEM RTT AND CHL FUNCTIONAL SR 3.7.6.4 Verify the TURBINE BYPASS SYSTEM RESPONSE TIME is within limits. IAW SFCP - 18 months EVENTS: EVENT TITLE 0881 PERFORM 44.180.005 MAIN TURBINE BYPASS SYSTEM RTT AND CHL FUNCTIONAL SR 3.8.1.13.a Verify each EDG operates for 24 hours: a. For all but the final 2 hours loaded 2500 kW and 2600 kW; and IAW SFCP - 18 months EVENTS: EVENT TITLE 0298 PERFORM 24.307.30 EDG NO.11 24 HOUR RUN FOLLOWED BY HOT FAST RESTART 0299 PERFORM 24.307.31 EDG NO.12 24 HOUR RUN FOLLOWED BY HOT FAST RESTART 0300 PERFORM 24.307.32 EDG NO.13 24 HOUR RUN FOLLOWED BY HOT FAST RESTART 0301 PERFORM 24.307.33 EDG NO.14 24 HOUR RUN FOLLOWED BY HOT FAST RESTART SR 3.8.1.13.b Verify each EDG operates for 24 hours: b. For the final 2 hours of the test loaded 2800 kW and 2900 kW. IAW SFCP - 18 months EVENTS: EVENT TITLE 0298 PERFORM 24.307.30 EDG NO.11 24 HOUR RUN FOLLOWED BY HOT FAST RESTART 0299 PERFORM 24.307.31 EDG NO.12 24 HOUR RUN FOLLOWED BY HOT FAST RESTART 0300 PERFORM 24.307.32 EDG NO.13 24 HOUR RUN FOLLOWED BY HOT FAST RESTART 0301 PERFORM 24.307.33 EDG NO.14 24 HOUR RUN FOLLOWED BY HOT FAST RESTART SR 3.8.1.14.a Verify each EDG starts and achieves: a. In 10 seconds, voltage 3950 V and frequency 58.8 Hz; and IAW SFCP - 18 months EVENTS: EVENT TITLE 0298 PERFORM 24.307.30 EDG NO.11 24 HOUR RUN FOLLOWED BY HOT FAST RESTART 0299 PERFORM 24.307.31 EDG NO.12 24 HOUR RUN FOLLOWED BY HOT FAST RESTART 0300 PERFORM 24.307.32 EDG NO.13 24 HOUR RUN FOLLOWED BY HOT FAST RESTART 0301 PERFORM 24.307.33 EDG NO.14 24 HOUR RUN FOLLOWED BY HOT FAST RESTART DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 95 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 109 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.8.1.14.b Verify each EDG starts and achieves: b. Steady state voltage 3950 V and 4580 V and frequency 58.8 Hz and 61.2 Hz. IAW SFCP - 18 months EVENTS: EVENT TITLE 0298 PERFORM 24.307.30 EDG NO.11 24 HOUR RUN FOLLOWED BY HOT FAST RESTART 0299 PERFORM 24.307.31 EDG NO.12 24 HOUR RUN FOLLOWED BY HOT FAST RESTART 0300 PERFORM 24.307.32 EDG NO.13 24 HOUR RUN FOLLOWED BY HOT FAST RESTART 0301 PERFORM 24.307.33 EDG NO.14 24 HOUR RUN FOLLOWED BY HOT FAST RESTART SR 3.8.1.16 Verify interval between each sequenced load block is within +/- 10% of design interval for each load sequencer timer. IAW SFCP - 18 months EVENTS: EVENT TITLE 0215 PERFORM 42.307.05 DIV 1 EDG AUTO LOAD SEQUENCE TIMER CALIBRATION 1215 PERFORM 42.307.05 DIV 2 EDG AUTO LOAD SEQUENCE TIMER CALIBRATION SR 3.8.4.3 Verify battery cells, cell plates, and racks show no visual indication of physical damage or abnormal deterioration that could IAW SFCP - 18 months degrade battery performance.
| |
| EVENTS: EVENT TITLE 0217 PERFORM 42.309.03 DIV 1 18 MONTH 130/260 VDC BATTERY CHECK (2A-1 ONLY) 1102 PERFORM 42.309.06 DIV 2 18 MONTH 130/260 VDC BATTERY CHECK (2B-1 ONLY) 1217 PERFORM 42.309.03 DIV 1 18 MONTH 130/260 VDC BATTERY CHECK (2A-2 ONLY) 2102 PERFORM 42.309.06 DIV 2 18 MONTH 130/260 VDC BATTERY CHECK (2B-2 ONLY)
| |
| SR 3.8.4.4 Remove visible corrosion and verify battery cell to cell and terminal connections are coated with anti-corrosion material. IAW SFCP - 18 months EVENTS: EVENT TITLE 0217 PERFORM 42.309.03 DIV 1 18 MONTH 130/260 VDC BATTERY CHECK (2A-1 ONLY) 1102 PERFORM 42.309.06 DIV 2 18 MONTH 130/260 VDC BATTERY CHECK (2B-1 ONLY) 1217 PERFORM 42.309.03 DIV 1 18 MONTH 130/260 VDC BATTERY CHECK (2A-2 ONLY) 2102 PERFORM 42.309.06 DIV 2 18 MONTH 130/260 VDC BATTERY CHECK (2B-2 ONLY)
| |
| DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 96 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 110 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.8.4.5.a Verify each battery: a. Cell-to-cell and terminal connection resistance is 1.5E-4 ohm. IAW SFCP - 18 months EVENTS: EVENT TITLE 0217 PERFORM 42.309.03 DIV 1 18 MONTH 130/260 VDC BATTERY CHECK (2A-1 ONLY) 1102 PERFORM 42.309.06 DIV 2 18 MONTH 130/260 VDC BATTERY CHECK (2B-1 ONLY) 1217 PERFORM 42.309.03 DIV 1 18 MONTH 130/260 VDC BATTERY CHECK (2A-2 ONLY) 2102 PERFORM 42.309.06 DIV 2 18 MONTH 130/260 VDC BATTERY CHECK (2B-2 ONLY)
| |
| SR 3.8.4.5.b Verify each battery: b. Total cell-to-cell and terminal connection resistance is 2.7E-3 ohm. IAW SFCP - 18 months EVENTS: EVENT TITLE 0217 PERFORM 42.309.03 DIV 1 18 MONTH 130/260 VDC BATTERY CHECK (2A-1 ONLY) 1102 PERFORM 42.309.06 DIV 2 18 MONTH 130/260 VDC BATTERY CHECK (2B-1 ONLY) 1217 PERFORM 42.309.03 DIV 1 18 MONTH 130/260 VDC BATTERY CHECK (2A-2 ONLY) 2102 PERFORM 42.309.06 DIV 2 18 MONTH 130/260 VDC BATTERY CHECK (2B-2 ONLY)
| |
| SR 3.8.4.6 Verify each required battery charger supplies 100 amps at 124.7 V for 4 hours. IAW SFCP - 18 months EVENTS: EVENT TITLE 0218 PERFORM 42.309.04 DIV 1 BATTERY CHARGER LOAD TEST - 2A-1 ONLY 1218 PERFORM 42.309.04 DIV 2 BATTERY CHARGER LOAD TEST - 2B-1 ONLY 1292 PERFORM 42.309.04 DIV 1 BATTERY CHARGER LOAD TEST - 2A-2 ONLY 1293 PERFORM 42.309.04 DIV 1 BATTERY CHARGER LOAD TEST - 2A1-2 ONLY 2219 PERFORM 42.309.04 DIV 2 BATTERY CHARGER LOAD TEST - 2B-2 ONLY 2220 PERFORM 42.309.04 DIV 2 BATTERY CHARGER LOAD TEST - 2B1-2 ONLY SR 3.8.4.7 Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the actual or simulated emergency loads for IAW SFCP - 18 months the design duty cycle when subjected to a battery service test.
| |
| EVENTS: EVENT TITLE 0217 PERFORM 42.309.03 DIV 1 18 MONTH 130/260 VDC BATTERY CHECK (2A-1 ONLY) 1102 PERFORM 42.309.06 DIV 2 18 MONTH 130/260 VDC BATTERY CHECK (2B-1 ONLY) 1217 PERFORM 42.309.03 DIV 1 18 MONTH 130/260 VDC BATTERY CHECK (2A-2 ONLY) 2102 PERFORM 42.309.06 DIV 2 18 MONTH 130/260 VDC BATTERY CHECK (2B-2 ONLY)
| |
| DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 97 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 111 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 3.8.4.8 Verify battery capacity is 80% of the manufacturer's rating when subjected to a performance discharge test. IAW SFCP - 60 months(Note 4)
| |
| EVENTS: EVENT TITLE 0219 PERFORM 42.309.05 DIV 1 (5 YEAR) 130/260 VDC BATTERY CHECK (2A-1 ONLY) 1103 PERFORM 42.309.07 DIV 2 (5 YEAR) 130/260 VDC BATTERY CHECK (2B-1 ONLY) 1219 PERFORM 42.309.05 DIV 1 (5 YEAR) 130/260 VDC BATTERY CHECK (2A-2 ONLY) 2103 PERFORM 42.309.07 DIV 2 (5 YEAR) 130/260 VDC BATTERY CHECK (2B-2 ONLY)
| |
| SR 5.5.2 This program provides controls to minimize leakage from those portions of systems outside containment that could contain TS - at refueling cycle intervals or highly radioactive fluids during a serious transient or accident to levels as low as practicable. The systems include Core Spray, less High Pressure Coolant Injection, Residual Heat Removal, Reactor Core Isolation Cooling, reactor water sampling, Post Accident Sampling, reactor water cleanup, Hydrogen Recombiners, Primary Containment Monitoring, control rod drive discharge headers, and Standby Gas Treatment. The program shall include the following:
| |
| : a. Preventive maintenance and periodic visual requirements; and inspection
| |
| : b. Integrated leak test requirements for refueling cycle intervals or less.
| |
| EVENTS: EVENT TITLE 0359 PERFORM 43.202.001 HPCI LEAKAGE MONITORING TEST 0360 PERFORM 43.203.001 CSS DIV 1 LEAKAGE MONITORING TEST 0361 PERFORM 43.203.005 CSS DIV 2 LEAKAGE MONITORING TEST 0362 PERFORM 43.204.001 RHR DIVISION 1 LEAKAGE MONITORING TEST 0363 PERFORM 43.204.002 RHR DIVISION 2 LEAKAGE MONITORING TEST 0493 PERFORM 43.404.002 DIVISION 2 STANDBY GAS TREATMENT FILTER PERFORMANCE TEST 0494 PERFORM 43.409.001 DIV 1 POST LOCA THERMAL RECOMBINER SYSTEM LEAKAGE TEST 0977 PERFORM 43.206.001 RCIC LEAKAGE MONITORING TEST 1043 PERFORM 43.714.001 POST ACCIDENT SAMPLING SYSTEM LEAKAGE MONITORING TEST 1090 PERFORM 43.404.001 DIV 1 STANDBY GAS TREATMENT FILTER PERFORMANCE TEST 1117 PERFORM 43.409.002 DIV 2 POST LOCA THERMAL RECOMBINER SYSTEM LEAKAGE TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 98 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 112 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 5.5.7.a Demonstrate for each of the ESF systems that an inplace test of the HEPA filters shows a penetration and system bypass TS - at the frequencies specified in
| |
| < specified below when tested in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1980 at the system Regulatory Guide 1.52, Revision 2 flowrate specified below +/- 10%.
| |
| EVENTS: EVENT TITLE 0493 PERFORM 43.404.002 DIVISION 2 STANDBY GAS TREATMENT FILTER PERFORMANCE TEST 0495 PERFORM 43.413.001 SECTIONS 5.1, 5.2 AND 5.5 THRU 5.13 CONTL RM EMERG FILTER PERF 1090 PERFORM 43.404.001 DIV 1 STANDBY GAS TREATMENT FILTER PERFORMANCE TEST SR 5.5.7.b Demonstrate for each of the ESF systems that an inplace test of the charcoal adsorber shows a penetration and system bypass TS - at the frequencies specified in
| |
| < specified below when tested in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1980 at the system Regulatory Guide 1.52, Revision 2 flowrate specified below +/- 10%.
| |
| EVENTS: EVENT TITLE 0493 PERFORM 43.404.002 DIVISION 2 STANDBY GAS TREATMENT FILTER PERFORMANCE TEST 0495 PERFORM 43.413.001 SECTIONS 5.1, 5.2 AND 5.5 THRU 5.13 CONTL RM EMERG FILTER PERF 1090 PERFORM 43.404.001 DIV 1 STANDBY GAS TREATMENT FILTER PERFORMANCE TEST SR 5.5.7.c Demonstrate for each of the ESF systems that a laboratory test of a sample of the charcoal adsorber. when obtained as TS - at the frequencies specified in described in Regulatory Guide 1.52, Revision 2, shows the methyl iodide penetration less than the value specified below when Regulatory Guide 1.52, Revision 2 tested in accordance with ASTM D3803-1989 at a temperature of 30°C (86°F) and at the relative humidity specified below.
| |
| EVENTS: EVENT TITLE 1493 PERFORM 43.404.002 DIVISION 2 SGTS CHARCOAL SAMPLE WITHDRAWAL 1495 PERFORM 43.413.001 SECT 5.3 & 5.4 CHARCOAL SAMPLE WITHDRAWAL & LAB TESTING 2090 PERFORM 43.404.001 DIVISION 1 SGTS CHARCOAL SAMPLE WITHDRAWAL SR 5.5.7.d Demonstrate for each of the ESF systems that the pressure drop across the combined HEPA filters, the prefilters, and the TS - at the frequencies specified in charcoal adsorbers is less than the value specified below when tested in accordance with Regulatory Guide 1.52, Revision 2, Regulatory Guide 1.52, Revision 2 and ASME N510-1980 at the system flowrate specified as follows +/- 10%.
| |
| EVENTS: EVENT TITLE 0493 PERFORM 43.404.002 DIVISION 2 STANDBY GAS TREATMENT FILTER PERFORMANCE TEST 0495 PERFORM 43.413.001 SECTIONS 5.1, 5.2 AND 5.5 THRU 5.13 CONTL RM EMERG FILTER PERF 1090 PERFORM 43.404.001 DIV 1 STANDBY GAS TREATMENT FILTER PERFORMANCE TEST 1205 PERFORM 43.413.005 CONTROL RM ENVELOPE DIFFERENTIAL PRESS TEST DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 99 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 113 of 395 REQUIREMENT REQUIREMENT TITLE FREQ SR 5.5.7.e Demonstrate that the heaters for each of the ESF systems dissipate the value specified below when tested in accordance with TS - at the frequencies specified in ASME N510-1980. Regulatory Guide 1.52, Revision 2 EVENTS: EVENT TITLE 0493 PERFORM 43.404.002 DIVISION 2 STANDBY GAS TREATMENT FILTER PERFORMANCE TEST 0495 PERFORM 43.413.001 SECTIONS 5.1, 5.2 AND 5.5 THRU 5.13 CONTL RM EMERG FILTER PERF 1090 PERFORM 43.404.001 DIV 1 STANDBY GAS TREATMENT FILTER PERFORMANCE TEST SR 5.5.14.d Measurement, at designated locations, of the CRE pressure relative to all external areas adjacent to the CRE boundary during TS - 18 months on a STAGGERED the pressurization mode of operation by one subsystem of the CREF System, operating at the flow rate required by the VFTP, TEST BASIS at a Frequency of 18 months on a STAGGERED TEST BASIS. The results shall be trended and assessed every 18 months.
| |
| EVENTS: EVENT TITLE 1205 PERFORM 43.413.005 CONTROL RM ENVELOPE DIFFERENTIAL PRESS TEST 1205A PERFORM ASSESSMENT of 43.413.005 RESULTS DTE-19001, Rev. 1 - Fermi 2 Technical Specification Surveillance Requirement Interval Extension Scope 1-July-2019 Page 100 of 100
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 114 of 395 Engineering Report No. DTE-19001 Revision 1 ATTACHMENT 3 TECHNICAL SPECIFICATION EVENT FAILURE HISTORY EVALUATION (270 PAGES)
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 ATTACHMENT 3 - FERMI 2 TECHNICAL SPECIFICATION Page 115 of 395 EVENT FAILURE HISTORY EVALUATION Event Title Associated SRs and Function 0204 PERFORM 44.080.605 EAST AND WEST GLAND SEAL SR 3.3.7.2.4 SR 3.3.7.3.4 EXHAUSTER/MECHANICAL VACUUM PUMP
| |
| # Performances: 1 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 2 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 116 of 395 0213 PERFORM 42.302.02 DIV 1 BUS 64B/11EA 4160V UNDERVOLTAGE SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b LOGIC FUNCTIONAL
| |
| # Performances: 7 # Failures: 3 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 6/17/2009 A SPF Note 1: "Step 6.5.12, 64B B9 Bkr left in Removed due to breaker retaining bolt The identified failure(s) would not have CARD 09-24754". CARD 09-24754 states: "During performance of 42.302.02 step prevented the performance of the required 6.5.7 breaker compartment 64B-B9 was accessed to remove a previously installed safety function of the equipment. Therefore, jumper per the procedure. When the cubicle door was opened a 3/8" bolt, nut, and lock this failure will have no impact on an washer were found in the front of the cubicle near the lower left corner of the breaker. extension to a 24 month surveillance interval.
| |
| During performance of the procedure the breaker was racked from disconnect to test and was cycled closed and then back open. Test leader and work group supervisor were informed. With test leader and work group supervisor concurrence the hardware was removed from the cubicle and the procedure was completed satisfactorily. After the procedure was completed the breaker was removed from the switchgear and left removed for subsequent inspection. The hardware that was removed from the cubicle has been given to the Component Engineer. An inspection should performed of the breaker to determine the cause and replace the hardware. A review of past CARDs documents a potentially similar event on CARD 09-22885 at breaker 64A-A7." As described in investigation: "the 3/8" bolt, nut, and lock washer found were found in the front of the cubicle near the lower left corner of the breaker. This is one of the two bolts that mount the racking mechanism to the breaker. The second bolt, nut and washer are orientated at a right angle to the bolt mentioned above. At all times the racking mechanism was fully attached to the breaker and permitted the breaker to be racked in or out as needed. The loss of this bolt would not have affected the function of this breaker."
| |
| Reportability/Operability Review states: "This is the maintenance tie breaker and would only be used to power the bus during outages. To support the bus operability the breaker would have to have the ability to open to load shed the bus in a loss of voltage scenario.
| |
| Because the breaker has been removed from the cubicle it is in a condition that would support its accident condition and therefore the switchgear is OPERABLE." Cause states: "The nut was not sufficiently tightened, but the cause cannot clearly be determined. The work was completed four years ago. Some contributory causes at the time may have been time pressure to complete the refurbishment combined with an underlying reduced emphasis on human performance tools. The station's human performance program has been significantly enhanced since 2005. A review of the procedure 35.304.010 was conducted and found to be adequate. However it should be noted that 35.304.010 is currently in revision to include additional points for verification DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 3 of 270
| |
| | |
| during breaker assembly to be align with station Human Performance expectations. TRVEND 24MCGNF319001 Rev 1 Because this breaker is Safety-Related, a WO will be required to install a new bolt, nut Page 117 of 395 and washer." WO 29994339 completed reinstallation of recovered hardware and checked breaker for any loose or missing hardware that is accessible.
| |
| 8/19/2010 A SPF Note "unexpected Annunciator Alarm - Submitted CARD 10-27260" CARD 10- The identified failure(s) would not have 27260 states: "Annunciator alarm 9D24 ("DIV 1 ESS BUS 11A BRKR TRIPPED" ) on prevented the performance of the required panel H11 P809 was still engaged and had not cleared after step 6.5.24. After careful safety function of the equipment. Therefore, circuit analysis step 6.4.19, subtext 3. "Take E.D.G. OUTPUT CONTROL SWITCH to this failure will have no impact on an TRIP and then release. " of 42.302.02 was performed. At this point alarm 9D24 on H11 extension to a 24 month surveillance interval.
| |
| P809 cleared. It is theorized that the Control Switch was not taken far enough to left detent during the initial performance of the Trip Test. (step 6.4.19, subtext 3). This resulted in a RED window in the Neutral Spring Return position. Following the second evolution of step 6.4.19, subtext 3 a GREEN window appeared in the Neutral position and the alarm cleared." No impact as related to completion of the procedure or acceptance criteria. Submitted CARD for trending.
| |
| 6/19/2014 A SPF Note: "Completed up to Step 6.2.10. Step 6.2.11 stopped, found breaker out of The identified failure(s) would not have positon due to error in previously installed jumper. Performing restoration per SM prevented the performance of the required direction. CARD 14-25101 was written." CARD 14-25101 states: "Step 6.1.24 at safety function of the equipment. Therefore, R3000S005 was to install a jumper from terminal TC4-11 to TD3-6. While installing a this failure will have no impact on an jumper on terminal point TC4-11, worker inadvertently made contact with another point extension to a 24 month surveillance interval.
| |
| on term block TC-4. The inadvertent contact caused Bus 11EA Position EA3 breaker to close. Note that breaker was in test position and at no point was there a transient or challenge to personnel, nuclear, or radiological safety. An investigation determined the correct termination point was flagged but due to close proximity, another point was inadvertently contacted when installing on TC4-11. The HU tools not properly used were situational awareness and self-checking. This event was evaluated against MGA23 and determined to be a Crew Level Reset based on criteria 5.5.6.1.b and 5.5.6.6.c. No further action is required." SPF states: Procedure not performed, Take no credit.
| |
| Event Title Associated SRs and Function 0215 PERFORM 42.307.05 DIV 1 EDG AUTO LOAD SEQUENCE TIMER SR 3.8.1.16 CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 4 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 118 of 395 0217 PERFORM 42.309.03 DIV 1 18 MONTH 130/260 VDC BATTERY CHECK SR 3.8.4.3 SR 3.8.4.4 (2A-1 ONLY) SR 3.8.4.5.a SR 3.8.4.5.b SR 3.8.4.7
| |
| # Performances: 4 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/19/2014 A Noted during performance of Step 6.12, CARD 14-21296 written: CARD 14-21296 The identified failure(s) would not have states: "Performing step 6.12, Post Discharge Data of procedure 42.309.03; observed prevented the performance of the required small pieces of positive and negative plate material in between plates and across portions safety function of the equipment. Therefore, of plates. Concerned that this may be abnormal deterioration or a contributor to the this failure will have no impact on an battery cell health, the system engineer should mitigate the possible abnormalities. The extension to a 24 month surveillance interval.
| |
| following numbered cells have the above concerns on the front and top of the battery plates: 1, 5, 23, 31, 33, 39, 43, 49, and 51. The following numbered cells have the above concerns on the back and top of the battery plates: 24, 50, and 52. All test parameters met acceptance criteria and were satisfactorily completed for the 18 Month Surveillance of 2a-1 Battery Bank." Reportability/Operability Review states: "Some of the battery cells had protrusions from some of the plates. These are only a concern if they extend to a plate of the opposite polarity. None of the protrusions are in contact with both polarity plates. The insulators described above function to keep these protrusions from contacting a plate of the opposite polarity. The SE has known about this cell and has been monitoring it. There has been no change over the past year which included a recent discharge test and recharge. Div 1 Batteries remain Operable."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 5 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 119 of 395 0218 PERFORM 42.309.04 DIV 1 BATTERY CHARGER LOAD TEST - 2A-1 SR 3.8.4.6 ONLY
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failure which is not indicative of a repetitive time based failure mechanism. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 8/23/2012 C SPF Comments Note: "Failed Load Test - CARD 12-26958 written and load test This is an event driven failure in that a test reperformed after calibration of charger was performed. Second load test performed equipment cable/connection were confirmed SAT." SPF Cover Sheet Note: "2nd test following charger PM (WO 32378478) to be defective as use of new cables resolved completed SAT." WO 32378478 - Test Div 1 130 Vdc Batt Charger 2A-1 performed the issue. Therefore, this failure will have and Div 1 130 Vdc Battery Charger 2A-1 returned to service on 8/23/2012. During no impact on an extension to a 24 month performance of WO 32378478, ammeter failed calibration. CARD 12-26973 written. surveillance interval.
| |
| CARD 12-26973 states: "During the performance of Work Order 32378478 and in accordance with 35.309.010, Step 4.7.6 the panel mounted DC ammeter for R3200S020A failed to calibrate. If the DC ammeter was adjusted to meet acceptance criteria for the lower band set points it would not meet acceptance criteria when mVolt input was adjusted for the high band set point. The AS LEFT condition of the DC ammeter is such that the (3) lower band set points are within acceptance criteria and the high band set point was (off scale) > 150 DC Amps which is greater than Acceptance Criteria of 144A - 150A DC. Reportability/Operability Review states: "The panel mounted DC ammeter failed to calibrate. This is local indication only and has no impact on the ability of the 2A-1 charger to perform its safety function, which has been demonstrated with a battery charger load test. 2A-1 130V Battery charger remains OPERABLE." WO 35214905 initiated. Per Maximo, WO 35214905 is cancelled, POD Note: Ammeter will be replaced by WO 34790291. WO 34790291 "Replace 'A' and 'B' Boards and Test Charger 2A-1" performed; replaced all 3 Control B Cards and 1 Control A Card on 1/22/2014. CARD 12-26958 "2A-1 Battery Charger did not meet voltage acceptance criteria" states: "charger output voltage dropped to 121 VDC. This is below the acceptance criteria of 124.7 VDC. Aborted test, notified shift manager, maintenance supervisor, and submitted CARD." Reportability/Operability Review states:
| |
| "This condition was discovered during planned maintenance and requires resolution in order for the battery charger to perform its intended function. There is no loss of function with the spare battery charger in service in place of 2A-1. 2A-1 130V Battery charger remains inoperable on LCO 12-0423. This is a tracking LCO with the spare charger in service." Description/Investigation explained: This activity was investigated and determined to be the cable and or the connections to the Alber Unit. This was confirmed with the use of new cables and the problem was corrected. No further DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 6 of 270
| |
| | |
| investigation is required." While performing load test of Division 1 battery TRVEND 24MCGNF319001 Rev 1 charger 2A-1, charger output voltage dropped to 121 VDC. This is below the acceptance Page 120 of 395 criteria of 124.7 VDC. Aborted test, notified Shift Manager, Maint Supv and submitted CARD. CARD 12-26958 documents that 2A-1 charger output voltage did not meet acceptance criteria during the performance of a planned load test. The load test was suspended and calibration of the battery charger performed with no issue noted. The charger load test was then re-performed satisfactorily. The most probable cause for the low voltage reading on the initial test is a degraded cable connection in the test setup.
| |
| Since this was a test equipment issue and the test has been re-performed successfully this condition does not impact the ability of 2A-1 to perform its safety function. The new cables will be installed prior to the next performance of the charger load test. CARD 12-26958 Reportability/Operability Review states: This condition was discovered during planned maintenance and requires resolution in order for the battery charger to perform its intended function. There is no loss of function with the spare battery charger in service in place of 2A-1.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 7 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 121 of 395 0219 PERFORM 42.309.05 DIV 1 (5 YEAR) 130/260 VDC BATTERY CHECK SR 3.8.4.8 (2A-1 ONLY)
| |
| # Performances: 2 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/6/2006 A SPF note: "Battery Charger 2A-1 Tripping. Put spare charger in service, wrote CARD The identified failure(s) would not have 06-21855 for WR." CARD 06-21855 states: "With Op's support it was reset several prevented the performance of the required times. We installed a temporary cooling fan blowing into the charger but it did not safety function of the equipment. Therefore, resolve the problem. Op's requested to put the batteries on float due to the loads on the this failure will have no impact on an system. The room temperature where the charge is located is elevated due to the Air extension to a 24 month surveillance interval.
| |
| Conditioner being down due to no water supply. With Op's support put the charger on float." Reportability/Operability Review states: "Division 1 DC is currently inoperable for maintenance and this issue needs to be resolved to allow an equalizing charge post battery testing." WO 00OZ061006 written to perform troubleshooting on Battery Charger 2A-1, R32005D20A, to determine why charger kept tripping while on equalize.
| |
| Work Order Work Performed / Corrective Action states: "High Voltage Shutdown (HVSD) card setting found too low. Adjusted card to high end of acceptance criteria.
| |
| Contacted Ops for restoration of AC power to charger in order to set float & equalize voltages as required by Steps 4.9.22 and 23. Although voltages were within range, adjusted equalize voltage to lower end of acceptance criteria band. This allows more tolerance between equalize voltage and high voltage shutdown. Removed temp battery &
| |
| equipment, restored to normal configuration using applicable steps (4.11.7, 4.11.8, 4.11.10 & 4.11.11) of 35.309.010. Notified Ops to restore charger on DC grid for PMT.
| |
| Work package completed on 4/10/2006 satisfactorily.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 8 of 270
| |
| | |
| 11/14/2010 A SPF Note: "2A-1 Charger found with blown output fuse at 0600 on 11/10/10. Overall The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 Batt voltage dropped to 113V. Battery was off equalize charge for an unknown Page 122 of 395 prevented the performance of the required amount of time so need to restart 36 hour clock from time of restart. 1) CARD 10-30412 safety function of the equipment. Therefore, submitted. 2) Replaced output fuse. 3) Adjusted current limit of 2A-1 Charger (WO this failure will have no impact on an 32024706). 4) Placed Battery back on charge at 1100 hours." CARD 10-30412 states: extension to a 24 month surveillance interval.
| |
| "During equalize charge of battery 2A-1, output fuse of 2A-1 battery charger (2PA-2 ckt
| |
| : 3) blew. This occurred between 0600 & 0700 on 11/10/10. At approx. 0900 we replaced both fuses in this position, and placed charger 2A-1 back in service on float charge.
| |
| Observed output current for approx. 5 mins. and found to be 122 amps (near capacity of 125A fuse). OPS procedure 23.309 identifies output current limit should be 115 amps.
| |
| Advised OPS to remove charger from service until 2A-1 charger current limit is adjusted. Charger was removed from service awaiting WO to repair."
| |
| Reportability/Operability Review Comments state: "Fuses were replaced by Operation and current limiter adjustment performed by electrical maintenance per 35.309.01. The battery charger has been returned to fully function and will support DC Electrical as needed. During the period of time when the battery charger was shutdown it was not required battery charger (by Tech Spec 3.8.5). DC Electrical remains operable." WO 32024706 created and completed adjustment of current limit.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 9 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 123 of 395 0227 PERFORM 24.106.06 SCRAM DISCHARGE VOL. VENT AND DRAIN SR 3.1.8.2.a SR 3.1.8.2.b VALVES SCRAM OPERABILITY
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failure which is not indicative of a repetitive time based failure mechanism. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/13/2015 C SPF states Steps 5.1.4, 5.1.5, and 5.1.8; C1100-F180 failed to stroke, C1100-F010 This is an event driven failure in that the stroked but time was not recorded due to failure of C1100-F180. CARD 15-28941 was valve failing to close when a scram signal written. CARD states: "During performance of 24.106.06 Scram Discharge Volume was provided was due to a mispositioned Vent and Drain Valve Operability Test C1100-F180 failed to close when a full scram handwheel (manual operator for C1100F180 was inserted. All other valves stroked as expected during this surveillance." in full "Open" verse "Neutral"). The Maintenance Rule Functional Failure (MRFF) evaluation states "because the vent valves handwheel must be in the "Neutral" position (C1100F010, C1100F180) are redundant the F010 would have prevented any system for this actuator to stroke properly.
| |
| leakage to the Reactor Building Equipment Drain Sump (G1101D073) in the occurrence Therefore, this failure will have no impact of a scram signal. The F180 was never and would never have been challenged and thus on an extension to a 24 month surveillance function C1100-13 was maintained. No other MR functions were impacted by this event. interval.
| |
| Therefore, this event is NOT considered a MRFF." CARD 15-28941 generated work order 44298153 for I&C to troubleshoot/perform valve diagnostics. Troubleshooting under WO 44298153 found C1100-F180 manual operator in the full open position vice the neutral position. The handwheel must be in the neutral position for this actuator to stroke properly. This explains why the valve failed to close on the scram signal. The manual operator was returned to the neutral position and PMT was successfully performed.
| |
| Event Title Associated SRs and Function 0239 PERFORM 24.137.18 SEC-5.2 MS LINE DRN & DRN ISO VLV OP & SR 3.3.3.1.2-8 SR 3.3.6.1.5-2.a LOC POSITION VERIF TEST SR 3.3.6.1.5-2.b SR 3.3.6.1.5-2.c SR 3.3.6.1.5-2.d SR 3.3.6.1.6-2.e SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 10 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 124 of 395 0244 PERFORM 24.138.02 SEC-5.2 RX RECIRC LOCAL VALVE POSITION SR 3.3.3.1.2-8 SR 3.3.5.1.6-2.h VERIFICATION TEST SR 3.3.6.1.6-2.e SR 3.5.1.7
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 11 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 125 of 395 0245 PERFORM 24.139.03 SEC-5.3,5.4 SLC LOOP A PUMP FLOW,MANUAL SR 3.1.7.8 SR 3.1.7.9 INITIATE & SQUIB FIRING
| |
| # Performances: 4 # Failures: 3 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 10/16/2007 A SPF States: C4100-F006 did not indicate open at H11P603 or local (RWCU PIT above The identified failure(s) would not have RWCU Pump Room RB2-C12). Stopped surveillance, placed system in a safe condition prevented the performance of the required to allow investigation. SPF also noted was that "Water flow into RPV was observed by safety function of the equipment. Therefore,
| |
| 'CRUD' and bubbles on RB-5 as well as test tank level lowering." CARD 07-26218 this failure will have no impact on an submitted. CARD 07-26218 states: "During surveillance 24.139.03 (Step 5.4.11.6) SLC extension to a 24 month surveillance interval.
| |
| outboard injection check valve C4100F006 did not indicate open in the control room.
| |
| Disc open lite never came on. The valve showed slight movement locally and test tank level lowered as expected giving indication that water was going into the vessel. Further, the 5th floor reported air bubbles then crud burst positively confirming flow from SLC.
| |
| CRS and SM informed." CARD Reportability/Operability Review states: "As stated in the CARD there was positive confirmation of SLC injection into the RPV. This issue deals with the injection check valve indication only." WO 25892091 written to troubleshoot and repair as required. WO 25892091 found both limit switch actuating arms out of position due to loose set screws. Manually "stroked" valve and set position switches C41N402A and C41N402B. Valve was hard to rotate. Replaced worn out spring and limit switch set screws. Manually stroked C4100F006 and verified proper Control Room indication.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 12 of 270
| |
| | |
| 11/16/2010 A SPF Note 1: 3D11 SLC Ignition Continuity Loss did not alarm. Alarm is defeated for The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 SLC Pump A (Step 5.4.12.5) - Alarm is scheduled to be repaired during RF 14 (WO Page 126 of 395 prevented the performance of the required 30725183). SPF Note 2: C4100-F006, SLC Inj Line Otbd Check Valve, DISC Open safety function of the equipment. Therefore, light did not light at H11P603 (Step 5.4.12.6). Valve indicated open locally. CARD 10- this failure will have no impact on an 30382 submitted. CARD 10-30382 states: While performing 24.139.03, SLC Manual extension to a 24 month surveillance interval.
| |
| Initiation Operability Test, C4100-F006 did not indicate OPEN in MCR on H11P603 as required by step 5.4.12.6. Light bulbs were replaced and OPEN indication still was not received. The valve was observed open locally. This step is not Acceptance Criteria.
| |
| CARD Reportability/Operability Review states: C4100-F006 closed indication is required as acceptance criteria for operability per 24.139.03. Although the closed indication was lit, when required, it never went away, even when there was flow through the system and the C4100-F006 was verified open locally. This renders the closed indication Inoperable. SU code, must be repaired prior to Mode 2. WO 32025826 written to repair open indication. Limit switches checked okay. Control Room confirmed indication of Full Open and Full Closed. It was noted that C4100-F006 Check Valve was very difficult to move. Even with spring return, when manipulated open, valve would not close on its own. Valve had to be moved to closed position.
| |
| CARD 10-31037 written to investigate problem. CARD states: While checking limit switches for C4100-F006 check valve indication (WO#32025826), found C4100-F006 binding and hard to manipulate. CARD Troubleshooting Datasheet WR 32076094 prepared to investigate issue. WO 32076094 written to investigate possible valve binding, rework and repair as necessary. Valve was stroked and observed "tightness is normal and acceptable" per PE/ISI, per telecom. Valve does not need rework or repair.
| |
| Valve is acceptable as-is. As per OCC no work needs to be performed on valve. Limit switch set.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 13 of 270
| |
| | |
| 3/12/2014 A SPF states: Step 5.4.12.4, C4100-F006, SLC Inj Line Otbd Check Valve, DISC Open The identified failure(s)
| |
| TRVENDwould not have 24MCGNF319001 Rev 1 light, did not come on. Flow was observed into vessel from SLC Test Tank. Also, at step Page 127 of 395 prevented the performance of the required 5.4.12.8, 3D11 SLC Ignition Continuity Loss, did not alarm. CARD 14-22182 written. safety function of the equipment. Therefore, CARD states: "During performance of 24.139.03 (step 5.4.12.4), C4100-F006 'SLC Inj this failure will have no impact on an Line Otbd Check Valve' Disc Open light did not indicate ON with flow to the vessel. extension to a 24 month surveillance interval.
| |
| The green Disc Closed light remained ON. The valve moved in the Open direction locally, however, the lever arm did not come in contact with the limit switch. Flow noise was heard locally at the valve and flow was verified into the reactor vessel by observing a decreasing level in the SLC Test Tank. The green Disc Closed light remained ON the entire time. Also on step 5.4.12.8, did not receive 3D11 'SLC Ignition Continuity Loss' alarm as required on this step. At H11P613, C41M600A Squib Valve current verified
| |
| <2mA. Request adjustment/repair of limit switch on C4100-F006." CARD Reportability
| |
| / Operability Review states: "Valve position indication is required by Tech Spec 5.5.6, ISI-IST Program. Outage Milestone 16RFM2 Prior to Mode 2. LCO SU. "Maintenance Rule Functional Failure Evaluation states: "C4100-F006 valve did change position as noted in the CARD. The limit switch provides indication only. Operations noted the valve moved in the open direction. The CARD also states the 3D11 "SLC Ignition Continuity Loss" alarm was not received per Step 5.4.12.8. The alarm should have come in it was verified the C41M600A squib valve current was below 2ma. Consulted with Operations (Expert Panel Member) and C97 SE, per operation the 3D11 SLC ignition continuity Loss Alarm is used for indication only and has no impact on Maintenance Rule (MR). Therefore, since 3D11 has no impact on MR there is no impact on C9700 functions. The function of C4100F006 valve was not lost, therefore this event is not Maintenance Rule Functional Failure." C4100F006 functioned as designed and as expected should it be called upon to actuate during plant operation. WO 38139016 written to troubleshoot and rework cause for no Open position indication on C4100-F006. Work Order completed adjustment of limit position switches and C4100-F006 retested indication and 3D11 SLC Ignition Continuity Loss, satisfactorily.
| |
| Event Title Associated SRs and Function 0248 PERFORM 24.144.01 SEC-5.2 TWMS VALVE OPERABILITY & SR 3.3.3.1.2-8 SR 3.3.6.1.6-2.e POSITION VERIF. TEST
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 14 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 128 of 395 0250 PERFORM 24.202.02 HPCI FLOW RATE TEST AT 165 PSIG SR 3.5.1.10
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/29/2009 A SPF notes: Note 1 E41-RA06, E41-RA10, and E41-RA13 readings were high above the The identified failure(s) would not have allowable range in step 5.1.14.and 5.1.33. Note 2 E41-RA11 low below allowable range prevented the performance of the required in Step 5.1.14 and 5.1.33. Several local parameters not as expected during HPCI Run. safety function of the equipment. Therefore, CARD 09-23432 submitted. System Engineer and Shift Mgr informed. CARD 09- this failure will have no impact on an 23432 states: The following HPCI lube oil parameters were not as expected during the extension to a 24 month surveillance interval.
| |
| performance of 24.202.02. Readings were taken while unit was running per step 5.1.33:
| |
| : 1) Thrust bearing pressure (E41-RA11)-11.5 psig, allowable 14-18 psig, 2) Overspeed Trip inlet pressure (E41-RA10)-21.2 psig, allowable 17-21psig and; 3) Oil supply to trip unit (E41-RA06)-22 psig, allowable 17-21 psig. The following readings were taken while the unit was shutdown with the aux oil pump running per step 5.1.14: 1) Oil supply to trip unit (E41-Ra06)-23.5 psig, allowable 17-21 psig, 2) Thrust bearing pressure (E41-RA11)-11.5 psig, allowable 14-18 psig, 3) Overspeed Trip inlet pressure (E41-RA10)-23 psig, allowable 17-21 psig, and 4) Coupler Bearing Pressure (E41-RA13)-13.5 psig allowable 9-13 psig. All of this data was forwarded to the system engineer and no actions are recommended at this time. None of the readings were acceptance criteria and no unexpected alarms were received during the run. CARD Reportability/Operability Review states: The gage E41RA11 still reads 12# with the oil system shutdown and needs to be replaced. This failed instrumentation does not make the HPCI pump INOPERABLE. This reading is acceptance criteria for 24.202.01 and needs to be available for the next run of the surveillance once the issues with the first performance are resolved involving the affect on RCIC during the HPCI surveillance run. Authorized a scope add to get a package to replace the gage. Each of the noted oil pressures (with one exception) were slightly out of the band high due to cold oil on the initial start of the lube oil pump and HPCI turbine. This has been discussed with the system engineer and is acceptable. During the HPCI run those oil pressures dropped down into the acceptable band as the oil heated up. The one exception was the thrust bearing oil pressure, which was low out of the band at 11.5 psi, with an acceptable band of 14 - 18 psi. This was the result of a failed pressure gauge (as discovered by the fact that it continued to read approximately 12 psi after the oil pump was shutdown), which was replaced under a work order 29766192 the following day.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 15 of 270
| |
| | |
| 12/4/2010 A SPF Notes: Coupler Bearing Pressure below the allowable band in Steps 5.1.14 (Table 1) The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 and 5.1.33 ((Table 2). CARD 10-30378 had already been written prior to start of this Page 129 of 395 prevented the performance of the required surveillance. CARD Reportability/Operability Review states: This is a non-Tech Spec safety function of the equipment. Therefore, component. HPCI Coupler Bearing Pressure is recorded during surveillances: 24.202.01, this failure will have no impact on an 24.202.02 and 24.202.08 however this is not used to satisfy acceptance criteria. No extension to a 24 month surveillance interval.
| |
| operability concerns or impact. WO 32034966 replaced old gauge with new gauge.
| |
| Returned to service.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 16 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 130 of 395 0253 PERFORM 24.202.04 HPCI OFFLINE AUTO INITIATION AND TIME SR 3.3.5.1.5-3.a SR 3.3.5.1.5-3.b RESPONSE TEST SR 3.3.5.1.5-3.c SR 3.5.1.11 SR 3.5.1.14
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| Two failures are identified as event driven failures which are not indicative of a repetitive time based failure mechanism. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/20/2009 C SPF Note 1: Wrong test box connected, CARD 09-23014 submitted; No credit for steps This is an event driven failure in that the performed. Surveillance will be re-performed. CARD 09-23014 states: "During the selection of the wrong GE Test box (M&TE) performance of surveillance 24.202.04 HPCI system offline auto initiation time response contributed directly to the failure of the test.
| |
| test a GE style 1 test box was used vice a style 2 box. This lead to not getting the Therefore, this failure will have no impact expected system response during step 5.1.56.3 and not meeting acceptance criteria. This on an extension to a 24 month surveillance mistake will cause the need to run an addition partial surveillance to meet the acceptance interval.
| |
| criteria." Reportability/Operability Review states: "Surveillance signed off as unsat, no credit taken. Reperforming surveillance." CARD Closure Summary indicates: "The cause of the event was a lack of attention to detail when reviewing the required test equipment list in the surveillance and therefore not complying with that procedural requirement. Assumptions were also made that the GE test box that was used in the past for other surveillances would also be acceptable for this surveillance. Selecting the wrong GE test box only impacted the performance of this surveillance." Actions taken as a result of this issue were: 1) Addressing the individual performance issues with the operators involved. 2) Communicating lessons learned to the operations department via required reading package 09-06-03, which also explained the different styles of GE test boxes along with the methods available to determine which test box to use.Note 3:
| |
| Wrong step number referenced in Step 6.1.2 (Should be Step 5.1.70), CARD 09-23016 submitted. DCR 09-0976 corrects issue with regard to incorrect step number referenced.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 17 of 270
| |
| | |
| 5/1/2012 C First performance: SPF Note 1: AT Step 5.1.25, E4150F006, HPCI Pump Disch Inbd Both are event driven failures TRVEND in that during Rev 1 24MCGNF319001 Iso Vlv, failed to Open. CARD 12-23967 submitted. Backed out of procedure. SPF the first performance, the failure wasPage 131 of 395 Response: EIT found Test Jack broken. CARD 12-23967 states: "During performance, determined to be associated with a faulty test at step 5.1.25, actuation did not happen for approximately 2 minutes and when it did jack used to connect the GE Test Module E4150F006 did not open. Everything else that should have happened did after delay into Jack E41A-J1 to facilitate testing. The accept E4150F006 did not open. Stopped surveillance, placed HPCI Aux. oil pump in procedure was revised (TCN) to install single off, and placed test box switch in off." Reportability/Operability Review states: "HPCI is pole test switches, in place of the GE Test inoperable. Condition added to LCO 2011-0359. CARD Notes state: Determined to be Module. During the second performance, the a test plug issue. Surveillance was TCN'd and completed satisfactorily. The test plug will low output of the regulator did not provide need repair in the future to allow use of the test box. WO 34402117 initiated to correct sufficient pressure to fully stroke valve faulty test jack. WO 34402117 was completed on 2/21/2014. Cannon pin tool was used E4100F054. Hence, the reason for the faulty to push "Pin F" back into connector. Continuity testing completed SAT. During a indication of the valve position, not the limit second performance: SPF Note 3: Step 5.1.22.3, E4100-F054 will not open since L/S switches. The degraded function of this are not adjusted right (valve is actually open) - CARD 12-24024." CARD 12-24024 valve to fully open did not impact the safety states: E4100F054 did not indicate open with valve fully open (indicated closed), functions of HPCI to add water to the RPV or fingered limit switches, and lost all indication with valve open. Verified power, air and isolate containment. System Eng valve position locally, all are in service and correct; just limit switches are not working. recommended keeping the deficient Marotta Request I&C work limit switches." CARD Reportability/Operability Review states: regulator in place until an ERE could be "Indication only, not required to support HPCI operability." WO 34426276 written for completed to correct the reoccurring issue limit switches adjustment of E4100F054. During performance of WO (05/29/2013) it with the regulator. The Marotta pressure was determined that Marrota Regulator needs to be replaced (P50F411). CARD 13- regulator was eventually replaced. Therefore, 23878 submitted. CARD states: "During performance of WO 34426276 to rework/repair both failures will have no impact on an E4100F054 indication problem, it was found that valve was not fully stroking and that extension to a 24 month surveillance interval.
| |
| pressure coming out of Marotta was at 31.3 psig; should be at 37.5 PSIG. This Marotta was changed out in December of 2012 by WO 26108190 and appears to have drifted down in the past 5 months. There is one Marotta in stock. Require a shop work order to check to see if Marotta we have in stock is properly calibrated to be used as replacement for P50F411." System Engineering recommends keeping current regulator in service at this time and a ERE completed to replace regulator to fix re-occurring issues with the Marotta regulator. CARD 13-23878 Reportability/Operability Review states:
| |
| "E4100F054 is HPCI turbine steam line drain pot steam trap bypass AOV. Valve opens if the Drain Pot level gets too high. Valve is closed when HPCI is started. To support the HPCI function the valve is closed or isolated from the main condenser by 2 other valves E4100F028 and E4100F029. Valve is closing properly and supports HPCI system function. HPCI remains OPERABLE." WO 36635876 replaced faulty Marotta Regulator on 10/29/2014.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 18 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 132 of 395 0255 PERFORM 24.202.05 SEC-5.2 & 5.3 HPCI LOCAL VALVE POS SR 3.3.3.1.2-8 SR 3.3.5.1.6-3.f INDICATION VERIF & LSFT SR 3.3.6.1.5-3.a SR 3.3.6.1.5-3.b SR 3.3.6.1.5-3.c SR 3.3.6.1.5-3.d SR 3.3.6.1.6-3.f SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 3 24 Month Justification: Notes:
| |
| Two failures are identified as event driven failures which are not indicative of a repetitive time based failure mechanism. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 3/19/2014 A During the testing of Valve E4150-F042, Torus Suction Inboard Isolation valve, the The identified failure(s) would not have Open pushbutton had to be continually depressed to fully stroke the valve to the full open prevented the performance of the required position. CARD 12-24169 was written to document this finding. CARD 12-24169 safety function of the equipment. Therefore, states: "When given an open signal by pressing the pushbutton in the MCR, E4150F042 this failure will have no impact on an does not stroke full open unless the open pushbutton is held. The valve works fine in the extension to a 24 month surveillance interval.
| |
| closed direction. According to Drawing 1-2221-08, it appears there is a problem in the opening circuit seal-in through the closed pushbutton. Based on the fact that the valve properly strokes closed and it opens when the pushbutton is held, there is no concerns with the auto positioning circuitry." CARD 12-24169 Reportability/Operability review states: "The suction for HPCI comes from either the CST or the Torus. The E4150F042 is the suction from the Torus. The valve still functions strokes closed as required which supports the Primary Containment isolation function. The valve open contactor functioned and the auto open signal does not rely upon the seal-in from the closed push button as the auto signal is a contact from a relay that goes directly to the contactor so the function to support HPCI operability is maintained. The HPCI system and primary containment isolation valve are OPERABLE because the valve is still capable of auto opening and closing to support the design functions." Work Order 34450676 was previously written on 5/8/12 to correct valve issue. On 5/27/14, WO found broken Aux contact O/A, removed contact and replaced with new one from stock.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 19 of 270
| |
| | |
| 3/23/2014 C In Step 5.2.42 of the surveillance procedure, valve E4100F029 position indication in the This is an event driven failure TRVEND in that the lowRev 1 24MCGNF319001 Main Control Room did not change state (indicated full closed). Valve did stroke Page 133 of 395 output of the regulator did not provide locally. CARD 14-22730 written to address problem. CARD 14-22730 states: "While sufficient pressure to fully stroke valve trying to perform PMT for 36700624 the open light did come on when the open push E4100F029 following the diagnostic testing.
| |
| button was depressed. The closed light stayed on the entire time. Locally the valve is Hence, the reason for the faulty indication of moving what appears to be about 3/4 of an inch." Valve E4100F029 was repacked to the valve position in the Main Control correct a steam leak via WO 36700624 and returned to service following diagnostic Room. The output of the regulator was valve testing on 3/8/14 with the limit switches never being removed during the valve miscalculated by the technicians performing repack and diagnostic testing. On 3/18/14, WO 36700624 was revised to troubleshoot the valve diagnostic testing. The correct and rework loss of the OPEN position indication for valve E4100F029. Valve was calculated output pressure is 34.7 psig and stroked from the control room with the pushbutton and the stroke length came up short this is the value to which the regulator of desired stroke length. WO 36700624 comments state: "The actuator for valve output should have been set upon completion E4100F029 has a bench set of 21.5 -32.6 psig to stroke full travel. The Marotta of the diagnostic testing. Therefore, this regulator is outputting approx. 32 psig. This is a known issue and CARD 13-23878 failure will have no impact on an extension was written to create WO to replace. This regulator supplies four valves and just does to a 24 month surveillance interval.
| |
| not have enough output to fully stroke valve. Limit switches were mechanically actuated with proper indication in control room verifying good limit switches." The review of WO 36700624 in CARD 14-22730 indicates that per the valve diagnostics, 32.0 psig is approximately half stroke. Full stroke appeared to be at 35.0 psi during the valve diagnostic. This is an approximation based on looking at graphs. Conferred with the AOV engineer, and the calculated full stroke psi from the diagnostic data is 34.7 psi.
| |
| This supports that the lack of full stroke length is due to low air pressure and not from valve friction.
| |
| 11/23/2015 C In Step 5.2.21 of the procedure, valve E4150F042, HPCI Torus Suction Inboard This is an event driven failure in that the Isolation Valve, did not go to the full open position without continually depressing the discovery of the Open contactor Aux contact Open pushbutton. WO 42002118 is referenced on the Surveillance Procedure Form block interlock finger being broken was (SPF). WO 42002118 states the issue with the open seal-in circuit of valve E4150F042 discovered during the performance of was discovered during the performance of another procedure (44.030.152) on 10/28/14. procedure 44.030.152, Online HPCI System WO 42002118 was initiated on 10/30/2014 but was not worked until 2/23/16. Logic Functional Test, which was being Consequently, the aforementioned issue with the Open pushbutton and the subsequent performed in October 2014 prior to the opening of valve E4150F042 occurred prior to the start of this surveillance procedure on refueling outage dates for RF-10.
| |
| 11/23/15. WO 42002118 found Open contactor Aux contact block interlock finger Consequently, the discovery of the identified broken off. Replaced the Base 2 position aux contact block. Restored the open contactor failure occurred prior to the 18-month and verified the mechanical interlocks are operational. Coordinated testing with scheduled performance of procedure Operations to confirm the Open circuit is working and functional. 24.202.05 during the RF-10 outage.
| |
| Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 20 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 134 of 395 0257 PERFORM 24.203.02 SEC-5.3 DIVISION 1 CSS SIM AUTO ACT - SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b E2150F005A ONLY SR 3.5.1.11 SR 3.5.1.14 SR 3.5.2.9
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0258 PERFORM 24.203.03 SEC-5.3 DIVISION 2 CSS SIM AUTO ACT - SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b E2150F005B ONLY SR 3.5.1.11 SR 3.5.1.14 SR 3.5.2.9
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0260 PERFORM 24.203.04 SEC-5.3 DIV.1 CSS LOCAL VALVE POSITION SR 3.3.3.1.2-8 SR 3.3.5.1.6-1.d INDICATION VERIF. SR 3.3.5.3.3-1.b SR 3.5.2.9
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 21 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 135 of 395 0263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACTUATION TEST SR 3.3.5.1.5-2.a SR 3.3.5.1.5-2.b
| |
| & VALVE OPER TEST SR 3.3.5.1.5-2.c SR 3.3.5.1.5-2.d SR 3.3.5.1.5-2.e SR 3.3.5.1.5-2.f SR 3.3.5.1.5-2.g SR 3.5.1.11 SR 3.5.1.14
| |
| # Performances: 5 # Failures: 1 24 Month Justification: Notes: Per Maximo: Perform 0263 OR (1263 + 2263) depending on equipment availability.
| |
| One failure is identified as a unique failure which is not indicative of a repetitive time based failure mechanism. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/9/2017 D SPF Note: "At Step 5.2.35.2, 72CF threw on to 72F Bus. It did not affect stroke times." The identified failure is unique and does not CARD 17-23266 submitted. CARD 17-23266 states: "72C-3C tripped. Walkdown of the occur on a repetitive basis and is not breaker found a trip of the 87 device (over current) and the Lockout Relay. Surveillance associated with a time-based failure 24.204.03 (LPCI Simulated Automatic Actuation Test) was in progress at step 5.2.35.2. mechanism. Therefore, this failure will have Loads off swing bus 72CF were transferred to position 72F-5F as expected. No other no impact on an extension to a 24 month abnormalities were noted. This event is similar to CARD 15-28495." surveillance interval.
| |
| Reportability/Operability Review states: Declared LPCI Swing bus inoperable and added condition to LCO 2016-0381. Applied mode 1, 2 and 3 restraints." CARD Cause: "The Direct Cause was: Degraded CT. This was the only change to the circuit since successful completion of the circuit. The Apparent Cause is Abnormal Electrical Stress from a loose connection/open circuit in RF17 (CARD 15-28495). The open circuit of the CT in RF17 could have developed high voltages and degraded the CT. This degradation cannot be detected at low current test conditions. Due to the fast acting relaying the high voltages may not have been long enough in duration to cause a complete failure of the CT. A Contributing Cause is Degradation of the 87 relay time delay. Original manufacture time delay curve states the relay should actuate between 14 and 38 milliseconds and should be around 30 at the test values utilized by Fermi. The 87 relay is actuating at 8 milliseconds. Cause Code E01-Setpoint Drift. Corrective Actions:
| |
| DC/AC-Replace the affected CT's at 72C-F MCC completed. CC-Replace the 87 relay with a relay including a time delay per ERE-44596 - completed. The extent of the apparent cause is limited to CT's that have been open circuited. There is one other known occurrence in which a CT was open circuited. This was the failed knife switch in the 345KV relay house coming out of RF17. This CT has been operated throughout the last cycle in the range it is expected to operate at and has not shown any degradation.
| |
| The extent of the contributing cause is limited to the 50 and 87 relays in the 72C-3C circuit. The model relay was not found used in any other locations. The 50 and 87 relays were replaced under ERE-44596. This failure was determined to be a Functional Failure as when breaker 72C, position 3C tripped unexpectedly this resulted in inability of the DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 22 of 270
| |
| | |
| breaker to supply power to MCC 72-CF which is a risk significant load. Failure of TRVEND 24MCGNF319001 Rev 1 Function R1400-01 resulted. MRFF Evaluation Justification states: The causal analysis Page 136 of 395 determined that the cause was most likely that the CT was degraded during the RF17 event in which the CT was open-circuited. Fermi performed testing on the CT which did not reveal the degradation due to the differences in testing capabilities and in-field currents. There was also no OE or industry recommendations to suggest that the CT should be replaced just because it was open-circuited since it passed testing. The closest cause code is M3 as the CT tested SAT and there was no industry recommendation or OE available to suggest that any other actions should have been taken in RF17 to prevent this failure. Therefore this is not a Maintenance Preventable Functional Failure.
| |
| The performance criteria of 0 bus failures has been exceeded. CARD 17-23803 has been submitted to evaluate the system for classification of (a)(1) status. CARD 17-23803 states: The system has been evaluated for (a)(1) status and the 8/7/17 MR Expert panel approved the system to remain (a)(2). This recommendation is because the only maintenance preventable failure was an HU issue not an equipment issue. There are also no actions to be driven by a Get-Well-Plan to improve the reliability of the equipment.
| |
| WO 47455670 replaced CT-1 Current Transformers with new CTs in MCC 72C-F, position 1C and also replaced both 50 & 87 relays at Bus 72C-3C. Partial performance of 24.204.03, Section 5.2 was performed as PMT for this Work Order.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 23 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 137 of 395 0265 PERFORM 24.204.05 SEC-5.1 DIV. 1 RHR LOCAL VALVE POSITION SR 3.3.3.1.2-8 SR 3.3.5.1.6-2.h INDICATION & STROKE SR 3.3.5.3.3-2.b SR 3.3.6.1.6-2.e SR 3.3.6.1.6-6.c SR 3.5.1.14 SR 3.5.2.9
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/21/2014 A SPF Note 1: Step 5.1.6.2 E1100F050A green light did not go out, failed acceptance The identified failure(s) would not have criteria - CARD 14-21515 submitted to repair" CARD 14-21515 states : "Step 5.1.6.2 of prevented the performance of the required 24.204.05 requires the E1100F050A Closed light to go out for acceptance criteria. The safety function of the equipment. Therefore, valve stroked locally and the Open light came on, meeting those two parts of the three this failure will have no impact on an acceptance criteria. The failure of the closed light to go out means step 5.1.6 did not extension to a 24 month surveillance interval.
| |
| meet acceptance criteria. Request the position indication for E1100F050A be adjusted to complete the surveillance meeting acceptance criteria." Reportability/Operability Review states: "E1100F050A did not indicate full open during surveillance testing. The local position of the valve was verified to be full open. A limit switch adjustment is required. The limit switch for the E1100-F050A was adjusted by I&C and the test reperformed Sat." Maintenance Rule Functional Failure evaluation completed, it explains: "the safety related functions of the E1100F050A are to open to permit LPCI flow to the reactor vessel during a postulated LOCA and to automatically close upon cessation of flow to maintain reactor coolant pressure boundary. The non-safety related function is to open to permit flow for the Shutdown Cooling mode of operation. The condition described in the CARD is concerned with the ability of the valve to stroke with the actuator - i.e. the limit switch was required to be adjusted to resolve the indication issue. This condition had no effect on the ability of the check valve to physically open or close. Each of the potentially-affected functions were retained, and no MRFF occurred."
| |
| Event Title Associated SRs and Function 0271 PERFORM 24.206.04 SEC-5.1 RCIC SYSTEM FLOW TEST AT 150 PSIG SR 3.5.3.4
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Satisfied by Event 0274 when performed with Reactor Pressure between 150 psig and 200 psig DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 24 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 138 of 395 0272 PERFORM 24.206.02 SEC-5.2 RCIC VAL POS INDICATION VERIF. / SR 3.3.3.1.2-8 SR 3.3.5.2.5-1 MANUAL INITIATE SR 3.3.5.2.5-2 SR 3.3.5.2.5-3 SR 3.3.5.2.6-4 SR 3.3.6.1.6-4.f SR 3.5.3.5
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/15/2017 A SPF Note 1: "E5150-F084 failed to stroke closed in 24.206.02. CARD 17-23503 After The identified failure(s) would not have T.S. no issues found, stroked valve SAT" CARD 17-23503 states: "there is proper open prevented the performance of the required indication in the MCR, upon pushing the close push button had no change in state, safety function of equipment. Therefore, this checked pushbutton lights, mechanical operation of the pushbutton to no avail." failure will have no impact on an extension Reportability/Operability Review states: "As part of the troubleshooting, the operator to a 24 month surveillance interval.
| |
| attempted to stroke the valve so that electrical maintenance could collect data. The valve stroked on the first attempt. Data collected during the troubleshooting were all satisfactory. Following troubleshooting the CR operator again stroked the valve without issue. RCIC is fully capable of performing its intended safety function." Additional comments provided state: "The condition described in the CARD impacts the manual operation of the valve for stroke time testing only. Follow-up attempts to manually close and reopen the valve from the MCR was successful and no high resistance readings were discovered when addition troubleshooting was performed. RCIC was able to perform its Maintenance Rule functions. This is not a Maintenance Rule Functional Failure or MSPI failure. RCIC would have been able to meet the mission time of 24 hours. "SPF Note 2: "TCN# generated for stroking E5150F045 due to Lvl 8 isolation being in affect, CARD written to incorporate TCN and reorder steps for efficiency: CARD 17-23507" CARD 17-23507 states: "section 5.2 Recently added steps 5.2.77 & 5.2.78 and did not account for plant conditions, Currently level 8 Shutdown is in affect for RCIC and stroking of the E5150F045 is not possible unless Level 8 is defeated, Currently TCN is being made to continue, this needs to be incorporated into the Procedure. Also for efficiency request reorder step to place all defeats for interlocks in section 5.2 at the beginning of the procedure and restoration at then end, due to this section requires Local position indication TOT, Steam tunnel RCIC Quad which, can accrue dose while waiting for manipulations in the Relay Room. TCN # Will be added after processing."
| |
| CARD indicates: "TCN number T12608; Revision 45 issued."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 25 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 139 of 395 0274 PERFORM 24.206.04 SEC-5.2 RCIC SYSTEM AUTOMATIC SR 3.5.3.4 SR 3.5.3.5 ACTUATION TEST
| |
| # Performances: 6 # Failures: 3 24 Month Justification: Notes: Satisfies Event 0271 when performed with Reactor Pressure between 150 psig and 200 psig The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/29/2009 A SPF Note 1: "Step 5.2.40 verifies 1D24 alarms. The step should verify 1D24 clears. Rev The identified failure(s) would not have 45 says "Clear", Rev 46 was changed to "Alarms" - Discuss with SM and submit CARD prevented the performance of the required 09-23429" CARD 09-23429 Closure Summary states: "This CARD is being closed to safety function of the equipment. Therefore, CARD 09-23471: Procedure enhancement for 24.206.04 RCIC SYSTEM AUTOMATIC this failure will have no impact on an ACTUATION, which has additional procedure enhancements to the same procedure." extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 26 of 270
| |
| | |
| 12/3/2010 A SPF Note 1: "Step 5.2.36 oil filter inlet pressure slightly low at 12.5 psig (range 13-20 The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 psig). CARD 10-31523 submitted for investigation. Oil filter inlet pressure is SAT." Page 140 of 395 prevented the performance of the required CARD 10-31523 states: "RCIC turbine oil filter inlet pressure indication on E51-RA01 safety function of the equipment. Therefore, was reading 12.5 psig. Expected band is 13-17 psig and allowable band is 13-20 psig. this failure will have no impact on an Inlet steam pressure was 150 psig and turbine speed at that time was 2400 RPM." CARD extension to a 24 month surveillance interval.
| |
| Reportability/Operability Review states: "The condition of the RCIC turbine oil filter inlet pressure indication on E51-RA01 being less than allowable band is 13-20 psig, recorded pressure 12.5psig, has been attributed to instrument error by the System Engineer based upon past performances RCIC surveillance run. System Engineer comments: "The last time this low press surveillance was performed (4/09) the oil dp was 1.5. The last two high press surveillances (5/10 and 8/10) the oil filter dp was 2.0.
| |
| Since the oil outlet pressure was 12.0 psig, using the same 1.5 psid (since no work was performed on the oil system) the inlet oil pressure was about 13.5 psig. This would indicate that the gauge is not reading correctly, and may need calibration." Additional comments provided indicate oil filter outlet pressure was in band at 12 psig, therefore adequate oil pressure to the machine exists. System Engineer calculated inlet oil pressure was about 13.5 psig, which is an acceptable oil pressure. RCIC lube oil system is capable of adequately supplying the required lubrication for RICIC operation. RCIC is capable of meeting the safety related functions and is OPERABLE." WO 32114199 eventually replaced the gauge in May 2011. SPF Note 2: "Step 5.2.40 verifies alarm 1D24 alarms; should be alarm clears." CARD 10-31520 submitted to correct Step 5.2.40 which incorrectly verifies alarm 1D24 "alarms" verse "clears". CARD 10-31520 investigation determined: "The procedure revision (49) was done by DCR 10-1453 but only included changes based on the request from CARD 09-23471. Two different procedure changes were requested by CARDs 09-23429 and 09-23471. The 09-23429 CARD was closed to the 09-23471 CARD. The closed CARD (09-23429) information was included in the immediate actions of the open CARD but was missed by the CARD owner and the technical reviewer during the procedure revision 49 process. A review of the procedure revisions found that rev 44 had the correct information for step 5.2.40 to verify the alarm clear. However revision 45 (2008) changed step 5.2.40 from clear to alarm. There is no change summary or revision bar for this step to be changed. Therefore this step was inadvertently changed and was not caught during the revision 45 change, done after RF12." This discrepancy was found during the cyclic performance of the procedure during RF13 and was not corrected for the RF14 performance. This event was determined to be an Engineering Human Performance (HU) Event. Procedure revised by DCR 10-1600 to change the alarm status verification from alarm to clear.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 27 of 270
| |
| | |
| 4/19/2017 A SPF Note: "Step 5.2.36 E51-RA01 is low OOS. This also effects oil filter dip reading The identified failure(s)
| |
| TRVENDwould not have 24MCGNF319001 Rev 1 (neg number). RA02 is in band but higher than RA01. Performed final walkdown on Page 141 of 395 prevented the performance of the required RCIC. All other parameters are normal. RA01 verified valve open. Mech agitated gauge safety function of the equipment. Therefore, with no difference noted. CARD 17-23743 submitted." CARD 17-23743 states: this failure will have no impact on an "E51RA01, Turbine Oil Filter Inlet Pressure Indication, is reading low OOS at 11.5 extension to a 24 month surveillance interval.
| |
| PSIG. Outlet pressure, E41RA02, is reading in band at 12 PSIG." CARD Reportability/Operability Review states: RCIC turbine oil filter inlet pressure was below allowable pressure of 15-20 psig. Indicated pressure was 11.5 psig. The filter outlet pressure was 12 psig which is the pressure supply to the turbine bearings which was in the allowable band. The inlet pressure is marked only to get a differential reading for the filter to know if it needs to be changed or not. There was no concern with this low reading because of the outlet pressure being in band. This is not acceptance criteria for the surveillance. These readings are taken for system engineering trending of system performance. All acceptance criteria for the surveillance were met. No impact on the ability of the RCIC system to fulfill it's design function. RCIC remains Operable." WO 47555089 written. Maximo indicates status is WDLY (Waiting On Daily Scheduling).
| |
| Event Title Associated SRs and Function 0277 PERFORM 24.207.06 DIV. 1 EECW/EESW ACTUATION FUNCTIONAL SR 3.3.5.1.5-1.b SR 3.3.5.1.5-2.b TEST SR 3.3.5.1.5-3.b SR 3.3.5.1.5-4.b SR 3.3.5.1.5-5.b SR 3.7.2.5
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 28 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 142 of 395 0278 PERFORM 24.207.07 DIV. 2 EECW/EESW ACTUATION FUNCTIONAL SR 3.3.5.1.5-1.b SR 3.3.5.1.5-2.b TEST SR 3.3.5.1.5-3.b SR 3.3.5.1.5-4.b SR 3.3.5.1.5-5.b SR 3.7.2.5
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 10/13/2015 A SPF states: "Steps 5.1.19 and 5.1.35, P4400-F603B did not indicate full closed by limit The identified failure(s) would not have switches (dual in MCR) and prevented P4400-F602B from opening. P4400-F603B prevented the performance of the required indicated closed locally. Shift Manager informed. CARD 15-27745 submitted." CARD safety function of equipment. Therefore, this 15-27745 states: "On initiation of Div. 2 EECW IAW 24.207.07, P4400-F603B did not failure will have no impact on an extension indicate full closed in the MCR and P4400-F602B did not open (due to its logic not to a 24 month surveillance interval.
| |
| seeing the P4400-F603B full closed). Locally, from the floor, the valve appeared full closed. The test was continued and the valve opened normally, and indicates properly in the open position. Another stroke was attempted IAW a 24.207.05 partial surveillance, with an operator monitoring valve closure locally. No abnormalities were noted locally, but the valve again indicated dual in the MCR when it was full closed locally and P4400-F602B did not open. It appears the limit switches associated with the open indicating light and interlock to P4400-F602B (these 2 limit switches are on the same rotor) require adjustment. This is a failed PMT for W.O. 36245899." Reportability/Operability Review states: "Div 2 EECW is currently Inoperable for RF17 work and is being controlled under LCO 15-0030. Work order 44128630 is being prepared to address the position indication issue on P4400-F603B and has been added to that LCO." This event was determined not to be a Functional Failure. WO 44128630 completed adjustment of limit switches and stroked P4400-F603B to verify proper valve position indication satisfactorily. The problem was caused, identified and corrected during the same maintenance / out of service period. The system was run on 09/22 for placing the Div 2 EECW Hx B001D in - service. At that time there was no issue with the indication of valve P4400-F603B. The work performed during this event took place at the P4400-F603B valve: P4400-F603B-PERFORM MOV THRUST (VIPER) TESTING.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 29 of 270
| |
| | |
| 4/10/2017 A SPF notes that alarm 2D22 EECW Makeup Tank B Pressure High/Low is in alarm, The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 alarm is invalid. A CARD was NOT written for this occurrence. Reference is to CARD Page 143 of 395 prevented the performance of the required 16-21856 (Div 2 EECW Head Tank Low Pressure Alarm will not clear) written 2 safety function of equipment. Therefore, this 2016, CARD 16-21963 (Switch calibration drift) written 3/2/2016, and CARD 17-21705 failure will have no impact on an extension (2D22 Div 2 EECW Head Tank Low Pressure Alarm locked in) written 3/1/2017. WO to a 24 month surveillance interval.
| |
| 47178162 replaced P44N410B, calibrated, and returned to service on 3/16/2017. Per Maximo, WO 46558652, Calibrate Div 2 EECW Make-Up Tank Pump Instruments, was performed on 6/20/2017. Work Order, Step 40.3 Perform 44N410B calibration check per the Instrument Spec Sheet, indicates P44N410B (including Ann. 2D22) was As Found SAT, no adjustment required.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 30 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 144 of 395 0280 PERFORM 24.207.04 SEC-5.2 RBCCW/EECW DIV 1 VALVE POSTION SR 3.3.3.1.2-8 INDICATION VERIF
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failure which is not indicative of a repetitive time based failure mechanism. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/7/2012 C SPF Note 1: "Step 5.2.9 P4400F246 could not be verified sufficiently closed. Drain hose This is an event driven failure in that the remained at full stream for 1 minute. Drainage never stopped or substantially slowed. valve maintenance contributed directly to the This does not meet acceptance criteria. CARD 12-22910 submitted." CARD 12-22910 As Found condition. Therefore, this failure states: "After 30 seconds, the drainage should have stopped or substantially slowed. This will have no impact on an extension to a 24 did not occur. Reportability/Operability Review states: "EECW inside the Drywell is not month surveillance interval.
| |
| required to support Mode 4, 5 functions of EECW including OPDRVs and movement of recently irradiated fuel. EECW inside the Drywell is required to support Mode 1,2,3 and has been declared inoperable." Maintenance Rule Functional Failure evaluation completed: "P4400F246 check valve is internal to the drywell and therefore would not have any impact on being able to isolate the drywell from the rest of the system.
| |
| Furthermore, since this failure was found during the PMT of WO# P423100100 and prior to being returned to service, per MMR APP D table 1, the failure would not be considered a functional failure." CARD recommendation is to replace the valve. WO 34290900 written to perform As Found "Inspection" and replace valve. WO notes "History" that valve was recently inspected under PM P423100100, but failed surveillance testing, due to not fully closing." WO 34290900 found valve in like new condition and installed in correct orientation. Valve stroked "smoothly" in both directions. No debris or FME observed in inlet or outlet. Valve was determined to have nothing wrong and was returned to system. No replacement required.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 31 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 145 of 395 0281 PERFORM 24.307.01 SECT 5.2 EDG 11 ECCS START WITH LOSS OF SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b OFFSITE POWER TEST SR 3.5.1.11
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/23/2015 A SPF states: "When open button for E1150F024A pushed, lost indication for valve. The identified failure(s) would not have CARD 15-29268 written." CARD 15-29268 states: "During performance of 24.307.01, prevented the performance of the required Div-1 EDG-11 LOP LOCA Testing, in section 5.2, E1150-F024A deenergized during a safety function of the equipment. Therefore, remote operation attempt from the MCR. RHR (pump A) had just started from this failure will have no impact on an LOP/LOCA digital sequencer initiation signal, and panel operator depressed the open extension to a 24 month surveillance interval.
| |
| pushbutton for E1150-F024A. Valve indication immediately went blank. No RHR flow was indicated on panel gage. Pump remained running on minimum flow. MCC bucket 72B-3A-5A thermal overloads were reset with no return of valve position indication.
| |
| Bucket was deenergized locally and inspected. Fuses were checked in-place satisfactory.
| |
| System remained filled - no voiding occurred." Reportability/Operability Review states:
| |
| "E1150-F024A lost position indication during a remote operation attempt from the MCR. Investigation found a blown control power fuse that impacted control room position indication only. This had no impact on the control functions of the valve. All fuses in bucket replaced, bucket reenergized, and MCR indication restored." Following the replacement of the fuses, E1150-F024A was successfully stroked per 24.204.01. This issue had no impact on the ability of the E1150-F024A to meet its design functions. The E1150F024A remains operable. There is no component failure or degradation that could prevent the equipment from performing its functions and this is supported by the shift managers comments. "E1150-F024A lost position indication during a remote operation attempt from the MCR. Investigation found a blown control power fuse that impacted control room position indication only. This had no impact on the control functions of the valve."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 32 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 146 of 395 0282 PERFORM 24.307.02 SECT 5.2 EDG 12 ECCS START WITH LOSS OF SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b OFFSITE POWER TEST SR 3.5.1.11
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 3/20/2014 A SPF Note 1 states: Step 5.2.57, Output breaker closure time 12.22 seconds; greater than The identified failure(s) would not have 10 seconds limit. CRS/SM - OCC informed. CARD 14-22590 written. CARD 14- prevented the performance of the required 22590 states: During RF16 LOP/LOCA surveillance testing for EDG 12 via 24.307.02, safety function of the equipment. Therefore, it was found on Step 5.2.57 that EDG 12 failed output breaker (EB3) closure time this failure will have no impact on an acceptance criteria. Breaker closure time was 12.22 seconds while Acceptance Criteria is extension to a 24 month surveillance interval.
| |
| <= 10 seconds (Tech Spec 3.8.1). The memory function on the chart recorder was used to reprint the script chart and closure time was verified. Field flash time was 3.0 seconds and rated voltage/frequency time was 8.0 seconds. These are all normal values for EDG
| |
| : 12. Investigate cause and provide corrective action. Under troubleshooting WO 38172364, the 12EB-EB3 breaker was functionally tested and the following relays were tested: T3A1, 59SX, 59S, 1MV62 and 27X-12EB. All testing was performed satisfactorily, except for time delay testing of relay 1MV62. The initial as found time delay was 16.56 seconds. The time delay testing was repeated numerous times, however the relay was never able to meet the ALT of 4.5825 - 4.8175 seconds and there was no repeatability in the values; repeat attempts were 6.38, 7.00 and 6.51 sec's, the setpoint is 4.7 sec. The relay contacts were verified to be changing state and working properly.
| |
| CARD 14-22732 was written to document failed relay. CARD 14-22732 states:
| |
| Performing WO 38172364, testing relays due to EDG12 not meeting LOP/LOCA criteria, found time delay relay 1MV62 (print I-N-2572-18) high out of spec and could not adjust the relay to meet acceptance criteria. WO 38172364 allows replacement of the relay if found out of spec. 1MV62 relay was replaced with a bench tested relay from stock and the PMT (24.307.02, Section 5.2) was completed satisfactorily. CARD 14-22590 Description/Investigation notes state: The 1MV62 time delay relay is a 125 VDC Agastat 7012PB (delay on pick-up) model with a range of 0.5 to 5 seconds. Per CECO, it is QA1, Seismic I and Tech Spec related. A review of the work history revealed that the relay set point had been 1 second until RF14. EDP 35621 Rev A (Degraded Voltage Improvements) revised the time delay setting to 4.7 seconds for all the load shed time delay relays (4) for the EDG output breakers. This change was to ensure that during a degraded voltage event coincident with a LOCA, there is adequate time from the initiation of load shedding for voltage to decay at large motors prior to the EDG output breaker reclosing. The 1MV62 relay was as found within the 1 second APT (0.9 to 1.1 sec) and then adjusted to within the new ALT (4.5825 to 4.8175 sec) and tested twice DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 33 of 270
| |
| | |
| under WO 31423675 on 11/10/10. Based on PM/CM history, there is no replacement TRVEND 24MCGNF319001 Rev 1 documentation for the 1MV62 relay. An evaluation of the current Agastat 7012PB Page 147 of 395 model relay for the load shed time delay application was completed and it was determined, with EFT support, that the 7012PC model is more appropriate for the application. The current 4.7 second time delay setpoint for the relays (7012PB) is near the end of the 0.5 to 5 second timing range. The setpoint of 4.7 seconds is within the timing range; however, VMR4-9, for Agastat Timing Relays, states that for easiest adjustment and lowest cost, the shortest time range suitable for the application should be selected. The next highest range is the 7012PC with a range of 1.5 to 15 seconds. Four WOs were created to replace the existing relays with the 7012PC model, or equivalent.
| |
| To date (July 2018), per Maximo, two WOs, 38563406 (11EA) and 38182257 (13EC) have been completed. CARD 14-22590 Failure Information details: The slow time occurred while performing 24.307.02 (ECCS Start w/ LOP) Section 5.2 of, however Section 5.1 (LOP) had been performed successfully and the output breaker closed in under 10 seconds. Since the output breaker had closed in under 10 seconds for Section 5.1, there is reasonable assurance that the failure had occurred when Section 5.2 was performed. A review of all the EDG 12 supported loads was performed by PSE to determine the impact of the 2.2 second delay in 12EB-EB3 closure time. Based on review, the delay would not have affected the availability of the EDG 12 support and auxiliary equipment (MCC 72EB-2D), as this equipment, is not sequenced on for at least 45 seconds. Per DC-6034, Vol I/II and TRVEND GE14 LOCA Report Rev 1, the LOP/LOCA response assumes a 20-25 second EDG starting delay. Additionally, low pressure injection is delayed approximately 10-13 minutes for the limiting small break LOCA. There would be no impact to the essential room coolers supported by EDG 12 (Div 1 Battery Charger/MCC area, Div 1 SGTS Fan, Div 1 RHR, Div 1 Thermal Recombiner area and Div 1 EECW area) as the delay is judged to be well within the thermal inertia of the room heat sources and sinks such that its effect on area environmental responses would be expected to be negligible. The review also determined that all the Div 1 EDG 12 supported valves would not be affected by the delay. EDG 12 remained capable of performing its required MR functions under design conditions with the output breaker closure time of 12.22 seconds. Therefore, there was no loss of functions R1400-01, R1400-02, R3000-01, R3000-02 and R3000-07. There was not a MRFF for R1400 or R3000, or an R1400 bus failure. This failure would not have resulted in the inability to control a critical safety function (e.g. Reactor water level and pressure, Primary and Secondary Containment, Drywell temperature and pressure, Spent Fuel Pool temperature and level, etc.), or capability to shutdown the Reactor and maintain it in a shutdown condition. The EDG did start and load. The EDG's are considered a "CC2", which is a Low Critical Component defined in AP-913. By definition, a CC2 component cannot cause a loss of a critical safety function. The 10 second start criteria is a design requirement listed in the UFSAR. Although the EDG did start and load, it did not meet the Technical Specifications and UFSAR design criteria description. Additionally, an evaluation of the current PM strategy for the EDG output breaker load shed time delay relays was performed and the frequencies of PMs R931 and R932 were revised from 3300 days to 2200 days (4R). CARD 14-22590 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 34 of 270
| |
| | |
| Closure Summary states: THE DIRECT CAUSE IS: E01 Setpoint Drift, because the as TRVEND 24MCGNF319001 Rev 1 found time delay of 1MV62 was 16.56 seconds, as opposed to the setpoint of 4.7 seconds Page 148 of 395 with an APT of 4.5546 - 4.8454 seconds. The setpoint drift of the relay caused the EDG 12 output breaker 12EB-EB3 to close in 12.22 seconds after the EDG 12 emergency start signal.
| |
| 4/15/2017 A SPF notes:"Step 5.2.113 and 5.2.115 EDG-12 center phase amps reading low in MCR at The identified failure(s) would not have 140 Amps verse 418 Amps locally. CARD 17-23535 submitted." CARD 17-23535 prevented the performance of the required states: "EDG-12 Ammeter in MCR reading low on center phase compared to local safety function of the equipment. Therefore, indication, noted during 24.307.02 section 5.2. Cycled selector switch several times to this failure will have no impact on an validate good connection. With EDG-12 at 2600kW R30-R818 indicated X -> 400, Y - extension to a 24 month surveillance interval.
| |
| >140, and Z -> 425 amps where-as local readings are x ->408, Y -> 418, and Z -> 425.
| |
| Need investigation and WO generated if required." Reportability/Operability Review states: "R30R818, EDG 12 Ammeter provides indication only for the MCR operator.
| |
| The lower than normal reading on the center phase does not impact the safety related functions required to be performed by EDG12. EDG 12 remains operable." WO 47506238 written to calibrate EDG-12 AC Ammeters. WO Work Performed states:
| |
| "Found Y Phase '1TZ' transducer bad. Replaced with like for like replacement. All calibrations performed satisfactorily."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 35 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 149 of 395 0283 PERFORM 24.307.03 SECT 5.2 EDG 13 ECCS START WITH LOSS OF SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b OFFSITE POWER TEST SR 3.5.1.11
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/17/2015 A SPF Note 1: "EDG 13 received auto start but no load shed or load sequence. Note 1: The identified failure(s) would not have Steps not performed due to EDG Synch to bus. EDG Paralleled and load IAW SOP prevented the performance of the required 23.307 and S/D IAW 24.307.03, CARD 15-29052" SPF Cover noted: "HU error at Step safety function of the equipment. Therefore, 5.2.32.6 prevented automatic load shedding and resequencing." CARD 15-29052 states: this failure will have no impact on an "During LOP/LOCA testing of EDG #13 per 24.307.03, page 59, at Step 5, at the count extension to a 24 month surveillance interval.
| |
| of two (counting down from 10) the 27C Potential Cutoff Switches were opened in the Div 2 Swgr Room. At Step 6, the 27A & 27C Potential Cutoff Switches were closed prior to 65E-E6 tripping Open, which is not in accordance with the procedure. At the count of zero, Step 7 was performed in the Relay Room, which repositioned Test Switch Modules for Core Spray and RHR. This resulted in Bus 65E not load shedding. In order to continue an EIT will be formed for recommendations on how to either back out or continue forward in the procedure, and how to load the EDG." CARD Reportability/Operability Review states: "Initial investigation determined that the failure to open all three of the 27C device knife switches and then re-closed prior to the LOCA signal was the reason the Load shed did not occur. The logic was reset and component restored to the standby condition and the retest was performed successfully. No additional actions required to support Operability of EDG 13." CARD Investigation determined operator opened the knife switches and then before the feeder breaker for the bus opened, operator closed the knife switches because countdown to 0 ended. Expected response was not observed. Operator believed he needed to complete his action "by the count of 0" instead of waiting on the action to take place.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 36 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 150 of 395 0284 PERFORM 24.307.04 SECT 5.2 EDG 14 ECCS START WITH LOSS OF SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b OFFSITE POWER TEST SR 3.5.1.11
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failure which is not indicative of a repetitive time based failure mechanism. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/28/2012 C SPF Note 1 (Event 284): "Steps 5.2.23.1, 5.2.24, 5.2.26.12, 5.2.38.2.a, 5.2.51.7 not This is an event driven failure in that breaker performed due to 72F-3A breaker issue. CARD 12-23915 submitted, TE-R30-12-044 secondary contacts were not cleaned Technical Evaluation concluded: "Based on this Technical Evaluation, there is no thoroughly which contributed directly to the impact on the acceptance criteria of Surveillance Procedure 24.307.04. This is based on As Found condition. Therefore, this failure troubleshooting that verified that load shed occurred which tripped the breaker, and the will have no impact on an extension to a 24 52XX was verified to have picked up from the load sequencer relay contact. The 72F-3A month surveillance interval.
| |
| post maintenance testing (WO 34392170) must perform 'overlap' testing to verify proper closing of the breaker. CARD 12-23915 states: "During LOP/LOCA testing of EDG #14 per 24.307.04 Section 5.1, Step 5.1.19.7 T4600C004 Div 2 SGTS exhaust fan did not sequence back on. 72F pos 3A supplies Div 2 SGTS, the load that should have sequenced back on is T4600C004, SGTS Div 2 Exhaust Fan. The CMC for 72F pos 3A is in the "Close" position, it indicates "Open" green light, and "Tripped" white light.
| |
| The CMC for the SGTS Div 2 Exhaust Fan is in "Run" with no indication, and ammeter indicating zero. SM/CRS informed." One of the Immediate/Compensatory Actions was to perform troubleshooting per MMA26. WO 34392170 initiated to: "Troubleshoot 72F Pos 3A Switchgear Breaker for reason it would not sequence back on as expected, during LOP / LOCA Testing. Inspect breaker and Perform cubicle inspection." Troubleshooting identified that the secondary disconnect was in poor condition. The close signal was validated at 52XX contact 2-8 lower terminal. This leaves potential causes of loose wiring, high resistance secondary disconnect and potential mechanical binding. Wiring inspections were SAT, if mechanically bound, the breaker would prematurely trip free when racked out and it did not (eliminating binding). With the breaker removed from the cubicle, approximately 10 ohms resistance was identified from 52XX contact 2-8 to the secondary disconnect 3 with the 52XX contact closed. The resistance was likely much higher at the position the breaker was sitting on the secondary disconnect, however to perform this measurement the breaker has to be racked out (thus wiping the contact). It is concluded that the cause of this failure was a high resistance secondary disconnect due to poor condition which could have been prevented through proper maintenance practices. Therefore, this was MPFF cause code (E10) Personnel Error."
| |
| WO 34392170 performed; secondary disconnects were cleaned and breaker was functionally tested SAT. CARD investigation concluded cause of event appears to be DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 37 of 270
| |
| | |
| due to the secondary contact cleaning that was performed during the Bus Inspection. The TRVEND 24MCGNF319001 Rev 1 contacts had been cleaned but not enough to remove all of the film on the secondary Page 151 of 395 contacts. As detailed in CARD
| |
| | |
| == Conclusion:==
| |
| This is partly attributed to not being allowed to use wire brushes in switchgear anymore due to FME along with not spending the time need to get the contacts properly cleaned. An alternate method needs to be identified to allow a more positive cleaning of the contacts. From CARD Action Item Completion Comments: 07/20/2012 11:39:28 AM Communicated this event to the Electrical Department at the refocus meeting on 7/19/12. The group brought up the issue of not being able to use wire brushes when needed in the RRA for appropriate work activities mainly cleaning the secondary contact. Comments relayed were that we can still use them we just have to spend the time to get the proper paperwork filled out to get the brush approved for the job. Discussion included the need to take the time required to perform the work correctly the first time. Maintenance Rule Functional Failure form completed, Justification states: "The Maintenance Rule Specific Guidelines for R1400 is "A loss of Switchgear (electrical bus) or switchgear position resulting in the loss of another SSC's Maintenance Rule function is a Switchgear FF". The load shed portion of maintenance rule function R3000-01 was maintained when the breaker tripped as required. The breaker failed to close, however the load sequencer close signal was received as verified by the 52XX relay energized and close signal validated at 52XX contact 2-8 lower terminal during MMA26 troubleshooting, thus the load sequence portion was met as well. When the breaker failed to close, MR functions T4600-01 and R1400-02 were not maintained, therefore this was a MRFF.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 38 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 152 of 395 0298 PERFORM 24.307.30 EDG NO.11 24 HOUR RUN FOLLOWED BY HOT SR 3.8.1.13.a SR 3.8.1.13.b FAST RESTART SR 3.8.1.14.a SR 3.8.1.14.b
| |
| # Performances: 6 # Failures: 4 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 12/22/2008 A SPF Note 1: Step 5.1.76, Fuel oil level is less than Tech Spec limit of 35,645 gallons. The identified failure(s) would not have Reading is at 33kgal. Entered LCO 2008-0577. SPF Note 2: LCO 2008-0577 cleared prevented the performance of the required 12/23/08 0427; Level 39 kgallons, Acceptance Criteria is met. safety function of equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 5/18/2010 A SPF Note: Two performances; "Fuel Oil Tank level is not within acceptance criteria. The identified failure(s) would not have Low level is being tracked by LCO 2010-0202." A second partial surveillance prevented the performance of the required performance to validate tank level at 38.3 kgallons was also completed on 5/18/2010. safety function of equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 12/18/2013 A SPF Note 1: "Step 5.1.76 acceptance criteria for EDG 11 Fuel Oil Tank not met. Low The identified failure(s) would not have level is being tracked by LCO 2013-0501, tanker is on-site." A second partial prevented the performance of the required surveillance performance to validate tank level at 41,000 gallons was completed on safety function of equipment. Therefore, this 12/18/2013.SPF Note 2: "Step 5.1.85, Lube Oil Tank High/Low alarm not clear. failure will have no impact on an extension CARD 13-28896 was initiated to order lube oil." CARD 13-28896 states: "EDG #11 to a 24 month surveillance interval.
| |
| Lube oil tank noted 11.75 at step 5.1.38 of 24.307.30, which is less than the NOTE previous to the step, which states the Desired level is 18" or greater." CARD 13-28896 Reportability/Operability Review states: "There is no specific surveillance requirement for the storage tank level and the low level alarm actuates at 62 Gallons of capacity left.
| |
| The actions to be taken at the low level alarm is to add oil." WO 37826817 added approximately 210 gallons of lube oil on 12/20/2013.
| |
| 1/13/2017 A SPF Note: Step 5.1.76 "Fuel Oil Storage Tank LOOS". Low level is being tracked by The identified failure(s) would not have LCO 2017-0055. A second partial surveillance performance to validate tank level at prevented the performance of the required 36.7 kgallons was completed on 1/13/2017. safety function of equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 39 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 153 of 395 0299 PERFORM 24.307.31 EDG NO.12 24 HOUR RUN FOLLOWED BY HOT SR 3.8.1.13.a SR 3.8.1.13.b FAST RESTART SR 3.8.1.14.a SR 3.8.1.14.b
| |
| # Performances: 6 # Failures: 5 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 9/26/2008 A SPF Note: "Step 5.1.76 Fuel Oil Storage Tank low (32.8kgal) due to extended run. Fuel The identified failure(s) would not have oil ordered and enroute with delivery expected 9-26-2008, 0630." LCO 2008-0400 is prevented the performance of the required tracking. A second partial surveillance performance to validate tank level at 39.6 safety function of equipment. Therefore, this kgallons was completed on 9/26/2008. failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 5/25/2010 A SPF Note: "Fuel Oil Storage Tank low due to 24hr run. - Fuel oil truck arriving @ 0800 The identified failure(s) would not have 5/25/10 LCO 2010-0213 is tracking fuel oil level" A second partial surveillance prevented the performance of the required performance to validate tank level at 37.7 kgallons was completed on 5/25/2010. safety function of equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 8/22/2013 A SPF Front Page: "EDG 12 FO Level Low (33.8kgal) - Step 5.1.7 & 7 7.3.6 not met - The identified failure(s) would not have tracked on LCO 2013-0353." A second partial surveillance performance to validate tank prevented the performance of the required level at 39.3 kgallons was completed on 8/23/2013.SPF Note 2: "Step 5.1.76 page 26, safety function of equipment. Therefore, this fuel oil tank level < 35,645 gallons - LCO entered as fuel delivery will be days on failure will have no impact on an extension 8/23/2013" to a 24 month surveillance interval.
| |
| 6/19/2015 A SPF Note 2: "Step 5.1.76 Fuel Oil Storage Tank below Tech Spec. LCO 2015-0117" A The identified failure(s) would not have second partial surveillance performance to validate tank level at 39.6 kgallons was prevented the performance of the required completed on 6/19/2015. safety function of equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 40 of 270
| |
| | |
| 8/19/2016 A SPF Note 1: "Unable to perform steps due to A DFOT pump check valve not fully The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 closing. Selector switch for EDG 12 transfer pumps is caution tagged in A position. Page 154 of 395 prevented the performance of the required CARD 16-25753 and LCO 2016-0322 written." CARD 16-25753 states: "EDG 12 FO safety function of equipment. Therefore, this xfer pump A discharge check valve did not close with FO xfer pump B running. agitated failure will have no impact on an extension check valve and it closed. This inops FO xfer pump B, need to repair A pump's to a 24 month surveillance interval.
| |
| discharge check valve." CARD 16-25753 Reportability / Operability Review states:
| |
| "The fuel oil transfer pumps are designed support EDG function by continuously transfer of fuel oil from the storage tank to the day tank. EDG 12 Fuel oil transfer pump selector switch is selected to the "A" pump and caution tagged (STR 16-1001) to maintain the function. EDG-12 remains OPERABLE." E-mail: Note from SE about 16-25753 states: "MRFF evaluation not required: The CARD clearly states that there was no equipment failure / degradation that could prevent the equipment from performing its function and this is supported by Shift Manager's comments. As long as one FO transfer pump remains in service the EDG is capable of performing it's maintenance rule and safety related functions." WO 45743816 written to disassemble, inspect, clean, and rework check valve as necessary. New plug, spring and gasket replaced for valve. PMT to leak check valve with transfer pump R3000C002 in operation completed SAT. SPF Note "Storage Tank level 33.8 kgallons - below acceptance criteria due to 24 hour run."
| |
| LCO 2016-0403" A second partial surveillance performance to validate tank level at 39 kgallons was completed on 8/20/2016.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 41 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 155 of 395 0300 PERFORM 24.307.32 EDG NO.13 24 HOUR RUN FOLLOWED BY HOT SR 3.8.1.13.a SR 3.8.1.13.b FAST RESTART SR 3.8.1.14.a SR 3.8.1.14.b
| |
| # Performances: 6 # Failures: 6 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 10/3/2008 A SPF Note 1: "Fuel Oil Storage Tank level low out of spec." LCO 2008-0435 expires The identified failure(s) would not have 10/4/08 3:20 pm; Fuel oil is on order, level will be corrected within 24 hours." A prevented the performance of the required second partial surveillance performance to validate tank level at 37.6 kgallons was safety function of equipment. Therefore, this completed on 10/3/2008. failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 8/3/2010 A SPF Note: "Step 5.1.76, Fuel Oil Storage Tank acceptance criteria not met, level < The identified failure(s) would not have 35,645 gallons LCO 2010-0329 entered; Fuel oil ordered." A separate performance for prevented the performance of the required "Fuel Oil Level only" to document LCO Log Form indicating LCO 2010-0329 was safety function of equipment. Therefore, this exited on 08/03/2010 at 13:21. failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 2/3/2012 A SPF Note: "During 24 hour run oil tank level rose from 29.5 at 1523 to 31.5 at 1210, A The identified failure(s) would not have third measurement was taken at 1600 which measure 30". Suspect inaccuracy in initial prevented the performance of the required measurement." CARD 12-20936 written." CARD 12-20936 states: "Measured lube oil safety function of equipment. Therefore, this tank level during the 24-hr run increased 2 inches during the 20-hr measuring period, failure will have no impact on an extension suspect an inaccurate initial oil level measurement, due to a third measurement toward to a 24 month surveillance interval.
| |
| the end of the run showing a lowering lube oil level as expected. These steps in the surveillance are to determine lube oil consumption rate of the engine during a 20-hour portion of the 24-hour run. These steps are not acceptance criteria."
| |
| Reportability/Operability Review states: "There is no acceptance criteria for the amount of oil required in the tank and the tank can be filled as needed during the assumed mission time for the EDG. Because there is still adequate volume in the storage tank and the reservoir has adequate oil to provide lubrication throughout the EDG mission time no operability concerns exist." CARD Closure Summary: Event was reviewed at the CRC and this is determined to be a personnel error. No training required. Lube oil tank level was misread. Event was determined to be Operations - Operations Support Crew Clock Reset briefing sheet completed.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 42 of 270
| |
| | |
| 8/30/2013 A SPF Note 1: "Step 5.1.76 acceptance criteria not met. EDG 13 Fuel Oil Storage Tank The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 Level less than 35,645 gallons. CR informed, fuel oil ordered LCO 2013-0167 " A Page 156 of 395 prevented the performance of the required second partial surveillance performance to validate tank level at 40 kgallons was safety function of equipment. Therefore, this completed on 8/30/2013. failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 5/9/2015 A SPF Note: "24.307.32, pg 23 Step 5.1.76 FO Storage Tank Level low out of spec at 34.5 The identified failure(s) would not have kgallons, Tech Spec 35645 gallons - LCO 15-0112" A second partial surveillance prevented the performance of the required performance to validate level at 38.7kgallons completed on 5/9/2015. safety function of equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 11/21/2016 A SPF Cover Sheet Note: "Step 5.1.76 EDG 13 FO Storage Tank level less than Tech Spec The identified failure(s) would not have requirement. LCO 2016-0609 is tracking" A second partial surveillance performance to prevented the performance of the required validate level at 38.7kgallons completed on 11/22/2016. safety function of equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 43 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 157 of 395 0301 PERFORM 24.307.33 EDG NO.14 24 HOUR RUN FOLLOWED BY HOT SR 3.8.1.13.a SR 3.8.1.13.b FAST RESTART SR 3.8.1.14.a SR 3.8.1.14.b
| |
| # Performances: 7 # Failures: 7 24 Month Justification: Notes:
| |
| Two failures are identified as event driven failures which are not indicative of a repetitive time based failure mechanism. The other failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/14/2008 A SPF cover sheet note: Fuel oil level LCO-2008-0511 entered. Restore fuel oil level to The identified failure(s) would not have within limits. LCO 2008-0511 exited 11/14/2008 at 2334. This performance also prevented the performance of the required served as PMT for WO 28905658 which was written to drain, flush and refill EDG 14 safety function of equipment. Therefore, this Governor with oil to eliminate bubbles collecting in the governor sightglass. failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 4/9/2010 A SPF Note 1: "EDG 14 Fuel Oil Storage Tank level less than 35,645 gallons. LCO 2010- The identified failure(s) would not have 0121" SPF Note 2: "EDG Rectifier Diode light flickers. CARD 10-23229 written for prevented the performance of the required bulb replacement." CARD 10-23229 states: "EDG-14 exciter cabinet neon rectifier bulb safety function of equipment. Therefore, this DS45 is dimming from normal EDG full load lighting characteristics. Compared to failure will have no impact on an extension other rectifier bulbs, this bulb is much dimmer. Rectifier bulbs indicate if there are to a 24 month surveillance interval.
| |
| problems with the diodes contained within the rectifier. Work Order required to change bulb before next EDG-14 Run week of May 10, 2010." CARD 10-23229 Reportability/Operability Review states: "the dim bulb does not affect the function of the component. Even if the light is completely out the function is maintained. The engine was also just run loaded for 24 hours per a surveillance with no noted voltage control issues; therefore the EDG remains OPERABLE." WO 31180518 written to replace light bulbs. Noted to System Engineer in WO 31180518: "During EDG 14 run on 6/8/10, DS45 light was back on, but dim and oscillating. There were 3 neon lights that were slightly dimmer and oscillating, there are DS43, DS45 and DS51. Recommend replacing all 3 lights. WO 31180518 replaced rectifier bulbs DS43, DS45 and DS51 on 1/3/2011.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 44 of 270
| |
| | |
| 8/9/2013 C SPF Note: "Surveillance stopped at 23 hour mark due to air leak on supply line to air This is an event driven failure TRVEND in that 24MCGNF319001 Rev 1 coolant system TCV. Performed SOP S/D and tagged out EDG 14 STR 13-2341 and maintenance performed in 1988 toPage 158 of 395 CARD 13-25574 written." CARD 13-25574 states: "EDG #14 was manually shutdown repair/replace a damaged air pressure during 24.307.33 due to high air temperature going to the blower. Repair is needed to regulator contributed directly to the As the broken fitting between F048D and RA07D. Evaluation is needed from System Found condition. Therefore, this failure will Engineering whether or not a blower clearance/tolerance inspection is warranted based have no impact on an extension to a 24 on the air temperature of 210 degrees on RA23D. Evaluation is also needed to determine month surveillance interval.
| |
| if the air relief valve setpoint on F048D should be checked, along with air regulator setpoint on RA07D, also to determine if the loss of air pressure in this control loop should have driven the TCV F023D to the full cool position, and if that is the case, then why did the air temperature go high instead of low. The time frame the engine ran with the air temperature between 180 to 210 degrees was 3-4 minutes." What happened?
| |
| ACE investigation for CARD 13-25574 had determined the EDG 14 pipe nipple was found broken during implementation of WO# 013B881201 (Repair/Replace Damaged Air Pressure Regulator R30F047D to R30-PI-RA07D) in the year 1988. A review of this WO had determined that it is probable the pipe nipple was incorrectly replaced with Schedule 40 pipe, rather than Schedule 80 pipe, during implementation of WO#
| |
| 013B881201 in the year 1988 even though the WO did not specifically state the nipple was replaced. The as-found installation of Schedule 40 pipe nipple contributed to the unplanned shutdown of EDG 14 during a 24 hour run on 8/9/13 (CARD 13-25574). As noted in ACE for CARD 13-25574 timeline of some key events are: 1) "EDG 14 air cooler temperature transmitter pneumatic R30NA18D was found failed during EDG 14 air cooler temperature control loop calibration check per WO 30897690. Output of transmitter was found to stay low at 3 psig with a temperature input of 145 degree F whereas the expected output should have been 15 psig. EDG 14 air cooler temperature transmitter pneumatic R30NA18D was then replaced and loop calibration check was performed per WO 37065764. 2) EDG 14 engine air coolant control header relief valve R3000F048D was tested per WO 37060708 and as-found to be relieving low, out of tolerance at 37 psig, versus the required 40 psig. Relief valve R3000F048D was then replaced per WO 37060708. 3) The broken air line pipe nipple between EDG 14 engine air coolant control header relief valve R3000F048D and EDG 14 air cooler pressure regulator valve R30FAO1D as well as Pressure regulator valve R30FAO1D were replaced per WO 37060690. 4) EDG 14 blower inspection and cylinder liner inspections were performed per WO 37061328 following high blower air temperatures during the 24 hour run. Results of the inspections were satisfactory. 5) On 8/11/2013, at 0042, Operations returned R3001S004 EDG 14 to service in accordance with SOP 23.307, section 5.8 - Standby Mode EDG 14 following repairs. 6) On 8/11/2013, Exited LCO 2013-0336 for EDG 14 broken air line after return to service and completion of a licensed operator walkdown. EDG 14 was declared operable. 7) On 8/17/2013, Started R3001S004 EDG 14 in accordance with 24.307.33 - Emergency Diesel Generator 14 -
| |
| 24 Hour Run Followed By Hot Fast Restart. CARD 13-25574, CARD Closure Summary states: "During the performance of 24.307.33, EDG 14, 24 hour Run on 08/09/2013, Scavenge Air Temperature increased to a point where the EDG was manually shut down by operations approximately twenty two hours into the run. THE DIRECT CAUSE IS -
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 45 of 270
| |
| | |
| The air pipe nipple fitting between EDG 14 engine air coolant control header relief valve TRVEND 24MCGNF319001 Rev 1 R3000F048D and EDG 14 air cooler pressure regulator R30FA01D on EDG 14 had Page 159 of 395 sheared causing pressure oscillations to the air coolant system (ACS) which resulted in a failure of EDG 14 air cooler temperature pneumatic transmitter R30NA18D.
| |
| APPARENT CAUSE ONE IS - Incorrect Material Identified - The pipe nipple air line fitting between relief valve R3000F048D and pressure regulator valve R30FA01D on EDG 14 had completely sheared due to the use of schedule 40 pipe as opposed to schedule 80. APPARENT CAUSE TWO IS - Abnormal Stress - The use of U-bolts to support the connecting valves R3000F048D and R30FA01D caused bending fatigue on the pipe nipple fitting MRFF = Maintenance Rule Functional Failure Yes MSPI =
| |
| Mitigating System Performance IndicatoNo MPFF = Maintenance Performance Functional Failure = No Revised MSPI basis failure criteria for this MRFF as the previous basis wasincorrect. MSPI basis documentation (WebARMS DSN: MSPI) states in Table 1-SC that one of four EDGs are required for the EDG system to provide its MSPI function. Further, credit can be taken to crosstie an EDG to other ESF busses within the same division. This is accomplished via procedure 23.321. Based on this reason, the existing MRFF was revised to remove the MSPI failure.
| |
| 8/18/2013 A SPF Note 1: "Step 5.1.76, EDG 14 Fuel Oil Storage Tank level less than Tech Spec The identified failure(s) would not have value. Track per LCO 2013-0348" LCO 2013-0348 exited 8/18/2013, 1810 - Final prevented the performance of the required storage tank level is 39,000 gallons. SPF Note 2: "Step 5.1.38 EDG 14 Lube Oil safety function of equipment. Therefore, this Storage Tank level less than desired level of 18 inches. Level at end of surveillance failure will have no impact on an extension 14.5 inches. CARD 13-25794 written." CARD 13-25794 states: "During the 24 hour to a 24 month surveillance interval.
| |
| run on EDG #14, the measured Lube Oil Storage Tank was measured at 16.5 inches. A note prior to the step states that desired level is greater than 18 inches. Recommend a work order to add oil to the tank to bring level above desired level. The step is not acceptance criteria, it is used to determine lube oil consumption rate during the 24-hr run which will still be able to be performed." CARD 13-25794 Reportability/Operability Review states: "There is no specific surveillance requirement for the storage tank level and the low level alarm actuates at 62 gallons of capacity left. The actions to be taken at the low level alarm is to add oil. Priority 4 work order to get this included in the EDG 14 SSO scheduled this year. If the low level alarm is received then the ARP will direct oil to be added to clear the alarm. The alarm is at 10" decreasing." WO 37128427 is referenced by this CARD, Maximo indicates Work Order "CAN". SE concurs with cancellation.
| |
| 3/6/2015 A SPF Note: "Step 5.1.76 FO Storage Tank level low out of spec at 33.85 kgallons, Tech The identified failure(s) would not have Spec 35,645 gallons. LCO 2015-0062 is tracking" A second partial surveillance prevented the performance of the required performance to validate level at 39.1kgallons completed on 3/7/2015. safety function of equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 46 of 270
| |
| | |
| 8/5/2016 C SPF Note 3: "Water separator leaking by cross-tie with EDG 13 air compressor. Re- This is an event driven failure TRVEND in that parts Rev 1 24MCGNF319001 performed step 5.1.77 following cross tying EDG 13 supplying EDG 14" CARD 16- Page deficiency (i.e., more proficient parts for160 of 395 26206 written. CARD 16-26206 states: "While performing 24.307.33 EDG Starting Air rebuild are available) contributed directly to compressor runtime alarm came up (3D18-IPCS inputs abnormal). An operator the As Found condition. Therefore, this determined the excess runtime was due to leakage past Trap (R3001D088). The leakage failure will have no impact on an extension is preventing the shut down of the compressor, and is currently at 234 psig and steady. to a 24 month surveillance interval.
| |
| Starting Air Reservoir Tech Spec is 215 psig. The same issue had been corrected under PM work order 42282686, trap (MM100047082) had been changed out with new. The plastic base of the trap was found cracked causing the leak. Also reference CARD 16-24244, Request WO to repair issue." Reportability/Operability Review states: "The safety function to support the EDG is to provide a flow path from the air compressor to the receiver to maintain a minimum pressure of 225# to allow for 5 starts of the EDG without need of replenishment. The air system has been cross tied with the EDG 13 air system and the receiver pressure is being maintained above the minimum. Condition on the air dryer is not affecting the ability to maintain the receiver charged and EDG 14 remains operable." Event was determined to NOT be a MRFF or MSPI failure. On 9/7/16, the Rework Review Board determined that this condition (i.e. CARD 16-26206) is rework. CARD 16-26206 was closed to CARD 16-28067 "Repeat Rework Events due to Parts Deficiency associated with R3001D088". CARD 16-26206 generated WO 45852822. WO 45852822 installed a new water trap on 8/21/2016. CARD 16-28067 states: "In the past 2 months, multiple rework events have occurred due to a parts deficiency associated with R3001D088, EDG14 Starting Air Compressor Water Trap.
| |
| Theserework events were documented under CARDs 16-26205 and 16-27204. From 2000 to 2016, there have been approximately 18 CARDs documenting a degrading condition associated with this component. Request Engineering FIRST Team evaluate an equivalent part that this less susceptible to premature degradation. On 10/10/16, Maintenance verified with the Engineering FIRST Team that there is no existing Equivalent Replacement Evaluation (ERE) in the Configuration Management Interface System (CMIS) for this water trap. Investigation documents from SE - 11/11/2016 09:32:49 PM. These units can continue to be rebuilt with rebuild kits from the manufacturer,Stock item master 100118137. The subject drain traps appear to have reached the end of their useful life. The installed model is constructed with carbon steel and stainless steel with various soft goods. Recommend replacement with a new unit which is still available. Recommend 505SS unit where the materials of construction are stainless and the seals are Viton. WO 46523276 requested. Per Maximo WO 46523276 status is WAITASGN.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 47 of 270
| |
| | |
| 8/5/2016 A SPF Note 1: "Re-perform Steps 5.1.28, substeps 4 and 5. CARD 16-26203" CARD 16- The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 26203 states: "EDG output breaker did not close at top (12) noon on the synchroscope Page 161 of 395 prevented the performance of the required during the first attempt for breaker sync per 24.307.33. The output breaker tripped alarm safety function of equipment. Therefore, was received in the MCR and on the SOER but no breaker tripped indication was these failures will have no impact on an present on the actual breaker or CMC switch. The performers reported they let go of the extension to a 24 month surveillance interval.
| |
| breaker closed switch just past top (12) noon on the synchroscope and the breaker did not attempt to close. The performers stopped and expanded their team; following discussing the issue with the tagging center and MCR the performers attempted a second breaker sync of the output breaker. During the second attempt the breaker did close, but the breaker closed when the DG 14 synchroscope was approximately 5 minutes past top 12 noon." CARD 16-26203 Reportability/Operability Review states: "The local synchroscope indicator or the synch. check relay needs to be calibrated. These components are utilized when performing manual synchronization of the EDG-14 output breaker, and are not used during an emergency start and load of the EDG. This condition has no impact on the ability of EDG-14 to supply its safety busses following an accident signal. This will not impact the ability of EDG-14 to performing is safety functions." WO 45852781 written to Calibrate/Adjust EDG 14 Synchroscope and to also calibrate synch check relay. Synch check relay was calibrated per 35.318.011 SAT on 1/23/2017. EDG Synchroscope (R30R010D) was calibrated under WO 43736993, Recal EDG 14 Local and Control Room Indicators, also on 1/23/2017. Noticed static buildup on meter (R30R010D) during initial testing. Worked fine after static removal.
| |
| SPF Note 2: Step 5.1.76 recorded 34.3kgallons of fuel after 24 hour run. Tech Spec is 35,645 gallons. LCO 2016-0319 is tracking. A second performance of surveillance was completed to validate EDG Fuel Oil Storage Tank at 39.478 kgallons on 8/5/2016.
| |
| Event Title Associated SRs and Function 0311 PERFORM 24.402.06 DRYWELL TO TORUS BYPASS LEAK TEST (AS SR 3.6.1.1.2 FOUND)
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 48 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 162 of 395 0314 PERFORM 24.404.02 SEC-5.3 DIV. 1 SGTS RUN/AUTO SR 3.3.6.2.5-4 SR 3.6.4.2.3 INITIATE/POSITION IND. SR 3.6.4.3.3 SR 3.6.4.3.4
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0317 PERFORM 24.405.03 SECONDARY CONTAINMENT INTEGRITY TEST SR 3.6.4.1.5 SR 3.6.4.1.6 (USING DIV 1 SGTS)
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0321 PERFORM 24.406.02 SEC-5.2 NITROGEN INERT VLV POS SR 3.3.3.1.2-8 SR 3.3.6.1.6-2.e INDICATION VERIF MODE 4,5
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 49 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 163 of 395 0322 PERFORM 24.408.03 SEC-5.2 DIV 1 PRIMARY CONT MONT SYS VLV SR 3.3.3.1.2-8 SR 3.3.6.1.6-2.e OP AND IND VERIF
| |
| # Performances: 7 # Failures: 2 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failure which is not indicative of a repetitive time based failure mechanism. One failure would be detected by the performance of a surveillance test on a more frequent basis. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 1/19/2015 B SPF comments state: "Could not complete Step 5.2.37: T50-F450, PCMS Rad Mon In Although this failure occurred during the 18-Otbd Iso valve, would not reopen after several attempts. Shutdown PCRMS IAW 23- month surveillance procedure test, the failure 408. Stopped Surveillance testing. Backed out of 24.408.03 Section 5.2." CARD 15- would have been identified on a more 20450 was written to document finding. CARD 15-20450 states: "During performance frequent basis during the 91 day surveillance of 24.408.03, T50-F450 would not open back up. Valve will indicate dual with the open performance. Consequently, the identified pushbutton depressed, then go full closed when the button is released. T50-F450 is a failure would be detected by a more frequent primary containment isolation valve which is currently closed meeting its function." activity. Therefore, this failure will have no Summary of CARD 15-20450 Reportability / Operability review indicates the valve impact on an extension to a 24 month failing to re-open during the surveillance test results in a loss of flowpath for PCRMS; surveillance interval.
| |
| however, the PCIV function of valve T50-F450 is not impacted due to the fact that the valve remains closed. CARD 15-20450 lists the direct cause of the failure to be an out of calibration OPEN reed switch. CARD 15-20450 also indicates that the valve is tested every 91 days for Operability, Calibration, and Stroke Position per Section 5.1 of this same surveillance procedure, 24.408.03. WO 42407068 was initiated on 01/20/2015 to test, adjust position switches for T50-F450. WO troubleshooting found that loosening the open switch clamp screw caused the valve to stroke open and closed as designed.
| |
| There is no specified vendor torque for the screw and it is to be adjusted by skill of the craft so the switch functions properly. The valve indication also started working again.
| |
| The valve was then stroked multiple times without any failures. The cover for the electric assembly was reinstalled loosely with a new gasket and the valve was then stroked several more times and functioned properly. The valve was returned to service and LCO 15-0041 was cleared.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 50 of 270
| |
| | |
| 7/23/2016 C In procedure Step 5.2.62, there is a procedure error in that valve T5000-T421A is This is an event driven failure TRVEND in that a 24MCGNF319001 Rev 1 directed to the Close position; however, the verification in Steps 5.2.62.1 and 5.2.62.2 is Page 164 of 395 procedure error prevented the procedure for the valve to indicate full Open. Additionally, the valve identification number is from being completed as written. The incorrect in Step 5.2.62.2. CARD 16-25843 written to document this procedure required verification of Valve T5000-F421A deficiency. CARD reflects DCR 16-1075 is making the identified changes to the position was not able to be achieved due to procedure. the procedure error. The procedure was revised to address the deficiency and reperformed at a later date with satisfactory results. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0324 PERFORM 24.409.02 SEC-5.2 DIV.1 POST LOCA RECOMBINER SR 3.3.3.1.2-8 LOCAL VALVE POSITION IND
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0327 PERFORM 24.413.04 DIV 1 CR EMRG FILTER AUTO TRANSFER TEST SR 3.7.3.3
| |
| # Performances: 5 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0350 PERFORM 24.630.01 REMOTE SHUTDOWN PANEL CONTROL SR 3.3.3.2.2 CIRCUIT/SWITCH TEST
| |
| # Performances: 5 # Failures: 0 24 Month Justification: Notes: Ref. DTE-19001, Section 3 Design Inputs There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 51 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 165 of 395 0350A PERFORM 24.630.01 Sec-5.1(SDC Vlv-E1150F008) & Sec-5.2(CRD) SR 3.3.3.2.2 REMOTE S/D PNL CONTROL CIRCUIT/SW. TEST
| |
| # Performances: 2 # Failures: 0 24 Month Justification: Notes: Ref. DTE-19001, Section 3 Design Inputs There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0350B PERFORM 24.630.01 Sec-5.4(RCIC Vlvs & SRVs) REMOTE S/D PNL SR 3.3.3.2.2 CONTROL CIRCUIT/SW. TEST
| |
| # Performances: 1 # Failures: 0 24 Month Justification: Notes: Ref. DTE-19001, Section 3 Design Inputs There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0350C PERFORM 24.630.01 Sec-5.3, 5.4(Div 1-RHR,RHRSW,MDCT FAN) SR 3.3.3.2.2 REMOTE S/D PNL CONTROL CIRCUIT/SW. TEST
| |
| # Performances: 2 # Failures: 0 24 Month Justification: Notes: Ref. DTE-19001, Section 3 Design Inputs There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0350D PERFORM 24.630.01 (E1150F008 only) REMOTE S/D PANEL CONTROL SR 3.3.3.2.2 CIRCUIT/SWITCH TEST
| |
| # Performances: 2 # Failures: 0 24 Month Justification: Notes: Ref. DTE-19001, Section 3 Design Inputs There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 52 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 166 of 395 0350E PERFORM 24.630.01 (Sec-5.7-RX Recirc) REMOTE SHUTDOWN PANEL SR 3.3.3.2.2 CONTROL CIRCUIT/SWITCH TEST
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Ref. DTE-19001, Section 3 Design Inputs There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0350F PERFORM 24.630.01 Sec-5.3(E1150F009 & B3105F023A) REMOTE S/D SR 3.3.3.2.2 PANEL CONTROL CIRCUIT/SWITCH TEST
| |
| # Performances: 1 # Failures: 0 24 Month Justification: Notes: Ref. DTE-19001, Section 3 Design Inputs There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0351 PERFORM 24.702.01 SEC-5.3 MISCELLANEOUS SYSTEMS LOCAL SR 3.3.3.1.2-8 SR 3.3.6.1.6-2.e VALVE POSITION VERIF.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0353 PERFORM 24.707.01 SEC-5.1 RWCU LOCAL VALVE POSITION SR 3.3.3.1.2-8 SR 3.3.6.1.5-5.a VERIFICATION SR 3.3.6.1.5-5.b SR 3.3.6.1.5-5.c SR 3.3.6.1.5-5.d SR 3.3.6.1.5-5.e SR 3.3.6.1.6-5.f SR 3.5.2.8 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 53 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 167 of 395 0359 PERFORM 43.202.001 HPCI LEAKAGE MONITORING TEST SR 5.5.2
| |
| # Performances: 6 # Failures: 6 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 3/3/2011 A SPF Note 1: "E4100-F054 has a 2ml/min packing leak CARD 11-22355 generated" The identified failure(s) would not have CARD 11-22355 states: "E4100F054 (HPCI Steam Supply Drain Pot BypassValve) prevented the performance of the required was identified as having a 1 ml/min packing leak." Reportability/Operability Review safety function of the equipment. Therefore, states: "The minor leakage that was identified (1 ml/min) does not impact the ability of this failure will have no impact on an the HPCI system to meet it's safety functions. There is no noticeable impact to the area extension to a 24 month surveillance interval.
| |
| room temperatures which are monitored daily and has limits for maximum design temperatures with the turbine in standby therefore there is no impact on the EQ program for the equipment in the room. No operability concerns or impact." WO 32449278 requested. Per Maximo, POD Notes, WO 34151339 Replace Valve E4100F054 Per RID-82399 completed in RF15, 04/25/2012SPF Note 2: "E4101C001A Inboard Seal has a 3ml/min leak CARD 11-22352 generated" CARD 11-22352 states: "During the performance of 43.202.001 a 3 ml/min leak was identified on the Main High Pressure Coolant Injection Pump (E4101C001A) inboard pump seal." Reportability/Operability Review states: "The minor leakage that was identified (3 ml/min) does not impact the ability of the HPCI system to meet it's safety functions as listed below. No operability concerns or impact." WO 32454815 requested. Per Maximo WO 32454815 = CAN.
| |
| SPF Note 3: "E4101C002 Outboard side has a 3ml/min leak under insulation; exact location could not be identified. CARD 11-22354 generated" CARD 11-22354 states "During the performance of 43.202.001, a 3 ml/min was identified on the outboard side to the High Pressure Coolant Injection Turbine (E4102C002). The exact source of the leak could not be located because of the insulation." Reportability/Operability Review states: "The minor leakage that was identified (3 ml/min) does not impact the ability of the HPCI system to meet it's safety functions. There was no noticeable impact to the area room temperatures therefore there is no impact on the EQ program for the equipment in the room. No operability concerns or impact." WO 32449266 requested. Scope of this work request is to locate blockage and replace small bore piping on the gland seal piping to the barometric condenser if required. WO 32449266, Leak on HPCI Turbine While Operating, performed troubleshooting for leak and identified a lose pipe union under insulation. Union was cleaned and tighten; completed SAT on 10/8/2018.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 54 of 270
| |
| | |
| 1/1/2013 A SPF Note 1: E4100F227 10ml/min leak through seat CARD 11-00092 (written The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 3/3/2011) and WO 32449205 E4100F227 HPCI keep fill pressure relief is leaking by Page 168 of 395 prevented the performance of the required (reported 3/7/2011, scheduled start 5/29/2013) SPF Note 2: E4101C002 Outboard seal safety function of the equipment. Therefore, leak 0.25 ml/min CARD 11-22354 - Leak on HPCI Turbine (written 3/3/2011) and WO this failure will have no impact on an 32449266 - Leak on HPCI Turbine While Operating already exist.SPF Note 3: extension to a 24 month surveillance interval.
| |
| "E4101C001A 20ml/min Outboard seal leak; 25ml/min Inboard seal leak CARD 11-22352 Leak on Inboard Pump Seal (written 3/3/2011) and WO 32454815 "04-Leak on Inboard Pump Seal exists and leakage is being trended by System Engineering" (per Maximo WO 32454815 status = CAN) 5/28/2014 A SPF Note 1: "E4101C001A has 8ml/min seal leak CARD 11-22352 Leak on Inboard The identified failure(s) would not have Pump Seal (written 3/3/2011) and WO 29766220 "Water leaking from outboard prevented the performance of the required mechanical seal of HPCI main pump exist. The work order is in replan to add the safety function of the equipment. Therefore, replacement of inboard pump seal" (per Maximo WO 29766220 status = CAN this failure will have no impact on an 12/4/2015) SPF Note 2: "E4100F174 has a 15 dpm (0.75 ml/min) packing leak. In extension to a 24 month surveillance interval.
| |
| addition, the pipe cap downstream of the E4100F174 has a 15 dpm (0.75 ml/min) leak.
| |
| With the packing leak on the E4100F174, this would be indication that the E4100F773 is leaking past its seat. CARD 14-24476 was generated for the packing leak on E4100F174 and pipe cap downstream of the E4100F174." CARD 14-24476 states: "Per 43.202.001, the current system leakage total is 9.50 ml/min versus the 250 ml/min total system leakage acceptance criteria in step 5.4.1 of 43.202.001." Reportability/Operability Review states: "Because leakage is within allowable limits and no EQ concern exists this condition will not prevent HPCI from performing its safety function. HPCI remains OPERABLE." Determined to be NOT a Maintenance Rule Functional Failure. WO 38493090 - Cut out and replace valves E4100F173 and E4100F174 written and completed on 8/23/2017.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 55 of 270
| |
| | |
| 8/27/2015 A SPF Note 1: "E4150-F041 packing leak 0.8ml/min - Existing CARD 15-00196 and WO The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 29416225" (Per Maximo WO 29416225 status = CAN 4/10/2018) SPF Note 2: Page 169 of 395 prevented the performance of the required "E4101C001A (pump) has seal leak of 5.3 ml/min; WO 29766220 exists (Per Maximo safety function of the equipment. Therefore, WO 29766220 status = CAN 12/4/2015) SPF Note 3: "E4101C002 has leak 2.8 this failure will have no impact on an ml/min; Existing CARD 15-21492, WO 32449266 exts "SPF Note 4: "E4100-F028 extension to a 24 month surveillance interval.
| |
| packing leak 1.0 ml/min - CARDs 14-00120 and 14-29232 were generated and WO 38574926 and WO 38578191 exist." CARD 14-00120 (9/8/2014 ), WO 38574926 requested. WO 38574926 - perform As-Found / As-left diagnostics and repack valve E4100F028. (Returned to Service 10/26/2015 CARD 14-29232 (12/6/2014 ), WO 38574926 and WO 38578191 requested. (NOTE: WO 38578191 "Electrical Security Routine Work Order (CAMERAS)" is not relevant to E4100-F028); WO 38574926 -
| |
| perform As-Found / As-left diagnostics and repack valve E4100F028. (Returned to Service 10/26/2015)SPF Note 5: "E4100-F031 packing leak 0.3 ml/min - CARD 15-23775 was generated (5/30/2015 during rounds) and WO 43179751 exists." WO 43179751 Repack valve E4100F031 (Returned to Service 11/6/2015) SPF Note 6:
| |
| "E4100-F174 leak 0.1 ml/min - CARD 14-24476 was generated (5/28/2014) and WO 38493066 and WO 28493090 exist" CARD 14-24476 (WO 28493090 Returned to Service 8/22/2017; (Per Maximo WO 38493066 status = CAN-CLSD) SPF Note 7:
| |
| "E4100-F087 leak 1.5 ml/min - Existing CARD 14-00756 (12/23/2014) and existing WO 42317426" WO 42317426 Repack valve E4100F087 (Returned to Service 11/7/2015) 5/25/2017 A SPF Note 1: "E4100F173 was identified to have 3 ml/min packing leak CARD 17- The identified failure(s) would not have 20848 (WO 38493090) already exists to address issue" CARD 17-20848 "Possible water prevented the performance of the required intrusion at Security Staging area" is incorrect reference. CARD 14-24476 is referenced safety function of the equipment. Therefore, by WO 38493090 - WO 38493090 - Cut out and replace valves E4100F173 and this failure will have no impact on an E4100F174. WO 38493090 completed, Returned to Service 8/22/2017 SPF Note 2: extension to a 24 month surveillance interval.
| |
| "E4150F041 was identified to have a 0.8 ml/min packing leak CARD 15-00196 (WO 29416225) already exists to address issue" (Per Maximo WO 29416225 status = CAN 4/10/2018)
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 56 of 270
| |
| | |
| 8/25/2018 A SPF Note 1: E4101C002 has 200 ml/min leak. CARD 17-30495 previously written. The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 Work Order 32449266 is scheduled to work 10/1/2018. WO 32449266 (WO status per Page 170 of 395 prevented the performance of the required Maximo = COMP 10/9/2018) SPF Note 2: "E4150F059 has a 1.5 ml/min packing leak safety function of the equipment. Therefore, CARD 18-26398 generated. CARD 18-26398 states: "E4150F059 "HPCI Lube Oil this failure will have no impact on an Cooling Water SupplyIsolation MOV" has a 1.5 ml/min (30 dpm) packing leak. The extension to a 24 month surveillance interval.
| |
| current total leakage for HPCI system is 201.5 ml/min, which is below the acceptance criteria of 250 ml/min (see 43.202.001 Step 5.4.1). This total includes the 1.5 ml/min packing leak for the E4150F059. Reportability/Operability Review states: "This minor leak does not impact the ability of E4150-F059 to perform its required function in support the HPCI system in standby or running conditions. E4150-F059 and the HPCI system remain OPERABLE." WO 51689529 (WO status per Maximo = INPLN sch start 8-17-2020)
| |
| Event Title Associated SRs and Function 0360 PERFORM 43.203.001 CSS DIV 1 LEAKAGE MONITORING TEST SR 5.5.2
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0361 PERFORM 43.203.005 CSS DIV 2 LEAKAGE MONITORING TEST SR 5.5.2
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 57 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 171 of 395 0362 PERFORM 43.204.001 RHR DIVISION 1 LEAKAGE MONITORING TEST SR 5.5.2
| |
| # Performances: 6 # Failures: 6 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 7/27/2010 A SPF Note: "E1150F047A - 1 dpm packing leak CARD 10-26405 generated" CARD 10- The identified failure(s) would not have 26405 states: "E1150F047A, RHR Division 1 Heat Exchanger A Inlet Isolation Motor prevented the performance of the required Operated Valve, was noted to have a 1 dpm packing leak. Catch is installed to contain safety function of the equipment. Therefore, leak. This packing leak was originally identified on CARD 07-01630, which was closed this failure will have no impact on an to WO 25369596. WO 25369596 has since been cancelled" Reportability/Operability extension to a 24 month surveillance interval.
| |
| Review states: "The size of the leak from the packing does not inhibit the ability of the RHR system to perform itsfunctions of LPCI injection, Torus Cooling, Torus Spray or Drywell spray. The system will still develop sufficient flow with this leak to support all the required modes of RHR. Therefore the RHR system remains OPERABLE." Event has been evaluated by Engineering as NOT a MRFF. WO 31596221 requested. Per Maximo WO 31596221 status = CAN 4/16/2014 - On 8/26/13, Performance Engineering did not note any leakage from this valve under Surveillance 43.204.001 (Work Order 34062480). Therefore, System Engineering recommends the cancellation of this Work Order.
| |
| 4/6/2012 A SPF Note 1: "E1150F017A has a 3 dpm packing leak CARD 12-22866 generated" The identified failure(s) would not have CARD 12-22866 Reportability/Operability Review states: "43.204.001 "RHR DIVISION prevented the performance of the required 1 LEAKAGE MONITORING TEST" tracks system leakage against a cumulative limit safety function of the equipment. Therefore, of 40 ml/min. This leak brings the current total system leakage of Div 1 RHR to 3.5 this failure will have no impact on an ml/min, which is in the acceptable range for total system leakage. Division 1 RHR will extension to a 24 month surveillance interval.
| |
| be declared operable following the current system outage." WO 34300003 requested.
| |
| Per Maximo WO 34300003 status = CAN 1/19/2018 SPF Note 2: "E1150F048A has a 4 dpm packing leak CARD 12-22870 generated" CARD 12-22870 Reportability/Operability Review states: "Per 43.204.01 , the specification is less than or equal to 40 ml/min. Current RHR System leakage is 3.5ml/min. Significant margin is maintain for total system leak with the minor leak on E1150F048A. Therefore, TS 5.5.2 has been met and Div 1 RHR is able to perform its function(s). Division 1 RHR remains operable due to the leakage not impacting the operation of the RHR pump" WO 34300042 scope is to torque the packing on valve E1150F048A. WO 34300042 completed 10/23/2013.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 58 of 270
| |
| | |
| 8/26/2013 A SPF Note 1: "E1150F017A has a 3 dpm (0.15 ml/min) packing leak CARD 12-22866 The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 exists and Work Order 34300003 exists" CARD 12-22866 Reportability / Operability Page 172 of 395 prevented the performance of the required Review states: "43.204.001 "RHR DIVISION 1 LEAKAGE MONITORING TEST" safety function of the equipment. Therefore, tracks system leakage against a cumulative limit of 40 ml/min. This leak brings the this failure will have no impact on an current total system leakage of Div 1 RHR to 3.5 ml/min, which is in the acceptable extension to a 24 month surveillance interval.
| |
| range for total system leakage. Division 1 RHR will be declared operable following the current system outage." WO 34300003 requested. Per Maximo WO 34300003 Log note: WO Cancel - Per SE recommendation. OSC approved. Maximo Status: CAN 1/19/2018 - Potential RF21 work SPF Note 2: "E1150F007A - Packing was wet on the E1150F007A <1dpm, small puddle on floor below valve (probably from stroking during system lineup) Based on leak description no CARD required "packing is wet".
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 59 of 270
| |
| | |
| 1/22/2015 A SPF Note 1: "E1150F048A has 1 dpm (0.05 ml/min) packing leak CARD 15-20559 was The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 initiated" CARD 15-20559 states: "E1150F048A (RHR-Div I Hx A Bypass Valve) was Page 173 of 395 prevented the performance of the required identified as having 0.05 mL/min (1 dpm) leak from the packing area. The total leakage safety function of the equipment. Therefore, for the Div I RHR system was determined to be 0.6 mL/min, which is below the this failure will have no impact on an acceptance criteria of 40 mL/min" Reportability/Operability Review states: "TS 5.5.2 has extension to a 24 month surveillance interval.
| |
| been met. Division 1 RHR remains Operable." WO 42443178 requested. WO 42443178 - E1150F048A Packing Leak Discovered during Leakage Reduction Walkdown, status per Maximo = INPLN 3/10/2015 SPF Note 2: "E1150F047A has 1 dpm (0.05 ml/min) packing leak CARD 15-20558 was initiated" CARD 15-20558 states: "E1150F047A (RHR-Div I Hx A InletIsolation Valve) was identified as having 0.05 ml/min (1 dpm) leak from the packing area. The total leakage for the Div I RHR system was determined to be 0.6 ml/min, which is below the acceptance criteria of 40 mL/min" Reportability/Operability Review states: "TS 5.5.2 has been met. Division 1 RHR remains Operable." WO 42443131 requested. WO 42443131 - E1150F047A Packing Leak Discovered during Leakage Reduction Walkdown, status per Maximo =
| |
| CAN5/11/2018 SPF Note 3: "E1150F017A has a 4 dpm (0.2 ml/min) packing leak CARD 12-22866 was generated (4/6/2012) and Work Order 34300003 exists" Per Maximo WO 34300003 status = CAN 1/19/2018 SPF Note 4: "E1100F082A has 2 dpm (0.1 ml/min) packing leak CARD 15-20562 was initiated" CARD 15-20562 states:
| |
| "E1150F082A (RHR-Div I Cross-tieBypass Valve) was identified as having 0.1 mL/min (2 dpm) leak from the packing area. The total leakage for the Div I RHR system was determined to be 0.6 ml/min, which is below the acceptance criteria of 40 mL/min" Reportability/Operability Review states: "TS 5.5.2 has been met. Division 1 RHR remains Operable." No WO requested. CARD Closure Summary states: "Minor packing adjustment made. Monitored valve packing with no leakage apparent." SPF Note 5: "E1150F007A has 4 dpm (0.2 ml/min) packing leak CARD 15-20556 was initiated" CARD 15-20556 states: "E1150F007A (Div I RHR Pumps MinFlow Valve) was identified as having 0.2 ml/min (4 dpm) leak from the packing area. The total leakage for the Div I RHR system was determined to be 0.6 ml/min, which is below the acceptance criteria of 40 mL/min" Reportability/Operability Review states: "The total leakage for the Div I RHR system was determined to be 0.6 ml/min, which is below the acceptance criteria of 40 ml/min (see 43.204.001). Therefore, TS 5.5.2 has been met.
| |
| Division 1 RHR remains Operable." WO 42443124 requested. WO 42443124 -
| |
| E1150F007A Packing Leak Discovered during Leakage Reduction Walkdown, status per Maximo = INPLN 3/10/2015 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 60 of 270
| |
| | |
| 8/23/2016 A SPF Note 1: "E1100F082A has 0.2 ml/min packing leak CARD 16-26674 was created The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 to address leak" CARD 16-26674 states: "E1100F082A (RHR Div. 1 Cross Tie Bypass Page 174 of 395 prevented the performance of the required Valve) was identified as having 0.2 ml/min (4 dpm) packing leak. Based on this leak safety function of the equipment. Therefore, rate, E1100F082A is not a major contributor to the RHR Div. 1 total leakage. The this failure will have no impact on an current total leakage for the Div. 1 RHR system is 474.28 mL/min, which is above the extension to a 24 month surveillance interval.
| |
| acceptance criteria of 40 ml/min (see 43.204.001 step 5.3). A previously identified leak of 473.18 ml/min (0.125 gpm), coming from a drain downstream of E1100F087 (RHR Keep Fill Station relief valve) caused the 40 ml/min acceptance criteria to be exceeded.
| |
| See CARD 16-25846 (WOs 45744382 and 45744411) for more detail. CARD 16-26674 - WO 45959457 requested. During execution of the WO, mechanical maintenance noted the end of the leak off port on the valve was wet and stated the leak appeared to be coming from the leak off port; not the valve packing. Mechanical maintenance also noted there was not an active leak, but did state the valve is in the closed position which could mask any leak through the leak off port. To remediate the leak, CARD 19-20340 is requesting a WO to cap/plug the leak-off port IAW 3071-012.
| |
| No further engineering paperwork is required SPF Note 2: "E1150F017A has 0.4 ml/min packing leak CARD already exists to address issue (see WO 34300003)" Per Maximo WO 34300003 status = CAN 1/19/2018 SPF Note 3: "E1150F007A has a0.2 ml/min leak CARD already exists to address issue (see WO 42443124)" WO 42443124 - E1150F007A Packing Leak Discovered during Leakage Reduction Walkdown, status per Maximo = INPLN 3/10/2015 SPF Note 4: "E1150F047A has a 0.05 ml/min packing leak CARD already exists to address issue (see WO 42443131)"
| |
| WO 42443131 - E1150F047A Packing Leak Discovered during Leakage Reduction Walkdown, status per Maximo = CAN 5/11/2018, Maximo Log note: "SE -Cancel: This WO can be canceled. 1 DPM packing leak does not necessitate repack. "SPF Note 5:
| |
| "E1150F048A has a 0.25 ml/min) packing leak CARD already exists to address issue (see WO 42443178)" WO 42443178 - E1150F048A Packing Leak Discovered during Leakage Reduction Walkdown, Maximo status: INPLN 3/10/2015Surv 43.204.001 (Page 11) Table 6: Other Leakage and Remarks state: "No internal leakage identified on E1100F184 and E1100F185 although CARD 16-25846 identified leakage (7/24/2016) past E100F184 and E1100F185 seats at a leakage rate of approximately 0.125gpm" This was previously identified leakage during performance of 24.204.01, LPCI Pump and Suppression Pool Cooling/Spray Pump and Valve Operability. WOs 45744382 and 45744411 were both completed 3/22/2017 to rework/replace the respective check valves.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 61 of 270
| |
| | |
| 1/18/2018 A SPF Note 1: "E1150F007A has 1.5 ml/min (300 dpm) packing leak - CARD 15-20556/ The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 WO 42443124 already exists. WO 42443124 - E1150F007A Packing Leak Discovered Page 175 of 395 prevented the performance of the required during Leakage Reduction Walkdown, status per Maximo = INPLN 3/10/2015 SPF safety function of the equipment. Therefore, Note 2: "E1150F017A has 0.4 ml/min (8 dpm) packing leak - CARD 12-22866 (WO this failure will have no impact on an 34300003) already exists" WO 34300003 status per Maximo = CAN 1/19/2018 SPF extension to a 24 month surveillance interval.
| |
| Note 3: "E1150F047A has a 0.05 ml/min (1 dpm) packing leak - CARD 15-20558 (WO 42443131) already exists" WO 42443131 - E1150F047A Packing Leak Discovered during Leakage Reduction Walkdown, status per Maximo = CAN 5/11/2018; Maximo Log note: "SE -Cancel: This WO can be canceled. 1 DPM packing leak does not necessitate repack." SPF Note 4: "E1150F048A has a 0.25 ml/min (5 dpm) packing leak - CARD 15-20559 (WO 42443178) already exists" WO 42443178 - E1150F048A Packing Leak Discovered during Leakage Reduction Walkdown, status per Maximo =
| |
| INPLN 3/10/2015 SPF Note 5: "E1100F082A has 0.2 ml/min (4 dpm) packing leak CARD 16-26674 (WO 45959457) already exists" WO 45959457 Leakage Reduction Inspection - E1100F082A Packing Leak status per Maximo = WCREV 6/28/2018 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 62 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 176 of 395 0363 PERFORM 43.204.002 RHR DIVISION 2 LEAKAGE MONITORING TEST SR 5.5.2
| |
| # Performances: 6 # Failures: 4 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 12/8/2011 A SPF Note 1: "E1150F007B has 20 dpm (1ml/min) packing leak - CARD 11-30813 The identified failure(s) would not have generated" CARD 11-30813 states: "E1150F007B has a packing leak of 20 dpm (1 prevented the performance of the required ml/min). Repair leak. Informed Main Control Room of leak." Reportability/Operability safety function of the equipment. Therefore, Review states: "TS 5.5.2 has been met. Division 2 RHR remains operable due to leakage this failure will have no impact on an not impacting operation of RHR pump and system leakage remaining below 40 ml/min." extension to a 24 month surveillance interval.
| |
| MRFF Evaluation completed: "This packing leak is the only identified leakage on this division, with the leakage at 1 ml/m, this does not exceed the criterion of less than 40 ml/m. Therefore, this event is a NOT a Maintenance Rule Functional Failure." WO 33753013 requested. WO 33753013 -Packing Leak On E1150F007B was not able to repair leakage. New CARD 12-25028 written. CARD states: "Attempt was made to retorque, and no movement was attained. Need new work request to go deeper into valve. Follower was sitting 1/16" on shaft. Follower cannot be raised up against motor base support arms. Arms are bolted about 1/8" low." Purpose of CARD 12-25028 was to document attempt to tighten packing to reduce leak rate was unsuccessful. CARD 12-25028 documents leak rate has remained unchanged from CARD 11-30813. On 6/20/12, System Engineering verified from Performance Engineering total leak rate for Division 2 RHR is still 1 mL/min out of a total allowable of 40 mL/min. Since current leak rate is still within leakage reduction program limits as specified in UFSAR and Technical Specifications (RHR Function E1100-17), this condition is not a MRFF. WO 34606001 requested. Per Maximo WO 34606001 Status: CAN 9/11/2013" On 2/26/13, Performance Engineering inspected condition of this packing leak under 43.204.002.
| |
| Within 43.204.002, engineer noted packing was wet and leakage rate to be significantly less than 1 dpm. Therefore, System Engineering recommends cancellation of this work order. SPF Note 2: "E1150F017A has a 5 dpm (0.25 ml/min packing leak - WO 32037189 exists for repack, WO 32633929 exists for contingency bonnet replacement" Per Maximo WO 32037189 status: CAN 2/10/2012; WO 34014106 replaced WO 32037189. WO 34014106 refers to WO 34300003; WO indicates SE Cancel - Refueling Outage 21. WO 32633929 status: SE CANCEL 7/1/2014 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 63 of 270
| |
| | |
| 11/25/2014 A SPF Note 1: "E1100F089 and F090 were inaccessible. RWCU was protected due to The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 Condenser tube leak. "SPF Note 2: "E1150F017B has 1 dpm (0.05 ml/min) leak - Page 177 of 395 prevented the performance of the required CARD 14-24282 already exists to address this issue. CARD requests WO 38465413 for safety function of the equipment. Therefore, repair. SPF Note 3: "E1150F007B has 1 dpm (0.05 ml/min) packing leak - CARD 14- this failure will have no impact on an 29049 was written to address this issue." CARD 14-29049 states: "1dpm (0.05 mL/min) extension to a 24 month surveillance interval.
| |
| leak was identified from the E1150F007B (RHR Pmps B&D Min Flow Bypass) packing area. The current total identified leak for the Div 2 RHR system is 0.1 ml/min, which is below the acceptance criteria listed in 43.204.002 of 40ml/min."
| |
| Reportability/Operability Review states: "This is a small leak of 1 dpm (per 43.204.002, RHR Division 2 Leakage monitoring test 20 dpm = 1 ml/min). The current total identified leak for the Div 2 RHR system is 0.1 mL/min, which is below the acceptance criteria listed in 43.204.002 of 40 mL/min. Therefore, TS 5.5.2 has been met. Division 2 RHR remains Operable" WO 42175345 requested. WO 42175345 CBM - Leak from Packing Area of E1150F007B status per Maximo = CAN; Maximo Log Note: SE-CANCEL DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 64 of 270
| |
| | |
| 9/4/2016 A SPF Note 1: "E1150F006D - 0.15 ml/min packing leak coming from leak off nipple. - The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 CARD 15-23754 previously written (5/29/2015) - WO 43179716" Per Maximo WO Page 178 of 395 prevented the performance of the required 43179716 = CAN 2/15/2018. SPF Note 2: "E1150F007B 0.60 ml/min packing leak - safety function of the equipment. Therefore, CARD 15-27859 (10/16/2015) previously written WO 44159467" WO 44159467 this failure will have no impact on an E1150F007B Leaking - 12 dpm packing leak completed 4/18/2017 SPF Note 3: extension to a 24 month surveillance interval.
| |
| "E1100F078 0.05 ml/min leak on indicator shaft packing - CARD 15-27716 previously written WO 44138441" Per Maximo WO 44138441 status = CAN 5/11/2018 SPF Note 4: "E1100F034D 0.05 ml/min packing leak - CARD 16-27065 generated" CARD 16-27065 states: "E1100F034D (RHR Pump D Discharge Isolation Valve) was identified as having 0.05 mL/min (1 dpm) packing leak. The current total leakage for the RHR Div 2 system is 6.35 mL/min, which is below the acceptance criteria of 40 mL/min" Reportability/Operability Review states: "Per the Leakage Reduction procedure 43.204.002, total system leakage for Div 2 RHR is 6.35 ml/min versus the 40 ml/min acceptance criteria. Minor system leakage does not impact the safety related function of Div 2 RHR. D2 RHR remains OPERABLE" WO 46021508 requested. WO 46021508 Leakage Reduction Inspection Results - E1100F034D completed 11/27/2017 SPF Note 5: "E1150F024B 0.05 ml/min packing leak - CARD 16-27066 generated" CARD 16-27066 states: "E1150F024B (Div 2 RHR Torus Cooling Isolation Valve) was identified as having 0.05 mL/min (1 dpm) packing leak. The current total leakage for the RHR Div 2 system is 6.35 mL/min, which is below the acceptance criteria of 40 mL/min" Reportability/Operability Review states: "Per the Leakage Reduction procedure 43.204.002, total system leakage for Div 2 RHR is 6.35 ml/min versus the 40 ml/min acceptance criteria. Minor system leakage does not impact the safety related function of Div 2 RHR. D2 RHR remains OPERABLE" WO 46021535 requested. Per Maximo WO 46021535 status = WDLY 9/8/2016 SPF Note 6: "E1100F180B 0.05 ml/min packing leak - CARD 16-27067 generated" CARD 16-27067 states:
| |
| "E1100F180B (RHR Div 2 Supply to Thermal Recombiner Water Spray Cooler T4804B001B Vent Valve) was identified as having 0.05 mL/min (1 dpm) packing leak.
| |
| The current total leakage for the RHR Div 2 system is 6.35 mL/min, which is below the acceptance criteria of 40 mL/min" Reportability/Operability Review states: "Per the Leakage Reduction procedure 43.204.002, total system leakage for Div 2 RHR is 6.35 ml/min versus the 40 ml/min acceptance criteria. Minor system leakage does not impact the safety related function of Div 2 RHR. D2 RHR remains OPERABLE" WO 46021557 requested. WO 46021557 status per Maximo = WDLY 9/8/2016 SPF Note 7:
| |
| "E1100F090 and E1100F089 leaking past their seats coming from the E1100F087. (108 dpm) 5.4 ml/min - CARD 16-27068 generated" CARD 16-27068 states: "leakage of 5.4 mL/min (108 dpm) was observed into the funnel drain of E1100F087 (RHR Keep Fill Station relief valve). This is an indication of Div 2 RHR Keep Fill check valves (E1100F089 and E1100F090) are leaking past their seat. The 5.4 mL/min is now tracked under the Leakage Reduction program. The current total leakage for the RHR Div 2 system is 6.35 mL/min, which is below the acceptance criteria of 40 mL/min" Reportability/Operability Review states: "Per the Leakage Reduction procedure 43.204.002, total system leakage for Div 2 RHR is 6.35 ml/min versus the 40 ml/min acceptance criteria. Minor system leakage does not impact the safety related function of DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 65 of 270
| |
| | |
| Div 2 RHR. D2 RHR remains OPERABLE" WO 46067141 and WO 46067164 TRVEND 24MCGNF319001 Rev 1 requested. WO 46067141 and WO 46067164 status per Maximo = INPLN 5/30/2017 Page 179 of 395 11/21/2017 A SPF Note 1: "E1150F006B has a 0.1 ml/min (2 dpm) packing leak. CARD 17-20919 The identified failure(s) would not have (WO 47058381) already exists." Per Maximo WO 47058381 status = INPLN 10/12/2018 prevented the performance of the required safety function of the equipment. Therefore, SPF Note 2: "E1150F006D has a 0.1 ml/min (2 dpm) packing leak. CARD 15-23754 this failure will have no impact on an (WO 43179716) already exists." Per Maximo WO 43179716 status = CAN 2/15/2018 extension to a 24 month surveillance interval.
| |
| SPF Note 3: E1100F034D has a 0.05 ml/min (1 dpm) packing leak. CARD 16-27065 (WO 46021508) already exists." WO 46021508 Leakage Reduction Inspection Results -
| |
| E1100F034D completed 11/27/2017 SPF Note 4: "E1100F001B has a 0.05 ml/min (1 dpm) leak from a threaded connection. CARD 17-23248 (WO 47454538) already exists." Per Maximo WO 47454538 Leak identified on E1100F001B during PMT VT-2 Inspection status = INPLN 4/26/2017 SPF Note 5: "E1100F089 and E1100F090 leaking past their seat. Leak is coming from E1100F089 into a floor drain at 5.4 ml/min (108 dpm) CARD 16-27068 (WO 46067141 for F089 and WO 46067164 for F090) already exist." Per Maximo WO 46067141 Leakage Reduction Program - E1100F089 - Leaking past seat and WO 46067164 Leakage Reduction Program - E1100F090 leaking past seat status = INPLN (5/30/2017) SPF Note 6: "E1150F047B has a 0.05 ml/min (1 dpm) leak from the leak off nipple. CARD 17-29383 was created to address issue." CARD 17-29383 states: "E1150F047B (RHR DIV2 HX "B" INLET ISO MOV) was identified as having 0.05mL/min (1 dpm) leak coming from the leak off nipple. The current total leakage for the RHR Div 2 system is 5.75 mL/min, which is below the acceptance criteria of 40 mL/min" Reportability/Operability Review states: "Current system leakage per 43.204.002 "RHR Division 2 Leakage Monitoring Test" including the 1dpm (0.05 ml/min) identified in this CARD is 5.75 ml/min, versus the 40.0 ml/min total system leakage acceptance (per step 5.4 in procedure 43.204.002). The 1 dpm leak does not affect the ability of the valve to be positioned to support RHR modes of operation. Div 2 RHR remains OPERABLE." WO 49267598 requested. WO 49267598 Leakage Reduction Program Inspection E5150F047B status per Maximo = WDLY 11/28/2017 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 66 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 180 of 395 0493 PERFORM 43.404.002 DIVISION 2 STANDBY GAS TREATMENT SR 5.5.2 SR 5.5.7.a FILTER PERFORMANCE TEST SR 5.5.7.b SR 5.5.7.d SR 5.5.7.e
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/2/2016 A SPF Note: "Light burned out in compartment behind door with test port #5. Does not The identified failure(s) would not have impact function of filter. CARD 16-28700 initiated for Work Order."Also noted: prevented the performance of the required "Test was interrupted prior to performance of Step 5.5 due to suspect heater wires. safety function of the equipment. Therefore, CARD 16-28716 initiated, Work Order 46449609 corrected wiring issue. (See Event this failure will have no impact on an 3493, WO 43150321 for detail). Performed Section 5.3, then performed 5.5. Entire ST extension to a 24 month surveillance interval.
| |
| 6/19/2018 A Noted on page 16, Step 5.1.8 CARD 16-28700 previously submitted. WO 46461838 is The identified failure(s) would not have R2WK status and scheduled for 7/31/2018 to replace burnt out light inside door with prevented the performance of the required Test Port #5 - does not impact the function of the filter system. WO 46461838 safety function of the equipment. Therefore, completed replacement of light bulb on 7/31/2018. this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 67 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 181 of 395 0494 PERFORM 43.409.001 DIV 1 POST LOCA THERMAL RECOMBINER SR 5.5.2 SYSTEM LEAKAGE TEST
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 10/19/2015 A SPF Note: "System leakage within Spec, However leakage was detected on examination The identified failure(s) would not have points 5 and 16 on the leakage Examination Data Sheet (Attachment 2, Page 1 of 1) prevented the performance of the required CARD 15-27979 was written per Step 6.1.7.1" CARD 15-27979 states: "43.409.001 has safety function of the equipment. Therefore, an allowable total system leakage acceptance criterion of 3.00 SCFH and the actual this failure will have no impact on an measured leakage was 1.44 SCFH. However, Step 6.1.7.1 in procedure 43.409.001 Rev. extension to a 24 month surveillance interval.
| |
| 30, requires a CARD be written to identify which components had detected leakage. The two components with detected leakage were T4804F003A, Bonnet Area (#5 on the Leakage Examination Data Sheet in 43.409.001) and T4804F604A, Flange farthest from Containment (#16 on the Leakage Examination Data Sheet in 43.409.001)."
| |
| Reportability/Operability Review states: "System leakage determined to beless than total system leak acceptance criteria and therefore no degraded condition. No operability or Reportability assessment required." Maintenance Rule Functional Failure (MRFF) evaluation not required. System leakage is less than total system leak acceptance criteria and there is no degraded condition.
| |
| 4/10/2017 A SPF Note: "Leakage identified from T4804-F003A and T4804-F604A. CARD 17-23217 The identified failure(s) would not have initiated." CARD 17-23217 states: "total system leakage was identified at 2.95 SCFH prevented the performance of the required with an acceptance criteria of 3.0 SCFH. Two valves were identified asthe major safety function of the equipment. Therefore, contributors to the total system leakage. Valves T4804F003A andT4804F604A both this failure will have no impact on an have significant packing /packing gland leakage. It is requested that both valves be extension to a 24 month surveillance interval.
| |
| repacked or have the packing adjusted prior to the next scheduled test. Both of these valves were previously identified as leaking during RF17 testing."
| |
| Reportability/Operability Review states: "T4804F604A is a primary containment isolation valves (PCIV). As found leakage thru this penetration determined to be 2.95 SCFH. Allowable leakage for this penetration met acceptance criteria 3.0 SCFH. This condition does not impact the ability of the PCIV to perform its safety related function.
| |
| T4804F604A remains OPERABLE." Per Maximo WO 47458075 Status:FLDCOMP, 10/10/2017 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 68 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 182 of 395 0495 PERFORM 43.413.001 SECTIONS 5.1, 5.2 AND 5.5 THRU 5.13 CONTL SR 5.5.7.a SR 5.5.7.b RM EMERG FILTER PERF SR 5.5.7.d SR 5.5.7.e
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| One failure is identified as event driven failure which is not indicative of a repetitive time based failure mechanism. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/18/2009 C SPF Note 3: Determined downstream Halide detector had failed. Section 5.10 and 5.11 This is an event driven failure in that the test results are invalid. Test equipment left installed. Resolution: CARD 09-22871; equipment (Halide detector) being utilized to reperform Sections 5.5, 5.10 and 5.11 using second copy of procedure. CARD 09-22871 document the test results failed during the states: "Halide detectors are used to measure charcoal bed upstream and downstream procedure performance. Therefore, this halide concentrations to verify proper charcoal operation. Downstream halide failure will have no impact on an extension concentrations were zero for both the Recirculation Filter and Emergency Filter to a 24 month surveillance interval.
| |
| Charcoal during performance of 43.413.001 on 4/16/09. The Emergency Filter Charcoal is expected to have a downstream reading due to its small bed depth. To validate results, the downstream sample tap was moved to the upstream detector and residual halide was detected, indicating that the downstream detector, M&TE Number ZZ-108-M, had failed. Notified Shift Manager in the Main Control Room."
| |
| Reportability/Operability Review states: "SGTS is not required to be Operable in the current mode. Retesting of both divisions of SGTS need to be completed prior to plant startup from RF13." Work Orders 29710795 and 29710836 are referenced, however, per Maximo, both were cancelled. Determined to be M&TE failure, reperform partial surveillance is indicated. Applicable steps in Section 5.5, and Sections 5.10 and 5.11 were reperformed satisfactorily.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 69 of 270
| |
| | |
| 11/1/2015 A SPF Note: "Zip-lock bag entered CCHVAC System during restoration activities. CARD The identified failure(s)
| |
| TRVENDwould not have 24MCGNF319001 Rev 1 15-28460 initiated to retrieve Zip-lock bag." CARD 15-28460 states: "During Page 183 of 395 prevented the performance of the required performance of WO# 37581722 to restore CCHVAC to its normal configuration, a one safety function of the equipment. Therefore, gallon zip-lock bag entered the internals of the CCHVAC system through T4102 testport this failure will have no impact on an
| |
| #11. Per 43.413.001, Encl. C, Page 1 it is presumed that the bag is displaced against the extension to a 24 month surveillance interval.
| |
| HEPA filter within the compartment directly below testport #11. Request WO to retrieve zip-lock bag during RF17." It was removed on 11/04/15 with work order 44238494.
| |
| During performance of this work order the System Engineer removed the bag and inspected the HEPA filters, which are in this compartment, to ensure there was no damage. No damage to the filters was expected and none was noted during the inspection. Primary causes were attributed to Work Quality (Workmanship) to maintain situational awareness and procedure use and adherence. A Crew Learning Opportunity (CLO) was written to share lessons learned. Action Item Completion Comments state:
| |
| "The functions evaluated for this issue are: Function T4102-03, Maintain Control Center Envelope at a positive pressure with respect to outside ambient pressure in Emergency Recirculation Mode. Function T4102-04, Filtration system ensures that resultant operator doses are within regulatory limits following a DBA. The CCHVAC system was declared inoperable to perform this PST event and was not declared operable again until after the bag was removed and the system returned to normal configuration. The Control Center Envelope was maintained at a positive pressure with respect to the outside ambient pressure prior to and after the bag entered the filter compartment. During this event, the CCHVAC system maintained its T4102-03 function. A small area of a HEPA filter was covered. There was adequate flow through the filtration unit because the Control Center Envelop pressure was maintained. No flow was impeded in the area of the charcoal filter so Operator doses would have been maintained within regulatory limits following a DBA. The unit maintained its T4102-04 function. This event is not a functional failure."
| |
| Event Title Associated SRs and Function 0496 PERFORM 44.010.037 RPS(TS A/TC A1)-NS4(TS A/TC A) DW SR 3.3.1.1.14-7 SR 3.3.1.1.15-7 PRESSURE, C71N650A, CALIBRATION/FUNC SR 3.3.6.1.4-2.c SR 3.3.6.1.4-7.b SR 3.3.6.1.5-2.c SR 3.3.6.1.5-7.b SR 3.3.6.2.4-2 SR 3.3.6.2.5-2 SR 3.3.7.1.5-2 SR 3.3.7.1.6-2 SR 3.6.1.3.8 SR 3.6.4.2.3 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 70 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 184 of 395 0497 PERFORM 44.010.038 RPS(TS B/TC B1)-NS4(TS A/TC B) DW SR 3.3.1.1.14-7 SR 3.3.1.1.15-7 PRESSURE, C71N650B, CALIBRATION/FUNC SR 3.3.6.1.4-2.c SR 3.3.6.1.4-7.b SR 3.3.6.1.5-2.c SR 3.3.6.1.5-7.b SR 3.3.6.2.4-2 SR 3.3.6.2.5-2 SR 3.3.7.1.5-2 SR 3.3.7.1.6-2 SR 3.6.1.3.8 SR 3.6.4.2.3 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0498 PERFORM 44.010.039 RPS(TS A/TC A2)-NS4(TS B/TC C) DW SR 3.3.1.1.14-7 SR 3.3.1.1.15-7 PRESSURE, C71N650C, CALIBRATION/FUNC SR 3.3.6.1.4-2.c SR 3.3.6.1.5-2.c SR 3.3.6.2.4-2 SR 3.3.6.2.5-2 SR 3.3.7.1.5-2 SR 3.3.7.1.6-2 SR 3.6.1.3.8 SR 3.6.4.2.3 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0499 PERFORM 44.010.040 RPS(TS B/TC B2)-NS4(TS B/TC D) DW SR 3.3.1.1.14-7 SR 3.3.1.1.15-7 PRESSURE, C71N650D, CALIBRATION/FUNC SR 3.3.6.1.4-2.c SR 3.3.6.1.5-2.c SR 3.3.6.2.4-2 SR 3.3.6.2.5-2 SR 3.3.7.1.5-2 SR 3.3.7.1.6-2 SR 3.6.1.3.8 SR 3.6.4.2.3 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 71 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 185 of 395 0504 PERFORM 44.010.049 RPS-MSIV, TRIP SYS A CHANNEL A1,RTT SR 3.3.1.1.17-5
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0505 PERFORM 44.010.050 RPS-MSIV, TRIP SYS B CHANNEL B1,RTT SR 3.3.1.1.17-5
| |
| # Performances: 5 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0506 PERFORM 44.010.051 RPS-MSIV, TRIP SYS A CHANNEL A2,RTT SR 3.3.1.1.17-5
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0507 PERFORM 44.010.052 RPS-MSIV, TRIP SYS B CHANNEL B2,RTT SR 3.3.1.1.17-5
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 72 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 186 of 395 0508 PERFORM 44.010.053 RPS-TURBINE STOP VALVE CLOSURE, TRIP SR 3.3.1.1.17-9 SYS A,CHAN A1,RTT
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0509 PERFORM 44.010.054 RPS-TURBINE STOP VALVE CLOSURE, TRIP SR 3.3.1.1.17-9 SYS B, CHAN B1,RTT
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0510 PERFORM 44.010.055 RPS-TURBINE STOP VALVE CLOSURE, TRIP SR 3.3.1.1.17-9 SYS A, CHAN A2, RTT
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0511 PERFORM 44.010.056 RPS-TURBINE STOP VALVE CLOSURE, TRIP SR 3.3.1.1.17-9 SR 3.5.2.8 SYS B, CHAN B2, RTT
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 73 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 187 of 395 0512 PERFORM 44.010.057 RPS-TURBINE CONT VALVE FAST SR 3.3.1.1.17-10 CLOSURE,TRIP SYS A,CH A1,RTT
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0513 PERFORM 44.010.058 RPS-TURBINE CONT VALVE FAST SR 3.3.1.1.17-10 CLOSURE,TRIP SYS B,CH B1,RTT
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 74 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 188 of 395 0514 PERFORM 44.010.059 RPS-TURBINE CONT VALVE FAST SR 3.3.1.1.17-10 CLOSURE,TRIP SYS A,CH A2,RTT
| |
| # Performances: 4 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/29/2010 A SPF Notes: "Step 6.1.13 Response time for relay 37C de-energizing to four Pilot The identified failure(s) would not have SCRAM Solenoids de-energized in 54 milli-seconds exceeds the acceptance criteria of prevented the performance of the required
| |
| <50 milli-seconds. Notified CRS, Discussed with I&C Supervisor, he recommended safety function of the equipment. Therefore, obtaining copy of the recording. Per CRS discussion, continued with surveillance. Step this failure will have no impact on an 6.1.20 acceptance criteria exceeded, 52 msec (accept Criteria <50 msec). Notified CRS. extension to a 24 month surveillance interval.
| |
| Saved as Record 12 in BT folder on the hard (C) drive. Step 8.1 failed to meet Acceptance Criteria. Notified CRS. CARD 10-31266 written." CARD 10-31266 Description/Investigation states: "Step 6.1.13 response time was found to be 54 msec, which did not meet the ACCEPTANCE CRITERIA of < 50 msec, and the Step 6.1.20 response time was found to be 52 msec, which did not meet the ACCEPTANCE CRITERIA of < 50 msec. After Step 6.1.13, the Control Room Supervisor (CRS) was notified, and the situation was discussed with an I&C Supervisor. The Vision XP (RC-058-M , 5/20/2011) data for the Step 6.1.13 response time recorded was downloaded to a memory stick, as well as the previously run 44.010.059 data. The surveillance was continued. When Step 6.1.20 failed to meet the A.C., the CRS was notified, the data was saved as RECORD 12 in BT folder on the hard (C) drive of the recorder, and the surveillance continued. The CRS was notified that Step 8.1 ACCEPTANCE CRITERIA had failed. The recorder was brought back to the I&C shop to download and print out the re-performed Step 6.1.20 results." Investigation determined that the Surveillance was performed on Day shift with SAT results, then re-performed on Nights with UNSAT results. The difference was in the testing method. The SAT performance had the recorder hooked up to the back of the scram light holder. The UNSAT performance had the scram light bulbs removed and a test adapter installed in the bulb socket. The Surveillance performance over the years has been close to the 50ms acceptance criteria.
| |
| The slight difference in the times was with the different testing method. Maintenance Rule Functional Failure form documents: "The description of this event indicates that the RPS system met the Maintenance Rule function C7100-02 in that a scram signal was present. The issue is that the signal did not meet the acceptance criteria for response time. The event documents the second time that the procedure was performed. During the first performance (which passed the acceptance criteria) I&C noted that no qualified individual performed the test. The first performance occurred measuring the response across a relay room scram light. The second performance, which initiated CARD 10-DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 75 of 270
| |
| | |
| 31266, was performed with qualified individuals and the relay room scram light TRVEND 24MCGNF319001 Rev 1 removed with response measured at the removed light lamp socket. However, the test Page 189 of 395 was repeated later with the scram light installed and measuring the response time across the light (additional path to discharge the energy stored in the scram solenoids) and the acceptance criteria was met. Work Order 32084102, assigned to CARD 10-31266, was cancelled as no corrective actions are necessary. The RPS met the criteria for response time and performed the scram function as expected thus no Maintenance Rule Functional Failure occurred." CARD 10-31266-02 Action Item Completion Comments state: "CARD 10-31320 was also written to address a similar issue. The difference between the two equipment hook-ups is minimal; a couple of milliseconds(ms). The corrective action from CARD 10-31320 was to change the Acceptance Criteria from 50 to 65 ms. Therefore we will not be close to the time and either testing method is acceptable." CARD 10-31320 investigation determined, from the revision history, that up until 44.010.059, Rev 21, the acceptance criteria for the TCV fast closure response time was < 80ms. During revision 22 of procedure 44.010.059, the response time was changed from < 80 ms to < 50 ms using NE-PJ-90-0271 dated May 30, 1990, a letter from PSE to I&C Maintenance. A review of NE-PJ-90-0271 concluded that the change of response time from < 80 ms to < 50 ms during revision 22 of procedure 44.010.059 was an error. As a CAAAC, a cross-discipline group meeting was conducted and determined, the 44.010.057 through 44.010.060 procedures needed to have acceptance criteria changed from <50 milliseconds (msec) to <65 msec." Procedures 44.010.057 through 44.010.060 were revised to change the acceptance criteria Response Time from
| |
| <50 msec to <65 msec.
| |
| Event Title Associated SRs and Function 0515 PERFORM 44.010.060 RPS-TURBINE CONT VALVE FAST SR 3.3.1.1.17-10 CLOSURE,TRIP SYS B,CH B2,RTT
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 76 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 190 of 395 0516 PERFORM 44.010.061 RPS LOGIC FUNCTIONAL SR 3.3.1.1.13-11 SR 3.3.1.1.15-1.a SR 3.3.1.1.15-1.b SR 3.3.1.1.15-3 SR 3.3.1.1.15-4 SR 3.3.1.1.15-5 SR 3.3.1.1.15-7 SR 3.3.1.1.15-8.a SR 3.3.1.1.15-8.b SR 3.3.1.1.15-9 SR 3.3.1.1.15-10 SR 3.3.1.1.15-11 SR 3.3.1.1.15-12 SR 3.3.2.1.4-3 SR 3.3.6.1.5-1.b
| |
| # Performances: 7 # Failures: 7 24 Month Justification: Notes:
| |
| One failure is identified as event driven failures which is not indicative of a repetitive time based failure mechanism. The other failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/24/2009 C SPF Note: "Step 6.6.18.2, Channel 9, failed to indicate approximately 120 Vac, This is an event driven failure in that the test discussed with I&C Supervisor and CRS; permission granted to check for voltage at H11- equipment cable failed during the procedure P611, AA-98 to AA-100. Found approximately 120 Vac at terminals. Checked voltage performance. Function of the channel was at input to recorder and found 0 Vac. Determined cable or connector breakout for proven by other means (i.e., voltage check).
| |
| channel 9 is faulty. Since time delay value is not acceptance criteria and function of the Therefore, this failure will have no impact channel was proven by voltage check, was directed to write a CARD later and continue on an extension to a 24 month surveillance with surveillance. CARD 09-23175 submitted." CARD 09-23175 Closure Summary interval.
| |
| states: "CARD was initiated when the timing of C7100M017D was not obtained as part of 44.010.061 due to a cable failure within the testing device. The cable failure was identified and corrected. The relay in question was shown through voltage checks to have changed state. RPS would require a second relay to time out prematurely as well to create an issue. The other associated relay was not identified as timing prematurely.
| |
| Relay C7100M017D was replaced on 08-05-2009 as expected and dropout times are SAT and recorded in the package. No further activity is required for this CARD."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 77 of 270
| |
| | |
| 4/24/2009 A SPF Notes several issues: 1) "Step 6.1.3.2 After shorting link was removed when The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 attempting to tighten thermal screw on AA-114 Technician found screw cross threaded Page 191 of 395 prevented the performance of the required and unable to re-tighten screw. Lifted wire 114 from terminal to take half SCRAM. safety function of the equipment. Therefore, CARD 09-23150 written. CARD 09-23150 states: "found screw that holds in the SRM this failure will have no impact on an shorting links cross threaded. Terminal AA-114 in H11P611 (see step 6.1.3.2 of extension to a 24 month surveillance interval.
| |
| 44.010.061) needs to be tapped/ re-threaded. Plant has a half scram installed at this time due to lifting of wire 114 in order to check the screw alignment. Contingency: if the terminal cannot be cleaned or tapped: then the terminal block may need to be replaced." WO 29738038 written to replace screw/rethread terminal in H11P611. WO 29738038 successfully chased threads, screw engaged SAT. 2) Step 6.6.12.9, Blue SCRAM lights failed to come on for rod 02-31. Associated valves (i.e., C11 -F126 and C11-F127) indicate OPEN. CARD 09-23169 submitted. CARD 09-23169 states:
| |
| "BLUE SCRAM lights on Full Core Display not ON for rod 02-31, C1103D085 during 44.010.061, Step 6.6.12.9. IAW with 44.010.061, Step 6.6.13.6, verified C11-F126 and C11-F127 for 02-31 OPEN." Continued surveillance, this step was not ACCEPTANCE CRITERIA. Comments state: "Limit switches need adjustment/replaced. No operability impact on the HCU." WO 29741807 is referenced but per Maximo was cancelled. WO POD Notes State: Contingent on results of Event AB74. WO 29610163 (AB74) Perform Verification of SCRAM Lights on Full Core Display completed AE on 10/24/2010. 3)
| |
| "Step 6.6.17.6 Time delay value obtained in Step 6.6.17.1 for relay K17A is outside of specified value. CARD 09-23173 submitted." CARD 09-23173 states: "1) In Step 6.6.17.6., the time delay value obtained in Step 6.6.17.1. (drop out time of 12.122 seconds for C71AK17A ) was not within the specified value of 10 +2/-1 seconds. 2) In Step 6.6.18.6., the time delay value obtained in Step 6.6.18.1 (drop out time of 13.033 seconds for C71AK17B ) was not within the specified value of 10 +2/-1 seconds. I&C Supervisor and CRS notified at each Step; directed to continue with surveillance and submit CARD later." Comments provided in CARD 09-23173 state: "The C71AK17A and C71AK17B relays allow resetting a scram 10 seconds after the mode switch is taken to shutdown. The relays functioned as expected with the exception of the time delay being slightly out of acceptable band. The time delay value is not acceptance criteria for the surveillance and does not impact the operability of the RPS system." WO 29741891 is referenced but per Maximo Status is CAN. C71A-K17A relay will be calibrated under WO 25969785 (PM F765). C71A-K17B is being replaced under WO 29155712, NRC Part 21 Notification - Tyco Electronics E7024 Time-Delay Relays.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 78 of 270
| |
| | |
| 11/15/2010 A SPF Note 2: Steps 6.6.17.1 C71A K17A, Step 6.6.18.1 C71A K17B, and Step 6.6.18.2 The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 C71A K17D all had drop out times UNSAT. Discussed with CRS and CARD written Page 192 of 395 prevented the performance of the required 10-30696. CARD 10-30696 states: "Step(s) 6.1.16 and 6.1.17 relays K17A, K17B, and safety function of the equipment. Therefore, K17D drop out times were not within specification. Times were: K17A - 13.15 seconds, this failure will have no impact on an K17B - 12.48 seconds, K17D - 13.15 seconds. The specification for these relays is 10 extension to a 24 month surveillance interval.
| |
| +2/-1 seconds. Informed Control Room Supervisor during the surveillance. Request a work order be generated to adjust the Agastat relays." Comments stated in CARD 10-30696 state: "The drop out times identified in the CARD did not impact any of the surveillance acceptance criteria. No operability concerns or impact." CARD also noted:
| |
| "This is not a new issue. Every outage there are issues with the timing of the RPS scram reset time delay relays. There is no adverse condition to quality for the event described in that the safety function requires a minimum of eight seconds before the relay drops out.
| |
| There is no safety function associated with relay dropouts longer than the listed tolerance. No operability concerns or impact."
| |
| 4/30/2012 A SPF noted: "The time delay relay value in Step 6.6.18.1 did not meet the expected time The identified failure(s) would not have interval (10 +2/-1 seconds, time was 14.950 seconds). A work order needs to be prevented the performance of the required generated to adjust this relay (K17B)." This value is not acceptance criteria for safety function of the equipment. Therefore, 44.010.061. CARD was not written. this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 3/20/2014 A SPF: Note: "Step 6.6.18.1 failed specified tolerance. Discussed with FLS and CRS. The identified failure(s) would not have This has failed in past performances of this surveillance. The time documented does prevented the performance of the required meet Tech Specs. A CARD will be written to document this issue. SM concurs. CARD safety function of the equipment. Therefore, 14-22609 written." CARD 14-22609 states: "Step 6.6.18.1 states, "This time should be this failure will have no impact on an 10 +2/-1 seconds." The actual time was 17.5 seconds. This value is not acceptance extension to a 24 month surveillance interval.
| |
| criteria. Request WO for Electrical to repair / replace." As noted in CARD 14-22609, EFFECT ON SSC ABILITY TO PERFORM SAFETY FUNCTION: "...this time delay value is not acceptance criteria. 44.010.061 was completed satisfactorily and all acceptance criteria were met. This relay controls the minimum amount of time required to allow operators to reset a reactor scram following a reactor scram. There are no Tech Spec or Operability requirements associated with this function." OPERABILITY IMPACT: RPS Trip System B remains Operable. MRFF Justification states: "The sufficient minimum time for rods to fully insert is 8 seconds. The setpoint for the timing relay is 10/ -1, +2 seconds. The setpoint and tolerance allows sufficient time plus margin for the rods to fully insert before a scram can be reset. Once the timing relay has exceeded 8 seconds, the support function of the relay has been met. Since the as found time of the relay was 17.5 seconds, the relay provided the required support function and thus no Maintenance Rule Function was lost. The timing relay does not provide interface to other Maintenance Rule systems that would be impacted by this event. C7100 Maintenance Rule Functional Failure, Maintenance Preventable Functional Failure, or Repetitive Maintenance Preventable Functional Failure did not occur during this event."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 79 of 270
| |
| | |
| 11/16/2015 A SPF notes two issues: 1) "At Step 6.6.5.9, SCRAM light is on for Rod 22-59. The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 Associated valves are open by STR 15-5109. Step 6.6.12.9 will NOT be satisfied for rod Page 193 of 395 prevented the performance of the required 22-59. CRS and Supervisor informed. Proceed with surveillance. CARD 15-29030 safety function of the equipment. Therefore, submitted." 2) "At Step 6.6.12.9, rods 6-47, 14-11, 18-27, 18-39, 18-51, 22-19, 30-15, this failure will have no impact on an 30-23, 38-27, 38-43, 38-55, 42-47, 58-39 SCRAM lights did not turn on. All assoc extension to a 24 month surveillance interval.
| |
| valves verified open except 6-47, 18-51, and 58-39. CARD 15-29030 written.
| |
| Supervisor and CRS informed. Turn over to Day Shift. Cycled switches on associated HCUs SAT. All SCRAM lights on . CARD 15-20930 Description / Investigation states:
| |
| "HCU's 58-39, 06-47 and 18-51 After receiving a turnover from the I&C night shift the day shift received permission from the FLS and SM to go out and cycle the F126 and F127 limit switches on these 3 HCU's to see if the blue SCRAM lights would illuminate on the full core display. HCU 06-47 illuminated on its own during the shift turnover.
| |
| Cycled the limit switches for HCU's 58-39 and 18-51 and both SCRAM lights on the full core display illuminated. 44.010.061 was continued to completion." CARD closed with no further action required.
| |
| 4/15/2017 A SPF Note: "Steps 6.6.17.1, 6.6.18.1 and 6.6.18.2, response times for relays K17A, K17B The identified failure(s) would not have and K17D were found out of spec high. Time delay values are not acceptance criteria. prevented the performance of the required Notified FLS so Work Order can be initiated for adjustments." CARD was not safety function of the equipment. Therefore, documented on SPF. No reference to Work Order. this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 80 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 194 of 395 0517 PERFORM 44.010.062 RPS MSIV'S-INBOARD VALVE LIMIT SR 3.3.1.1.14-5 SWITCH,DIV 1&2,CAL
| |
| # Performances: 6 # Failures: 3 24 Month Justification: Notes:
| |
| Two failures are identified as event driven failures which are not indicative of a repetitive time based failure mechanism. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/22/2009 A As Found data for Limit Switch B21-N572B was out of tolerance. Switch was adjusted The identified failure(s) would not have to within tolerance and As Left data was acceptable. prevented the performance of the required safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 4/20/2012 C As Found data for Limit Switch B21-N572D was out of calibration tolerance and This is an event dirven failure in that the As exceeded Allowable Value. Switch was adjusted to within tolerance and As Left data Found data being out of tolerance and was acceptable. exceeding the allowable value was due to the limit switch being removed and reinstalling during maintenance on the valve actuator.
| |
| Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 11/9/2015 C As Found data for Limit Switch B21-N572A was out of calibration tolerance and This is an event driven failure in that the exceeded Allowable Value. Switch was adjusted to within tolerance and As Left data failure was caused from the rebuild of the was acceptable. MSIV and replacement of the limit switch.
| |
| Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 81 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 195 of 395 0518 PERFORM 44.010.063 RPS MSIV-OUTBOARD VALVE LIMIT SR 3.3.1.1.14-5 SWITCH,DIV 1&2,CAL
| |
| # Performances: 7 # Failures: 1 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failure which is not indicative of a repetitive time based failure mechanism. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/14/2017 C As Found data for Limit Switch B21-N574D was out of calibration tolerance and This is an event driven failure in that the exceeded Allowable Value. Switch was adjusted to within tolerance and As Left data failure was caused by the replacement of the was acceptable. limit switch. This procedure performance is the first calibration after the replacement.
| |
| Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0523 PERFORM 44.010.075 RPS-SDV HIGH WTR LVL TRIP SYS A, SR 3.3.1.1.14-8.a SR 3.3.1.1.15-8.a CHANNEL A1/A CAL/FUNCT.
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 7/10/2017 A As Found data for transmitter C11-N016A was out of tolerance high. Transmitter was The identified failure(s) would not have adjusted to within tolerance and As Left data was acceptable. prevented the performance of the required safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 82 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 196 of 395 0524 PERFORM 44.010.076 RPS-SDV HIGH WTR LVL TRIP SYS B, SR 3.3.1.1.14-8.a SR 3.3.1.1.15-8.a CHANNEL B1/B CAL/FUNCT.
| |
| # Performances: 7 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0525 PERFORM 44.010.077 RPS-SDV HIGH WTR LVL TRIP SYS A, SR 3.3.1.1.14-8.a SR 3.3.1.1.15-8.a CHANNEL A2/C CAL/FUNCT.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0526 PERFORM 44.010.078 RPS-SDV HIGH WTR LVL TRIP SYS B, SR 3.3.1.1.14-8.a SR 3.3.1.1.15-8.a CHANNEL B2/D CAL/FUNCT.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0527 PERFORM 44.020.501 RWCU NSSSS- INBD ISOLATION VALVE LOGIC SR 3.3.6.1.5-5.a SR 3.3.6.1.5-5.b SYSTEM FUNCTIONAL SR 3.3.6.1.5-5.c SR 3.3.6.1.5-5.d SR 3.3.6.1.5-5.e SR 3.5.2.8 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 83 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 197 of 395 0528 PERFORM 44.020.601 RWCU NSSSS- OTBD ISOLATION VALVE SR 3.3.6.1.5-5.a SR 3.3.6.1.5-5.b LOGIC SYSTEM FUNCTIONAL SR 3.3.6.1.5-5.c SR 3.3.6.1.5-5.d SR 3.3.6.1.5-5.e SR 3.5.2.8 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SR 3.3.6.1.4-1.a SR 3.3.6.1.4-2.b SYS A,CHNL A,XMTR CAL SR 3.3.6.1.4-5.e SR 3.3.6.1.5-1.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-5.e SR 3.3.6.2.4-1 SR 3.3.6.2.5-1 SR 3.3.7.1.5-1 SR 3.3.7.1.6-1 SR 3.6.1.3.8 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SR 3.3.6.1.4-1.a SR 3.3.6.1.4-2.b SYS B,CHNL B,XMTR CAL SR 3.3.6.1.4-5.e SR 3.3.6.1.5-1.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-5.e SR 3.3.6.2.4-1 SR 3.3.6.2.5-1 SR 3.3.7.1.5-1 SR 3.3.7.1.6-1 SR 3.6.1.3.8 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 84 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 198 of 395 0533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SR 3.3.6.1.4-1.a SR 3.3.6.1.4-2.b SYS A,CHNL C,XMTR CAL SR 3.3.6.1.4-5.e SR 3.3.6.1.5-1.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-5.e SR 3.3.6.2.4-1 SR 3.3.6.2.5-1 SR 3.3.7.1.5-1 SR 3.3.7.1.6-1 SR 3.6.1.3.8 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SR 3.3.6.1.4-1.a SR 3.3.6.1.4-2.b SYS B,CHNL D,XMTR CAL SR 3.3.6.1.4-5.e SR 3.3.6.1.5-1.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-5.e SR 3.3.6.2.4-1 SR 3.3.6.2.5-1 SR 3.3.7.1.5-1 SR 3.3.7.1.6-1 SR 3.6.1.3.8 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 85 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 199 of 395 0535 PERFORM 64.020.105 FUEL POOL VENT EXH RAD MON,DIV 1,CHL SR 3.3.6.2.4-3 SR 3.3.6.2.5-3 A,RADIOLOGICAL CAL SR 3.3.7.1.5-3 SR 3.3.7.1.6-3
| |
| # Performances: 7 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/21/2015 A As Found Trip Unit readings were out of tolerance (high) at 5 and 50 mr/hr and recorder The identified failure(s) would not have reading was out of tolerance (high) at 50 mr/hr. Per Section 6.3 Sensor/Converter prevented the performance of the required Adjustment, adjustments were applied with all As Left tolerance readings within safety function of the equipment. Therefore, tolerance. this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0536 PERFORM 64.020.106 FUEL POOL VENT EXH RAD MON, DIV 2, CH B, SR 3.3.6.2.4-3 SR 3.3.6.2.5-3 RADIOLOGICAL CAL SR 3.3.7.1.5-3 SR 3.3.7.1.6-3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 86 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 200 of 395 0537 PERFORM 64.020.107 FUEL POOL VENT EXH RAD MON, DIV 1, CH C, SR 3.3.6.2.4-3 SR 3.3.6.2.5-3 RADIOLOGICAL CAL SR 3.3.7.1.5-3 SR 3.3.7.1.6-3
| |
| # Performances: 7 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 1/25/2010 A As Found Trip Unit and recorder readings were out of tolerance (low) at 5 mr/hr. Per The identified failure(s) would not have Section 6.3 Sensor/Converter Adjustment, adjustments were applied with all As Left prevented the performance of the required tolerance readings within tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 87 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 201 of 395 0538 PERFORM 64.020.108 FUEL POOL VENT EXH RAD MON, DIV 2, CH D, SR 3.3.6.2.4-3 SR 3.3.6.2.5-3 RADIOLOGICAL CAL SR 3.3.7.1.5-3 SR 3.3.7.1.6-3
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failure which is not indicative of a repetitive time based failure mechanism. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 10/27/2016 C SPF notes that "while acceptance criteria was met, a secondary containment isolation This is an event driven failure in that the signal was generated at Step 7.3.1. Annunciator 3D27 remains in alarm, Notified failure was caused by inadvertent contact Supervisor, CRS and SM. Entered LCO 2016-0565, CARD 16-28575 written." CARD (i.e. grounding) within the cabinet during 16-28575 states: "Unplanned ESF actuation (Trip of RBHVAC, Auto start Div 1 SGTS jumper removal which caused a fuse to blow.
| |
| and CCHVAC Auto Swap to Recirc) following surveillance test on fuel pool vent This caused relays K81 and K82 in the aux radiation monitor. Performing 64.020.108 for Fuel Pool Ventilation Exhaust Radiation trip unit to lose power, which in turn caused Monitor, Division 2, Channel D, after jumpers had been removed and independent ESF actuations. Therefore, this failure will verification in progress, notified by control room to stop work." Rpt/Op Comments have no impact on an extension to a 24 state: "Troubleshooting determined that the isolation signal was due to a blown fuse month surveillance interval.
| |
| D11A, in H11P606 which supplies 24 VDC to FP Vent Exh Rad Mon D upscale trip and downscale relays. The fuse was replaced, and the alarm cleared. Following the completion of 44.020.104, and completion of a licensed operator walkdown, Channel D Fuel Pool Vent Exhaust Rad Monitor was declared Operable and LCO 2016-0565 was Exited. Direct Cause of the blown fuse was attributed to inadvertent contact inside the cabinet while removing the jumpers during calibration activities on fuel pool vent radiation monitor. Comments provided state: "CARD 16-28575 does not require a Maintenance Rule Functional Failure evaluation. Per criteria iv. MRFF evaluation not required: The problem was caused, identified and will be corrected during the same maintenance / out of service period. RBHVAC, SGTS, CCHVAC, Process Radiation Monitors, Isolation Logic, and the Visual Annunciator System were impacted by this event. Given this was an invalid actuation and all systems functioned as designed, there are no additional Maintenance Rule Functional Failure evaluations necessary for this event." CARD 16-28575, Action Item 16-28575-04 determined reset criteria was met and briefing sheet was issued.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 88 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 202 of 395 0548 PERFORM 44.020.152 NS4 REACTOR WATER CLEANUP SR 3.3.6.1.4-5.a SR 3.3.6.1.5-5.a DIFFERENTIAL FLOW CAL./FUNC. SR 3.5.2.8
| |
| # Performances: 6 # Failures: 3 24 Month Justification: Notes:
| |
| One failure is identified as event driven failure which is not indicative of a repetitive time based failure mechanism. The other failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/9/2010 A G33-R616A (Table 15) As Found reading was out of tolerance (high). Per Step 6.6.13, The identified failure(s) would not have Timer dial adjustment made. G33-R616A (Table 15) As Left within tolerance. prevented the performance of the required safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 4/13/2012 A SPF notes that Table 6 values are out of tolerance (Step 6.2.7) Notified CRS. WO The identified failure(s) would not have 33287816 written to repair (9/9/2011) related to CARD 11-28226. Work Order Partial prevented the performance of the required Completion Notification Form (5/9/2012) states: "Per management, work to be safety function of the equipment. Therefore, completed at a later date. A defective power supply C96K754 needs to be replaced. this failure will have no impact on an RWCU Differential Loop is in service. The input to IPS G33DF1055 is faulty." CARD extension to a 24 month surveillance interval.
| |
| 12-24322 (written 5/9/2012) is referenced as well as new WO 34468061. CARD 12-24322 Reportability / Operability Review states: "A substitute value has been inserted for this point since initial discovery (see CARD 11-28226), therefore no impact to the calculated heat balance." WO 34407194 replaced defective power supply in February 2014.
| |
| 7/8/2015 C SPF Note: "6.2.2.4: High side vent plug flats rounded off. Could not get 90 in-lbs This is an event driven failure in that torque, able to achieve 70 in-lbs. Found torque at 50 in-lbs. Generated CARD 15-24662 previous maintenance caused vent plug flats to replace plugs. WO 42506575 revised to replace vent plug and torqued to 90 in-lbs." to be rounded off. Therefore, this failure will CARD 15-24662 states: "While performing 44.020.152, it was found that the high have no impact on an extension to a 24 pressure side vent plug on G33N036 (RWCU PMPS DISCH FLOW XMTR) had month surveillance interval.
| |
| rounded off flats. Procedure has us torque the vent plugs to 90 Inch pounds but we were only able to achieve 70 inch pounds due to the rounded flats. Found the torque at 50 inch pounds." CARD Reportability / Operability Review states: "There was no noted leakage from the vent plug as found. With no leakage from the plug noted there is no impact on the function of the flow transmitter and the flow indication was normal prior to the RWCU system shutdown." New vent plug was ordered, then replaced by WO 42506575 on 7/8/2015.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 89 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 203 of 395 0551 PERFORM 44.020.158 NS4 RWCU AREA TEMP, DIV 1, SR 3.3.6.1.4-5.b SR 3.3.6.1.5-5.b CAL/FUNCTIONAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0552 PERFORM 44.020.159 NS4 RWCU AREA NRHX DISCHARGE SR 3.3.6.1.4-5.b SR 3.3.6.1.5-5.b TEMPERATURE, DIV 2,CAL/FUNC. SR 3.5.2.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0560 PERFORM 44.020.203 NS4 HPCI STEAM LINE FLOW, TRIP SYS A, SR 3.3.6.1.4-3.a SR 3.3.6.1.5-3.a CAL/FUNCTIONAL SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0561 PERFORM 44.020.204 NS4 HPCI STEAM LINE FLOW, TRIP SYS B, SR 3.3.6.1.4-3.a SR 3.3.6.1.5-3.a CAL/FUNCTIONAL SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 90 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 204 of 395 0563 PERFORM 44.020.211 NS4 HPCI STEAM LINE PRESSURE,TRIP SYS SR 3.3.6.1.4-3.b SR 3.3.6.1.5-3.b A,CHANNEL A,CAL/FUNC.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0564 PERFORM 44.020.212 NS4 HPCI STEAM LINE PRESSURE,TRIP SYS SR 3.3.6.1.4-3.b SR 3.3.6.1.5-3.b B,CHANNEL B,CAL/FUNC.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0565 PERFORM 44.020.213 NS4 HPCI STEAM LINE PRESSURE,TRIP SYS SR 3.3.6.1.4-3.b SR 3.3.6.1.5-3.b A,CHANNEL C,CAL/FUNC.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0566 PERFORM 44.020.214 NS4 HPCI STEAM LINE PRESSURE, TRIP SYS B, SR 3.3.6.1.4-3.b SR 3.3.6.1.5-3.b CH D, CAL/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 91 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 205 of 395 0572 PERFORM 44.020.223 NS4 HPCI TURB EXHAUST DIAPHRAGM SR 3.3.6.1.4-3.c SR 3.3.6.1.5-3.c PRESS,TRIP SYS A,CH A,CAL/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0573 PERFORM 44.020.224 NS4 HPCI TURB EXHAUST DIAPHRAGM SR 3.3.6.1.4-3.c SR 3.3.6.1.5-3.c PRESS,D2,CHL''B'', CAL. / FUNC.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0574 PERFORM 44.020.225 NS4 HPCI TURB EXHAUST DIAPHRAGM SR 3.3.6.1.4-3.c SR 3.3.6.1.5-3.c PRESS,TRIP SYS A,CH C,CAL/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0575 PERFORM 44.020.226 NS4 HPCI TURB EXHAUST DIAPHRAGM SR 3.3.6.1.4-3.c SR 3.3.6.1.5-3.c PRESS,D2,CHL''D'', CAL. / FUNC.
| |
| # Performances: 7 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 92 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 206 of 395 0578 PERFORM 44.020.229 NS4 HPCI/RCIC ROOMS AREA TEMP,CHNL A, SR 3.3.6.1.4-3.d SR 3.3.6.1.4-4.d CALIBRATION / FUNC. SR 3.3.6.1.5-3.d SR 3.3.6.1.5-4.d
| |
| # Performances: 7 # Failures: 2 24 Month Justification: Notes:
| |
| One failure is identified as event driven failure which is not indicative of a repetitive time based failure mechanism. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 12/2/2011 A SPF Note 2: "At Step 6.1.3, when knife switches RR-21 and RR-22 were opened 1D70 The identified failure(s) would not have unexpectedly alarmed. Analysis verified the knife switches RR-19 and RR-20 are prevented the performance of the required degraded or terminals are possibly loose. CARD 11-30668 - WOs written after safety function of the equipment. Therefore, Supervision and MCR Staff ascertained trouble. WR to be generated to perform this failure will have no impact on an surveillance to clean/torque/replace terminal block." CARD 11-30668 states: "During extension to a 24 month surveillance interval.
| |
| performance of step 6.1.3 Control Room annunciator 1D70 "STEAM LEAK DETECTION DIFFERENTIAL TEMP HIGH" came in unexpectedly. Test team stopped, re-verified proper terminal knife block switches (RR21 & RR22) in H11P614, had been opened and notified CRS and I&C supervision. Review of plant drawing I-2095-27 revealed adjacent terminal knife block switches (RR19 & RR20) which are terminated to E41N601A (HPCI AREA LEAK DETECT "A" TEMP DIFF SW) are associated with 1D70. Recommend replacing knife switches RR19 & RR20."
| |
| Reportability/Operability Review states: "temperature switch is for differential temperature in HPCI room; not a Technical Specification instrument. Switch is only an alarm which would alert Operators for further investigation." CARD Description/Investigation: "Ops log, 01/04/2012 06:04, Performed 1D70 STEAM LEAK DETECTION DIFF TEMP HIGH Annunciator in and clear numerous times. Cause of alarm is E41N601A, HPCI AREA LEAK DETECT "A" TEMP DIFF SW, reading erratically between 40 and 60 degF. HPCI Room temperature is unchanged and G33R621 Pt. 3 reads 6 degF. CARD 11-30668 previously submitted. FIN WO 33721983 is planned to work on day shift today." CARD Notes: "Oxidation may have built up on knife switches causing an intermittent open." WO 33721983 replaced two knife switches on 1-4-12.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 93 of 270
| |
| | |
| 12/2/2011 C SPF Note 1: "At Step 6.2.9 we could not get proper torque value because terminal block This is an event driven failure TRVEND in that the 24MCGNF319001 Rev 1 screws are damaged - CARD 11-30673 written, obtained permission to move forward." failure was caused by previous Page 207 of 395 CARD 11-30673 states: "While performing surveillance 44.020.229 for WR# 30980704, overtightening of the terminal screws.
| |
| at steps 6.2.9 and 6.5.9 we were not able to get proper torque applied / verified at the Therefore, this failure will have no impact terminal blocks. The screw heads for RR-21 ( E41N602A) and the screw heads for TT-3 on an extension to a 24 month surveillance and TT-4 (E51N602A) were damaged by previous overtightening. Need to generate WR interval.
| |
| to replace these three terminal blocks." Reportability/Operability Review states: "there is reasonable assurance that the terminations are greater than or equal to the proper minimum torque value. This condition has no impact on the ability of the noted instruments and associated circuitry to perform their respective safety functions.
| |
| E41N602A, E51N602A and the associated circuitry remain operable." From CARD 11-30673: "The Cause: Investigation for CARD 11-30673 identified the hole for the screw is >4 mm, the diameter of the screw head is 3.75 mm, the area for applying torque to the screw is 0.7 mm, the screw is not attached rigidly in the hole. The screw is attached to the clamping mechanism and it is not rigidly held in place. Therefore the tip of the screwdriver is not centered on the screw head. If the screw was rigid, and the screwdriver tip was not centered, the torque can be applied to about 3.75 mm -3.5 mm
| |
| -(4-3.5)/2 or 0.1 mm of the 0.7 mm, causing damage to the metal of the screw. The Corrective Action(s): For Tech Spec procedures, revise procedures 44.020.159 &160, 44.020.229 & 230. Revision to include: Torque terminals to 0.5 nm using torque screwdriver, Weidmuller, (0.5 - 1.7 Nm) with 0.8 x 4 MM screwdriver tip." Procedures 44.020.229 has been revised. Work request 33734802 replaces terminals on RR and TT terminal strips in H11P614 for E41N602A and E51N602A. SPF Note 3: "At Step 6.5.9 both TT-3 and TT-4 terminal blocks are stripped also, unable to torque - Notified Ops again; obtained permission to move forward and wrote CARD 11-30673."
| |
| Event Title Associated SRs and Function 0579 PERFORM 44.020.230 NS4 HPCI/RCIC ROOMS AREA TEMP,CHNL B, SR 3.3.6.1.4-3.d SR 3.3.6.1.4-4.d CALIBRATION / FUNC. SR 3.3.6.1.5-3.d SR 3.3.6.1.5-4.d
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 94 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 208 of 395 0582 PERFORM 44.020.233 NS4 RCIC STEAM LINE FLOW, TRIP SYS A, SR 3.3.6.1.4-4.a SR 3.3.6.1.5-4.a CAL/FUNCT SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/13/2010 A Table 5, E51-N657A Gross Fail Trips, As Found readings, found out of Acceptable The identified failure(s) would not have Performance Tolerance (APT) range. E51-N657A Gross Fail Trips calibrated per prevented the performance of the required Attachment 1, Step 3 to within As Left Tolerance (ALT) Table 7, E51-N660A Gross safety function of the equipment. Therefore, Fail Trips, As Found readings, found out of Acceptable Performance Tolerance (APT) this failure will have no impact on an range. E51-N660A Gross Fail Trips calibrated per Attachment 1, Step 3 to within As extension to a 24 month surveillance interval.
| |
| Left Tolerance (ALT).
| |
| Event Title Associated SRs and Function 0583 PERFORM 44.020.234 NS4 RCIC STEAM LINE FLOW, TRIP SYS B, SR 3.3.6.1.4-4.a SR 3.3.6.1.5-4.a CALIBRATION/FUNCTIONAL SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/13/2010 A Table 4, E51-N657B Gross Fail Trips, As Found readings, found out of Acceptable The identified failure(s) would not have Performance Tolerance (APT) range. E51-N657B Gross Fail Trips calibrated per prevented the performance of the required Attachment 2, Step 2 to within As Left Tolerance (ALT) Table 6, E51-N660B Gross Fail safety function of the equipment. Therefore, Trips, As Found readings, found out of Acceptable Performance Tolerance (APT) range. this failure will have no impact on an E51-N660B Gross Fail Trips calibrated per Attachment 1, Step 1 to within As Left extension to a 24 month surveillance interval.
| |
| Tolerance (ALT).
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 95 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 209 of 395 0584 PERFORM 44.020.239 NS4 RCIC STEAM LINE PRESSURE,DIV 1,CHNL SR 3.3.6.1.4-4.b SR 3.3.6.1.5-4.b A,CALIBRATION/FUNC.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0585 PERFORM 44.020.240 NS4 RCIC STEAM LINE PRESSURE,DIV 2,CHNL SR 3.3.6.1.4-4.b SR 3.3.6.1.5-4.b B,CALIBRATION/FUNC.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0586 PERFORM 44.020.241 NS4 RCIC STEAM LINE PRESSURE,DIV 1,CHNL SR 3.3.6.1.4-4.b SR 3.3.6.1.5-4.b C,CALIBRATION/FUNC.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 96 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 210 of 395 0587 PERFORM 44.020.242 NS4 RCIC STEAM LINE PRESSURE,DIV 2,CHNL SR 3.3.6.1.4-4.b SR 3.3.6.1.5-4.b D,CALIBRATION/FUNC.
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 1/24/2013 A SPF Note: "Step 6.1.83 As Found below zero. Per Surv went to Attachment 1, Step 2, The identified failure(s) would not have completed 2.a thru 2.d. Could not adjust Gross Fail Low to within spec, Table 4 is NOT prevented the performance of the required Acceptance Criteria. - I&C Supervisor/SM/CRS informed; Low Gross Fail not safety function of the equipment. Therefore, Acceptance Criteria, complete Surv as follows: perform Att 1, Step 3.g and 3.j, this failure will have no impact on an continuing with Step 6.1.11 through completion of procedure. NOTE 1: Att 1 Steps 2d - extension to a 24 month surveillance interval.
| |
| 2.g, 3.a - 3.f, 3.h and 3.i will not be performed as Low Gross Fail circuit has failed.
| |
| Intention is to complete surveillance as Low Gross Fail is NOT Acceptance Criteria. SM Approval has been obtained. Initiated CARD 13-20599." CARD 13-20599 states: "Step 6.1.6.8, Table 4 (not acceptance criteria) Low gross fails outside of Acceptable Performance Tolerance (APT). Attempted to calibrate it per Att. 1, Step 2. Would not calibrate. Informed CRS/ SM/I&C Supervisor. Completed rest of surveillance SAT."
| |
| Reportability/Operability Review states: "The ability of the RCIC system to perform it's safety function is not impacted by the failure of the GROSS FAIL LATCH. RCIC remains operable." MRFF Evaluation completed: "Failure of the Gross Fail Latch would not have prevented RCIC from starting or cause steam line isolation and the system to trip. Therefore RCIC would be able to perform its Maintenance Rule function. Therefore this event is not a MR functional failure." CARD is requesting a WO to replace MTU E51N658D. WO 35977374 requested. Per Maximo WO 35977374 cancelled. WO 36462465 used in place of cancelled WO. WO 36462465 - replace Rosemount Trip Unit, E51N658D, RCIC Stm Line Low Press Diff Trip Unit, due to Multiple failures.
| |
| WO 36462465 replaced MTU, As Left data SAT, 5/1/2013.
| |
| Event Title Associated SRs and Function 0588 PERFORM 44.020.247 NS4 RCIC TURBINE EXH DIA PRESS,D1,CHNL SR 3.3.6.1.4-4.c SR 3.3.6.1.5-4.c A,CALIBRATION/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 97 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 211 of 395 0589 PERFORM 44.020.248 NS4 RCIC TURBINE EXH DIA PRESS,D2,CHNL SR 3.3.6.1.4-4.c SR 3.3.6.1.5-4.c B,CALIBRATION/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0590 PERFORM 44.020.249 NS4 RCIC TURBINE EXH DIA PRESS,D1,CHNL SR 3.3.6.1.4-4.c SR 3.3.6.1.5-4.c C,CALIBRATION/FUNC
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 8/10/2016 A SPF Note: "MTU Reset value found low out of Acceptable Performance Tolerance The identified failure(s) would not have (APT) - See Table 3, page 5 (Step 6.1.4) - Supervisor, CRS, SM informed CARD 16- prevented the performance of the required 26297 written. Continued with Surv. As Left SAT." CARD 16-26297 states: "reset value safety function of the equipment. Therefore, for MTU E51N655C was As Found low out of APT. The low tolerance is 9.05, and the this failure will have no impact on an reset was found at 9.04." Reportability/Operability Review states: "The instrument was extension to a 24 month surveillance interval.
| |
| calibrated successfully, and the as left readings are satisfactory. This condition does not impact the ability of the trip unit to perform its required function. E51N655C is OPERABLE." Action Item Completion Comments: "Two signals are required for each division of isolation logic which prevents a failure of one instrument from causing an unnecessary isolation by using two-out-of-two logic. MTU E51N655C tripped conservatively low while E51N655A tripped within APT. The CARD clearly states that there was no equipment failure / degradation that could prevent the equipment from performing its function and this is supported by Shift Manager's comments." Trend Condition Only.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 98 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 212 of 395 0591 PERFORM 44.020.250 NS4 RCIC TURBINE EXH DIA PRESS,D2,CHNL D SR 3.3.6.1.4-4.c SR 3.3.6.1.5-4.c CALIBRATION/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0600 PERFORM 44.020.027 NS4 MAIN STEAM LINE PRESSURE, TRIP SYS SR 3.3.6.1.4-1.b SR 3.3.6.1.5-1.b A, CH A, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 3 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 10/24/2009 A B21-N076A Transmitter As Found Acceptance Criteria was not met. All readings were The identified failure(s) would not have low, with most below the Acceptable Performance Tolerance (APT) MIN value. prevented the performance of the required Transmitter was successfully calibrated with all As Left Tolerance (ALT) values in safety function of the equipment. Therefore, range. this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 6/14/2011 A B21-N076A Transmitter As Found Acceptance Criteria was not met. All readings were The identified failure(s) would not have above the Acceptable Performance Tolerance (APT) MAX value. Transmitter was prevented the performance of the required successfully calibrated with all As Left Tolerance (ALT) values in range. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 2/21/2013 A B21-N076A Transmitter As Found Acceptance Criteria was not met. All readings were The identified failure(s) would not have low, with some readings below the Acceptable Performance Tolerance (APT) MIN prevented the performance of the required value. Transmitter was successfully calibrated with all As Left Tolerance (ALT) values safety function of the equipment. Therefore, in range. this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 99 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 213 of 395 0601 PERFORM 44.020.028 NS4 MAIN STEAM LINE PRESSURE,TRIP SYS B, SR 3.3.6.1.4-1.b SR 3.3.6.1.5-1.b CH B, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 8/24/2016 A SPF Note 1: "While performing step 6.1.13 did not get expected results. MS Line Low The identified failure(s) would not have Pressure Ch-B remained red. Should have changed to green. Resolution: Informed prevented the performance of the required Control Room Supervisor and I&C Supervisor. Plan to re-perform steps 6.1.1, 6.1.2, safety function of the equipment. Therefore, 6.1.7 & 6.1.12.4 to cycle relay A71B-K4B. Repeat once if necessary." SPF Note 2: this failure will have no impact on an "Did not resolve discrepancy in Note 1. Completed remainder of procedure per extension to a 24 month surveillance interval.
| |
| CRS/Supervision. Wrote CARD 16-26685" Several CARDs have been written in the past dating back to 2000. The last was CARD 15-23625 Troubleshooting determined Work Order needed to rework/replace A71K4B. CARD 16-26685 requested WO 43192002. WO 43192002 was worked 11/8/2016 to clean contacts. Annunciator was re-tested satisfactorily using 44.020.024, NSSSS-Main Steam Line Press, Div II Chn Func Test.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 100 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 214 of 395 0602 PERFORM 44.020.029 NS4 MAIN STEAM LINE PRESSURE,TRIP SYS A, SR 3.3.6.1.4-1.b SR 3.3.6.1.5-1.b CHNL C,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 6/14/2011 A B21-N676C MTU Gross Fail Trip reset working intermittently. Informed CRS & The identified failure(s) would not have Supervisor CARD 11-25872 written to correct." CARD 11-25872 states: "at step 6.1.9 prevented the performance of the required the gross fail reset button worked intermittently, requiring manypresses of the button safety function of the equipment. Therefore, before the alarm would come into the Control Room. It would clear at testability but this failure will have no impact on an when it would come back in at testability it would not come in Control Room. extension to a 24 month surveillance interval.
| |
| Recommend Changing out the 510 card for a 710 card." Reportability/Operability Review states "This is not acceptance criteria in the procedure nor does it affect the trip function of the unit. No operability concern." WO 32878407 initiated to replace B21N676C, Main Steam Line Pressure, MTU. WO 32878407 was completed on 12/20/2012.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 101 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 215 of 395 0603 PERFORM 44.020.030 NS4 MAIN STEAM LINE PRESSURE, TRIP SYS SR 3.3.6.1.4-1.b SR 3.3.6.1.5-1.b B, CH D, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 3/2/2012 A SPF Note: B21N676D (MTU) failed. The input resistor check Table 2. Write a CARD The identified failure(s) would not have to rework B21N676D MTU. Talked to Supervisor, CRS, and SM. Decided to back out prevented the performance of the required per Steps 6.3.1, 6.3.11 - 6.3.14 and 8.2" CARD 12-21682 states: "MTU B21N676D safety function of the equipment. Therefore, failed the input resistor check on Table 2. There is no adjustment for this resistor. this failure will have no impact on an 44.020.030 Step 6.1.4 states: If As Found data recorded on Table 2 are within As Left extension to a 24 month surveillance interval.
| |
| Tolerance (ALT), then enter N/A in As Left column. Otherwise, issue a work order to rework the MTU. Reportability/Operability Review states: "Instrument Declared inoperable, NS4 signal was restored to support repairs. The Instrument is required to be placed in a tripped condition by 3/3/12, 0059 per T.S. 3.3.6.1." The Main Steam Line Pressure Low MSIV Closure logic depends on trip channel A (B21N676A or C) and trip channel B (B21N676B or D) with the Mode Switch in Run to initiate an MSIV Closure (ref 23.601 pg 33 B21N076A, B, C, and D). All 4 instruments and trip units were capable of performing the MSIV Closure function in accordance with MR function B2100-05. Based on the analysis, no Maintenance Rule Function was lost during the event. Since no Maintenance Rule Function was lost, no MRFF occurred. Also, the event was not a Maintenance Preventable Functional Failure as no MRFF occurred. WO 34118863 replaced original Rosemount 510 DU MTU with more current 710 DU MTU.
| |
| Partial performance per Rev 36 and WO 34118863 completed successfully. Procedure was revised (Rev 37) in support of replacement of B21-N676D and performed successfully.
| |
| Event Title Associated SRs and Function 0606 PERFORM 44.020.303 NS4 RX PRESS SDC CUT- IN SR 3.3.6.1.4-6.a SR 3.3.6.1.5-6.a PERMIS,D1,CAL/FUNC**ISOLATES SDC-F009
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 102 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 216 of 395 0607 PERFORM 44.020.304 NS4 RX PRESS SDC CUT- IN SR 3.3.6.1.4-6.a SR 3.3.6.1.5-6.a PERMIS,D2,CAL/FUNC**ISOLATES SDC-F008
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0628 PERFORM 44.020.416 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS A,B21N612A,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0629 PERFORM 44.020.420 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS B,B21N612B,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0630 PERFORM 44.020.424 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS A,B21N612C,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 103 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 217 of 395 0631 PERFORM 44.020.428 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS B,B21N612D,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0632 PERFORM 44.020.063 NS4 CONDENSER PRESS TRIP SYSTEM A, SR 3.3.6.1.4-1.d SR 3.3.6.1.5-1.d CHANNEL A, CAL/FUNCT SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/25/2009 A B21-N096A Transmitter As Found Acceptable Performance Tolerance (APT) was not The identified failure(s) would not have met. Most all readings were above the Acceptable Performance Tolerance (APT) MAX prevented the performance of the required values. Transmitter was successfully calibrated with all As Left Tolerance (ALT) safety function of the equipment. Therefore, values in range. this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 104 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 218 of 395 0633 PERFORM 44.020.064 NS4 CONDENSER PRESS TRIP SYSTEM B, SR 3.3.6.1.4-1.d SR 3.3.6.1.5-1.d CHANNEL B, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 4 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 8/11/2008 A B21-N696B Gross Fail Trip, As Found; Low and High values were found out of the The identified failure(s) would not have Acceptable Performance Tolerance (APT) range. B21-N696B MTU High Gross Fail trip prevented the performance of the required was calibrated to within As Left Tolerance (ALT) values. CARD was NOT written. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 2/10/2012 A B21-N696B Gross Fail Trip, As Found Low reading was found below and As Found The identified failure(s) would not have High reading was found above the Acceptable Performance Tolerance (APT). B21- prevented the performance of the required N696B MTU High Gross Fail trip was calibrated to within As Left Tolerance (ALT) safety function of the equipment. Therefore, values. CARD 12-21110 written - The primary function of the gross failure circuits is to this failure will have no impact on an detect an open and shorted transmitter loop. A precision accuracy is not required to extension to a 24 month surveillance interval.
| |
| ensure that the gross failure circuits perform their intended function. Also, the single turn potentiometers used to make the gross failure adjustments cause inherent inaccuracies that affect the tolerance of the gross failure circuits. Consequently, the 2%
| |
| tolerance insures that field calibration is achievable, but does not affect the intended function of the gross failure circuits. The B21N696B is the master trip unit (MTU) and the gross failure does not impact the testability instruments functions or set-points. The condenser pressure high function was working as designed and within acceptable tolerance. The problem was in the MTU gross failure verification. All the testing for the trip units were completed satisfactorily, therefore all instruments remained OPERABLE.
| |
| 11/6/2013 A B21-N696B Analog Indicator As Found reading at 77.78% of Span (decr) was found The identified failure(s) would not have below Acceptable Performance Tolerance (APT) . Analog Indicator was successfully prevented the performance of the required calibrated with all As Left Tolerance (ALT) values in range. CARD was NOT written. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 105 of 270
| |
| | |
| 2/5/2015 A SPF Note: "B21-N696B Analog Indicator outside of As Left Tolerance. Informed Lead The identified failure(s)
| |
| TRVENDwould not have 24MCGNF319001 Rev 1 Tech and CS, performed best Cal fit for As Left data. Wrote CARD 15-20944 to replace Page 219 of 395 prevented the performance of the required MTU under a Work Order." CARD 15-20944 states: "found B21-N696B analog safety function of the equipment. Therefore, indicator outside of As Left Tolerance. B21-N696B is a 510 MTU. Recommend this failure will have no impact on an replacing unit with a 710 MTU under a work order." Reportability/Operability Review extension to a 24 month surveillance interval.
| |
| states: "The failure of the analog indicator to calibrate does not impact the B21N696B Trip Unit's ability to perform its safety function. B21N696B Trip Unit remains OPERABLE." WO 42531710 was written to replace Rosemount Trip Unit, B21N696B with 710 MTU. Performance of 44.020.064, dated 8/3/2016, was completed as PMT for WO 42531710.
| |
| Event Title Associated SRs and Function 0634 PERFORM 44.020.065 NS4 CONDENSER PRESS TRIP SYSTEM A, SR 3.3.6.1.4-1.d SR 3.3.6.1.5-1.d CHANNEL C, CAL/FUNCT SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 106 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 220 of 395 0635 PERFORM 44.020.066 NS4 CONDENSER PRESS TRIP SYSTEM B, SR 3.3.6.1.4-1.d SR 3.3.6.1.5-1.d CHANNEL D, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 8/11/2008 A B21-N696D Gross Fail Trip, High reading was found below Acceptable Performance The identified failure(s) would not have Tolerance (APT) MIN value. High Gross Fail Trip was calibrated to within As Left prevented the performance of the required Tolerance (ALT). safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 6/4/2010 A B21-N696D Gross Fail Trip, High reading was found above Acceptable Performance The identified failure(s) would not have Tolerance (APT) MAX value. High Gross Fail Trip was calibrated to within As Left prevented the performance of the required Tolerance (ALT). safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 107 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 221 of 395 0636 PERFORM 44.020.432 NS4 TB AREA TEMP, TRIP SYS A, CH A, SR 3.3.6.1.4-1.g SR 3.3.6.1.5-1.g B21N616A, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 12/8/2010 A SPF Note: "Step 6.1.20 Resistance readings bad for BB-20 and BB-21. Readings bad The identified failure(s) would not have because leads lifted incorrectly in Step 6.1.3. Believe shield cable lifted and RTD lead prevented the performance of the required left landed on TB-BB-19. Stopped, discussed with I&C Supervisor and CRS. Finished safety function of the equipment. Therefore, out current Surv. Intend to reperform. CARD 10-31676" CARD 10-31676 states: this failure will have no impact on an "During performance of step 6.1.21, in surveillance procedure 44.020.432 (Turbine extension to a 24 month surveillance interval.
| |
| Building Area Temp Cal/Func), Instrument & Control Technicians lifted two leads from the same terminal. Both leads were labeled "19". The tech's performed a resistance reading and found it out of spec low. The surveillance was stopped after concurrence with the Shift Manager and the I&C Supervisor. During the performance review it was found that though the tech's lifted the leads from the correct terminal they assumed which lead was the one that needed the resistance reading. They reasoned that this surveillance had been performed successfully in the past and took the reading on the incorrect wire." Resistance values obtained at Step 6.1.20 exceeded tolerance. CARD Description/Investigation states: "Interview with the crew identified that the wires were not marked (e.g. which was the shield and which was the RTD ground). They both were labeled with a "19" wire marker. As it turned out, the last time the surveillance was performed the technicians landed the negative lead and then the shield. When my crew performed it and when presented with two wires on the same term identified as the same wire, they may have assumed the outer most wire was the negative lead as that should be where the technicians who last performed it should have re-terminated it. The technicians sorted out the error and when they went to re-perform the surveillance they added wire markers to better identity the wires so this error would not happen again.
| |
| The surveillance was completed and the system restored to normal. This event was shared with the I&C shop, Electrical shop, and the Projects group. The surveillance was successfully reperformed and during this performance a wire marker was put on the correct wire. A review of the panels that contain the terminals of the sister surveillance's revealed no like issues."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 108 of 270
| |
| | |
| 7/19/2017 A SPF Note: "During performance of 6.1.13, Z2 nest lost power and half SCRAM The identified failure(s)
| |
| TRVENDwould not have 24MCGNF319001 Rev 1 occurred. Surveillance cannot be completed; CARD 17-25956 - Put equipment in safe Page 222 of 395 prevented the performance of the required condition and return to a normal, As Found condition. Perform Steps 6.1.18, 6.1.19, safety function of the equipment. Therefore, 6.1.21 and 6.2.11." Reportability/Operability Review states: "During performance of this failure will have no impact on an Step 6.1.13, when read out assembly was installed and when Calibration Select and extension to a 24 month surveillance interval.
| |
| Command Switch center knob was pushed in, power supply fuse to H21P084 Z2 nest blew. Received half SCRAM A Train along with 3D81, Primary Containment Pressure High/Low, 3D85, Primary Containment Press A1 Trip, 3D94, Disch Vol Water Level A1 Trip and 1D35, NSSS Reac Vessel H2O L2 Ch A / C Trip. Additionally received NSSS Channel A trips for Reactor Vessel Low Wtr Level 1 and Condenser Low Vacuum. All trip units responded as expected to the loss of power and the following tracking LCO's were entered TS 3.3.1.1, 3.3.6.1, 3.3.6.2 and 3.3.7.1. Following fuse replacement all alarms and half SCRAM and half MSIV isolation was reset. The system was restored to normal and channel "A" of TB area temperature was verified to be reading as expected when compared to the as found indication. Exit 24 hour action per 3.3.6.1 condition A. TB area temperature, trip system A, channel A, B21N616A remains operable." Action Item Completion Comments: "The blown fuse put the Master Trip Units into their required safety function state. This would not have prevented an actual trip or actuation should they have been required by actual plant conditions. MRFF evaluation not required. Licensing reviewed the condition and events and determined the condition to be not reportable. WO 48200356 initiated to replace the cal unit and check the readout utilized during this surveillance. B21NA03A Calibration Unit and B21N616A MTU were replaced. Procedure 44.020.432 performed in entirety, satisfactorily.
| |
| Event Title Associated SRs and Function 0637 PERFORM 44.020.434 NS4 TB AREA TEMP, TRIP SYS B, CH B, SR 3.3.6.1.4-1.g SR 3.3.6.1.5-1.g B21N616B, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 109 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 223 of 395 0638 PERFORM 44.020.436 NS4 TB AREA TEMP, TRIP SYS A, CH C, SR 3.3.6.1.4-1.g SR 3.3.6.1.5-1.g B21N616C, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0639 PERFORM 44.020.438 NS4 TB AREA TEMP, TRIP SYS B, CH D, SR 3.3.6.1.4-1.g SR 3.3.6.1.5-1.g B21N616D, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0640 PERFORM 44.030.001 ECCS - CORE SPRAY SYSTEM, DIV 1, LOGIC SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b FUNCTIONAL TEST SR 3.3.5.1.5-1.c SR 3.5.1.11 SR 3.6.1.3.8
| |
| # Performances: 7 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0641 PERFORM 44.030.002 ECCS - CORE SPRAY SYSTEM, DIV 2, LOGIC SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b FUNCTIONAL TEST SR 3.3.5.1.5-1.c SR 3.5.1.11 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 110 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 224 of 395 0645 PERFORM 44.030.400 ECCS HPCI/RCIC CST LEVEL, E41N061B, SR 3.3.5.1.4-3.d SR 3.3.5.1.5-3.d CALIBRATION/FUNCTIONAL SR 3.3.5.2.4-3 SR 3.3.5.2.5-3
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| The failure does not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 9/3/2010 A E41-N061B Transmitter As Found readings, with exception of 100% of Span, were The identified failure(s) would not have below Acceptable Performance Tolerance (APT) MIN values. Transmitter was prevented the performance of the required successfully calibrated with all readings within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0646 PERFORM 44.030.156 ECCS HPCI TORUS LEVEL CALIBRATION - Div SR 3.3.5.1.4-3.e SR 3.3.5.1.5-3.e 1 areas
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes: Maximo Notes: 09/21/2011, Split event 0646 into two events 0646 and 0646D2, to work Div 1 & Div 2 areas separately.
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/8/2012 A E41-N662B Analog Indicator As Found reading at 98.7% of Span was below Acceptable The identified failure(s) would not have Performance Tolerance (APT) MIN value. Analog indicator was successfully calibrated prevented the performance of the required with all As Left Tolerance (ALT) within range.E41-N062B Transmitter As Found safety function of the equipment. Therefore, readings were all within Acceptable Performance Tolerance (APT) but all readings were this failure will have no impact on an below As Left Tolerance (ALT) MIN values. Transmitter was successfully calibrated extension to a 24 month surveillance interval.
| |
| with all readings within As Left Tolerance.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 111 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 225 of 395 0646D2 PERFORM 44.030.156 ECCS HPCI TORUS LEVEL CALIBRATION - Div SR 3.3.5.1.4-3.e SR 3.3.5.1.5-3.e 2 area
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0647 PERFORM 44.030.201 ECCS - ADS,TRIP SYS A LOGIC FUNCTIONAL SR 3.3.5.1.5-4.a SR 3.3.5.1.5-4.b TEST SR 3.3.5.1.5-4.c SR 3.3.5.1.5-4.d SR 3.3.5.1.5-4.e SR 3.3.5.1.5-4.f SR 3.3.5.1.5-4.g SR 3.3.5.1.5-4.h SR 3.5.1.12
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/17/2010 A SPF Note: "Step 6.4.11.2 - Term AA-7 to AA-8 read approx. 1.3K ohms. CRS suggests The identified failure(s) would not have performing Sect 6.4 at end of shift. Cycle SW's (pushbuttons) "Div 1 ADS Countdown prevented the performance of the required Timer Reset" and E1150F047A Manual Inhibit" then re-perform Step 6.4.11.2." Step safety function of the equipment. Therefore, was reperformed satisfactorily. This was not acceptance criteria. this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 4/16/2017 A SPF Note: "Step 6.4.11.2, looking for closed circuit AA-7 to AA-8 resulted in approx. The identified failure(s) would not have 500K ohms. Notified CRS and I&C Supervisor, I&C Supervisor suggested using prevented the performance of the required Simpson resulted in 400 Ohm reading; SAT reading for closed contacts. Continued on, safety function of the equipment. Therefore, no problems. Cycling test switch in Step 6.6 brought readings to <100 Ohms, SAT" this failure will have no impact on an This was not acceptance criteria. extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 112 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 226 of 395 0648 PERFORM 44.030.202 ECCS - ADS,TRIP SYS B LOGIC FUNCTIONAL SR 3.3.5.1.5-5.a SR 3.3.5.1.5-5.b TEST SR 3.3.5.1.5-5.c SR 3.3.5.1.5-5.d SR 3.3.5.1.5-5.e SR 3.3.5.1.5-5.f SR 3.3.5.1.5-5.g SR 3.3.5.1.5-5.h SR 3.5.1.12
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0649 PERFORM 44.030.209 ECCS CSS PUMP C DISCH PRESS, TRIP SYS A, SR 3.3.5.1.4-4.e SR 3.3.5.1.5-4.e ADS PERMIT, CAL/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0650 PERFORM 44.030.210 ECCS CSS PUMP D DISCH PRESS, TRIP SYS B, SR 3.3.5.1.4-5.e SR 3.3.5.1.5-5.e ADS PERMIT, CAL/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 113 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 227 of 395 0651 PERFORM 44.030.211 ECCS CSS PUMP A DISCH PRESS, TRIP SYS A, SR 3.3.5.1.4-4.e SR 3.3.5.1.5-4.e ADS PERMIT,CAL/FUNC
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 12/26/2012 A E21-N662A Analog Indicator As Found readings at 50% and 25% of Span (decr) were The identified failure(s) would not have below the Acceptable Performance Tolerance (APT). Analog Indicator was successfully prevented the performance of the required calibrated with all readings within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0652 PERFORM 44.030.212 ECCS CSS PUMP B DISCH PRESS, TRIP SYS B, SR 3.3.5.1.4-5.e SR 3.3.5.1.5-5.e (ADS PERMIT),CAL/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 114 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 228 of 395 0657 PERFORM 44.030.217 ECCS RHR PUMP A DISCH PRESS (ADS SR 3.3.5.1.4-4.f SR 3.3.5.1.5-4.f PERMIT) CAL/FUNC.
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 1/25/2010 A SPF states: "Table 7 on page 10 and Table B on attachment 4, page 2 was unable to The identified failure(s) would not have calibrate at the 60% mark for E11-R803 red pointer. Conferred with Shift Manager and prevented the performance of the required Supervisor. It was determined that this was not in the Tech Spec loop nor Acceptance safety function of the equipment. Therefore, Criteria. It was also determined that this instrument would be best repaired/addressed this failure will have no impact on an under the CARD process. CARD 10-20611 written to address issue." CARD 10-20611 extension to a 24 month surveillance interval.
| |
| Reportability/Operability Review states: "The discharge pressure indication is used for monitoring and does not prevent the pump from producing the necessary discharge pressure to support the safety functions. RHR and ADS remain OPERABLE." WO 30853073 requested. WO 30853073 status per Maximo = CAN. Maximo indicates: SE Comment 6/5/2015 - Recommend cancellation because E11R803 has since cal'd successfully. Also in; Table 1 - E11-N655A Analog Indicator, As Found reading at 100% was below Acceptable Performance Tolerance (APT). Indicator was successfully calibrated with all readings within As Left Tolerance.
| |
| Event Title Associated SRs and Function 0658 PERFORM 44.030.218 ECCS RHR PUMP B DISCH PRESS (ADS SR 3.3.5.1.4-5.f SR 3.3.5.1.5-5.f PERMIT) CAL/FUNC.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 115 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 229 of 395 0659 PERFORM 44.030.219 ECCS RHR PUMP C DISCH PRESS (ADS SR 3.3.5.1.4-4.f SR 3.3.5.1.5-4.f PERMIT) CAL/FUNC.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0670 PERFORM 44.030.220 ECCS RHR PUMP D DISCH PRESS(ADS SR 3.3.5.1.4-5.f SR 3.3.5.1.5-5.f PERMIT) DIV 2, CAL/FUNC.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1, CHNL A, SR 3.3.4.1.3.a SR 3.3.4.1.4.a XMTR CALIBRATION SR 3.3.5.1.4-1.a SR 3.3.5.1.4-2.a SR 3.3.5.1.4-2.d SR 3.3.5.1.4-3.a SR 3.3.5.1.4-3.c SR 3.3.5.1.4-4.a SR 3.3.5.1.5-1.a SR 3.3.5.1.5-2.a SR 3.3.5.1.5-2.d SR 3.3.5.1.5-3.a SR 3.3.5.1.5-3.c SR 3.3.5.1.5-4.a SR 3.3.5.2.4-1 SR 3.3.5.2.4-2 SR 3.3.5.2.5-1 SR 3.3.5.2.5-2 SR 3.5.1.11 SR 3.5.1.12 SR 3.5.3.5 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 116 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 230 of 395 0672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, XMTR SR 3.3.3.1.2-3 SR 3.3.4.1.3.a CALIBRATION SR 3.3.4.1.4.a SR 3.3.5.1.4-1.a SR 3.3.5.1.4-2.a SR 3.3.5.1.4-2.d SR 3.3.5.1.4-3.a SR 3.3.5.1.4-3.c SR 3.3.5.1.4-5.a SR 3.3.5.1.5-1.a SR 3.3.5.1.5-2.a SR 3.3.5.1.5-2.d SR 3.3.5.1.5-3.a SR 3.3.5.1.5-3.c SR 3.3.5.1.5-5.a SR 3.3.5.2.4-1 SR 3.3.5.2.4-2 SR 3.3.5.2.5-1 SR 3.3.5.2.5-2 SR 3.5.1.11 SR 3.5.1.12 SR 3.5.3.5 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, XMTR SR 3.3.3.1.2-3 SR 3.3.3.2.3-2 CALIBRATION SR 3.3.4.1.3.a SR 3.3.4.1.4.a SR 3.3.5.1.4-1.a SR 3.3.5.1.4-2.a SR 3.3.5.1.4-2.d SR 3.3.5.1.4-3.a SR 3.3.5.1.4-3.c SR 3.3.5.1.4-4.a SR 3.3.5.1.5-1.a SR 3.3.5.1.5-2.a SR 3.3.5.1.5-2.d SR 3.3.5.1.5-3.a SR 3.3.5.1.5-3.c SR 3.3.5.1.5-4.a SR 3.3.5.2.4-1 SR 3.3.5.2.5-1 SR 3.5.1.11 SR 3.5.1.12 SR 3.5.3.5 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 117 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 231 of 395 0674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, XMTR SR 3.3.4.1.3.a SR 3.3.4.1.4.a CALIBRATION SR 3.3.5.1.4-1.a SR 3.3.5.1.4-2.a SR 3.3.5.1.4-2.d SR 3.3.5.1.4-3.a SR 3.3.5.1.4-3.c SR 3.3.5.1.4-5.a SR 3.3.5.1.5-1.a SR 3.3.5.1.5-2.a SR 3.3.5.1.5-2.d SR 3.3.5.1.5-3.a SR 3.3.5.1.5-3.c SR 3.3.5.1.5-5.a SR 3.3.5.2.4-1 SR 3.3.5.2.5-1 SR 3.5.1.11 SR 3.5.1.12 SR 3.5.3.5 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0701 PERFORM 44.010.005 RPS-RX STEAM DOME PRESS, TRIP SYS A, SR 3.3.1.1.14-3 SR 3.3.1.1.15-3 CHNL A1/A, XMTR CAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0703 PERFORM 44.010.006 RPS-RX STEAM DOME PRESS, TRIP SYS B, SR 3.3.1.1.14-3 SR 3.3.1.1.15-3 CHNL B1/B, XMTR CAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 118 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 232 of 395 0704 PERFORM 44.010.007 RPS-RX STEAM DOME PRESS, TRIP SYS A, SR 3.3.1.1.14-3 SR 3.3.1.1.15-3 CHNL A2/C, XMTR CAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0705 PERFORM 44.010.008 RPS-RX STEAM DOME PRESS, TRIP SYS B, SR 3.3.1.1.14-3 SR 3.3.1.1.15-3 CHNL B2/D, XMTR CAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0729 PERFORM 44.010.136 APRM TWO-OUT-OF-FOUR RPS A1 RTT SR 3.3.1.1.17-2.e
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0730 PERFORM 44.010.137 APRM TWO-OUT-OF-FOUR RPS B1 RTT SR 3.3.1.1.17-2.e
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 119 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 233 of 395 0731 PERFORM 44.010.138 APRM TWO-OUT-OF-FOUR RPS A2 RTT SR 3.3.1.1.17-2.e
| |
| # Performances: 5 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0732 PERFORM 44.010.139 APRM TWO-OUT-OF-FOUR RPS B2 RTT SR 3.3.1.1.17-2.e
| |
| # Performances: 5 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR SR 3.3.1.1.14-4 SR 3.3.1.1.15-4 LVL 3, B21N080A, XMTR CAL SR 3.3.6.1.4-2.a SR 3.3.6.1.4-6.b SR 3.3.6.1.4-7.a SR 3.3.6.1.5-2.a SR 3.3.6.1.5-6.b SR 3.3.6.1.5-7.a SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR SR 3.3.1.1.14-4 SR 3.3.1.1.15-4 LVL 3, B21N080B, XTMR CAL SR 3.3.6.1.4-2.a SR 3.3.6.1.4-6.b SR 3.3.6.1.4-7.a SR 3.3.6.1.5-2.a SR 3.3.6.1.5-6.b SR 3.3.6.1.5-7.a SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 120 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 234 of 395 0752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR SR 3.3.1.1.14-4 SR 3.3.1.1.15-4 LVL 3, B21N080C, XMTR CAL SR 3.3.6.1.4-2.a SR 3.3.6.1.4-6.b SR 3.3.6.1.4-7.a SR 3.3.6.1.5-2.a SR 3.3.6.1.5-6.b SR 3.3.6.1.5-7.a SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR SR 3.3.1.1.14-4 SR 3.3.1.1.15-4 LVL 3, B21N080D, XMTR CAL SR 3.3.6.1.4-2.a SR 3.3.6.1.4-6.b SR 3.3.6.1.4-7.a SR 3.3.6.1.5-2.a SR 3.3.6.1.5-6.b SR 3.3.6.1.5-7.a SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/12/2009 A B21-N080D Transmitter As Found readings at 25% (incr) of Span was below the The identified failure(s) would not have Acceptable Performance Tolerance (APT) MIN value. Transmitter was successfully prevented the performance of the required calibrated with all readings within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 121 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 235 of 395 0761 PERFORM 64.080.029, MAIN STEAM LINE RADIATION MONITOR SR 3.3.6.1.4-2.d SR 3.3.6.1.5-2.d CHANNEL A CALIBRATION - LICENSE RENEWAL REQD SR 3.3.7.2.3 SR 3.3.7.3.3 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0762 PERFORM 64.080.030, MAIN STEAM LINE RADIATION MONITOR SR 3.3.6.1.4-2.d SR 3.3.6.1.5-2.d CHANNEL B CALIBRATION - LICENSE RENEWAL REQD SR 3.3.7.2.3 SR 3.3.7.3.3 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0763 PERFORM 64.080.031, MAIN STEAM LINE RADIATION MONITOR SR 3.3.6.1.4-2.d SR 3.3.6.1.5-2.d CHANNEL C CALIBRATION - LICENSE RENEWAL REQD SR 3.3.7.2.3 SR 3.3.7.3.3 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0764 PERFORM 64.080.032, MAIN STEAM LINE RADIATION MONITOR SR 3.3.6.1.4-2.d SR 3.3.6.1.5-2.d CHANNEL D CALIBRATION - LICENSE RENEWAL REQD SR 3.3.7.2.3 SR 3.3.7.3.3 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 122 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 236 of 395 0765 PERFORM 44.030.265 ECCS RX WTR LVL (ADS LVL3 & FW/MN TURB SR 3.3.2.2.3 SR 3.3.2.2.4 LVL8)D1,CH A,XMTR CAL SR 3.3.5.1.4-4.d SR 3.3.5.1.5-4.d SR 3.5.1.12
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 123 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 237 of 395 0766 PERFORM 44.030.266 ECCS RX WTR LVL (ADS LVL3 & FW/MN TURB SR 3.3.2.2.3 SR 3.3.2.2.4 LVL8)D2,CH B,XMTR CAL SR 3.3.5.1.4-5.d SR 3.3.5.1.5-5.d SR 3.5.1.12
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| One failure is identified as a unique failure which is not indicative of a repetitive time based failure mechanism. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/2/2009 D SPF Note 1: "Table 5 As Found data all high outside As Found tolerance."SPF Note 2: The identified failure is unique and does not "Step 6.2.7 Required limit exceeded for 19.85% (See Table 5) Step 6.2.9 Unable to occur on a repetitive basis and is not calibrate transmitter due to large deadband at zero adjustment (either 0.988 or 1.023, associated with a time-based failure closest to 1.000) Informed CRS and SM CARD 09-22140 - Back out of surveillance, mechanism. Therefore, this failure will have performed 6.2.10 - 6.2.12, 6.2.20.2, 6.2.20.3, 6.2.21, 7.0, 7.4, 8.2" CARD 09-22140 no impact on an extension to a 24 month states: "Unable to adjust zero pot of transmitter B21N095B, NB RX LVL 3 TRIP surveillance interval.
| |
| (NARROW RNG) DIV2 LVL XMTR for Main Turbine/N and S FW Turbine Level 8 Trips and ADS located on Rack H21P005. Deadband is 0.988 to 1.023 Vdc even after cleaning of pot. All As Found values were approx. 0.035 high throughout range.
| |
| Required limit of 1.821 Vdc at 19.85% was exceeded with reading at 1.827 Vdc.
| |
| Transmitter replacement is recommended. Mode 2 restraint. WO 29640637 requested.
| |
| WO 29640637 scope is: replace B21N095B, Div 2 Reactor Level Narrow Range Transmitter with a new transmitter. B21N095B replaced with "like for like" transmitter and calibrated to within As Left tolerance successfully. WO feedback states:
| |
| "Transmitter probably original installation, went out due to age."
| |
| 10/26/2010 A SPF Note: "B21N095B OOS low UNSAT - Calibrated SAT, wrote CARD 10-29528" The identified failure(s) would not have CARD 10-29528 states: "Calibrated according to procedure. SAT." Most all As Found prevented the performance of the required readings were below Acceptable Performance Tolerance (APT) MIN values. safety function of the equipment. Therefore, Reportability/Operability Review Comments: "B21N095B NB RX LVL 3 TRIP this failure will have no impact on an (NARROW RNG) DIV2 LVL XMTR Calibrated according to procedure. SAT." extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 124 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 238 of 395 0769 PERFORM 44.030.271 ECCS RX STM DOME PRES RHR/CSS SR 3.3.5.1.4-1.c SR 3.3.5.1.4-2.c INJECT,DIV 1,CHNL A,XMTR CAL SR 3.3.5.1.5-1.c SR 3.3.5.1.5-2.c SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0770 PERFORM 44.030.272 ECCS RX STM DOME PRES RHR/CSS SR 3.3.5.1.4-1.c SR 3.3.5.1.4-2.c INJECT,DIV 2,CHNL B,XMTR CAL SR 3.3.5.1.5-1.c SR 3.3.5.1.5-2.c SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0771 PERFORM 44.030.273 ECCS RX STM DOME PRES RHR/CSS SR 3.3.5.1.4-1.c SR 3.3.5.1.4-2.c INJECT,DIV 1,CHNL C,XMTR CAL SR 3.3.5.1.5-1.c SR 3.3.5.1.5-2.c SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0772 PERFORM 44.030.274 ECCS RX STM DOME PRES RHR/CSS SR 3.3.5.1.4-1.c SR 3.3.5.1.4-2.c INJECT,DIV 2,CHNL D,XMTR CAL SR 3.3.5.1.5-1.c SR 3.3.5.1.5-2.c SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 125 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 239 of 395 0773 PERFORM 44.030.283 ECCS RX STM DOME PRES RHR LOOP SLCT SR 3.3.5.1.4-2.e SR 3.3.5.1.5-2.e PERM,D1,CHL A, XMTR CAL SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0774 PERFORM 44.030.284 ECCS RX STM DOME PRES RHR LOOP SLCT SR 3.3.5.1.4-2.e SR 3.3.5.1.5-2.e PERM,DIV 2,CH ''B'',XMTR CAL SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0775 PERFORM 44.030.285 ECCS RX STM DOME PRES RHR LOOP SLCT SR 3.3.5.1.4-2.e SR 3.3.5.1.5-2.e PERM,DIV 1,CH ''C'',XMTR CAL SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0776 PERFORM 44.030.286 ECCS RX STM DOME PRES RHR LOOP SLCT SR 3.3.5.1.4-2.e SR 3.3.5.1.5-2.e PERM,DIV 2,CH ''D'',XMTR CAL SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 126 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 240 of 395 0777 PERFORM 44.030.295 ECCS DW PRESSURE ADS ACTUATION,DIV SR 3.3.5.1.4-4.b SR 3.3.5.1.5-2.f 1,CHNL A,CALIBRATION/FUNC SR 3.3.5.1.5-4.b SR 3.5.1.12
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 7/23/2009 A B21-N094A Transmitter As Found readings at 0%, 25% (incr) and 0% (decr) of Span The identified failure(s) would not have were below the Acceptable Performance Tolerance (APT) MIN values. Transmitter was prevented the performance of the required successfully calibrated with all readings within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0778 PERFORM 44.030.296 ECCS DW PRESSURE ADS ACTUATION,DIV SR 3.3.5.1.4-5.b SR 3.3.5.1.5-2.f 2,CHNL B,CALIBRATION/FUNC SR 3.3.5.1.5-5.b SR 3.5.1.12
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0779 PERFORM 44.030.297 ECCS DW PRESSURE ADS ACTUATION,DIV SR 3.3.5.1.4-4.b SR 3.3.5.1.5-2.f 1,CHNL C,CALIBRATION/FUNC SR 3.3.5.1.5-4.b SR 3.5.1.12
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 127 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 241 of 395 0780 PERFORM 44.030.298 ECCS DW PRESSURE ADS ACTUATION,DIV SR 3.3.5.1.4-5.b SR 3.3.5.1.5-2.f 2,CHNL D,CALIBRATION/FUNC SR 3.3.5.1.5-5.b SR 3.5.1.12
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0781 PERFORM 44.030.303 ECCS DW PRESS RHR/CSS & HPCI SR 3.3.5.1.4-1.b SR 3.3.5.1.4-2.b ACTUATE,DIV 1,CHNL A,CAL/FUNC SR 3.3.5.1.4-3.b SR 3.3.5.1.5-1.b SR 3.3.5.1.5-2.b SR 3.3.5.1.5-3.b SR 3.3.6.1.4-2.c SR 3.3.6.1.4-3.e SR 3.3.6.1.4-4.e SR 3.5.1.11 SR 3.6.1.3.8 SR 3.7.2.5
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 128 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 242 of 395 0782 PERFORM 44.030.304 ECCS DW PRESS RHR/CSS & HPCI SR 3.3.5.1.4-1.b SR 3.3.5.1.4-2.b ACTUATE,DIV 2,CHNL B,CAL/FUNC SR 3.3.5.1.4-3.b SR 3.3.5.1.5-1.b SR 3.3.5.1.5-2.b SR 3.3.5.1.5-3.b SR 3.3.6.1.4-2.c SR 3.3.6.1.4-3.e SR 3.3.6.1.4-4.e SR 3.5.1.11 SR 3.6.1.3.8 SR 3.7.2.5
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/8/2013 A CARD 13-27999 - B21N694F Drywell Pressure High Analog Indicator could not be The identified failure(s) would not have calibrated. This indicator has no impact on the ability of the transmitter to initiate the prevented the performance of the required trip function as designed when the setpoint is reached. It is not acceptance criteria in the safety function of the equipment. Therefore, surveillance. WO 37791351 initiated to replace B21N694F MTU. Replaced with new this failure will have no impact on an Rosemount model 710DUOTT2700 on 5/6/2014. extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0783 PERFORM 44.030.305 ECCS DW PRESS RHR/CSS & HPCI SR 3.3.5.1.4-1.b SR 3.3.5.1.4-2.b ACTUATE,DIV 1,CHNL C,CAL/FUNCT SR 3.3.5.1.4-3.b SR 3.3.5.1.5-1.b SR 3.3.5.1.5-2.b SR 3.3.5.1.5-3.b SR 3.3.6.1.4-2.c SR 3.3.6.1.4-3.e SR 3.3.6.1.4-4.e SR 3.5.1.11 SR 3.6.1.3.8 SR 3.7.2.5
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 129 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 243 of 395 0784 PERFORM 44.030.306 ECCS DW PRESS RHR/CSS & HPCI SR 3.3.5.1.4-1.b SR 3.3.5.1.4-2.b ACTUATE,DIV 2,CHNL D,CAL/FUNC SR 3.3.5.1.4-3.b SR 3.3.5.1.5-1.b SR 3.3.5.1.5-2.b SR 3.3.5.1.5-3.b SR 3.3.6.1.4-2.c SR 3.3.6.1.4-3.e SR 3.3.6.1.4-4.e SR 3.5.1.11 SR 3.6.1.3.8 SR 3.7.2.5
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/13/2009 A SPF Note: Analog indicator for B21N694H unable to adjust to bring within ALT. CARD The identified failure(s) would not have 09-20983 written to address problem" CARD 09-20983 states: "Drywell Pressure prevented the performance of the required cal/functional surveillance, analog indicator on MTU B21N694H would not calibrate. safety function of the equipment. Therefore, Technicians informed their supervisor and Control Room supervision. Since the analog this failure will have no impact on an indicator was not Acceptance Criteria, the technicians were instructed to continue with extension to a 24 month surveillance interval.
| |
| the surveillance. Analog indicator data on Table 2 of 44.030.306 is outside of As Left Tolerance. WO 29445781 initiated to replace B21N694H Meter. The surveillance was completed - all Acceptance Criteria was Sat. Request a work order to replace the analog indicator on B21N694H." Reportability/Operability Review states: "The analog indication is used during performance of shiftly surveillance to satisfy channel check.
| |
| Although the analog indication is slightly outside of its tolerance bands it is providing trendable information to be evaluated against multiple channels monitoring the same parameter during performance of the shiftly channel check. ECCS DW pressure instrument B21N694H remains operable." WO 29445781 requested. WO 29445781 replaced meter for B21N694H and calibrated with As Left Tolerance successfully.
| |
| 8/12/2010 A B21-N694H Gross Fail Latch As Found LOW was found outside the Acceptable The identified failure(s) would not have Performance Tolerance (APT) MAX value. B21-N694H Gross Fail Latch was calibrated prevented the performance of the required within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 130 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 244 of 395 0791 PERFORM 44.030.051 ECCS-RHR (LPCI MODE) DIV 1, LOGIC SR 3.3.5.1.5-2.a SR 3.3.5.1.5-2.b FUNCTIONAL TEST SR 3.3.5.1.5-2.c SR 3.3.5.1.5-2.d SR 3.3.5.1.5-2.e SR 3.3.5.1.5-2.f SR 3.3.5.1.5-2.g SR 3.5.1.11 SR 3.5.2.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0792 PERFORM 44.030.052 ECCS-RHR (LPCI MODE) DIV 2, LOGIC FUNCT SR 3.3.5.1.5-2.a SR 3.3.5.1.5-2.b TEST & VLV ACTUATION SR 3.3.5.1.5-2.c SR 3.3.5.1.5-2.d SR 3.3.5.1.5-2.e SR 3.3.5.1.5-2.f SR 3.3.5.1.5-2.g SR 3.5.1.11 SR 3.5.2.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0793 PERFORM 44.030.060 ECCS RX RECIRC RISER DP,DIV 1,CHNL SR 3.3.5.1.4-2.f SR 3.3.5.1.5-2.f A,CAL/FUNCTIONAL SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 131 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 245 of 395 0794 PERFORM 44.030.061 ECCS RX RECIRC RISER DP,DIV 2,CHNL SR 3.3.5.1.4-2.f SR 3.3.5.1.5-2.f B,CAL/FUNCTIONAL SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0795 PERFORM 44.030.062 ECCS RX RECIRC RISER DP,DIV 1,CHNL C, SR 3.3.5.1.4-2.f SR 3.3.5.1.5-2.f CALIBRATION/FUNCTIONAL SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0796 PERFORM 44.030.063 ECCS RX RECIRC RISER DP,DIV 2,CHNL SR 3.3.5.1.4-2.f SR 3.3.5.1.5-2.f D,CAL/FUNCTIONAL SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0797 PERFORM 44.030.072 ECCS RX RECIRC PUMP A DP, DIV 1, CHNL A, SR 3.3.5.1.4-2.g SR 3.3.5.1.5-2.g CALIBRATION/FUNCT SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 132 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 246 of 395 0798 PERFORM 44.030.073 ECCS RX RECIRC PUMP B DP, DIV 1, CHNL B, SR 3.3.5.1.4-2.g SR 3.3.5.1.5-2.g CALIBRATION/FUNCT SR 3.5.1.11
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 9/15/2010 A B31-N614A Gross Fail Latch As Found LOW was found outside the Acceptable The identified failure(s) would not have Performance Tolerance (APT) MIN value. B31-N614A Gross Fail Latch was calibrated prevented the performance of the required within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0799 PERFORM 44.030.074 ECCS RX RECIRC PUMP B DP, DIV 2, CHNL A, SR 3.3.5.1.4-2.g SR 3.3.5.1.5-2.g CALIBRATION/FUNCT SR 3.5.1.11
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 8/6/2009 A B21-N612B Gross Fail Trip As Found LOW was found outside the Acceptable The identified failure(s) would not have Performance Tolerance (APT) MIN value . B21-N612B Gross Fail Trip was calibrated prevented the performance of the required within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 133 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 247 of 395 0800 PERFORM 44.030.075 ECCS RX RECIRC PUMP A DP, DIV 2, CHNL B, SR 3.3.5.1.4-2.g SR 3.3.5.1.5-2.g CALIBRATION/FUNCT SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0801 PERFORM 44.030.082 ACCIDENT MONITOR RX WTR LEVEL,DIV 1, SR 3.3.3.1.2-2 XMTR CAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0802 PERFORM 44.030.083 ACCIDENT MONITOR RX WTR LEVEL,DIV 2, SR 3.3.3.1.2-2 XMTR CAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0803 PERFORM 44.040.005 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, SR 3.3.4.1.3.b SR 3.3.4.1.4.b CHL ''A'', XMTR CAL SR 3.3.6.3.3-1 SR 3.3.6.3.3-2 SR 3.3.6.3.4-1 SR 3.3.6.3.4-2 SR 3.6.1.6.2
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 134 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 248 of 395 0804 PERFORM 44.040.006 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, SR 3.3.4.1.3.b SR 3.3.4.1.4.b CHL ''B'', XMTR CAL SR 3.3.6.3.3-1 SR 3.3.6.3.3-2 SR 3.3.6.3.4-1 SR 3.3.6.3.4-2 SR 3.6.1.6.2
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0805 PERFORM 44.040.007 ATWS/SRV LOW LOW SET RX PRESS, DIV 1, SR 3.3.4.1.3.b SR 3.3.4.1.4.b CHL ''C'', XMTR CAL SR 3.3.6.3.3-2 SR 3.3.6.3.4-2 SR 3.6.1.6.2
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0806 PERFORM 44.040.008 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, SR 3.3.4.1.3.b SR 3.3.4.1.4.b CHL ''D'', XMTR CAL SR 3.3.6.3.3-2 SR 3.3.6.3.4-2 SR 3.6.1.6.2
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 135 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 249 of 395 0807 PERFORM 44.040.009 ATWS-SRV LOW LOW SET DIV 1 LOGIC SR 3.3.4.1.4.a SR 3.3.4.1.4.b FUNCTIONAL TEST SR 3.3.6.3.4-1 SR 3.3.6.3.4-2 SR 3.3.6.3.4-3 SR 3.5.1.11 SR 3.6.1.6.2
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failure which is not indicative of a repetitive time based failure mechanism. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/26/2009 C SPF Note 1: "Step 6.1.20, 6.1.21, 6.1.24, 6.1.25 Seal in light would not come on and This is an event driven failure in that the 130 Vdc not present. Informed CRS, SM and Supervisor. Continued with Surveillance failure caused by a misunderstanding of the to get out. Only problems noted. CARD 09-23278." CARD 09-23278 states: "step technician performing the surveillance as 6.1.20 unable to get the LLS DIV 1 SCRAM PRESS SEALED IN light to come on. related to trip and reset of the MTUs.
| |
| Informed CRS and Supervisor, Continued thru the surveillance and found step 6.1.21 at Therefore, this failure will have no impact 0 VDC vice 130 VDC and the same conditions at 6.1.24.1 and 6.1.25 for the rest of the on an extension to a 24 month surveillance surveillance no further problems were noted. Technician at H21-P082 also states that he interval.
| |
| never saw dim lights for test lights above Keylock test switches." WO 29744906 requested. Second performance SPF comments state: Failure of first surveillance was due to technician misunderstanding Step 6.1.10 which he believed step implied to "increase current source until both MTUs Trip, then adjust back to 0 after trips, This caused relay B21K253C to reset and lose lock in signal for relay/light action (see I-2095-38 drawing) with K33A." WO 29744906 cancellation note" Prior to signing on package further investigation revealed this event was due to an error while performing 44.040.009, this work order no longer needed."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 136 of 270
| |
| | |
| 11/19/2015 A SPF Note 1: "Step 6.1.1 - Placed CMC switch to Run and got "Tripped" indication on The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 CMC switch, annunciators 3D96 and 3D126 (expected). Did not receive "Run" Page 250 of 395 prevented the performance of the required indication on CMC switch. Stopped surveillance and informed FLS and CRS. Re- safety function of the equipment. Therefore, verified prerequisites in place. Turned over to night shift. - Power restored to F031A and this failure will have no impact on an F031B. Attempt to continue surveillance. SPF Note 2: "Step 6.1.1, 6.1.2 - Placed CMC extension to a 24 month surveillance interval.
| |
| to Run for A and B. Run lights on for both. B3105F031A started to open. Operator attempt to close. Unable to maintain closed. F023A closed, F031A opened. CMC for A and B returned to off. A field Bkr shows closed. - Emergent Issue Team (EIT) Formed, Attempt to troubleshoot problems with F031A opening and field Bkr closed. CARD 15-29087 written. Perform Steps 6.1.41, Section 6.6, Steps 7.1, 7.2, 7.5-7.8" CARD 15-29087 states: "B3105F031A jogged open unexpectedly during performance of 44.040.009 after Operations had completed steps 6.1.1 and 6.1.2. The F031A valve should have remained closed for the surveillance. The other division B3105F031B did not stroke open. Field breaker for Recirc MG Set A in Test Position did close before the jumper install step of 6.1.3. Operations attempted to close F031A via its pushbutton operator but the valve reopened after reaching its closed position. Surveillance was stopped and CRS and I&C Supervisor contacted. I&C Superintendent (Nights) and another Supervisor confirmed that fuses pulled and wire lifted for initial conditions were indeed the correct components called out in surveillance 44.040.009. The OCC initiated an EIT to determine the abnormal response issue." Reportability/Operability Review states: "Impact on LPCI function: The LPCI function was not impacted by this condition and remains OPERABLE. Impact on SDC function: Based on the low decay heat value and the significant cooling capacity available the Decay Heat Removal function was maintained. Div 1 RHR SDC and LPCI are Operable." Licensing Review completed" "Licensing has reviewed the condition and information provided in this CARD and CARD 15-29093; initiated to document and evaluate plant impact. Operations conservatively entered TS 3.4.9; however, there was no loss of SDC. Per the System Engineer, SDC was continually provided to the vessel at all times during this event even while the flow path was not in the normal configuration. SDC flow was taken from the vessel from the B RRS loop and returned to the vessel through the A RRS loop. There was no bypass flow. A review of IPCS data identified that both Div 1 RHR SDC Flow and Div 1 RHR HX Inlet Temperatures remained within the normal variances that were present before and after the event, with no noted changes. Based on all of the above, there was no loss of SDC." Investigation states: "Troubleshooting by the EIT team determined that the cause of the failure was due to the 52H switch in the 65G position G3 breaker failed to changed state when the breaker was racked out. The G3 breaker being racked in is a permissive in the auto-open circuit for the F031A valve and is the only break in the circuit that prevents the valve from opening during the surveillance.
| |
| With the 52H switch stuck in the racked in state the circuit remained intact and allowed the valve to open. Maintenance was able to fix the alignment issue with the 52H switch linkages. These linkages and switch operation are checked as part of the 6 year breaker PM. This PM has proven adequate at preventing failures of the 52H switch as this is the first time Fermi has experienced this issue." "THE DIRECT CAUSE IS M11 - Out of Mechanical Adjustment. This was chosen because the 52H linkages were out of DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 137 of 270
| |
| | |
| adjustment and bound." WO 44319594 requested, WO 44319594 Disassembled 52H TRVEND 24MCGNF319001 Rev 1 Switch pivot arm, cleaned, filed burrs and applied grease to pivot points, verified proper Page 251 of 395 operation during manual manipulation of switch. Removed Shutter guard, coordinated functional test with operations, functional test SAT. SPF Note 3: "EIT Found issue with breaker and electricians repaired it. No longer need to restore to normal. CRS and I&C Supervisor informed. Reverify prerequisites and start procedure performance at Section 6.1" SPF Note 4: "11-18-15/2207 Step 6.1.1 After reperforming/validating the prerequisites, when those step was performed, the RUN light never came ON; the CMC TRIP light immediately came ON, 3D96 MOTOR TRIPPED annunciated (along with 3D150). Stopped and discussed with CRS and I&C Supervisor: CRS wanted to see what would happen during 6.1.2; same thing happened. Stopped job. - Operations initiated STR C2015-002182 to lift leads to defeat the trips from B3105F031A & B to RRMG Breakers. SPF Note 5: "11-19-15/0159 Step 6.1.2 "B" RUN light did not come ON; TRIP light briefly can ON, then OFF and 3996 came in & stayed in alarm. 3D150 never did alarm. Steps 6.6.1 through 6.6.7 N/A'd per CRS in order to maintain setup for 44.040.010 performance. Also N/A'd - Problem was identified by Ops at the CMC switch; reoperation of it corrected the problem. Per CRS, continue with surveillance."
| |
| Event Title Associated SRs and Function 0808 PERFORM 44.040.010 ATWS-SRV LOW LOW SET DIV 2 LOGIC SR 3.3.4.1.4.a SR 3.3.4.1.4.b FUNCTIONAL TEST SR 3.3.6.3.4-1 SR 3.3.6.3.4-2 SR 3.3.6.3.4-3 SR 3.6.1.6.2
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0836 PERFORM 64.080.403 CONTROL CENTER MAKEUP AIR MNFLD RAD SR 3.3.7.1.5-4 MON,D1,CAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 138 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 252 of 395 0837 PERFORM 64.080.404 CONTROL CENTER MAKEUP AIR MNFLD RAD SR 3.3.7.1.5-4 MON,D2,CAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0845 PERFORM 44.110.001 REMOTE SHUTDOWN RX PRESS,DIV 1,CAL SR 3.3.3.2.3-1
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 139 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 253 of 395 0846 PERFORM 44.110.003 REMOTE SHUTDOWN RHR FLOW SR 3.3.3.2.3-5 INDICATION,CAL
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 10/26/2012 A Unable to physically attain 100% span indication value on Indicator E11-R603A due to The identified failure(s) would not have indicator needle being bent and hitting upper stop. All other calibration data within prevented the performance of the required tolerance. Text in procedure states indication is for information only and does not safety function of the equipment. Therefore, satisfy any Technical Specification requirements. CARD 12-28765 written. CARD this failure will have no impact on an states: "While performing surv. 44.110.003, it was found that Div 1 RHR Flow Indicator extension to a 24 month surveillance interval.
| |
| E11R603A would not go to above 27500 mark. Needle is hitting upper stop and is bent.
| |
| The 28000 reading for Table 2 in surv. 44.110.003 could not be obtained. Stopped and notified Senior Lead, CRS and SM. Table 2 is not acceptance criteria and was told to write this CARD and continue with Surv. Recorder is a Hayes Republic and performing the calibration per the surv. would not remedy this issue. Recommend replacing recorder." Reportability/Operability Review states: "E11R603A is not required for RHR operability. Div 1 RHR remains OPERABLE." WO 35551395 requested.
| |
| 1/23/2014 A Procedure states "Table 2 data As Found Unsat/Unobtainable: Indicator is documented The identified failure(s) would not have bad." CARD 12-28765 and WO 35551395 generated to repair/replace E11R603A. prevented the performance of the required Procedure NOTE states that data recorded for Indicator E11-R603A is for instrument safety function of the equipment. Therefore, loop performance information only and is not required for Technical Specifications this failure will have no impact on an requirements. CARD 12-28765 (written10/26/2012) states the indicator would not go extension to a 24 month surveillance interval.
| |
| above the 27500 mark. Needle is hitting the upper stop and is bent. CARD also states the indicator is not used as acceptance criteria for testing RHR but is used as a Channel Check of C35R005 which is intended as a gross comparison. Indicator E11R603A is not required for RHR Operability. WO 35551395 replaced E11R603A on 7/20/2015 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 140 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 254 of 395 0847 PERFORM 44.110.004 REMOTE SHUTDOWN RCIC FLOW SR 3.3.3.2.3-6 INDICATION,CAL
| |
| # Performances: 7 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0848 PERFORM 44.110.006 REMOTE SHUTDOWN DW PRESS,DIV SR 3.3.3.2.3-4 1,CHANNEL CALIBRATION
| |
| # Performances: 7 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0849 PERFORM 44.110.009 REMOTE SHUTDOWN TORUS WATER SR 3.3.3.2.3-3 TEMP,DIV 1,CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0850 PERFORM 44.120.001 ACCIDENT MONITORING RX PRESSURE,DIV 1, SR 3.3.3.1.2-1 SR 3.3.3.1.2-3 CHANNEL CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 141 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 255 of 395 0851 PERFORM 44.120.002 ACCIDENT MONITORING RX PRESSURE,DIV 2, SR 3.3.3.1.2-1 SR 3.3.3.1.2-3 CHANNEL CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0852 PERFORM 44.120.005 ACCIDENT MONITORING DW PRESSURE,DIV SR 3.3.3.1.2-6 1, CHANNEL CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0853 PERFORM 44.120.006 ACCIDENT MONITORING DW PRESSURE,DIV SR 3.3.3.1.2-6 2,CHANNEL CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0854 PERFORM 44.120.007 ACCIDENT MONITORING DIV SR 3.3.3.1.2-5 1,TEMPERATURE RECORDER,CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 142 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 256 of 395 0855 PERFORM 44.120.008 ACCIDENT MONITORING DIV SR 3.3.3.1.2-5 2,TEMPERATURE RECORDER,CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0856 PERFORM 44.120.009 ACCIDENT MONITORING TORUS WTR SR 3.3.3.1.2-4 LVL,DIV 1,CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0857 PERFORM 44.120.010 ACCIDENT MONITORING TORUS WTR SR 3.3.3.1.2-4 LVL,DIV 2,CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 143 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 257 of 395 0866 PERFORM 64.120.040 CONTAINMENT AREA HIGH RANGE SR 3.3.3.1.2-7 RADIATION MONITOR DIV 1 ELEC CAL
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/19/2015 A SPF Note: "100% Full Scale reading on meter failed low, other readings checked were The identified failure(s) would not have within acceptance criteria - Notified CRS and initiated CARD 15-21384" CARD 15- prevented the performance of the required 21384 states: "Containment Area High Range Radiation Monitor Div 1, electronic safety function of the equipment. Therefore, calibration, it was found that at 100% input D11K816A monitor output voltage of 9.87 this failure will have no impact on an VDC did not meet acceptance criteria for being between 9.90 and 10.10 VDC. All other extension to a 24 month surveillance interval.
| |
| points checked were within acceptance criteria." Reportability/Operability Review states:
| |
| "CARD documents that the as found readings for D11K816A meter does not meet acceptance criteria for 64.120.040. The D11K816A, Div 1 Containment Area Hi Range Rad Monitor has been declared inoperable and LCO 15-0092 entered. Division 2 CHRRMS is inoperable and LCO 15-0092 entered." Investigation states: "This event is not a failure. The radiation monitor was still able to provide its function throughout the usable range of the instrument despite the 100% scale range being low by 0.03 VDC.
| |
| During the performance of 64.120.041, the 100% scale voltage of D11K816A was found to be 9.87VDC when it should have been between 9.90VDC and 10.10VDC. This does not impact the usable range of the indicator during an actual event. As found data was within specification for every test input except for the 100% scale reading which was low by 0.03 VDC. In the Containment High Range Radiation Monitor scale, every reading from 5.8x10^0 through 1.7x10^7 would still give accurate indication to operators during an actual event requiring this radiation monitor. Emergency procedures to determine core damage would still be able to use this radiation monitor to reliably determine cladding loss since a reading of 50,000 R/hr (5x10^4) corresponds to 100%
| |
| GAP release two hours after shutdown. (EP-101 Rev. 39 Enclosure A Tab F) The radiation monitor's high setpoint is 500 R/hr (5x10^2) and the high-high setpoint is 1000 R/hr (1x10^3). This event is not a Maintenance Rule Functional Failure. This does not impact the usable range of the indicator during an actual event. WO 42596242 requested, WO 42598602 (cancelled - duplicate). WO 42596242 completed with RP Technicians performing calibration with SAT results.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 144 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 258 of 395 0867 PERFORM 64.120.041 CONTAINMENT AREA HIGH RANGE SR 3.3.3.1.2-7 RADIATION MONITOR DIV 2 ELEC CAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0868 PERFORM 44.120.050 DW FLOOR DRN SUMP LVL CAL SR 3.4.6.3 (TRANSMITTERS PORTION)
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 145 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 259 of 395 0881 PERFORM 44.180.005 MAIN TURBINE BYPASS SYSTEM RTT AND SR 3.7.6.3 SR 3.7.6.4 CHL FUNCTIONAL
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| One failure would be detected by the performance of a surveillance test on a more frequent basis. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/12/2014 B SPF states: "At Step 6.1.2.8, The West Bypass Valve remained at 0% and Press Low Although this failure occurred during the 18-light ON. CRS and I&C Supv were notified. CRS directed lead to back out of month surveillance procedure test, the failure procedure. NSO wrote CARD 14-20992 to address Lo Pressure on UA problem." would have been identified on a more CARD 14-20992 states: Received 4D3 (Unitized Actuator Bypass Valve Fault) for frequent basis during the 120 day Pressure Low on West Bypass Valve when Governor Interlock Switch was placed in surveillance (TS SR 3.7.6.1) performance.
| |
| EXERCISE PERMIT per 44.180.005. West Bypass Valve did not open as expected. Consequently, the identified failure would be N3021-C041 W Byp Vlv UA remained running. Locally verified W Byp Vlv closed with detected by a more frequent activity.
| |
| UA hydraulic pressure at 160 psig. Shutdown UA IAW 23.110, accumulator nitrogen Therefore, this failure will have no impact precharge pressures were low with #1 at 1300 psig and #2 at 1350 psig (1485 to 1515 on an extension to a 24 month surveillance psig required per SOP)." Reportability/Operability Review states: "West MT Bypass interval.
| |
| Valve declared Inoperable and coded with S/U code." Description/Investigation states:
| |
| Troubleshooting under WO 38029454 found a poor connection at jumper bar for a terminal between resistors. This caused the solenoid valve to de-energize, resulting in the UA closing the valve/keeping it closed. WO documents that a high resistance connection was measured across the resistor network (made up of 2 resistors), but resistance measurements across each resistor individually was acceptable. A jumper link (bar) terminal, which connects the two resistors together was tightened, which corrected the high resistance condition. WO 38029454 completed follow-up performance (PMT) on 03/24/2014 satisfactorily. This failure is a Maintenance Rule Functional Failure (MRFF), counted against N3012 (Main Turbine Control System), for MR functions N3012-01and N3012-05. Based on the maintenance performed each outage, maintenance is conducted in accordance with all known industry/vendor recommendations. Failure is not considered Maintenance Preventable.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 146 of 270
| |
| | |
| 11/22/2015 A SPF Note (1st performance) "Step 6.1.2.8 Neither East or West Bypass Valves indicated The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 Full Open via position limit switches (Both valves Close light still Lit). Notified CRS Page 260 of 395 prevented the performance of the required and I&C Supv. IPCS indication for East Bypass is 97.4%, West Bypass 98.8%. Local safety function of the equipment. Therefore, for both indicated 100%. For indicators on H11P804, East Bypass is 98%, West Bypass this failure will have no impact on an is 99%. Recommendation is to return system to normal and investigate issue. CARD 15- extension to a 24 month surveillance interval.
| |
| 28945 submitted." CARD 15-28945 states: During performance of 44.180.005 (Main Turbine Bypass System RTT and Ch Functional) the East and West Bypass Valves (N1100-F059A/B) were directed to be fully OPEN by lowing Pressure Control setpoint to -12 psi. Both bypass valves stroked open. West Bypass Valve opened to 99% and East Bypass Valve opened to 97.5% as seen on IPCS and position indicator on H11-P804.
| |
| However the OPEN/CLOSED pushbuttons for both the East and West Bypass Valves remained indicating dual. East Bypass Valve was previously identified as not indicating full open on CARD 13-23003. No current position indication issues identified for the West Bypass Valve. Request WO to identify cause of and repair failure to receive full open indication on the OPEN/CLOSED pushbuttons for the East and West Bypass Valves (N1100-F059A/B.)" Reportability/Operability Review states: "No operability requirements are specifically applicable to the Open/Closed lights." WO 44305263 written to troubleshoot and repair the cause for not receiving a Full Open light on the Open/Close pushbutton in the Main Control Room for the East and West Main Steam Bypass valves. WO44305263, Work Performed page states: "Found East Bypass UA with low pressure alarm. CARD 15-29088 initiated. As Found limit switches SAT.
| |
| Only able to optimize a small amount due to design of the ramps. Any further adjustment and limit switch will not reset until valve closes. This is for both East and West Bypass Valves. Don't think this was enough adjustment to pass 44.180.005.
| |
| Supervision informed." CARD 15-29088 states: "Low pressure alarm is in due to valve having an open signal with the bypass tripped. It appears the servo bias shifted at the time the low pressure alarm came in. This happened previously, documented in WO 38174587. Recommend investigate servo bias drift and repair." WO 44323334 written to resolve this issue. WO completed (11/20/2015) to replace Servo valves, calibration completed SAT.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 147 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 261 of 395 0882 PERFORM 44.190.001 FEEDWTR/MAIN TURBINE TRIP SYSTEM- SR 3.3.2.2.4 LOGIC FUNCTIONAL TEST-NEIL REQ'D
| |
| # Performances: 7 # Failures: 1 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failure which is not indicative of a repetitive time based failure mechanism. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 3/27/2014 C During performance of 44.190.001, Step 6.2.1.6, dual indication was seen on N1100- This is an event driven failure in that F001B. I&C technicians entered the room and saw what appeared to be a misalignment previously completed maintenance of the linkage for the LVDT. Recommend a WO to correct the misalignment. contributed directly to the As Found Maintenance performed on the SRFPT HPSV limit switch indication box during RF16 condition. Therefore, this failure will have caused the linkage and piston to be at an off angle which resulted in the dual indication. no impact on an extension to a 24 month Removed the bracket between the valve marriage block and the limit switch rod. The surveillance interval.
| |
| end of the bracket was bent and resulted in the rod rubbing against the limit switch box. Straightened the bracket and adjusted the limit switch rod to 0 percent with the valve in the closed position. Contacted operations to re perform 44.190.001. Recommend this CARD be closed to tool pouch maintenance. In step 6.2.12, H21-P082 is incorrect.
| |
| The panel should be H21P083 per set up 6.1.2. CARD 14-22896 written to correct panel reference.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 148 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 262 of 395 0885 PERFORM 44.190.009 FEEDWTR/M. TURB TRIP SYS-RX WATER LVL SR 3.3.2.2.3 SR 3.3.2.2.4 8,DIV 1,CHNL C,XMTR CAL
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 3/30/2009 A B21-N094C Transmitter As Found readings were below the Acceptable Performance The identified failure(s) would not have Tolerance (APT) MIN values. Transmitter was successfully calibrated with all readings prevented the performance of the required within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0886 PERFORM 44.190.010 FEEDWTR/M. TURB TRIP SYS-RX WATER LVL SR 3.3.2.2.3 SR 3.3.2.2.4 8,DIV 2,CHNL D,XMTR CAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 0888 PERFORM 44.210.002 DRYWELL SUMP LEVEL CHANNEL SR 3.4.6.3 CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 149 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 263 of 395 0889 PERFORM 44.210.003 SRV TAIL PIPE PRES INSTRUMENTATION SR 3.3.6.3.3-3 SR 3.3.6.3.4-3 CALIBRATION SR 3.6.1.6.2
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/10/2015 A SPF Note: B21N411 pressure switch was as found low outside limits of Leave Alone The identified failure(s) would not have Tolerance (LAT). Switch is factory set with no adjustments. All other instruments were prevented the performance of the required within tolerance and meet acceptance criteria. - Notified CRS & FLS of instrument safety function of the equipment. Therefore, condition, CARD 15-28851 written to replace B21-N411N. CARD 15-28851 states: this failure will have no impact on an "While performing I&C Surveillance Procedure 44.210.003, (Reactor Coolant System - extension to a 24 month surveillance interval.
| |
| Safety Relief Valve (SRV) Tail-Pipe Pressure Instrumentation Calibration), Pressure Switch B21-N411N was As Found below Leave Alone Tolerance (LAT). This Instrument is factory set and has no adjustment. Request a W/O be generated to replace B21-N411N and test." There is no component failure or degradation that could prevent the equipment from performing its function. The tail pipe pressure switch energizes when there is >30psig in the tail pipe. Since the pressure switch was found BELOW the Leave Alone tolerance the switch would have energized as a slightly lower pressure in the tail pipe. This is more conservative and the pressure switch would have continued to provide the necessary signals into the LLS logic as required. The identified failure(s) would not have prevented the performance of the required safety function of the equipment. WO 44283594 written to replace failed pressure switch B21N411N.
| |
| Switch replaced and returned to service by performance of 44.210.003.
| |
| Event Title Associated SRs and Function 0890 PERFORM 64.210.031 PRIMARY CONTAINMENT ATMOSPHERE SR 3.4.6.3 RADIATION MONITOR CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 150 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 264 of 395 0897 PERFORM 44.220.115 SECT. 6.1 (H21P004) GROUP 1 INSTRUMENT SR 3.6.1.3.9 LINE EXCESS FLOW CHECK VALVE FUNCTIONAL
| |
| # Performances: 1 # Failures: 1 24 Month Justification: Notes: Performance includes 0897A, B and C Ref. DTE-19001, Section 3 Design Inputs One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/25/2009 A SPF Noted at Step 6.1.30.2.a & b: Green Closed lights did not illuminate. Check valve The identified failure(s) would not have did close, no fluid leak by. CARD 09-23266 submitted. CARD 09-23266 states: "the prevented the performance of the required green closed light for the B21-F507 excess flow check valve did not illuminate at either safety function of the equipment. Therefore, the H11-P805 panel (as required in step 6.1.30.2.a) or at H21-P402A (as required by this failure will have no impact on an step 6.1.30.2.b). Neither of these steps are acceptance criteria. The open indication does extension to a 24 month surveillance interval.
| |
| work." Reportability/Operability Review states: "B21-F507 excess flow check valve closed and performed its safety function and indicates open to know status of the valve therefore no operability issues." OCC decided that adjustment to the close indication would be performed at some other time. WO 29746050 corrected 11/24/2010.
| |
| Event Title Associated SRs and Function 0897A PERFORM 44.220.115 SECT. 6.2 (H21P009) GROUP 1 INSTRUMENT SR 3.6.1.3.9 LINE EXCESS FLOW CHECK VALVE FUNCTIONAL
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 0897 Event Title Associated SRs and Function 0897B PERFORM 44.220.115 SECT. 6.3 (H21P015) GROUP 1 INSTRUMENT SR 3.6.1.3.9 LINE EXCESS FLOW CHECK VALVE FUNCTIONAL
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 0897 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 151 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 265 of 395 0897C PERFORM 44.220.115 SECT. 6.4 (H21P036) GROUP 1 INSTRUMENT SR 3.6.1.3.9 LINE EXCESS FLOW CHECK VALVE FUNCTIONAL
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 0897 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 152 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 266 of 395 0904 PERFORM 44.220.203 TORUS TO DRYWELL VACUUM BREAKER SR 3.6.1.8.3 VALVE POS INDICATION CAL
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| One failure is identified as event driven failure which is not indicative of a repetitive time based failure mechanism. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/25/2009 A Two issues noted on SPF: 1) During performance at Step 6.1.4.1 for T2300-F400B, The identified failure(s) would not have valve did not stroke at all. Observed no change in light indications. NSO researched prevented the performance of the required problem. I&C Supv contacted. Operations personnel verified pneumatic supply lineup - safety function of the equipment. Therefore, SAT, and electric power supply - SAT, including verifying fuse was good per their this failure will have no impact on an procedure. NSO stated the OPEN pushbutton operation felt normal. Performed an extension to a 24 month surveillance interval.
| |
| opening stroke of adjacent T2300F400A - SAT, to confirm pneumatics. Retested T2300F400B - unsat again. Notified I&C Supervisor and CRS. Directed to submit this CARD, and continue with other valve tests. Suspect T2300F400B solenoid valve is faulty. Recommend a troubleshoot / rework / repair/replace WO. CARD 09-22893 written. CARD 09-22893 states: "The torus vacuum breakers are not part of the AOV program. These valves have an air actuator that is utilized during test stroking of the vacuum breakers only. These valves self actuate to limit differential pressure between the drywell and torus. This CARD is being re-assigned to the System Engineer to document cause for failure to stroke during testing." Troubleshooting performed under WO 29714444 , identified a failed air solenoid valve. Valve was replaced and T2300F400B was stroked successfully. 2) T23N402E would not calibrate. CARD 09-23024 was submitted; CARD 09-23024 states: "While performing 44.220.203 to test vacuum breakers, limit switch T23-N402E could not be adjusted to within expected tolerances.
| |
| Request that the limit switch be replaced. If adjusted to meet the tolerance for opening then the deadband will not allow the close light to come on." WO 29726455 installed new switch on 4/22/2009.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 153 of 270
| |
| | |
| 4/11/2017 C SPF Note: "T2300F400C would not open when CR switch depressed. CARD 17-23343 This is an event driven failure TRVEND in that the 24MCGNF319001 Rev 1 initiated. - Discrepancy resolved after proper valve line-up performed by Ops" CARD failure caused by Operations did not Page 267 of 395 17-23343 states: "During performance of 44.220.203 step 6.3.4 substep 1, the valve did perform/complete system alignment per not open. Locally the valve actuator moved to contact the valve pallet but did not seem to 23.425.02. Once Nitrogen was aligned have any force behind it. The pallet was pressed on slightly by a technician and the valve properly, the valves operated. There is no pallet moved to about 1/3 open and held there. When the open button was released the equipment deficiency. Therefore, this failure valve shut as expected. Technicians were able to manually open the valve pallet and the will have no impact on an extension to a 24 Setpoint Pressure Calibration was SAT at 27.5 lbs. force. Request investigation and month surveillance interval.
| |
| work order to determine why the valve cannot be opened from the control room."
| |
| Reportability/Operability Review states: "Per I&C note attached to this CARD, the Nitrogen supply was not lined up to support Vacuum Breaker operation. Once Nitrogen was aligned properly, the valves operated. There is no equipment deficiency.
| |
| OPERATIONS did not line up pneumatics for Torus Vacuum breakers per 23.425.02 as called out in Surveillance 44.220.203 Step 5.3. Removed WO from Action Requested."
| |
| Event Title Associated SRs and Function 0905 PERFORM 44.220.204 TORUS TO RX BLDG VACUUM BREAKER SR 3.6.1.7.3 VALVE POS INDICATION CAL
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/25/2010 A Vacuum Breaker T2300-F450A Valve Closure Time of 1.44 second was outside As The identified failure(s) would not have Found tolerance. Adjusted valve to within tolerance with As Left time of 2.68 second. prevented the performance of the required Vacuum Breaker T2300-F450B Opening Pressure (CT-F) of 45 lbs was outside As safety function of the equipment. Therefore, Found tolerance. Adjusted valve to within tolerance with As Left pressure of 32.5 lbs. this failure will have no impact on an Vacuum Breaker T2300-F450B Limit Switch As Found CLOSE Gap was Unsat. extension to a 24 month surveillance interval.
| |
| Adjustment was made and As Left tolerance was SAT.
| |
| 10/22/2015 A Vacuum Breaker T2300-F450B Opening Pressure (CT-F) was outside As Found The identified failure(s) would not have tolerance. Valve was checked by Maintenance with no adjustment needed. As Left prevented the performance of the required Opening Pressure (CT-F) was in tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 154 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 268 of 395 0977 PERFORM 43.206.001 RCIC LEAKAGE MONITORING TEST SR 5.5.2
| |
| # Performances: 6 # Failures: 6 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/18/2010 A SPF Note 1: "E5101C001 1.5 ml/min pump seal leak - CARD 09-23961 and WO The identified failure(s) would not have 29866490 exist" Per Maximo WO 29866490, 04-Mechanical Seal Leak on RCIC pump prevented the performance of the required status = CAN 7/29/2014 SPF Note 2: "E5100F024 1ml/min pacing leak - CARD 10- safety function of the equipment. Therefore, 21495 generated" CARD 10-21494 Reportability/Operability Review states: "The small this failure will have no impact on an magnitude of the leak is within the acceptance criteria of 200ml/min total leakage and extension to a 24 month surveillance interval.
| |
| does not prevent the turbine from getting adequate steam pressure to rotate the turbine and pump therefore RCIC remains OPERABLE. Operations has performed tool pouch maintenance for a manual valve IAW ODE-2 and tightened 2 flats each nut and checked the valve on the on the open back seat and the leakage did not stop." CARD Notes indicate: "On 2/18/10 1700 leakage on E5100F024 was stopped using tool pouch maintenance and tighten up on packing. Took up a total of 6 flats to stop leak. "SPF Note 3: "E5150F054 2 ml/min packing leak - CARD 09-23448 and WO 29769683 already exist." WO 29769683, 04-Packing leak on E5150F054, completed 11/19/2010 SPF Note 4: "E501C002 150 ml/min pump seal leak - CARD 08-24198 and WO 28179863 exist." Per Maximo WO 28179863, RCIC turbine water leaks status = CAN 1/12/2015 8/18/2011 A SPF Note 1: "E5101C001 RCIC Pump seal leak 1ml/min - WO 29866490 exists" Per The identified failure(s) would not have Maximo WO 29866490 status = CAN 7/29/2014 SPF Note 2: "E5101C002 RCIC prevented the performance of the required Turbine seal leak 150ml/min - WO 28179863 exists" Per Maximo WO 28179863 status safety function of the equipment. Therefore,
| |
| = CAN 1/12/2015 SPF Note 3: "E5150F054 packing leak 2ml/min - WO 29769683 this failure will have no impact on an exists" WO 29769683, 04-Packing leak on E5150F054, completed 11/19/2010 extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 155 of 270
| |
| | |
| 2/12/2013 A SPF Note 1: "A 1 dpm packing leak was identified on the source valve (V1) for The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 E51N058B which was located on H21P038. CARD 13-21068 generated" CARD 13- Page 269 of 395 prevented the performance of the required 21068 states: "1 dpm packing leak was identified on the Source Valve (V1) for safety function of the equipment. Therefore, E51N058B "RCIC Stm Line Low Pressure Transmitter", which is located onH21P038 this failure will have no impact on an "Local PNL/Rack (MR only) RCIC leak Detect Sys B Div.2 Inst. Rack."The overall extension to a 24 month surveillance interval.
| |
| system leakage is still within the system leakage criteria." Reportability/Operability Review states: "The 1 dpm packing leak on the source valve to the E51N058B is within system leakage limits and will not affect the ability of the instrument to generate the required isolation signal. Therefore, no impact on safety function. RCIC and Primary Containment Isolation Instrumentation remains OPERABLE." WO 36080302 requested.
| |
| WO 36080302 CBM Packing Leak on Source Valve (V1) for E51N058B Located on H21P038, status per Maximo = INPLN 2/18/2013 SPF Note 2: "A 1 ml/min packing leak on E5150F054 - Existing CARD 12-00329 (10/6/2012)" WO 35445274 requested. WO 35445274, Steam leak on E5150F054, completed 3/24/2014 SPF Note 3:
| |
| "A 1 ml/min packing leak on E5150F025 - Existing CARD 12-28228" WO 35445716 requested. WO 35445716, Repack E5150F025 Perform Diagnostics, completed 6/19/2013 SPF Note 4: "A 1.25 ml/min packing leak on E5150F053 - Existing CARD 12-26557 - Existing Work Order 35118569" WO 35118569, Repack E5100-F053, completed 6/18/2013 SPF Note 5: "A seal leak of 175 ml/min on E5101C002 -
| |
| Existing CARD 08-24198, Work Order (existing) 28179863 - Made Log Entry in WO 28179863 for increase of leakage on seal. Per Maximo WO 28179863 status = CAN 1/12/2015 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 156 of 270
| |
| | |
| 8/12/2014 A SPF Note 1: "1 dpm (0.05 ml/min) packing leak identified on the source valve (V1) for The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 E51N058B which is located on H21P038 (root isolation for PDXE-E51-N057B PXE- Page 270 of 395 prevented the performance of the required E51-N058B) - Existing CARD 13-21068 (2/12/2013), Existing Work Order 36080302. safety function of the equipment. Therefore, Per Maximo WO 36080302 status = INPLN 2/18/2013 SPF Note 2: "A 3 dpm (0.15 this failure will have no impact on an ml/min) packing leak on E5150F046 - CARD 14-26438 generated" - CARD 14-26438 extension to a 24 month surveillance interval.
| |
| states: "overall system total leakage is 178.75 ml/min, which is below the system leakage criteria of 200 ml/min in step 5.4 of 43.206.001." Reportability/Operability Review states: "The leak on this valve would not divert sufficient cooling flow from the RCIC Lube Oil Cooler to prevent it from performing its safety function. Overall system total leakage is 178.75 ml/min, which remains below the system leakage criteria of 200 ml/min. Area temperature remains unchanged, therefore no EQ concern exists. RCIC remains OPERABLE." MRFF Evaluation completed; Justification concluded: "The Acceptance Criteria for RCIC Total System Leakage is less than 200 mL/min. The total system leakage for RCIC including the leak from E5150F046 is 178.75 ml/min. Since 178.75 mL/min is less than the acceptance criteria of 200 mL/min, the additional 0.15 mL/min leak does not cause a Maintenance Rule FunctionalFailure or MSPI failure.
| |
| RCIC can meet the mission time of 24 hours with the additional leak." WO 38568284 requested. WO 38568284 CBM-Packing Leak on E5150F046 status per Maximo =
| |
| WDLY 8/18/2014 SPF Note 3: "A 2.5.ml/min packing leak on E5150F054 - CARD 14-26439 generated" CARD 14-26439 states: "overall system total leakage is 178.75 ml/min, which is below the system leakage criteria of 200 ml/min in step 5.4 of 43.206.001." Reportability/Operability Review states: "The leak on this valve would not divert sufficient steam from the RCIC turbine to prevent it from performing its safety function. Overall system total leakage is 178.75 ml/min, which remains below the system leakage criteria of 200 ml/min of 43.206.001. Area temperature remains unchanged, therefore no EQ concern exists. RCIC remains OPERABLE." MRFF Evaluation completed; Justification concluded: "The total system leakage for RCIC including the leak from E5150F054 is 178.75 ml/min. Since 178.75 mL/min is less than the acceptance criteria of 200 mL/min, the additional 2.5 mL/min leak does not cause a Maintenance Rule Functional Failure or MSPI failure. RCIC can meet the mission time of 24 hours with the additional leak." Investigation states: " The valve was to be replaced during the outage however upon investigation of the disassembled valve it was determined that the bonnet was steam cut and could be repaired. The bonnet was removed from the system and taken to the machine shop for repair. The duration of the required repair conflicted with other outage priorities and the decision was made to repair the vice replace the bonnet. Repairs were performed and the valve was placed back in service. It is unclear at this time why this valve is leaking after just four months.
| |
| Until the valve is disassembled we will be unable to determine if the bonnet or other components are the cause for the leakage. The valve has had a history on continued leakage and when the bonnet was found to be steam cut we thought we had discovered the cause." Conclusion states: "The valve needs to be replaced because it is installed for use in the wrong application." The issue is considered rework due to fact the valve failed within 12 months of being repaired. This valve can only be worked during outages and should have been repaired to minimize risk to the safe operation of the DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 157 of 270
| |
| | |
| system through the operating cycle. WO 38568287 requested: WO 38568287 scope: cut- TRVEND 24MCGNF319001 Rev 1 out and replace E5150F054 - W0 38568287 replaced E5150F054; returned to Service Page 271 of 395 11/5/2015; PMT Leak Inspection per 43.206.01 performed SAT 11/27/2015.SPF Note 4: "A 1ml/min packing leak on E5150F025 - CARD 26440 generated" CARD 14-26440 states: "Per 43.206.001 the overall system total leakage is 178.75 ml/min, which is below the system leakage criteria of 200 ml/min in step 5.4 of 43.206.001."
| |
| Reportability/Operability Review states: "The leak on this valve would not divert sufficient steam from the RCIC turbine to prevent it from performing its safety function.
| |
| Overall system total leakage is 178.75 ml/min, which remains below the system leakage criteria of 200 ml/min of 43.206.001. Area temperature remains unchanged, therefore no EQ concern exists. RCIC remains OPERABLE." WO 37976612 requested. WO 37976612 scope: Replace E5150F025 valve and actuator, replace hanger W-E51-5078-G11, and rework actuator pneumatic supply tubing per RID 85229. PMT Leak Checks per 43.206.001 completed SAT 11/27/2015 SPF Note 5: "A seal leak of 175 ml/min on E5101C002 - Existing CARD 08-24198, Existing Work Order 28179863" Per Maximo WO 28179863 status = CAN 1/12/2015 SPF Note 6: "Less than 1 dpm (0.05 ml/min) packing leak on E51F504 - CARD 14-26441 generated" CARD 14-26441 states:
| |
| "overall system total leakage is 178.75 ml/min, which is below the system leakage criteria of 200 ml/min in step 5.4 of 43.206.001." Reportability/Operability Review states: "The leak on this valve would not divert sufficient steam from the RCIC turbine to prevent it from performing its safety function. Overall system total leakage is 178.75 ml/min, which remains below the system leakage criteria of 200 ml/min of 43.206.001.
| |
| Area temperature remains unchanged, therefore no EQ concern exists. The minor packing leak does not affect the ability of the EFCV to close, there is no impact its function as a PCIV. E51F504 and RCIC remain OPERABLE." MRFF Evaluation completed: Justification, in part, states: "The leak found during the Leakage Monitoring Test does not cause a Maintenance Rule Functional Failure or MSPI failure. RCIC can meet the mission time of 24 hours with the additional leak." WO 38568292 requested.
| |
| WO 38568292 scope: Repack E51F504 RCIC Stm Flow To Turb V13-2384 Excess Flow Check Vlv. E51F504 repaired, returned to service 10/17/2015, leak checked; zero leaks noted, 11/20/2015 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 158 of 270
| |
| | |
| 2/9/2016 A SPF Note 1: "A 175.0 ml/min seal leak on E5101C002. CARD 08-24198 was The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 previously written, Work Order W303100100 exists." Work Order W303100100, Page 272 of 395 prevented the performance of the required Perform Internal Inspection of RCIC Turbine per NUE NE-PJ-90-0373, completed safety function of the equipment. Therefore, 3/31/2017 SPF Note 2: "A 0.05 ml/min packing leak identified on the source valve this failure will have no impact on an (V1) for E51N058B which is located on H21P038 (root isolation for PDXE-E51-N057B extension to a 24 month surveillance interval.
| |
| PXE-E51-N058B) - CARD 13-21068 was previously written; WO 36080302 exists" Per Maximo WO 36080302, CBM Packing Leak on Source Valve (V1) for E51N058B Located on H21P038 = INPLN 2/18/2013 SPF Note 3: "A 0.05 ml/min packing leak identified on E5150F046 - CARD 14-26438 was previously written, WO 38568284 exists." Per Maximo WO 38568284, CBM - Packing Leak on E5150F046 status =
| |
| WDLY 8/18/2014 SPF Note 4: "A 0.05 ml/min packing leak identified on E5150F029 - CARD 16-21239 was generated" CARD 16-21239 states: "The current overall system leakage is 175.15 ml/min versus the system leakage criteria of 200 ml/min in step 5.4 of 43.206.001." Reportability/Operability Review states: "This is minor water packing leak from the suction isolation valve. The leakage is small and the overall leakage for the system is 175.15 ml/min and is below the leakagecriteria of 200 ml/min. No impact on the system function to pump water into the reactor vessel and the required flow and pressure. RCIC remains OPERABLE." Determined not to be a Functional Failure. WO 44744158 requested. WO 44744158 CBM - Packing Leak on E5150F029 status per Maximo = WCREV 8/25/2017 8/5/2017 A SPF Note 1: "E5150F029 has a 1 dpm (0.05 ml/min) packing leak - CARD 16-21239 The identified failure(s) would not have (2/9/2016) - WO 44744158 already exists." Per Maximo WO 44744158 CBM - prevented the performance of the required Packing Leak on E5150F029 status = WCREV 8/25/2017 SPF Note 2: "E5150F054 safety function of the equipment. Therefore, has 1 dpm (0.05 ml/min) packing leak - CARD 17-26594 was written to address issue." this failure will have no impact on an CARD 17-26594 states: "While performing 43.206.001 "RCIC Leakage Monitoring extension to a 24 month surveillance interval.
| |
| Test", E5150F054 (RCIC DIV1 STM HEADER DRAIN POT TO WATER TRAP BYPASS AOV) was found to have a small plume of steam coming from its packing. It is estimated that this plume is equivalent to a 0.05 mL/min (1dpm) leak. The current total leakage for the RCIC system is 0.6 mL/min, which is below the acceptance criteria of 200 mL/min (see 43.206.001)." Reportability/Operability Review states: "The E5150F054 is the steam header drain pot to water trap bypass AOV. On a subsequent walk down there was no leak identified from the valve and therefore no impact on the system operability or the EQ requirements for the equipment in the area. RCIC remains OPERABLE." SPF Note 3: "E5100F039 has 10 dpm (0.5 ml/min packing leak - CARD 17-00103 (1/20/2017) -WO 46921343 already exists." WO 46921343, Packing Steam Leak from E5100-F039 completed 11/7/2017 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 159 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 273 of 395 0981 PERFORM 43.606.001 TRAVERSING IN-CORE PROBE SHEAR VALVE SR 3.6.1.3.10
| |
| 'A' EXPLOSIVE CHARGE
| |
| # Performances: 1 # Failures: 0 24 Month Justification: Notes: Surveillance test rotates with Events 1981 (TIP Shear Vlv B), 1982 (TIP Shear Vlv C), 1983 (TIP Shear Vlv D), and 1984 (TIP Shear Vlv E)
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 160 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 274 of 395 1043 PERFORM 43.714.001 POST ACCIDENT SAMPLING SYSTEM SR 5.5.2 LEAKAGE MONITORING TEST
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 6/16/2017 A SPF Note 1: "Test #1 - leakage rate was SAT. CARD 17-25342 generated when The identified failure(s) would not have restoring valve lineup P34-F404A indicated dual in the control room. STR C2017-1501 prevented the performance of the required restored remaining valve lineup. "CARD states: "attempted to close P34-F404A Div 2 safety function of the equipment. Therefore, PASS Drywell Atm OTBD Isol, however valve is not indicating full closed in less than 2 this failure will have no impact on an seconds. After approximately 15-20 minutes, observed valve no longer indicated dual, extension to a 24 month surveillance interval.
| |
| indicated fully closed." Reportability/Operability Review states: "IST required stroke time to close is <=2 seconds per 24.714.01. Therefore, valve is not capable of performing its isolation function. Penetration remained isolable with inboard isolation valve.
| |
| Primary containment isolation function and position indication function are INOPERABLE and being tracked on LCO 17-0347. The 4-hour action to isolate the affected penetration is complete." Evaluated and determined not to be a MRFF against P3400 or A7100. WO 47957122 initiated. WO notes: "Could not get valve to indicate dual. Valve stroked full open and full closed each stroke. As Found data SAT. Cycle times of P34F404A were SAT (less than 0.5 seconds open, less than 0.5 seconds closed)
| |
| Indication in MCR SAT. Could not recreate problem. SPF Note 2: "Test #2 - measured leakage rate was above acceptance criteria. The measured leakage rate for test #2 was 1.64 scfh verse 1.00 scfh. CARD 17-25370 generated" CARD states: "Snoop testing of all valve packing and fittings in test boundary resulted in no external air leakage identified. Therefore, 1.64 scfh leakage is attributed to internal leakage, past test boundary valve seats. Test boundary valves with suspected leakage are P3400F015 and P3400F018. Both valves are normally seal locked open. Since 43.714.001 is a Leakage Reduction procedure for identifying external leakage, and identified leakage is internal (past valve seats) troubleshooting of suspect test boundary valves to identify cause of seat leakage, will be performed during next LLRT of P3400F405A/P3400F406A (43.401.387), and P3400F405B/P3400F406B (43.401.386). P3400F015 and P3400F018 act as test boundary valves in these LLRT procedures, which contain troubleshooting steps to identify the source of internal leakage. Next scheduled LLRT on these valves is RF19. No further action is required. CARD is trend only." Reportability/Operability Review states: "P3400F015 and P3400F018 are test boundary valves only, and are not containment isolation valves. No operability requirements are applicable." This event has been evaluated and determined not to be a MR functional Failure against P3400.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 161 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 275 of 395 1051 PERFORM 44.010.064 RPS-TURBINE STOP VA. LIMIT SWITCH SR 3.3.1.1.14-9 CLOSURE CALIBRATION
| |
| # Performances: 5 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/10/2015 A As Found valve travel data for HP Stop Valve #1 was outside Acceptance Criteria. The identified failure(s) would not have Valve limit switches were adjusted per procedure guidance and As Left data was prevented the performance of the required Acceptable. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1068 PERFORM 64.080.033 MAIN STEAM LINE RADIATION DETECTOR SR 3.3.6.1.4-2.d SR 3.3.6.1.5-2.d D11N600E CALIBRATION WITH CHANNEL A (was 64.010.033) SR 3.3.7.2.3 SR 3.3.7.3.3 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1069 PERFORM 64.080.034 MAIN STEAM LINE RADIATION DETECTOR SR 3.3.6.1.4-2.d SR 3.3.6.1.5-2.d D11N600F CALIBRATION WITH CHANNEL C (was 64.010.034) SR 3.3.7.2.3 SR 3.3.7.3.3 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 162 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 276 of 395 1070 PERFORM 44.010.045 RPS SDV HIGH WTR LVL TRIP SYS A, CH A1/A SR 3.3.1.1.14-8.b SR 3.3.1.1.15-8.b FLT SWITCH CAL/FUNCT
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 3/9/2011 A As Found trip setpoint for Level Switch C11-N013A was outside the procedure The identified failure(s) would not have Acceptance Criteria tolerance. The switch was adjusted per procedure guidance to prevented the performance of the required within tolerance and returned to service satisfactorily. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1071 PERFORM 44.010.046 RPS SDV HIGH WTR LVL TRIP SYS B, CH B1/B SR 3.3.1.1.14-8.b SR 3.3.1.1.15-8.b FLT SWITCH CAL/FUNCT
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 3/9/2011 A As Found trip setpoint for Level Switch C11-N013B was outside the procedure The identified failure(s) would not have Acceptance Criteria tolerance. The switch was adjusted per procedure guidance to prevented the performance of the required within tolerance and returned to service satisfactorily. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 163 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 277 of 395 1072 PERFORM 44.010.047 RPS SDV HIGH WTR LVL TRIP SYS A, CH A2/C SR 3.3.1.1.14-8.b SR 3.3.1.1.15-8.b FLT SWITCH CAL/FUNCT
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failure which is not indicative of a repetitive time based failure mechanism. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 9/3/2015 C As Found trip setpoint for Level Switch C11-N013C was outside the procedure This is an event driven failure in that the Acceptance Criteria tolerance. The switch was NOT able to be adjusted to within failure was caused by the technician tolerance. CARD 15-26255 was initiated. CARD 15-26255 states: "C11N013C as- performing an adjustment on the wrong found unsat and unable to calibrate. Several attempts to calibrate Magnetrol level adjustment screw of the switch. This caused indicating switch were unsuccessful; manually actuating switch did not initiate the level switch to stop operating and the annunciator (3D94)." CARD 15-26255 investigation states: "During the calibration, surveillance to fail. Therefore, this failure the technician referred to enclosure A per step 6.1.7 and misinterpreted the function of will have no impact on an extension to a 24 the adjustment screw. All of the correct and required information was on enclosure A; month surveillance interval.
| |
| however, the illustration in enclosure A has a large screwdriver going to the wrong adjustment screw for this calibration, which is misleading. The technician performed the incorrect adjustment and when he did not get the required results, realized he had adjusted the wrong screw on the switch." The switch was able to be readjusted to within tolerance per WO 43849721.
| |
| Event Title Associated SRs and Function 1073 PERFORM 44.010.048 RPS SDV HIGH WTR LVL TRIP SYS B, CH B2/D SR 3.3.1.1.14-8.b SR 3.3.1.1.15-8.b FLT SWITCH CAL/FUNCT
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 164 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 278 of 395 1079 PERFORM 42.302.04 DIV 2 BUS 65E/13EC 4160V UNDERVOLTAGE SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b LOGIC FUNCTIONAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1082 PERFORM 44.210.004 SRV LO LO SET, SRV POSITION MONITOR SR 3.3.6.3.4-1 SR 3.3.6.3.4-2 FUNCTIONAL TEST SR 3.3.6.3.4-3 SR 3.6.1.6.2
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/11/2015 A At Step 6.13.10.4, IPCS point B21DC0643 was indicating OPEN when it should have The identified failure(s) would not have been indicating CLOSED. All other indications showed CLOSED. CARD 15-28865 prevented the performance of the required written and states: "During the performance of 44.210.004 step 6.13.10.4 IPCS Point safety function of the equipment. Therefore, B21DC0643 failed to indicate closed. Could be the card or relay contacts. All other this failure will have no impact on an indications for B2104-F013M were closed." Procedure performance was stopped and extension to a 24 month surveillance interval.
| |
| Control Room Supervisor and I&C Supervisor were notified. The procedure step is not acceptance criteria. Decision was made by all parties to continue the procedure performance and write up a discrepancy with a CARD to fix the problem. No other issues were found. System Engineering performed a Maintenance Rule Functional Failure evaluation and determined this condition is NOT a Functional Failure.
| |
| 4/13/2017 A At Step 6.13.10.4, IPCS point B21DC0643 did not indicate CLOSED as expected. This The identified failure(s) would not have same issue was identified during the 11/11/2015 performance, CARD 15-28865 written prevented the performance of the required and WO 44294945 requested. Deficiency remains unresolved at this performance. With safety function of the equipment. Therefore, ref to Maximo, WO 44294945 is currently INPLN with Scheduled Start on 04/10/2020. this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 165 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 279 of 395 1087 PERFORM 42.302.05 DIV 1 BUS 64C/12EB 4160V UNDERVOLTAGE SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b LOGIC FUNCTIONAL
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/8/2009 A During the performance of Step 6.4.17, the EDG O/P breaker did not close as expected. The identified failure(s) would not have The jumper dislodged from RA device terminal 9. Relanded the jumper and prevented the performance of the required reperformed the section with proper indications. Additionally, in Step 6.5.16 the relay safety function of the equipment. Therefore, target on YZ-27 (orange target) fell off. CARD 09-22455 written for repair. CARD 09- this failure will have no impact on an 22455 states: "The undervoltage relay did reset but the indicator is broken. This does extension to a 24 month surveillance interval.
| |
| not affect the functionality of the relay."
| |
| 11/20/2010 A In "Step 6.5.16 substep 2 and Step 7.1.1 substep 3, Undervoltage Relay YZ-27 on Bus The identified failure(s) would not have 12EB Pos EB3 target indicator is broken off. This is not procedure Acceptance Criteria. prevented the performance of the required WO 29672297 already scheduled to repair relay." In 2012 WO 29672297 bench tested safety function of the equipment. Therefore, and calibrated new replacement relay and installed. CARD 09-22455 previously this failure will have no impact on an addressed (4/8/2009) this condition and states: "The undervoltage relay did reset but the extension to a 24 month surveillance interval.
| |
| indicator is broken. This does not affect the functionality of the relay."
| |
| Event Title Associated SRs and Function 1088 PERFORM 42.302.06 DIV 2 BUS 65F/14ED 4160V UNDERVOLTAGE SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b LOGIC FUNCTIONAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 166 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 280 of 395 1090 PERFORM 43.404.001 DIV 1 STANDBY GAS TREATMENT FILTER SR 5.5.2 SR 5.5.7.a PERFORMANCE TEST SR 5.5.7.b SR 5.5.7.d SR 5.5.7.e
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 8/15/2018 A SPF Note: "Approximately 1 inch square of chipping paint noted near upstream filters. The identified failure(s) would not have Loose debris was removed. CARD 18-26127 submitted. CARD 18-26127 states: "some prevented the performance of the required loose paint was found in the Div 1 filter unit compartment upstream of the charcoal safety function of the equipment. Therefore, adsorber, see attached. The loose chips were removed so there is no impact to the this failure will have no impact on an charcoal adsorber. Requesting a WO to touch up the areas of removed paint. extension to a 24 month surveillance interval.
| |
| Reportability/Operability Review states: "the loose paint has been removed and there is no impact to the charcoal adsorber. With condition described in this CARD SGTS is capable of performing its design function under all operational conditions." WO 51590845 is currently at status INPLN per Maximo.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 167 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 281 of 395 1100 PERFORM 24.202.08 SEC-5.1 (Wtr Lvl) HPCI RTT & PUMP SR 3.3.5.1.5-3.a SR 3.3.5.1.5-3.b OPERABILITY AT 1025 PSIG SR 3.5.1.11 SR 3.5.1.14
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 8/27/2014 A SPF Note 2: "Step 5.1.13, G4100-F028 stroke time outside IST Limit. IAW P&L 2.20 The identified failure(s) would not have restroked valve with same time. CARD 14-26778 submitted" CARD 14-26778 states: prevented the performance of the required "Closed stroke time data collected for E4100F028 on 8/27/14 was found to be 0.1 second safety function of the equipment. Therefore, higher (6 seconds) compared to the IST limit of 2 seconds to 5.9 seconds. Second stroke this failure will have no impact on an obtained was also 6 seconds which resulted in failure of IST testing requirements." extension to a 24 month surveillance interval.
| |
| Reportability/Operability Review states: "E4100F028 "HPCI steam header drain to main condenser isolation valve" shuts to prevent direct flow of steam from steam piping into main condenser. No impact on system operability should valves fail to close. HPCI remains OPERABLE." No MRFF evaluation required. Investigation determined Procedure 24.202.08 was revised (Rev. 6) to perform closed stroke time for valves E4100F028 and E4100F029 prior to pump test per an NRC concern about preconditioning. At that time, focus was on obtaining baseline data for E4100F029 and two similar RCIC valves because valves did not have any stroke time data. Noted: work to obtain stroke times was on a challenging schedule to be done week prior to RF16.
| |
| When WO 37990793 was requested to obtain baseline measurements on E4100F029; E4100F028 was not included. E4100F028 should have been included in baseline testing WO mentioned above because reference stroke was affected. In other words, the former reference stroke time for E4100F028 was performed when all steam was isolated. New sequence placed E4100F028 ahead of pump test where steam was not isolated which had a slight impact on closed stroke time. As a result, when surveillance was performed in August 2014, stroke time of 6 seconds was found to be 0.1 seconds higher than IST upper limit. This is not related to degradation; only a change in test conditions.
| |
| Recommended new reference stroke time be created using an IST evaluation and data listed above. Also, procedures 24.202.01 (Event 0249) and 24.202.08 (Event 1100) will be revised to incorporate new stroke time acceptance criteria for E4100F028."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 168 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 282 of 395 1102 PERFORM 42.309.06 DIV 2 18 MONTH 130/260 VDC BATTERY CHECK SR 3.8.4.3 SR 3.8.4.4 (2B-1 ONLY) SR 3.8.4.5.a SR 3.8.4.5.b SR 3.8.4.7
| |
| # Performances: 4 # Failures: 3 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/19/2009 A Note at Acceptance Criteria Step 8.2 indicates "CARD 09-22790 documents abnormal The identified failure(s) would not have indications. TE-R32-09-040 evaluated the condition and determined it to be prevented the performance of the required acceptable." In Step 6.16.1 of SOE 08-05, found an anomaly on top of the black (+) safety function of the equipment. Therefore, plates of Battery 2B-1. CARD 09-22790 initiated. CARD 09-22790 states: "Step this failure will have no impact on an 6.16.1 of SOE 08-05 performs an inspection of the new battery installed during RF13. extension to a 24 month surveillance interval.
| |
| A grey material was noted on top of the positive and negative plates during the inspection. This was unexpected. Both the Div 1 and new BOP batteries were inspected and do not exhibit this same anomaly." The CARD goes on to state that a battery representative was dispatched to inspect the condition and determined that the grey material on top of the plates internal to the battery is lead sulfate. The lead sulfate on top of the battery plates will not have an adverse impact on the performance of the battery. In addition to the grey material on top of the plates, some of the cell separators are warped or frayed. Two of the cells (9 and 109) have a white appearance on the side edge of one of the positive (black) plates. Separator material is non-conductive and is used to separate the positive and negative plates from each other to keep them from shorting together. Therefore, any warping or fraying will not prevent the separator from performing its function since this is only seen on the edges of the separator. The last item of interest is the plate straps on a few of the cells do not have a smooth appearance.
| |
| This is at the top of the cell where the plates transition to the positive or negative posts that extend to the exterior of the battery. The uneven look of the plate straps is caused by the manufacturing process. If this process was not properly performed, a high resistance connection would cause the battery to fail its load test performed at the factory.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 169 of 270
| |
| | |
| 3/4/2014 A During the visual inspection performed in Step 6.1.1, battery charger for 2B-1, The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 R3200S021A, has broken power indication lens. CARD 14-21792 was initiated. CARD Page 283 of 395 prevented the performance of the required 14-21792 states: "... R3200S021A Battery Charger was missing its power indication safety function of the equipment. Therefore, lens, and the R3200S021B lens is badly cracked. The power indicating lights are for this failure will have no impact on an indication only and do not prevent the Div 2 ESF Battery Chargers from performing extension to a 24 month surveillance interval.
| |
| their safety function. This condition does not affect Div 2 ESF Battery Charger operability." WO 38107056 is referenced in the CARD. WO 38107056 is at status in Maximo "INPRG" with a scheduled start date of 3/27/19.
| |
| 3/29/2017 A 1) Found cracks and lifted posts on 95% of the battery cells. Initiated CARD 17-22739 The identified failure(s) would not have for trending. CARD 17-22739 states "that 95% of the cells have cell top cracking and prevented the performance of the required positive post lifting. Numerous Cards have been initiated over this condition. Consulted safety function of the equipment. Therefore, the system engineer and these conditions are normal wear and are being tracked over the this failure will have no impact on an life of the battery. This is a trending Card. The Battery load test performed satisfactory extension to a 24 month surveillance interval.
| |
| on 2B-1 and 2B-2." 2) Found damaged load stud on the positive link of pos #11 in 2PB2 R3200S011. Initiated CARD 17-22688 for repair. CARD 17-22688 states that while reinstalling the nut on the positive link stud, the stud began turning with the nut working its way back into the switchgear. Was able to turn the stud back out to its normal position. CARD evaluation states: "Position 11 in MCC 2PB-2 is a spare position and is only utilized in the performance of electrical maintenance procedures 42.309.06 and 42.309.07. Testing has been completed for RF18 and will not be required again until RF19. Based on this, repairs to the positive link stud is not required to be performed in RF18 but must be repaired prior to the Division 2 battery test in RF19.
| |
| Event Title Associated SRs and Function 1103 PERFORM 42.309.07 DIV 2 (5 YEAR) 130/260 VDC BATTERY CHECK SR 3.8.4.8 (2B-1 ONLY)
| |
| # Performances: 2 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 170 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 284 of 395 1111 PERFORM 24.413.05 DIV 2 CR EMRG FILTER AUTO TRANSFER TEST SR 3.3.7.1.6-1 SR 3.3.7.1.6-2 SR 3.3.7.1.6-3 SR 3.7.3.3
| |
| # Performances: 5 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1117 PERFORM 43.409.002 DIV 2 POST LOCA THERMAL RECOMBINER SR 5.5.2 SYSTEM LEAKAGE TEST
| |
| # Performances: 7 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 171 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 285 of 395 1120 PERFORM 24.409.03 SEC-5.2 DIV.2 POST LOCA RECOMBINER SR 3.3.3.1.2-8 LOCAL VALVE POSITION IND
| |
| # Performances: 6 # Failures: 3 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 8/1/2012 A In Step 5.2.21, valve T4804-F003B would not indicate full open at H11-P887 panel but The failure of the valve in this surveillance did indicate full open locally. Issue previously documented on CARD 11-29863. CARD performance was identified prior to the start 11-29863 (originated 11/02/11). CARD states: "During performance of 24.409.03, of the scheduled surveillance test. CARD 11-Section 5.1 on 11-2-2011, T4804F003B, CAC H2 RECOMB THERMAL RECOMB 29863, which documented the failure of DIV2 INLET FLOW CTRL MOV, did not indicate full open six minutes after T4804F003B, was originated on 11/02/2011 depressing open pushbutton at RR H11-P887. Suspect problem with MOV limit and the start of the surveillance test switches. Request WO to troubleshoot and repair as needed. Step 5.1.20 of 24.409.03, performance was approximately nine months strokes T4804-F003B open and close. When given close signal, T4804-F003B indicated later on 08/01/2012. As a result, this valve full closed after stroking." CARD Reportability /Operability Review states: There are failure was discovered during the interval no Tech Spec or TRM requirements associated with this valve. Valve timing history between the normally scheduled 18-month was not available. Valve went closed in approximately one minute after giving it a surveillance tests. Therefore, this failure will closed signal. Visual observation of valve on RB4 is not available to determine actual have no impact on an extension to a 24 valve position when it was indicating dual. Valve now indicates closed as required." month surveillance interval.
| |
| CARD indicates there was no Maintenance Rule Functional Failure and "the issue was the indication on flow control valve. Failure is not related to isolation failure." Work Order 33583960 written for repair of valve on 1/22/15. WO troubleshooting found torque switch broken and MOV binding. "While taking valve to manual, noted a piece of metal fly out of the torque switch. Valve is extremely difficult to operate, suspect valve is torqueing out as soon as torque switch bypass opens. Suspect stem bushing misalignment is causing excessive drag. OPS declared MOV INOP and CARD 15-20788 written." CARD 15-20788 states "During troubleshooting under WR 33583960 for valve not indicating Full Open, part of torque switch was found in limit switch compartment. Also noted MOV operated very difficult in manual mode and made squealing sounds and felt like valve has excessive dragging and binding." WO 42503092 written for repair on 7/25/16. WO 42503092 troubleshooting revealed valve could not be moved. Nudged actuator with yolk bolts loosened and noticed yoke bushing moving and lower flange moving - this should not happen. Yoke bushing should be welded. Also noted weight bearing bracket is warped and causes stress on yoke bushing. Mechanical WO is needed to correct issues. CARD 16-25908 written. CARD 16-25908 states: "While performing WO 42503092, binding issue on valve actuator T4804F003B, it was determined: actuator will no longer operate in hand mode; when actuator yolk bolts were removed actuator moved freely in both CW and CCW directions DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 172 of 270
| |
| | |
| while valve stem stayed still, and; suspect valve packing is too tight or valve stem has TRVEND 24MCGNF319001 Rev 1 become frozen in place." CARD 16-25908 determined this issue to NOT be a MRFF. Page 286 of 395 CARD NOTES indicate yoke bushing moving and getting cocked is apparent cause of valve binding. WO 45800147 is referenced in CARD. WO 45800147 is NOT in progress and has a scheduled work start date of 09-26-2019.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 173 of 270
| |
| | |
| 1/24/2014 A In Step 5.2.21, valve T4804-F003B full open indication not functional. Followed Note The failure of the valve in this TRVEND surveillance Rev 1 24MCGNF319001 on SPF which directed giving valve a full open signal for one minute. Issue previously performance was identified prior toPage 287 of 395 the start documented on CARD 11-29863. CARD 11-29863 (originated 11/02/11). CARD of the 2012 scheduled surveillance test.
| |
| states: "During performance of 24.409.03, Section 5.1 on 11-2-2011, T4804F003B, CARD 11-29863, which documented the CAC H2 RECOMB THERMAL RECOMB DIV2 INLET FLOW CTRL MOV, did not failure of T4804F003B, was originated on indicate full open six minutes after depressing open pushbutton at RR H11-P887. 11/02/2011. There is a past history and Suspect problem with MOV limit switches. Request WO to troubleshoot and repair as continued long period of time that this valve needed. Step 5.1.20 of 24.409.03, DIVISION II POST LOCA THERMAL was in need of repair prior to being returned RECOMBINER SYSTEM VALVE OPERABILITY TEST, strokes T4804-F003B open to service. As a result, this valve failure was and close. When given close signal, T4804-F003B indicated full closed after stroking." discovered prior to the normally scheduled CARD Reportability /Operability Review states: There are no Tech Spec or TRM 18-month surveillance test for 2014.
| |
| requirements associated with this valve. Valve timing history was not available. Valve Therefore, this failure will have no impact went closed in approximately one minute after giving it a closed signal. Visual on an extension to a 24 month surveillance observation of valve on RB4 is not available to determine actual valve position when it interval.
| |
| was indicating dual. Valve now indicates closed as required." CARD indicates there was no Maintenance Rule Functional Failure and "the issue was the indication on the flow control valve. T4804 no longer has a MRule function to recombine. The only MRule function T4804 has is containment isolation. This failure is not related to the isolation failure." WO 33583960 was written for repair of valve on 1/22/15. WO troubleshooting found torque switch broken and MOV binding. "While taking valve to manual, noted a piece of metal fly out of the torque switch. Valve is extremely difficult to operate, suspect the valve is torqueing out as soon as torque switch bypass opens.
| |
| Suspect stem bushing misalignment is causing excessive drag. OPS declared MOV INOP and CARD 15-20788 written." CARD 15-20788 states "During troubleshooting under WR 33583960 for valve not indicating Full Open, part of torque switch was found in limit switch compartment. Also noted MOV operated very difficult in manual mode and made squealing sounds and felt like valve has excessive dragging and binding."
| |
| WO 42503092 written for repair on 7/25/16. WO 42503092 troubleshooting revealed valve could not be moved. Nudged actuator with yolk bolts loosened and noticed yoke bushing moving and lower flange moving - this should not happen. Yoke bushing should be welded. Also noted weight bearing bracket is warped and causes stress on yoke bushing. Mechanical WO is needed to correct issues. CARD 16-25908 written.
| |
| CARD 16-25908 states: "While performing WO 42503092, binding issue on valve actuator T4804F003B, it was determined: actuator will no longer operate in hand mode; when actuator yolk bolts were removed actuator moved freely in both CW and CCW directions while valve stem stayed still, and; suspect valve packing is too tight or valve stem has become frozen in place." CARD 16-25908 determined this issue to NOT be a MRFF. CARD NOTES indicate yoke bushing moving and getting cocked is apparent cause of valve binding. WO 45800147 is referenced in CARD. WO 45800147 is NOT in progress and has a scheduled work start date of 09-26-2019.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 174 of 270
| |
| | |
| 7/29/2015 A In Step 5.2.21, valve T4804-F003B indicates dual regardless of position. Unable to The failure of the valve in this TRVEND surveillance Rev 1 24MCGNF319001 verify whether open or closed. CARD 11-29863 and 15-23061 document this performance was identified prior toPage 288 of 395 the start condition. CARD 15-23061 (initiated 4/29/15) states: "During 24.409.03, attempted to of the 2012 scheduled surveillance test.
| |
| close the T4804F003B, Flow Control Valve, on the H11P887, and valve stayed dual. CARD 11-29863, which documented the Valve switch was placed in close for several minutes. Locally, valve appears to be closed failure of T4804F003B, was originated on and attempted to agitate valve with no success. This valve has a past issue and CARD 11/02/2011. There is a past history and 11-29863 (initiated 11/2/11) was written on the open indication (valve shows dual in the continued long period of time that this valve open direction). Appears to be an issue with MOV limit switches." CARD Reportability was in need of repair prior to being returned
| |
| / Operability Report states: "The T4804F003B is not license based. It is not a primary to service. As a result, this valve failure was containment isolation valve and has no safety function. This is not license based." discovered prior to the normally scheduled System Engineering performed a Maintenance Rule Functional Failure evaluation and 18-month surveillance test for 2015.
| |
| determined this failure to NOT be a Functional Failure. CARD 15-23061 references Therefore, this failure will have no impact Work Order 42978887. WO 42978887 is at status "CAN" in the Online Work on an extension to a 24 month surveillance Management Website. WO 42978887 provides reason for cancellation: "Problem interval.
| |
| identified in CARD 15-20788. Equipment will be corrected in WO 42503092."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 175 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 289 of 395 1134 PERFORM 24.204.05 SEC-5.3 DIV. 2 RHR LOCAL VALVE POSITION SR 3.3.3.1.2-8 SR 3.3.5.1.6-2.h INDICATION & STROKE SR 3.3.5.3.3-2.b SR 3.3.6.1.6-2.e SR 3.3.6.1.6-6.c SR 3.5.1.14 SR 3.5.2.9
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failure which is not indicative of a repetitive time based failure mechanism. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/22/2012 C Panel H11-P902 circuit 4 broken which feeds indication and control to E11-F610B. As This is an event driven failure in that Panel a result, valve E1100-F050B was not able to be tested. CARD 12-23620 written to H11-P902 circuit 4 was discovered to be document issue. CARD 12-23620 states that while clearing STR 2012-001669, it was broken while clearing STR 2012-001669 noted the MCR valves did not receive any power. After investigation, found H11P902 during the performance of the surveillance circuit 4 power fuse good with no power coming out of the switch. Circuit 4 was cycled procedure which prevented the testing of many times and the door overridden with the switch on and had no power out of the valve E1100-F050B. Therefore, this failure switch to the fuses. H11P902 is powered up. This feeds control to E11F610B, torus will have no impact on an extension to a 24 purge and vent, drywell purge and vent valves, etc. Tool pouch repair was performed, month surveillance interval.
| |
| no WO needed.
| |
| 4/23/2012 A Valve E1100-F050B did not indicate Open properly (indicated dual). CARD 12-23670 The identified failure(s) would not have written to document issue. Indication repaired. CARD 12-23670 states: "While prevented the performance of the required stroking E1100-F050B during partial surveillance 24.205.05, the valve indicated dual safety function of the equipment. The valve while stroking open. Local position was verified as open. The open limit switch operated as expected in that the local valve appeared not to be in proper alignment. The valve does indicate the closed position position was verified to be open. The properly. This is a non contact type of limit switch. Request investigation and repair to problem was with the valve position realign the limit switch." CARD Reportability / Operability Review states: indication and not the actual valve position.
| |
| "E1100F050B does not meet ISI test requirements (TS 5.5.6)." CARD NOTES state: Therefore, this failure will have no impact "The proximity probe was adjusted 2 degrees, and the indication was restored to normal." on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 176 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 290 of 395 1135 PERFORM 24.204.08 NON-DIVISIONAL RHR VALVE POSITION & SR 3.3.3.1.2-8 SR 3.3.3.2.2 STROKE TIME TEST SR 3.3.5.1.6-2.h SR 3.3.5.3.3-2.b SR 3.3.6.1.6-2.e SR 3.3.6.1.6-6.c SR 3.5.2.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1142 PERFORM 24.404.04 SEC-5.3 DIV.2 SGTS RUN/AUTO SR 3.3.6.2.5-4 SR 3.6.4.2.3 INITIATE/POSITION IND. SR 3.6.4.3.3 SR 3.6.4.3.4
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1167 PERFORM 44.010.067 RPS-TS A, CH A, TURB STOP/CONTROL VLV SR 3.3.1.1.15-9 SR 3.3.1.1.15-10 TRIP BYPASS CAL/FUNC SR 3.3.1.1.16-9 SR 3.3.1.1.16-10
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1168 PERFORM 44.010.068 RPS-TS B, CHL B TURB STOP/CONTROL VLV SR 3.3.1.1.15-9 SR 3.3.1.1.15-10 TRIP BYPASS CAL/FUNC SR 3.3.1.1.16-9 SR 3.3.1.1.16-10
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 177 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 291 of 395 1169 PERFORM 44.010.069 RPS-TS A, CH C TURB STOP/CONTROL VLV SR 3.3.1.1.15-9 SR 3.3.1.1.15-10 TRIP BYPASS CAL/FUNC SR 3.3.1.1.16-9 SR 3.3.1.1.16-10
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1170 PERFORM 44.010.070 RPS-TS B, CH D TURB STOP/CONTROL VLV SR 3.3.1.1.15-9 SR 3.3.1.1.15-10 TRIP BYPASS CAL/FUNC SR 3.3.1.1.16-9 SR 3.3.1.1.16-10
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/13/2014 A During Step 6.1.3.2, the Master Trip Unit C71-N652D analog indicator needle was The identified failure(s) would not have sticking on analog indicator face/scale - unable to obtain data. Backed out of procedure prevented the performance of the required performance. Second performance of surveillance was completed satisfactorily. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1205 PERFORM 43.413.005 CONTROL RM ENVELOPE DIFFERENTIAL SR 5.5.7.d SR 5.5.14.d PRESS TEST
| |
| # Performances: 3 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 178 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 292 of 395 1205A PERFORM ASSESSMENT of 43.413.005 RESULTS SR 5.5.14.d
| |
| # Performances: 3 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1215 PERFORM 42.307.05 DIV 2 EDG AUTO LOAD SEQUENCE TIMER SR 3.8.1.16 CALIBRATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1217 PERFORM 42.309.03 DIV 1 18 MONTH 130/260 VDC BATTERY CHECK SR 3.8.4.3 SR 3.8.4.4 (2A-2 ONLY) SR 3.8.4.5.a SR 3.8.4.5.b SR 3.8.4.7
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1218 PERFORM 42.309.04 DIV 2 BATTERY CHARGER LOAD TEST - 2B-1 SR 3.8.4.6 ONLY
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 179 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 293 of 395 1219 PERFORM 42.309.05 DIV 1 (5 YEAR) 130/260 VDC BATTERY CHECK SR 3.8.4.8 (2A-2 ONLY)
| |
| # Performances: 2 # Failures: 2 24 Month Justification: Notes:
| |
| One failure would be detected by the performance of a surveillance test on a more frequent basis. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/13/2010 A SPF Note: "The following inter cell connections were high after clean and retorque; The identified failure(s) would not have Cells 82, 91 and 104. CARD 10-30481 written to track resistance readings." CARD 10- prevented the performance of the required 30481 states: "After the Div 1 2A-2 Battery test, step 6.9.4 of procedure 42.309.05 has safety function of the equipment. Therefore, maintenance take apart, clean and refasten the intercell battery connections of any cells this failure will have no impact on an that have a resistance greater than 38 micro-ohms. This value is a low threshold value extension to a 24 month surveillance used to keep the battery within 20% of the new connection resistance values. The battery interval.
| |
| is now 10 years old.The Tech Spec acceptance criteria is 150 micro-ohms. After, step 6.9.4 was performed, the following cells had resistances greater than the rework value:Cell 82 (45.3 micro-ohms) for posts A to CCell 91 (43.3 micro-ohms) for posts A to CCell 104 (75.2 micro-ohms) for posts A to CCell 104 (43.1 micro-ohms) for posts B to DThese values are well within TS acceptance criteria have no impact on the battery to perform its intended safety function. An administrative limit was placed on the battery resistance of 2700 micro-ohms for the entire bank of 58 cells. The total measured is 1892 micro-ohms. This value is also well within the administrative limit. Therefore, no concern exists for the battery intercell connection resistances. It is recommended that this CARD be used for trending only and that no further maintenance is necessary on the battery connections." Reportability/Operability Review states: "No additional operability impact from this condition."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 180 of 270
| |
| | |
| 10/29/2015 B SPF Note 1: "The following cells have term post separations and cracks; Cells 70, 68, All issues had been TRVEND previously identified and Rev 1 24MCGNF319001 72, 95, 98, 100, 103, and 113. CARD 15-21979 written (03/18/2015) for addressing documented in CARDs discovered Page while294 of 395 these issues, terminals passed Digital Low Range Ohmmeter (DLRO) testing under this performing monthly walkdown or quarterly SPF Event and per 42.309.05." CARD 15-21979 states: "While performing quarterly surveillances. Although the failures/or battery checks on Division 1 /130/260 VDC/2PA W.O.# 37498263, procedure # similar failures to those previously identified 42.309.02. Battery #83 has a crack in the top of the jar casing." Reportability/Operability were documented in the 18-month Review states: "The crack identified in this CARD involves the top plastic cover of the surveillance, the failures were identified on a battery cell only. This minor cracking has no impact on the structural integrity of the more frequent basis during either a monthly battery. The same minor cracking is evident on several other battery cells and has been system engineering walkdown or during 91 repaired using beads of sealant. This condition has no impact on the ability of the battery day surveillance performances.
| |
| to perform its safety function. Battery 2PA remains OPERABLE." SPF Note 2: Consequently, the identified failures were "Battery cells 74 and 95. Have copper contamination (74) and a bulged term post (95). detected by a more frequent activity.
| |
| CARDs 15-26054 (8/27/2015, monthly Sys Eng walkdown) for cell (74) and 15-26601 Therefore, this failure will have no impact (9/17/2015, performing WO 38301298 Div I Battery Surveillance) for cell (95). Both on an extension to a 24 month surveillance cells were changed out under WO 43878966." Both of these issues were identified interval.
| |
| previously to performance of this surveillance. CARD 15-26054 (8/27/2015) states:
| |
| "During the monthly system engineering walkdown it was discovered that cell 74 of the Division 1 battery had a brick red coating on the negative plate strap. This is early signs of copper contamination. It is recommended that cell 74 be replaced during RF-17."
| |
| Reportability/Operability Review states: "All acceptance criteria has been met. The noted issues have no impact on the ability of the Div 1 Batteries to meet their design function.
| |
| Div 1 130/260 Volt Battery remains Operable." CARD Closure Summary states: "The Cause. ES1 - Manufacturing: Copper contamination is most frequently caused by a misalignment of the copper inserts during the manufacturing process which causes some parts of the copper to have an abnormally thin lead coating. The Corrective Action.
| |
| Replaced cell 74 per WO 43878966 during RF17." CARD 15-26601 (9/17/15) states:
| |
| "While performing WO 38301298 Div I Quarterly 130/260 VDC Battery Check Surveillance, during General Inspection it was found that Cell 95 Positive Left Post appears to be swollen on the right side between the intercell connections. All Test Data was SAT for this cell and condition does not appear to be affecting the cell's current state." Reportability/Operability Review states: "...condition has no impact on the ability of the battery to perform its safety function. Battery 2PA remains OPERABLE." Cells 50, 52, & 95 were replaced per WO 43878966 during RF17.
| |
| Event Title Associated SRs and Function 1233 PERFORM 24.137.03 SEC-5.1 & 5.3 MSIV FAIL SAFE TEST / POSITION SR 3.3.3.1.2-8 INDICATION
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 181 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 295 of 395 1245 PERFORM 24.139.03 SEC-5.3,5.4 SLC LOOP B PUMP FLOW,MANUAL SR 3.1.7.8 SR 3.1.7.9 INITIATE & SQUIB FIRING
| |
| # Performances: 3 # Failures: 3 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/21/2009 A Control Room Indication light for Valve C4100-F006, SLC Inj Line Outbd Check Valve, The identified failure(s) would not have indicated dual position, Valve was verified Closed. CARD 09-22849 submitted. CARD prevented the performance of the required 09-22849 states while fast filling the system with air IAW procedure, there was a steady safety function of the equipment. The valve flow of air with no bubbles. This proves the check valve was closed locally. Requested operated as expected; however, the I&C to troubleshoot and repair limit switch for C4100-F006. CARD Reportability / indicating lights did not indicate proper Operability Review states that proper operation of C4100-F006 has been demonstrated; valve position. Therefore, this failure will therefore, indication for check valve position does not impact operability of the SLC have no impact on an extension to a 24 System. Work Order 29710512 found the valve position switch actuating arms and month surveillance interval.
| |
| actuating cams loose and out of adjustment. Tightened and adjusted cams and limit switch arms for proper operation. Check valve is closed and lights indicate closed.
| |
| Adjusted Open switch to best achievable. Unable to stroke valve to verify operation.
| |
| Checked lights by actuating switches with wrench.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 182 of 270
| |
| | |
| 4/16/2012 A Two issues are identified in this performance. 1) Control Room Indication light for The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 Valve C4100-F006, SLC Inj Line Outbd Check Valve, did not have a DISC OPEN light Page 296 of 395 prevented the performance of the required as expected. CARD 12-23026 submitted. CARD 12-23026 states "Locally at the valve safety function of the equipment. The valve the Operator reported that the arm on the valve moved in the Open direction but did not operated as expected; however, the come in contact with the limit switch. Locally the Operator heard flow noise in the in indicating lights did not indicate proper the pipe and when the pump was shut down the valve went closed. This is a repeat valve position. Therefore, this failure will problem from RFO#14 CARD 10-30382." CARD 12-23026 Reportability / Operability have no impact on an extension to a 24 Review states "Primary Containment Isolation Valve position indication requirements month surveillance interval.
| |
| are not met for this valve. C4100F006 PCIV position indication in Inoperable."
| |
| Maintenance Rule Functional Failure evaluation determined there to be NO functional failure. Work Order 34306046 created to track completion of Step 5.4.14.6. WO 34306046 troubleshooting indicated a defective position switch C41N402B. Replaced old switch with a new switch, installed old switch actuating arm on new switch, and verified Open/Close position from junction box near valve. 2) Procedure form states "did not get alarm 3D11 and ammeter/continuity light did not have proper indication."
| |
| CARD 12-23027 written. CARD 12-23027 states " When B Pump was started, did not get alarm 3D11 SLC ignition continuity loss and did not lose squib ckt B continuity light on P603. Ammeter C41M600B still showed 4 mA down from greater than 5 mA but not less than 2 mA. Since the ammeter did not go below 2 mA the alarm 3D11 did not come in and Ckt B continuity light did not go out." There was indication that the squib valve did fire based on the discharge pressure of the pump and pumping 3 inches of water out of the test tank. Operator in the area heard the valve fire, noted flow noise in the system, and movement of the arm on C4100F006 SLC Outbd check valve. CARD Reportability / Operability Review states this condition does not involve surveillance acceptance criteria and the CARD is for procedural enhancement with no system impact.
| |
| 11/18/2015 A Control Room Indication light for Valve C4100-F006, SLC Inj Line Outbd Check Valve, The identified failure(s) would not have indicated Closed during Pump run when it should have indicated Open. Good flow and prevented the performance of the required indication locally. CARD 15-28895 submitted. CARD 15-28895 states the valve safety function of the equipment. The valve indicated closed during the whole pump run. Locally valve did stroke open when pump operated as expected; however, the started and reclosed when pump was secured. Indicating lights in the MCR were indicating lights did not indicate proper checked and they were good. Flow looked good from the test tank, pump pressure was valve position. Therefore, this failure will good, and pump operated with no abnormalities locally. CARD also states this failure is have no impact on an extension to a 24 identified as rework and that the Valve team initially set up the limit switches and later month surveillance interval.
| |
| while the system was being run for PMT the condition described in the CARD occurred.
| |
| WO 44292412 referenced in CARD. Work Order indicates the check valve was able to be hand rotated toward Close and picked up the Close light. Rotation is about another 1/4 inch or so. There is a spring assist on Close for this valve which is about an inch long and 1/4 inch in diameter anchored to the shaft via a piece of metal. Cycled it closed and open a few times by hand with the same results each time. Operations says the valve is good to go.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 183 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 297 of 395 1260 PERFORM 24.203.04 SEC-5.4 DIV.2 CSS LOCAL VALVE POSITION SR 3.3.3.1.2-8 SR 3.3.5.1.6-1.d INDICATION VERIF. SR 3.3.5.3.3-1.b SR 3.5.2.9
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failure which is not indicative of a repetitive time based failure mechanism. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/24/2012 C Valve E2100-F006B failed to move even with valve E2150-F005B full open. CARD 12- This is an event driven failure in that 23741 submitted. CARD 12-23741 states the valve did not move at all and the actuator procedure could not be performed as open light did not come on. Fully closed the valve, then opened it, and the Operator in written. Once revised, this issue will not the drywell saw no movement of the valve disk. Did note a level increase in the RPV, prevent restoration of Div 2 Core Spray to but no movement of the disc. Valve lineup for the actuator was verified. Two problems Operable status. Therefore, this failure will are identified - one, the actuator did not move and two, the disc did not move. have no impact on an extension to a 24 Additional troubleshooting attempted to cycle the valve again while the test pushbutton month surveillance interval.
| |
| for F006B valve was held, the solenoid picked up, realigned but nitrogen was venting the entire time the pushbutton was held. When the Operator in the field used the breakaway tool the valve did open and proper indication for the disc and actuator was obtained. CARD 12-23741 Reportability/Operability Review states: "The E2100-F006B valve is able to be stroked by the local manual method with proper position indication and flow to the RPV. A separate CARD is being written to change the procedure to include the guidance that was in the previous revision, which allowed local manual operation of the E2100-F006B valve. The valve is currently capable of meeting the Acceptance Criteria in the back of the surveillance procedure; however, the procedure cannot be performed as written. Once the procedure is revised, this issue will not prevent restoration of Div 2 Core Spray system to Operable status. The applicable Maintenance Rule Functional Failure evaluation attached to the CARD states: "The failure of the actuator to open the check valve resulted in the need for manual operation to open E2100-F006B for testing. However, this actuator is used only for testing purposes, and its failure would not have prevented the check valve from opening when required - that is, in an accident scenario with the Div 2 CS pumps running and CS pressure greater than reactor pressure." WO 34381192 was generated to repair the valve. WO removed actuator from valve and rebuilt actuator. Replaced all elastomers, most of which were elastic but flat. Cylinder was SAT. Reinstalled rebuilt actuator and tested valve with satisfactory results.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 184 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 298 of 395 1263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACT. TEST (RHR SR 3.3.5.1.5-2.a SR 3.3.5.1.5-2.b Pump's & Vlv's) SR 3.3.5.1.5-2.c SR 3.3.5.1.5-2.d SR 3.3.5.1.5-2.e SR 3.3.5.1.5-2.f SR 3.3.5.1.5-2.g SR 3.5.1.11
| |
| # Performances: 1 # Failures: 0 24 Month Justification: Notes: Per Maximo: Perform 0263 OR (1263 + 2263) depending on equipment availability.
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1265 PERFORM 24.204.05 SEC-5.2 DIV 1 RHR LOCAL VALVE POSITION SR 3.3.3.1.2-8 SR 3.3.5.1.6-2.h INDICATION VERIF. SR 3.3.5.3.3-2.b SR 3.3.6.1.6-2.e SR 3.3.6.1.6-6.c SR 3.5.2.9
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/28/2011 A Valve position for E1150-F006A did not indicate either open or closed in the main The identified failure(s) would not have control room. Valve did stroke and position was verified locally in the field to be prevented the performance of the required correct. CARD 11-22973 previously written to address valve and CARD 11-24328 safety function of the equipment. CARD 11-written for this occurrence. CARD 11-22973 states: "The CLOSE light was seen 22973 Reportability / Operability Review flickering and then simply went out. Light bulbs were replaced, CLOSE light did not states: "Previous troubleshooting performed return. Power and control fuses were determined to be good. These indications were for CARD 10-22173 provided information seen while stroking E1150-F004A which is powered from the MCC position directly that the problem was associated with the above. Voltage reading was taken, 32 VDC was present. This would indicate a problem Limit Switch that provides closed indication with LS3 or TR23 or a loose connection in MCC. MCC was turned off and all wires in only (in the MCR) and does not impact the the MCC were found tight. When MCC was turned back on, E1150-F006A indicated valve from performing its intended function.
| |
| CLOSED." WO 32528607 referenced. WO found wires 5 and 6 coming from the MCC RHR remains operable. The problem with and going to the limit switch broken off behind the lugs. Replaced lugs and verified the closed position indication is intermittent continuity. Verified the proper orientation and sequence of valve limit switch rotors. and currently the closed indication is lit."
| |
| Valve was fully stroked with proper valve indication and left in satisfactory condition. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 185 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 299 of 395 1266 PERFORM 24.204.05 SEC-5.4 DIV 2 RHR LOCAL VALVE POSITION SR 3.3.3.1.2-8 SR 3.3.5.1.6-2.h INDICATION VERIF. SR 3.3.5.3.3-2.b SR 3.3.6.1.6-2.e SR 3.3.6.1.6-6.c SR 3.5.2.9
| |
| # Performances: 5 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/23/2012 A Valve E1100-F050B did not indicate OPEN properly - indicated dual. CARD 12-23670 The identified failure(s) would not have written to document issue. CARD 12-23670 states "While stroking E1100-F050B prevented the performance of the required during partial performance, the valve indicated dual while stroking open. Local position safety function of the equipment. Therefore, was verified as open. The open limit switch appeared not to be in proper alignment. this failure will have no impact on an The valve does indicate the close position properly. This is a non-contact type of limit extension to a 24 month surveillance interval.
| |
| switch." Maintenance performed a minor adjustment to the proximity probe. The proximity probe was adjusted two degrees and the indication was restored to normal.
| |
| 9/6/2012 A Valve E1100-F074 local position cannot be determined. CARD 12-27394 written to The identified failure(s) would not have document issue. CARD 12-27394 states: "The local positioner for E1100-F074 is prevented the performance of the required misaligned so that position cannot be properly determined. This also does not allow safety function of the equipment. CARD 12-proper contact with the limit switches. This is not acceptance criteria for the 27394 Reportability / Operability Review surveillance." WO 35290864 referenced. WO states: "Determined via OPS procedure states: "A misaligned position indication enclosure that the undocumented, unwired limit switches are used to visually verify does not prevent this drain valve from valve stroke. Reinstalled actuating arm to make limits move. Stroked SAT. Returned opening or closing when required.
| |
| to service." Therefore, no impact on the ability of the E1100-F074 from performing its function."
| |
| Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 186 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 300 of 395 1290 PERFORM 42.307.01 DIV 1 EDG ECCS EMERG START CIRCUITS & SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b AUTO TRIP/BYPASS,LF
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/17/2017 A SPF Notes: "Wrote CARD 17-21352" CARD states: "While performing SPF# The identified failure(s) would not have 43250733, Procedure 42.307.01 in EDG-11 Switchgear Room an Acceptance Criteria prevented the performance of the required step Failed. Step 6.5.4, Sub Step 6, expected results were supposed to be to verify circuit safety function of the equipment. Therefore, between terminals B2107 and B2108 are closed; circuit is open. All Sub Steps were this failure will have no impact on an satisfactory prior to this step. Results of action shows contacts #5 & #6 in 4A relay extension to a 24 month surveillance failed, relay is Start Logic Relay. Immediate Actions: Stopped job at step that failed interval.
| |
| and did not proceed. Immediately notified CR, NSO, and immediate Supervisor.
| |
| Supervisor went to field with craft and verified all work performed in step 6.5.4, all Sub Steps and performed; Peer Check and Verification completed. All work performed correctly. Troubleshooting plan presented to Operations and OCC." CARD Reportability/Operability Review states: "EDG 11 is currently inoperable for surveillance testing; condition does not impact operability of EDG 11. EDG 11 will be returned to operable status following surveillance testing." During surveillance testing an unsatisfactory reading was obtained when checking closed contact 5-6 of relay 4A for EDG 11. DMM (Agilent U1253B multimeter) in question uses a very low voltage when measuring low resistance readings. Fluke Model 8060A (M&TE) uses a higher voltage (2.5V) for determining resistances. When the Fluke 8060A was used an acceptable resistance reading was obtained (110 ohms). The higher voltage, used by Fluke 8060A, allowed resistance reading to be measured. Therefore, issue of high resistance measurement is the result of test equipment used and NOT of the contact itself. Test equipment had insufficient voltage to break through the oxide layer present on contacts.
| |
| This is not a problem for circuit because normal operating voltage is 130VDC. No maintenance rule or safety related functions were affected. Justification of closed contact using digital multimeters provided in CARD: "System Engineering has determined criteria in section 3.9 of 42.307.01, Rev 35 has been met; therefore, circuit will perform its function as designed."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 187 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 301 of 395 1291 PERFORM 42.307.02 DIV 2 EDG ECCS EMERG START CIRCUITS & SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b AUTO TRIP/BYPASS, LF
| |
| # Performances: 6 # Failures: 3 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 7/16/2009 A SPF Note: "Step 6.4.4.2.a Alarm Card not functioning properly CARD 09-25525 The identified failure(s) would not have written. Performed MWC05 Troubleshooting, found SFR contact 5-6 Open as expected, prevented the performance of the required continued Test with SM permission" CARD 09-25525 states: "EDG14 Start Failure safety function of the equipment. Therefore, alarm alarmed as expected however would not silence without holding silence button in. this failure will have no impact on an Suspect a failed alarm card. Please initiate a WO to repair/replace the card." extension to a 24 month surveillance Reportability/Operability Review states: "EDG 14 is currently inoperable for surveillance interval.
| |
| this is for the local alarm function only and has no impact on EDG 14 start or trip logic therefore no related operability issues." WO 30096983 written. WO scope is to determine if reason for Start Failure alarm to not silence is due to the Ronan Card and replace the card if necessary. WO replaced alarm card and PMT completed SAT.
| |
| 7/8/2015 A SPF notes: "CARD 15-24666 written for failed alarm card. Card will be replaced under The identified failure(s) would not have WO 43423068" CARD states: "While performing 42.307.02 on EDG-14, fuse FU-9 was prevented the performance of the required removed. When this fuse was removed 5 expected alarms came in. After the alarms safety function of the equipment. Therefore, came in they were acknowledged. Once acknowledged the Jacket Coolant Level Low this failure will have no impact on an alarm continues to alarm." Operations check the level and verified it was in the normal extension to a 24 month surveillance band. Reportability/Operability Review states: "The EDG 14 JCS level was verified to in interval.
| |
| the normal standby condition per operator rounds. The condition of the annunciator horn sounding continuously does not impact the EDG's ability to perform its safety function. EDG14 is OPERABLE." WO 43423068 scope: replace the Ronan Card for EDG-14 Jacket Coolant Level Low (local window #8) due to failure to reset. Work order completed satisfactorily, local and remote alarms verified to be working as required.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 188 of 270
| |
| | |
| 1/6/2017 A SPF Note 1: Expected response not achieved following performance of Step 6.18.3 - The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 CARD 17-20141 (CARD noted in SPF is 17-20417) CARD 17-20141 states: "While Page 302 of 395 prevented the performance of the required performing section 6.18, EDG 14 emergency stop button is to be manually pushed to safety function of the equipment. Therefore, bring in shutdown relay. When operations manually operated the emergency stop button this failure will have no impact on an nothing happened. After about an hour and a half the overspeed alarm came in. Notified extension to a 24 month surveillance operations, engineering, and first line supervision." Reportability/Operability Review interval.
| |
| states: "Due to failure identified in CARD, ACCEPTANCE CRITEREA steps of 42.307.02 are not met. This renders EDG-14 INOPERABLE." Tracked on LCO 17-0027. Completion of the fault tree identified R3001S004-022 Emergency Overspeed Switch (EOS) electronic limit switch had failed. WO 46819697 was created and replaced EOS. EOS was quarantined for further investigation of failure. As documented in EACE: "Infield disassembly confirmed oil present within the EOS, and a degraded oil seal on the EOS housing. EOS housing has an oil seal on the cover that helps to prevent oil intrusion. It should be noted that this switch is not designed to be installed in an oil rich environment. However, the degraded oil seal allowed for the minimal amount of oil intrusion at this location. As-found condition inspection of the EOS housing concluded housing oil seal was not properly seated in one location. Additionally, source of oil was a small seep from upper air start distributor gasket that only occurred with EDG in standby. This gasket was replaced by WO 42996058 (1-25-2017)." R3001S004-022 EDG 14 Emergency Overspeed Switch was replaced per WO 46819697 "Replace EOS switch for EDG 14" on 01/06/2017. 42.307.02, Section 6.18 was performed following EOS replacement satisfactorily. The EOS was sent to Fairbanks-Morse for failure analysis.
| |
| | |
| == Conclusion:==
| |
| "oil intrusion into this switch caused a condition where the contacts were unable to make a connection when switch was released. Further, the amount of oil that was contained within switch also contributed to plunger assembly hanging up due to a hydraulic vacuum or lock around plunger, so when engine trip mechanism moved away from the micro switch, plunger did not move back with it so contacts could close. The combination of these conditions from oil intrusion into switch mechanism caused failure of this micro switch." Technical Evaluation TE-R30-17-014 concluded: "loss of EOS would not have prevented engine from shutting down, only prevented opening of the EDG output breaker. There is no impact on lose of EOS because opening of the output breaker would have been accomplished via one of the other engine trip functions such as low lube oil or jacket coolant pressure that also energize shutdown relay (SDR), and open the output breaker." No maintenance rule or safety related functions were lost. Event was not an MSPI failure. Failure of EOS would not have prevented EDG from starting or running while supplying power to its emergency loads. The loss of one of the trips doesn't prevent engine from performing its emergency functions; it only prevents automatic shutdown. Therefore, EDG 14 would have remained operable with the degraded EOS.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 189 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 303 of 395 1292 PERFORM 42.309.04 DIV 1 BATTERY CHARGER LOAD TEST - 2A-2 SR 3.8.4.6 ONLY
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1293 PERFORM 42.309.04 DIV 1 BATTERY CHARGER LOAD TEST - 2A1-2 SR 3.8.4.6 ONLY
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1311 PERFORM 24.402.06 DRYWELL TO TORUS BYPASS LEAK TEST (AS SR 3.6.1.1.2 LEFT)
| |
| # Performances: 1 # Failures: 0 24 Month Justification: Notes: Only one As Left performance completed during analysis period following valve maintenance.
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1315 PERFORM 24.404.03 SEC-5.2 SGTS VALVE OPERABILITY & SR 3.3.3.1.2-8 SR 3.3.6.1.6-2.e POSITION INDICATION VERIF.
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 190 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 304 of 395 1317 PERFORM 24.405.03 SECONDARY CONTAINMENT INTEGRITY TEST SR 3.6.4.1.5 SR 3.6.4.1.6 (USING DIV 2 SGTS)
| |
| # Performances: 3 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1321 PERFORM 24.406.02 SEC-5.1 NITROGEN INERT VLV POS SR 3.3.3.1.2-8 SR 3.3.6.1.6-2.e INDICATION VERIF ANY MODE
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1345 PERFORM 24.139.03 SEC-5.1 SLC - RWCU ISOLATION FUNCTIONAL SR 3.3.6.1.5-5.d TEST
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1493 PERFORM 43.404.002 DIVISION 2 SGTS CHARCOAL SAMPLE SR 5.5.7.c WITHDRAWAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 191 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 305 of 395 1495 PERFORM 43.413.001 SECT 5.3 & 5.4 CHARCOAL SAMPLE SR 5.5.7.c WITHDRAWAL & LAB TESTING
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1531 PERFORM 44.020.007 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SR 3.3.6.1.4-1.a SR 3.3.6.1.4-2.b SYS A,CHL A,MTU CAL/FUNC SR 3.3.6.1.4-5.e SR 3.3.6.1.5-1.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-5.e SR 3.3.6.2.4-1 SR 3.3.6.2.5-1 SR 3.3.7.1.5-1 SR 3.3.7.1.6-1 SR 3.6.1.3.8 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1532 PERFORM 44.020.008 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SR 3.3.6.1.4-1.a SR 3.3.6.1.4-2.b SYS B,CHL B,MTU CAL/FUNC SR 3.3.6.1.4-5.e SR 3.3.6.1.5-1.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-5.e SR 3.3.6.2.4-1 SR 3.3.6.2.5-1 SR 3.3.7.1.5-1 SR 3.3.7.1.6-1 SR 3.6.1.3.8 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 192 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 306 of 395 1533 PERFORM 44.020.009 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SR 3.3.6.1.4-1.a SR 3.3.6.1.4-2.b SYS A,CHL C,MTU CAL/FUNC SR 3.3.6.1.4-5.e SR 3.3.6.1.5-1.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-5.e SR 3.3.6.2.4-1 SR 3.3.6.2.5-1 SR 3.3.7.1.5-1 SR 3.3.7.1.6-1 SR 3.6.1.3.8 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1534 PERFORM 44.020.010 NS4 RX VESSEL LOW WTR LEVEL 1&2,TRIP SR 3.3.6.1.4-1.a SR 3.3.6.1.4-2.b SYS B,CHL D,MTU CAL/FUNC SR 3.3.6.1.4-5.e SR 3.3.6.1.5-1.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-5.e SR 3.3.6.2.4-1 SR 3.3.6.2.5-1 SR 3.3.7.1.5-1 SR 3.3.7.1.6-1 SR 3.6.1.3.8 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 193 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 307 of 395 1540 PERFORM 44.020.011 PHASE 2 RX LOW WATER LEVEL 1, TRIP SYS SR 3.3.6.1.7-1.a A, CHANNEL A, RTT
| |
| # Performances: 4 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 7/12/2016 A SPF note: "Step 6.2.5.2 time was slower than requirement. Discussed with Supervisor The identified failure(s) would not have and CRS." "CRS requested we note slower response time in CARD and proceed with prevented the performance of the required completing SPF. Submitted CARD 16-25547." CARD 16-25547 states: "Response safety function of the equipment. Therefore, Time Test of B21N681A and B21N684A, step 6.2.5.2 failed to meet satisfactory value. this failure will have no impact on an Value is supposed to be <144mSec, value obtained during test was168mSec." extension to a 24 month surveillance interval.
| |
| Reportability/Operability Review states: "The Div 1 Rx Water Level 1 MSIV Isolation Master and Slave Trip Units exhibited a Phase 2 response time of 168 msec which is more than the expected value of 144 msec. Based on the most recent results of Phase 1 and 3 response time testing for the same trip units, 19 msec and 89 msec, respectively, the total response time for the described condition is 276 msec which remains below the total response time allowable value of 1 second (TRM Table TR3.3.6.1-1, Function 1.a).
| |
| Therefore, the results of the Phase 2 response time testing being higher than expected does not prevent fulfillment of the specified safety function of Rx Water Level 1 MSIV Isolation. Div 1 Rx Water Level 1 MSIV Isolation Master and Slave Trip Units remain OPERABLE." Two Work Orders are referenced in CARD 16-25547; WO 45758803 and WO 45758812. There is also a Note in the CARD that states: "The issue described in this CARD would be addressed by performing WO 34728649 to replace the MTU."
| |
| Per Maximo WO 34728649 and WO 45758803 were both Cancelled. WO 45758812 was completed; however MTU for B21N681A did not fit in the nest. A follow-up Work Order, WO 48871140 was initiated to replace MTU. CARD 17-28279 was also initiated. Per Maximo WO 48871140 was Cancelled. CARD 17-28279 references WO 48876158 Replace MTU B21N681A. Per Maximo, WO 48876158 is at status WCREV with scheduled start of 10/07/2019.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 194 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 308 of 395 1551 PERFORM 44.020.160 NS4 RWCU AREA DIFFERENTIAL SR 3.3.6.1.4-5.c SR 3.3.6.1.5-5.c TEMPERATURE DIV 1, CAL/FUNC
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 10/13/2011 A SPF note: "6.4.9.2 RR-12 right terminal too damaged to torque. Notified CRS/I&C The damaged terminal at RR-12 had not supervisor, added terminal to CARD 11-29296" CARD 11-29296 states: been loosened. The condition did not impact "Calibration/Functional requires terminal screws to be tightened to a torque value of 0.5 the function of Temperature Monitor G33-Nanometers. CARD 11-29296 was initiated when terminal screws were found damaged N602C. Surveillance was completed associated with performance of 44.020.159 - NSSSS RWCU Area NRHX Discharge satisfactorily. The identified failure(s) would Temperature, Div 2 Calibration/Functional. Added by note to CARD 11-29296: not have prevented the performance of the "Terminal RR-12 right side was identified as too damaged to torque while performing required safety function of the equipment.
| |
| 44.020.160 - NSSSS-RWCU Area Differential Temperature, Division 1, Therefore, this failure will have no impact Calibration/Functional". Reportability/Operability Review states: "The terminal screws on an extension to a 24 month surveillance that were found damaged and unable to be torqued had not been previously loosened interval.
| |
| during the performance of 44.020.159. The surveillance demonstrated proper performance of the RWCU Area Temperature -high instrumentation. The damaged terminal screws have no affect on RWCU Area Temp - High instrumentation. RWCU Area Temperature -High instrumentation remains operable. This condition does not impact the function of RWCU-Area temperature - high isolation instrumentation." This statement would apply similarly to the damaged RR-12 terminal identified while performing 44.020.160. Terminal RR-12 was eventually replaced by WO 32044326 on 10/9/2015.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 195 of 270
| |
| | |
| 4/8/2016 A SPF note: "Resistance to ground readings for G33N022C and G33N023C were low 187 The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 and 181 Ohms, expected to see >1Mohm. Notified CRS, wrote CARD 16-22957" Page 309 of 395 prevented the performance of the required CARD 16-22957 states: "step 6.3.4.4 had an unsatisfactory resistance reading of 181 safety function of the equipment. Therefore, ohms when it was expected to read >1.0 MEG Ohm. Discussed with CRS and Shift this failure will have no impact on an Manager and was directed to continue with test and generate a CARD." extension to a 24 month surveillance Reportability/Operability Review states: "The surveillance 44.020.160 contains a note interval.
| |
| prior to obtaining this reading that states the resistance reading may suggest thermocouple and/or lead wire degradation. The note goes on to say that these resistance readings do not make the channel inoperable because a failure is not indicated unless the TRIP of Temperature Monitor G33-N602C is affected. This was testing during the performance of 44.020.160 and found to be satisfactory. This has no impact on the ability of the instrument to function as designed. G33-N023C, RWCU Steam leak detection "C" Heat Exchanger room outlet temp element remains operable." WO 45100037 initiated for troubleshooting and repair. Work Order completed troubleshooting SAT for resistance readings; repair was not required. Suspect that terminal knife switches RR-11 and RR-12 were not fully open. Work Order was completed on 10/4/2016.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 196 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 310 of 395 1552 PERFORM 44.020.161 NS4 RWCU AREA DIFFERENTIAL TEMP, DIV 2, SR 3.3.6.1.4-5.c SR 3.3.6.1.5-5.c CAL/FUNCTIONAL
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 10/13/2011 A SPF note: "6.2.9.1 & 6.4.9.2; PP-13 and PP-12 left side terminal screws damaged. The identified failure(s) would not have Neither could be torqued. Notified CRS/I&C Supervisor, CARD 11-29296 written to prevented the performance of the required identify terminals" CARD 11-29296 states: "Calibration/Functional requires terminal safety function of the equipment. Therefore, screws to be tightened to a torque value of 0.5 Nanometers. CARD 11-29296 was this failure will have no impact on an initiated when terminal screws were found damaged associated with performance of extension to a 24 month surveillance 44.020.159 - NSSSS RWCU Area NRHX Discharge Temperature, Div 2 interval.
| |
| Calibration/Functional. Added by note to CARD 11-29296: "Terminals PP-12 and PP-13 left side were identified as too damaged to torque while performing 44.020.161 -
| |
| NSSSS RWCU Area Differential Temperature, Division 2, Calibration/Functional".
| |
| Reportability/Operability Review states: "The terminal screws that were found damaged and unable to be torqued had not been previously loosened during the performance of 44.020.159. The surveillance demonstrated proper performance of the RWCU Area Temperature -high instrumentation. The damaged terminal screws have no affect on RWCU Area Temp - High instrumentation. RWCU Area Temperature -High instrumentation remains operable. This condition does not impact the function of RWCU-Area temperature - high isolation instrumentation." This statement would apply similarly to the damaged PP-12 & PP-13 terminals identified while performing 44.020.161. Terminals PP-12 & PP-13 were eventually replaced by WO 33485963 on 10/10/2015.
| |
| Event Title Associated SRs and Function 1623 PERFORM 44.020.046 PHASE 2 MAIN STEAM LINE FLOW, DIV 2, SR 3.3.6.1.7-1.c CHANNEL D, RTT
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 197 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 311 of 395 1628 PERFORM 44.020.417 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS A,B21N613A,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1629 PERFORM 44.020.421 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS B,B21N613B,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1630 PERFORM 44.020.422 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS B,B21N614B,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1631 PERFORM 44.020.423 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS B,B21N615B,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 198 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 312 of 395 1636 PERFORM 44.020.433 NS4 TB AREA TEMP, TRIP SYS A, CH A, SR 3.3.6.1.4-1.g SR 3.3.6.1.5-1.g B21N617A, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1637 PERFORM 44.020.435 NS4 TB AREA TEMP, TRIP SYS B, CH B, SR 3.3.6.1.4-1.g SR 3.3.6.1.5-1.g B21N617B, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1638 PERFORM 44.020.437 NS4 TB AREA TEMP, TRIP SYS A, CH C, SR 3.3.6.1.4-1.g SR 3.3.6.1.5-1.g B21N617C, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 5/15/2012 A B21-N617C Gross Fail Trip, As Found Low and High readings out of range associated The identified failure(s) would not have with Acceptable Performance Tolerance (APT) values. B21-N617C Gross Fail Trip was prevented the performance of the required successfully calibrated with both Low and High readings within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 199 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 313 of 395 1639 PERFORM 44.020.439 NS4 TB AREA TEMP TRIP SYS B, CH D, SR 3.3.6.1.4-1.g SR 3.3.6.1.5-1.g B21N617D, CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 8 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 3/28/2015 A B21-N617D RTD Input Bridge As Found, 50% increasing and decreasing readings were The identified failure(s) would not have below Acceptable Performance Tolerance (APT) MIN value. RTD Input Bridge was prevented the performance of the required successfully calibrated within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 200 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 314 of 395 1644 PERFORM 44.030.152 ONLINE - HPCI SYSTEM LOGIC FUNCTIONAL SR 3.3.6.1.5-3.a SR 3.3.6.1.5-3.b TEST SR 3.3.6.1.5-3.c SR 3.3.6.1.5-3.d SR 3.3.6.1.5-3.e SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 10/28/2014 A SPF Note 1: "Step 6.2.5, E4150F042 did not open when pushbutton was momentarily The identified failure(s) would not have depressed. Pushbutton had to be held to fully open valve." CARD 14-28404 written. prevented the performance of the required CARD 14-28404 states: "During performance of 44.030.152, E4150F042, HPCI Torus safety function of the equipment. Therefore, Suction Inboard Isolation Valve failed to open while performing step 6.2.5. Second this failure will have no impact on an attempt to manually open valve holding open pushbutton depressed for 3 seconds extension to a 24 month surveillance resulted in dual indication. Valve was then closed, and a third attempt to open valve interval.
| |
| while holding open pushbutton depressed until valve fully opened was performed. This fully opened valve. Appears problem with opening circuit seal in when manually opening valve. Surveillance closes valve using a test box to simulate in inboard isolation valve logic signal and valve responded properly. This is similar issue as documented in CARD 12-24169. Request WO to troubleshoot and repair valve circuitry for E4150F042." Reportability/Operability Review states: "Suction for HPCI comes from either CST or Torus. E4150F042 is the suction from Torus. Valve still functions strokes closed as required which supports Primary Containment isolation function. Valve open contactor functioned and auto open signal does not rely upon seal in from closed push button as auto signal is a contact from a relay that goes directly to the contactor so function to support HPCI operability is maintained. HPCI system and primary containment isolation valve are OPERABLE because valve is still capable of auto opening and closing to support the design functions." Work Order 42002118 initiated to Troubleshoot E4150F042 Valve Open Seal-in Circuit. Work Order Notes: "This problem was last attempted to be repaired under WO 34450676 on 5/27/2014. During that W/O, O/a seal-in contact was replaced." WO found Aux Contact Block Interlock finger broken. Replaced broken Base 2 Position Aux Contact block. Opening circuit tested satisfactorily; Work Order completed 2-24-2016.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 201 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 315 of 395 1645 PERFORM 44.030.401 ECCS HPCI/RCIC CST LEVEL, E41N061D, SR 3.3.5.1.4-3.d SR 3.3.5.1.5-3.d CALIBRATION/FUNCTIONAL SR 3.3.5.2.4-3 SR 3.3.5.2.5-3
| |
| # Performances: 7 # Failures: 5 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 5/7/2009 A SPF note: "Found damaged fitting on low pressure side of E41N061D, this side is open The identified failure(s) would not have to atmosphere and used for calibration of transmitter only. CRS notified, CARD written prevented the performance of the required 09-23677" CARD 09-23677 Reportability/Operability Review states: "The identified safety function of the equipment. Therefore, damage to the low pressure side fitting does not affect the components ability to perform this failure will have no impact on an it's safety function. The E41N061 Transmitter is OPERABLE." WO 29810849 initiated extension to a 24 month surveillance to install new fitting on transmitter. WO 29810849 completed on 5/10/2012. interval.
| |
| 10/5/2010 A Table 5, E41-N061D Transmitter, As Found readings, found out of Acceptable The identified failure(s) would not have Performance Tolerance (APT) range. E41-N061D Transmitter calibrated per prevented the performance of the required Attachment 2, to within As Left Tolerance (ALT). safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 202 of 270
| |
| | |
| 12/20/2013 A SPF Note: " Performance of Step 6.1.6.3, power was lost to section Z2 of H21P081. The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 Indication for all units in Z2 was lost, current indication on readout assembly was lost Page 316 of 395 prevented the performance of the required and DMM voltage indicated 0.0. Worked stopped. CRS, Shift Manager and I&C safety function of the equipment. Therefore, Supervisor informed. Verified indications with Ops. Coordinated with Ops under Shift this failure will have no impact on an Manager directions. Pulled center knob of Cal Select and Command switch. Dialed extension to a 24 month surveillance Stable Current CCW, Turned Cal Select and Command switch to off. Turned Cal Power interval.
| |
| off and removed Readout Assy. Operators attempted to replace power fuse in Section Z2. Fuse immediately blew and flame was observed, Coordinated with Shift Manager, removed MTU E41N661D from H21P081. Observed damage to MTU circuitry. No other damage observed in Panel. Operators replaced power fuse again. Z2 power was restored. Operators reset Gross Fail on Z2. Indications were verified restored. CARD 13-28975 written. MTU, removed from E41N661D location, was quarantined for analysis." CARD 13-28875 states: "During performance of 44.030.401(HPCI/RCIC CST level, E41N061D Calibration/Functional) indication was lost on the H21-P081 Panel Z2 surface. Commenced ARP 2D5 (Testability Div 2 ECCS Logic/Power Failure) and discovered Fuse E41F2B blown. A new fuse was obtained and during replacement sparks, smoke and a small flame were visible coming from Trip Unit E41-N661D. Fuse E41F2B was promptly removed. After a discussion between Operations and I&C, Trip Unit E41-N661D was removed the adjacent cards inspected and Fuse E41F2B was replace successfully. The Z2 surface of H21-P081 was energized. With the Trip Unit E41-N661D removed HPCI and RCIC suction will remain selected to the Torus. CARD Reportability/Operability Review states: "CST Level Instrument E41-N661D is inoperable and tracked on LCO 13-0598. When the fuse blew the following instruments were affected B21N690D, B21N685B, E11N655B/D, E11N656B/D, E21N655B, E21N662B, E41N661B/D and E41N662B/D. The limiting time allowed was 24 Hours per Tech Spec 3.3.5.1, 3.3.5.2 and 3.3.3.1. Operability of these instruments was validated by a channel check following fuse replacement. No loss of safety function occurred during this event. RCIC and HPCI Suction remain aligned to the Torus due to the instrument failure. Investigation determined the cause of open fuse is a failed C25 capacitor on the circuit board on E41N661D HPCI Condensate Storage Tank (CST) Low Level Signal to Suppression Pool Suction Trip Unit. The failed capacitor caused a short and subsequent loss of power. On 6/18/1999, Rosemount made a Part 21 notification to the NRC, Event #35844. The purpose of the notification was regarding a potential need forcapacitor replacement in specific trip/calibration units. Rosemount found that capacitors that were exposed to temperatures and voltages in excess of normal operating conditions have failed. Introduction of contaminant such as moisture could also possibly cause a failure. The affected capacitors have a date code prior to 8630. As a precautionary measure, Rosemount made a component change featuring an enhanced moisture seal. Fermi evaluated this Part 21 notification per CARD 99-15134. The conclusion of this evaluation was to remain with the original C25 capacitors (reasons are listed in CARD). Event was determined to be a MRFF due to non risk significant functions lost on the E11 and E21 systems. E41N661D failure was the initiating event, therefore in accordance with MMR APP D the failure will be counted against E4100.
| |
| MRFF was determined to be NOT maintenance preventable. Work Order 37841716 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 203 of 270
| |
| | |
| initiated to troubleshoot loss of testability power associated with E41N661D. MTU for TRVEND 24MCGNF319001 Rev 1 E41N661D replaced. Surveillance test 44.030.401 was used as PMT for Work Order Page 317 of 395 and completed satisfactorily. Acceptance Criteria was met.
| |
| 8/21/2015 A Table 5, E41-N661D Desired Trip/Reset values, As Found readings, found out of The identified failure(s) would not have Acceptable Performance Tolerance (APT) range. E41-N661D Trip/Reset values prevented the performance of the required calibrated per procedure, Step 6.1.6, to within As Left Tolerance (ALT). safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 10/28/2016 A SPF note: "Acceptance Criteria in Table 5 was not met for As Found data; Notified The identified failure(s) would not have Supervisor and CRS; calibrated per Attachment 2, As Left data was satisfactory, wrote prevented the performance of the required CARD 16-28615." CARD 16-28615 states: "E41N061D was found out of calibration. safety function of the equipment. Therefore, The As Found Data for the Acceptance criteria in table 5 of 44.030.401 was not met as this failure will have no impact on an the data was out of APT. A calibration performed per attachment 2 of 44.030.401 was extension to a 24 month surveillance successful and As Left Data for Table 5 was satisfactory. Request investigation into interval.
| |
| whether E41N061D should be replaced as the As Found Data was outside APT by a significant amount which is extremely unusual for a Rosemount transmitter." CARD 16-28615 Reportability/Operability Review states: "calibration performed per attachment 2 of 44.030.401 was successful and As Left Data was satisfactory. This has no further impact on the ability of the E41N061D to function as designed in support of the CST Level-low suction transfer function for HPCI and RCIC systems. The E41N061D, HPCI and RCIC systems remain OPERABLE." CARD 16-28615 generated WO 46610734 as a contingency replacement work order scheduled with next performance of 44.030.401.
| |
| Per Maximo, WO 46610734 is at status GLHOLD Hold for GL Acct Determination scheduled start date 10/29/2019. Additionally, E41-N661D Gross Fail Latch As Found Low reading was above the Acceptable Left Tolerance (ALT) MAX value. E41-N661D was successfully calibrated, using attachment 1, Steps 2 and 3, with all readings within As Left Tolerance.
| |
| Event Title Associated SRs and Function 1646 PERFORM 44.030.402 HPCI SYSTEM CST/TORUS VALVES SR 3.3.5.1.5-3.d SR 3.3.5.1.5-3.e INTERLOCK TEST
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 204 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 318 of 395 1671 PERFORM 44.030.255 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL A, MTU SR 3.3.4.1.3.a SR 3.3.4.1.4.a CAL SR 3.3.5.1.4-1.a SR 3.3.5.1.4-2.a SR 3.3.5.1.4-2.d SR 3.3.5.1.4-3.a SR 3.3.5.1.4-3.c SR 3.3.5.1.4-4.a SR 3.3.5.1.5-1.a SR 3.3.5.1.5-2.a SR 3.3.5.1.5-2.d SR 3.3.5.1.5-3.a SR 3.3.5.1.5-3.c SR 3.3.5.1.5-4.a SR 3.3.5.2.4-1 SR 3.3.5.2.4-2 SR 3.3.5.2.5-1 SR 3.3.5.2.5-2 SR 3.5.1.11 SR 3.5.1.12 SR 3.5.3.5 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1672 PERFORM 44.030.256 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL B, MTU SR 3.3.3.1.2-3 SR 3.3.4.1.3.a CAL SR 3.3.4.1.4.a SR 3.3.5.1.4-1.a SR 3.3.5.1.4-2.a SR 3.3.5.1.4-2.d SR 3.3.5.1.4-3.a SR 3.3.5.1.4-3.c SR 3.3.5.1.4-5.a SR 3.3.5.1.5-1.a SR 3.3.5.1.5-2.a SR 3.3.5.1.5-2.d SR 3.3.5.1.5-3.a SR 3.3.5.1.5-3.c SR 3.3.5.1.5-5.a SR 3.3.5.2.4-1 SR 3.3.5.2.4-2 SR 3.3.5.2.5-1 SR 3.3.5.2.5-2 SR 3.5.1.11 SR 3.5.1.12 SR 3.5.3.5 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 205 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 319 of 395 1673 PERFORM 44.030.257 ECCS RX WTR LVL 1,2&8 DIV 1,CHNL C, MTU SR 3.3.3.1.2-3 SR 3.3.3.2.3-2 CAL SR 3.3.4.1.3.a SR 3.3.4.1.4.a SR 3.3.5.1.4-1.a SR 3.3.5.1.4-2.a SR 3.3.5.1.4-2.d SR 3.3.5.1.4-3.a SR 3.3.5.1.4-3.c SR 3.3.5.1.4-4.a SR 3.3.5.1.5-1.a SR 3.3.5.1.5-2.a SR 3.3.5.1.5-2.d SR 3.3.5.1.5-3.a SR 3.3.5.1.5-3.c SR 3.3.5.1.5-4.a SR 3.3.5.2.4-1 SR 3.3.5.2.5-1 SR 3.5.1.11 SR 3.5.1.12 SR 3.5.3.5 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/27/2011 A SPF Note: "6.1.27.5 1D42 did not clear when step 6.1.26 performed. CRS informed, The identified failure(s) would not have CARD 11-24254 written." CARD states: "Channel C, MTU CAL, alarm 1D42 did not prevented the performance of the required clear during step 6.1.26. Recorder read approximately 172". Recorder needs to be cal safety function of the equipment. Therefore, checked, reading low. Reportability/Operability Review states: "Recorder cannot perform this failure will have no impact on an its intended function for level only and is inoperable. RPV pressure indication is still extension to a 24 month surveillance accurate with expected plant conditions." WO 000Z063230: replace model 21000 interval.
| |
| recorder B21R623A with new model SV10C-150-133-A00 per IRID-77277. Recorder was replaced satisfactorily on 5/20/2011.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 206 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 320 of 395 1674 PERFORM 44.030.258 ECCS RX WTR LVL 1,2&8 DIV 2,CHNL D, MTU SR 3.3.4.1.3.a SR 3.3.4.1.4.a CALIBRATION SR 3.3.5.1.4-1.a SR 3.3.5.1.4-2.a SR 3.3.5.1.4-2.d SR 3.3.5.1.4-3.a SR 3.3.5.1.4-3.c SR 3.3.5.1.4-5.a SR 3.3.5.1.5-1.a SR 3.3.5.1.5-2.a SR 3.3.5.1.5-2.d SR 3.3.5.1.5-3.a SR 3.3.5.1.5-3.c SR 3.3.5.1.5-5.a SR 3.3.5.2.4-1 SR 3.3.5.2.5-1 SR 3.5.1.11 SR 3.5.1.12 SR 3.5.3.5 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 207 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 321 of 395 1701 PERFORM 44.010.005 RPS-RX STEAM DOME PRESS,TRIP SYS SR 3.3.1.1.14-3 SR 3.3.1.1.15-3 A,CHNL A1/A,MTU CAL/FUNC
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 9/14/2009 A SPF Note: "6.1.6 During performance of trip pot cycling technician reported abnormal The identified failure(s) would not have effort required to adjust pot. Also pot was not responding properly when adjusted. prevented the performance of the required Notified CRS and I&C Supervisor. Instructed to perform steps to return to normal safety function of the equipment. Therefore, (6.1.11 & 6.1.21 - 6.1.25, 6.1.27) returned to normal. Wrote CARD." CARD 10-28058 this failure will have no impact on an states: "Technician reported an abnormal effort was required to adjust potentiometer extension to a 24 month surveillance while performing the ten turn adjust for step 6.1.6. Technician also reported unexpected interval.
| |
| results when trip setpoint adjustments were attempted. For example what would normally require very small adjustments for optimal setting was requiring in excess of three complete turns of the pot." MRFF evaluation states: "The specific function B2100-02, Provide signals to RPS on high RPV pressure, low RPV water level, or MSIV closure. Since surveillance 44.010.005, RPS- Reactor Steam Dome Pressure, Trip System A, Channel Al/A (B21N678A) Calibration/Functional, met the as found acceptance criteria, the instrument/channel would have functioned as designed. MTU B21N678A trip adjustment potentiometer responding abnormally was not a MRFF."
| |
| Cause of failure was B21N678A, Signal conditioner, trip adjustment potentiometer seized as a result of age. The signal conditioner was the original Rosemount 510 model which are being replaced with the upgraded 710 model as the older conditioners fail in service. Work order 31769478 replaced the original Rosemount 510 conditioner with the upgraded 710 model. This surveillance was performed to verify proper operation of the new conditioner and all surveillance acceptance criteria was met.
| |
| Event Title Associated SRs and Function 1703 PERFORM 44.010.006 RPS-RX STEAM DOME PRESS,TRIP SYS SR 3.3.1.1.14-3 SR 3.3.1.1.15-3 B,CHNL B1/B,MTU CAL/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 208 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 322 of 395 1704 PERFORM 44.010.007 RPS-RX STEAM DOME PRESS,TRIP SYS SR 3.3.1.1.14-3 SR 3.3.1.1.15-3 A,CHNL A2/C,MTU CAL/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1705 PERFORM 44.010.008 RPS-RX STEAM DOME PRESS,TRIP SYS SR 3.3.1.1.14-3 SR 3.3.1.1.15-3 B,CHNL B2/D,MTU CAL/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1728 PERFORM 44.020.418 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS A,B21N614A,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1730 PERFORM 44.020.425 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS A,B21N613C,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 209 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 323 of 395 1731 PERFORM 44.020.426 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS A,B21N614C,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1732 PERFORM 44.020.427 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS A,B21N615C,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1750 PERFORM 44.010.017 RPS(TS A/TC A1)-NS4(TS A/TC A) RX LOW WTR SR 3.3.1.1.14-4 SR 3.3.1.1.15-4 LVL 3, B21N680A MTU CAL/FUNC SR 3.3.6.1.4-2.a SR 3.3.6.1.4-6.b SR 3.3.6.1.4-7.a SR 3.3.6.1.5-2.a SR 3.3.6.1.5-6.b SR 3.3.6.1.5-7.a SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 210 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 324 of 395 1751 PERFORM 44.010.018 RPS(TS B/TC B1)-NS4(TS A/TC B) RX LOW WTR SR 3.3.1.1.14-4 SR 3.3.1.1.15-4 LVL 3, B21N680B MTU CAL/FUNC SR 3.3.6.1.4-2.a SR 3.3.6.1.4-6.b SR 3.3.6.1.4-7.a SR 3.3.6.1.5-2.a SR 3.3.6.1.5-6.b SR 3.3.6.1.5-7.a SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1752 PERFORM 44.010.019 RPS(TS A/TC A2)-NS4(TS B/TC C) RX LOW WTR SR 3.3.1.1.14-4 SR 3.3.1.1.15-4 LVL 3, B21N680C MTU CAL/FUNC SR 3.3.6.1.4-2.a SR 3.3.6.1.4-6.b SR 3.3.6.1.4-7.a SR 3.3.6.1.5-2.a SR 3.3.6.1.5-6.b SR 3.3.6.1.5-7.a SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1753 PERFORM 44.010.020 RPS(TS B/TC B2)-NS4(TS B/TC D) RX LOW WTR SR 3.3.1.1.14-4 SR 3.3.1.1.15-4 LVL 3, B21N680D MTU CAL/FUNC SR 3.3.6.1.4-2.a SR 3.3.6.1.4-6.b SR 3.3.6.1.4-7.a SR 3.3.6.1.5-2.a SR 3.3.6.1.5-6.b SR 3.3.6.1.5-7.a SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 211 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 325 of 395 1765 PERFORM 44.030.265 ECCS RX WTR LVL (ADS LVL3-FW/MN TURB SR 3.3.2.2.3 SR 3.3.2.2.4 LVL8)D1,CH A,MTU CAL/CF SR 3.3.5.1.4-4.d SR 3.3.5.1.5-4.d SR 3.5.1.12
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1766 PERFORM 44.030.266 ECCS RX WTR LVL (ADS LVL3-FW/MN TURB SR 3.3.2.2.3 SR 3.3.2.2.4 LVL8)D2,CH B,MTU CAL/CF SR 3.3.5.1.4-5.d SR 3.3.5.1.5-5.d SR 3.5.1.12
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1769 PERFORM 44.030.271 ECCS RX STM DOME PRES RHR/CSS SR 3.3.5.1.4-1.c SR 3.3.5.1.4-2.c INJECT,DIV 1,CHNL A,MTU CAL/FUNC SR 3.3.5.1.5-1.c SR 3.3.5.1.5-2.c SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1770 PERFORM 44.030.272 ECCS RX STM DOME PRES RHR/CSS SR 3.3.5.1.4-1.c SR 3.3.5.1.4-2.c INJECT,DIV 2,CHNL B,MTU CAL/FUNC SR 3.3.5.1.5-1.c SR 3.3.5.1.5-2.c SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 212 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 326 of 395 1771 PERFORM 44.030.273 ECCS RX STM DOME PRES RHR/CSS SR 3.3.5.1.4-1.c SR 3.3.5.1.4-2.c INJECT,DIV 1,CHNL C,MTU CAL/FUNC SR 3.3.5.1.5-1.c SR 3.3.5.1.5-2.c SR 3.5.1.11
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 6/10/2015 A B21-N690C Analog Indicator As Found readings were below Acceptable Performance The identified failure(s) would not have Tolerance (APT) MIN value. Analog Indicator was successfully calibrated with all prevented the performance of the required readings within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 213 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 327 of 395 1772 PERFORM 44.030.274 ECCS RX STM DOME PRES RHR/CSS SR 3.3.5.1.4-1.c SR 3.3.5.1.4-2.c INJECT,DIV 2,CHNL D,MTU CAL/FUNC SR 3.3.5.1.5-1.c SR 3.3.5.1.5-2.c SR 3.5.1.11
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 7/29/2015 A B21-N690D Analog Indicator As Found, 100% reading was below Acceptable The identified failure(s) would not have Performance Tolerance (APT) MIN value. Analog Indicator was successfully calibrated prevented the performance of the required with all readings within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 2/2/2017 A SPF Note: "The analog indicator on B21N690D unable to cal per Att 1, Step 1. Zero The identified failure(s) would not have adjust screw fell out. Not acceptance criteria. Data is "best fit" Stopped, talked to CRS, prevented the performance of the required SM and I&C Supervisor. Said to write CARD and continue. CARD 17-20981" CARD safety function of the equipment. Therefore, states: "analog indicator B21N690D as found data was un-sat. This meter could not be this failure will have no impact on an calibrated to within as left tolerance per attachment 1 step 1. This is not acceptance extension to a 24 month surveillance criteria. Recommend replacing analog indicator or MTU." Reportability/Operability interval.
| |
| Review states: "Analog indicator is not used in the calibration of the trip unit nor the transmitter. The indicator is for trending data only. Talked to CARD initiator and only one point was outside ALT - 1200psig (which is above normal operating pressure and above when low pressure systems would be required), all other points were good. This indicator has no impact on the low pressure (ECCS) injection permissive. B21N690D (B21N090D) remains operable." Action Item Completion comments state: "The instrument provides a pressure signal for ECCS response. The isolation logic is 1 out of 2 taken twice as referenced in 23.601, "Instrument Trip Sheets." Each trip channel has 4 instruments that would generate the necessary input to trip thechannel. B21N690D being outside of calibration does not adversely impact the isolation logic because the 3 remaining instruments would generate thenecessary signals to cause the isolation.
| |
| Therefore, the function listed above was maintained. No MRFF occurred."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 214 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 328 of 395 1773 PERFORM 44.030.283 ECCS RX STM DOME PRES RHR LOOP SR 3.3.5.1.4-2.e SR 3.3.5.1.5-2.e SELECT,D1,CHL A,MTU-CAL/CF SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1774 PERFORM 44.030.284 ECCS RX STM DOME PRES RHR LOOP SR 3.3.5.1.4-2.e SR 3.3.5.1.5-2.e SELECT,D2,CHL B,MTU-CAL/CF SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1775 PERFORM 44.030.285 ECCS RX STM DOME PRES RHR LOOP SR 3.3.5.1.4-2.e SR 3.3.5.1.5-2.e SELECT,D1,CHL C,MTU-CAL/CF SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1776 PERFORM 44.030.286 ECCS RX STM DOME PRES RHR LOOP SR 3.3.5.1.4-2.e SR 3.3.5.1.5-2.e SELECT,D2,CHL D,MTU-CAL/CF SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 215 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 329 of 395 1797 PERFORM 44.030.076 ECCS RX RECIRC PUMP A DP, DIV 1, CH C, SR 3.3.5.1.4-2.g SR 3.3.5.1.5-2.g CALIBRATION/FUNCTIONAL SR 3.5.1.11
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 9/16/2011 A B31-N113A Transmitter As Found 100% reading was below Acceptable Performance The identified failure(s) would not have Tolerance (APT) MIN value. Transmitter was successfully calibrated within As Left prevented the performance of the required Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 3/15/2013 A SPF Note: "Step 6.2.5, Table 5 Transmitter outside of APT at 100% point. Informed SM The identified failure(s) would not have
| |
| & I&C Supervisor. Cal'd transmitter to within ALT, Initiated CARD 13-21935 for prevented the performance of the required investigation." CARD states: "During performance of 44.030.076, transmitter safety function of the equipment. Therefore, B31N113A was fount outside of APT at 100% point. All other points were within APT. this failure will have no impact on an Calibrated B31N113A per procedure to within ALT." Reportability/Operability Review extension to a 24 month surveillance states: "The transmitter was calibrated to within As Left Tolerance (ALT), therefore this interval.
| |
| condition does not affect theability of the ECCS Logic to perform its intended function. ECCS Instrumentation remains OPERABLE." Investigation determined the loss of one transmitter will not prevent the system from performing as designed. No functional failure occurred.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 216 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 330 of 395 1798 PERFORM 44.030.077 ECCS RX RECIRC PUMP B DP, DIV 1, CH D, SR 3.3.5.1.4-2.g SR 3.3.5.1.5-2.g CALIBRATION/FUNCTIONAL SR 3.5.1.11
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 6/9/2016 A B31-N615A Desired Trip/Reset Values As Found readings were above Acceptable The identified failure(s) would not have Performance Tolerance (APT) MAX value. B31-N615A Trip/Reset values calibrated prevented the performance of the required per procedure, Step 6.1.6, to within As Left Tolerance (ALT). safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1799 PERFORM 44.030.078 ECCS RX RECIRC PUMP B DP, DIV 2, CHNL C, SR 3.3.5.1.4-2.g SR 3.3.5.1.5-2.g CALIBRATION/FUNCT SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1800 PERFORM 44.030.079 ECCS RX RECIRC PUMP A DP, DIV 2, CH D, SR 3.3.5.1.4-2.g SR 3.3.5.1.5-2.g CALIBRATION/FUNCTIONAL SR 3.5.1.11
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 217 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 331 of 395 1801 PERFORM 44.030.082 ACCIDENT MONITOR RX WTR LEVEL,DIV 1, SR 3.3.3.1.2-2 MTU CAL/FUNC
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1802 PERFORM 44.030.083 ACCIDENT MONITOR RX WTR LEVEL,DIV 2, SR 3.3.3.1.2-2 MTU CAL/FUNC
| |
| # Performances: 7 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1803 PERFORM 44.040.005 ATWS/SRV LLS RX PRESS,DIV 1,CHNL A, MTU SR 3.3.4.1.3.b SR 3.3.4.1.4.b CAL/FUNC SR 3.3.6.3.3-1 SR 3.3.6.3.3-2 SR 3.3.6.3.4-1 SR 3.3.6.3.4-2 SR 3.6.1.6.2
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1804 PERFORM 44.040.006 ATWS/SRV LLS RX PRESS,DIV 2,CHNL B, MTU SR 3.3.4.1.3.b SR 3.3.4.1.4.b CAL/FUNC SR 3.3.6.3.3-1 SR 3.3.6.3.3-2 SR 3.3.6.3.4-1 SR 3.3.6.3.4-2 SR 3.6.1.6.2
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 218 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 332 of 395 1805 PERFORM 44.040.007 ATWS/SRV LLS RX PRESS,DIV 1,CHNL C, MTU SR 3.3.4.1.3.b SR 3.3.4.1.4.b CAL/FUNC SR 3.3.6.3.3-2 SR 3.3.6.3.4-2 SR 3.6.1.6.2
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 7/29/2009 A Both B21-N61IC Gross Fail Trip and B21-N708C Gross Fail Trip As Found readings The identified failure(s) would not have out of Acceptable Performance Tolerance (APT) range. CARD was not written. Each prevented the performance of the required were calibrated successfully within As Left Tolerance range. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1806 PERFORM 44.040.008 ATWS/SRV LOW LOW SET RX PRESS, DIV 2, SR 3.3.4.1.3.b SR 3.3.4.1.4.b CHL ''D'', MTU CAL/FUNC SR 3.3.6.3.3-2 SR 3.3.6.3.4-2 SR 3.6.1.6.2
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 219 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 333 of 395 1828 PERFORM 44.020.419 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS A,B21N615A,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 7/14/2016 A B21-N615A RTD Input Bridge As Found - some As Found readings (75% and 100%) The identified failure(s) would not have were below Acceptable Performance Tolerance (APT) MIN value. RTD Input Bridge prevented the performance of the required was successfully calibrated within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1831 PERFORM 44.020.429 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS B,B21N613D,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/6/2015 A B21-N613D Analog Indicator, some As Found readings were below Acceptable The identified failure(s) would not have Performance Tolerance (APT) MIN value. Analog Indicator was successfully calibrated prevented the performance of the required with all readings within As Left Tolerance. safety function of the equipment. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 220 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 334 of 395 1832 PERFORM 44.020.430 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS B,B21N614D,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/1/2018 A SPF Note: "Half MSIV Isolation came in during performance of Step 6.1.5. Suspected The identified failure(s) would not have issue with NSSSS Test Box. Resolution states: Perform steps to remove suspected test prevented the performance of the required box and replace with another tested test box. If necessary, Reset MSIV Trip Logic. safety function of the equipment. Therefore, CARD 18-20892 written" CARD 18-20892 states: "Half MSIV isolation signal occurred this failure will have no impact on an during performance of 44.020.430 during Step 6.1.6. NSSS test box was installed and extension to a 24 month surveillance should have prevented any surveillance related trip from coming in. Suspect bad test box interval.
| |
| was removed. Suspect test box was tested SAT. Reviewed drawing I-2095-15 to determine exactly what test box jumpers out, determined that it only jumpers the A71B-K2D relay contacts in the MSIV isolation string. Leaving various other possibilities for a potential cause of this occurrence. Also, reviewed past spurious trips in this string. I&C supervisor consulted with SM and determined to discontinue surveillances on this string until further investigation, and proper risk determinations can be made.
| |
| Reportability/Operability Review states: "There was no effect on the relays ability to perform the safety function. Actuation state of A71B-K7D is de-energized to support the safety functions. A71B-K7D relay did de-energize following receipt of the alarm. Half isolation was received during testing, utilizing an N4S test box. this test box jumpered out the A71B-K2D relay string. A71B-K7D did perform as designed, investigation is required into cause of spurious actuation. A71BK7D relay will fully perform its function and is operable but degraded." Troubleshooting package in RF19 produced no new results for cause of spurious half isolation. Previous events and monitoring have concluded that issue lies within the K10D string. WO # 52108126 exists to replace remaining components of K10D string (relay bases and crimp connections for C71K220D, C71K221D, and C71K222D. Next step would be to execute that WO.
| |
| Installing an intrusive temporary modification would not provide much value at this time as the issue has been localized to the K10D string. WO 52108126 was generated to perform this work and was attempted to be scope added in RF19 but was not completed.
| |
| Recommended that WO be added to next outage as another method of solving spurious half isolation issue.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 221 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 335 of 395 1833 PERFORM 44.020.431 NS4 MAIN STEAM LINE TUNNEL TEMP,TRIP SR 3.3.6.1.4-1.e SR 3.3.6.1.5-1.e SYS B,B21N615D,CAL/FUNC SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 222 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 336 of 395 1868 PERFORM 44.120.050 DW FLOOR DRN SUMP LVL CAL SR 3.4.6.3 (ALARM,LOGIC & INDICATION)
| |
| # Performances: 6 # Failures: 4 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 7/10/2009 A G1100-M002 Timer does not come on as expected in Step 6.1.4.1, but VOM goes The identified failure(s) would not have closed. Informed Control Room Supervisor, CARD 09-21464 already written about prevented the performance of the required problem. CARD 09-21464 states the problem as the timer green light would not come safety function of the equipment. The timing on during the performance of procedure 44.120.051 on 3/9/2009. The CARD goes on to function of Timer G1100-M002 was found to state that the timer was counting down and the alarm did work when tested on be functioning as expected and the As Found 3/9/2009. Reference is made to WO 29544182. WO 29544182 tested Timer G1100- time setting was within the procedure M002 and found the green light not functioning. The As Found time of the timer was acceptance criteria. The only function of within tolerance. Additionally, tested and inspected relays G11A-K626, K627, and Timer G1100-M002 that was not operating K628 - all relays functioning as expected. New timer obtained from stores - was tested, as expected was the green light. The green calibrated, and installed. Timer was left operating satisfactory. light on the timer is for indication purposes only and the failure of the green light did not impact the ability of the timer to perform its intended function. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 223 of 270
| |
| | |
| 1/6/2011 A 1) Pilot light on G1100-M002 Timer did not illuminate as expected in Step 6.1.4.1. The identified failure(s)
| |
| TRVENDwould not have 24MCGNF319001 Rev 1 This has been previously documented on CARD 10-25685. 2) In Step 6.1.4.2, VOM #1 Page 337 of 395 prevented the performance of the required indicates an Open circuit (46 Mohm), timer is running. Notified Control Room and safety function of the equipment. The timing I&C Supervisor. Agreed to let timer time out, restore, and back out of procedure to function of Timer G1100-M002 was found to investigate issue. NOTE: At 80.57 minutes, VOM #1 dropped from 4.6 VAC to 220 be functioning as expected and the As Found mVAC. CARD 11-20159 submitted. CARD 11-20159 states the contacts of time delay time setting was within the procedure relay G1100M002 did not change state with a request to change the time delay relay. acceptance criteria. The only function of WO 31500450 is referenced. WO replaced the timer since the light bulb on the timer Timer G1100-M002 that was not operating that was defective is not able to be replaced without replacing the timer. Timer was as expected was the pilot light. The pilot calibrated and returned to service operating satisfactorily. light on the timer is for indication purposes only and the failure of the pilot light did not impact the ability of the timer to perform its intended function. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 8/9/2012 A 1) Pilot light on G1100-M002 Timer did not illuminate as expected in Step 6.1.4.1. The identified failure(s) would not have This is a known issue. CARD 11-28300 Operability Report states the failure of the prevented the performance of the required timer pilot light to light does not impair the timer's ability to time down or initiate safety function of the equipment. Therefore, annunciator 2D95. WO 33151301 scheduled for 5/6/2013. Per Maximo WO 33151301 this failure will have no impact on an was cancelled. WO 37614152 replaced timer, ran partial calibration and performed extension to a 24 month surveillance functional test satisfactorily (WO 37654501) on 11/12/2013. 2) Annunciator 2D95 interval.
| |
| alarmed immediately following Step 6.2.2 versus approximately five minutes later as expected. Discussed problem with Control Room Supervisor and I&C Senior Leader.
| |
| Cause was determined to be G1100-M002 timing out when Step 6.2.2 was performed, even though M002 pilot light was "OFF". Instructed to place test switch to OFF and push D072 RESET pushbutton on H11-P614 to clear 2D95, then wait for G1100-M002 to time out prior to reperforming Step 6.2.2 and continuing with the surveillance.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 224 of 270
| |
| | |
| 12/28/2016 A Pilot light on G110-M002 Timer did not illuminate as expected in Step 6.1.4.1. Verified The identified failure(s)
| |
| TRVENDwould not have 24MCGNF319001 Rev 1 the timer was running as expected by the VOM indicating closed. CARD 16-30268 Page 338 of 395 prevented the performance of the required written to document issue. CARD 16-30268 Operability Review states "G1100-M002 safety function of the equipment. The timing DW FLR DRN Sump G1101-D072 Fill Timer light failed to come on during the pump function of Timer G110-M002 was found to down of the sump. The timer is functioning correctly but the proper operation of the be functioning as expected. The only pilot lamp is ACCEPTANCE CRITERIA in the surveillance procedure." WO 46799638 function of Timer G110-M002 that was not is referenced in the CARD. However, the CARD also states: "This CARD was written operating as expected was the pilot light.
| |
| for failure of the light to function properly during 44.120.050. In that surveillance, the The pilot light on the timer is for indication steps were not ACCEPTANCE CRITERIA. Later in the day, it failed to function again purposes only and the failure of the pilot during 44.120.051. In that surveillance, steps 6.1.6.1 and 6.1.7.1 are ACCEPTANCE light did not impact the ability of the timer to CRITERIA steps which are not satisfied due to the light not functioning properly. This perform its intended function. Therefore, this condition is not new and there is a work order (45572493) status of INPLN with no failure will have no impact on an extension scheduled start date. A new WO is not needed. The surveillance was revised to remove to a 24 month surveillance interval.
| |
| the light being lit as the acceptance criteria and the light does not make the surveillance a failure."
| |
| Event Title Associated SRs and Function 1885 PERFORM 44.190.009 FEEDWTR/M. TURB TRIP SYS-RX WATER LVL SR 3.3.2.2.3 SR 3.3.2.2.4 8,D1,CHNL C,MTU CAL/CF
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 1/19/2011 A Table 3 (page 6) B21-N695C Desired Trip/Reset Values, As Found Reset Reading was The identified failure(s) would not have below Acceptable Performance Tolerance (APT). There is no discussion of out of prevented the performance of the required tolerance. Page 7, which performs "Setpoint Adjust Pot Calibration/Preventive safety function of the equipment. Therefore, Maintenance" is not included in file copy. As left Readings for Trip and Reset were left this failure will have no impact on an within tolerance. extension to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 225 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 339 of 395 1886 PERFORM 44.190.010 FEEDWTR/M. TURB TRIP SYS-RX WATER LVL SR 3.3.2.2.3 SR 3.3.2.2.4 8,D2,CHNL D,MTU CAL/CF
| |
| # Performances: 7 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 7/27/2015 A SPF Note: "Step 6.1.6.3 Trip LED and output relay chatter while adjusting setpoint. The identified failure(s) would not have CRS, I&C Supervisor informed. Restored to Step 6.1.9 until decision is made." Backed prevented the performance of the required out of Surveillance, CARD 15-25191 written to address issue found during calibration safety function of the equipment. Therefore, check. CARD states: "During surveillance calibration step 6.1.6 of procedure this failure will have no impact on an 44.190.010, the trip unit B21N695D trip led and associated relays cycled excessively extension to a 24 month surveillance while trying to obtain setpoint. Will require new trip unit replacement and calibration." interval.
| |
| Reportability/Operability Review states: "B21N695D has been declared Inoperable and is being controlled under LCO 15-0362. This includes a 7 Day action to place the channel in the tripped condition per T.S. 3.3.2.2 Action A.1." Event was evaluated against function B2100 Provide signals on high level to terminate water injection to avert steam line flooding and initiate main turbine trip to prevent a water induction event. The function of the trip unit is to provide input into the trip logic for the main turbine and feedwater pumps when reactor water level exceeds 214. The associated trip logic is 1 out of 2 taken twice. Therefore, the failure or actuation of any one trip unit will not cause or prevent an actuation. The failed trip unit is an older style while the remaining three trip units are newer and are not likely to be experiencing this failure mechanism.
| |
| No failure of instrumentation that prevents actuation of the logic and/or associated equipment in one or both divisions was experienced. No B2100 Maintenance Rule Functional Failure occurred and no MPFF occurred. Work Order 43565374 written.
| |
| WO 43565374 scope is to replace B21N695D - Reactor Level 8 Trip Unit Division 2 Level Indication Switch. Currently installed instrument is a 510, replacement is a 710.
| |
| New MTU installed and calibrated using 44.190.010, Section 6.1 and all steps to support Section 6.1.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 226 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 340 of 395 1981 PERFORM 43.606.001 TRAVERSING IN-CORE PROBE SHEAR VALVE SR 3.6.1.3.10
| |
| 'B' EXPLOSIVE CHARGE
| |
| # Performances: 3 # Failures: 0 24 Month Justification: Notes: Surveillance test rotates with Events 0981 (TIP Shear Vlv A), 1982 (TIP Shear Vlv C), 1983 (TIP Shear Vlv D), and 1984 (TIP Shear Vlv E)
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 227 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 341 of 395 1982 PERFORM 43.606.001 TRAVERSING IN-CORE PROBE SHEAR VALVE SR 3.6.1.3.10
| |
| 'C' EXPLOSIVE CHARGE
| |
| # Performances: 1 # Failures: 1 24 Month Justification: Notes: Surveillance test rotates with Events 0981 (TIP Shear Vlv A), 1981 (TIP Shear Vlv B), 1983 (TIP Shear Vlv D), and 1984 (TIP Shear Vlv E)
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/26/2014 A SPF Note: "TIP B is past expiration date. Wrote CARD 14-20752" CARD 14-20752 The identified failure(s) would not have states: "During the preparation RF16 event 1982 Perform 43.606.001 Traversing In- prevented the performance of the required Core Probe Shear Valve "C" explosive charge, we discovered TIP "B" Shear valve safety function of the equipment. Therefore, explosive charge was past its expiration date. TIP "B" explosive charge was installed in this failure will have no impact on an RF13 with the following information: Batch Number MSV-1148-17, Serial Number 946 extension to a 24 month surveillance
| |
| , Expiration Date 01/2014" Reportability/Operability Review states: "This CARD interval.
| |
| documents that TIP "B" Shear valve explosive charge is past its expiration date. Both 43.606.001, Traversing In-Core Probe Shear Valve Explosive Charge Test and Replacement Section 7.0 Acceptance Criteria and UFSAR Table 6.2-2 Note 17 support that the explosive charge shall be replaced according to the manufacturer's recommended lifetime for the charge, i.e. prior to the expiration date. Therefore the C5100F001B cannot be relied upon to perform its safety function. The TIP System however is still capable of performing its intended non-safety related function of LPRM calibration with the remaining 4 channels available. TIP B Shear Valve is INOPERABLE. Traversing In-Core Probe (TIP) System remains OPERABLE. TIP B Ball Valve, C5100F002B remained OPERABLE and capable of isolating the penetration, therefore no loss of safety function." MRFF Evaluation was also completed. Justification stated: Since TIP "B" shear valve explosive charge has passed its expiration date, surveillance procedure 43.606.001 'Traversing In-Core Probe Shear Valve Explosive Charge Test and Replacement', work order 27033831, SST event 1981, was performed on 2-20-2014. TIP B squib fired when the keylock switch on the valve control monitor was placed in the fire position and completed the surveillance satisfactory. Since TIP B squib fired, it was able to perform its Maintenance Rule function to isolate containment. Therefore, this is not a Maintenance Rule Functional Failure (MRFF). Since this is not a MRFF, Maintenance Preventable Functional Failure (MPFF) is not applicable. THE DIRECT CAUSE IS PR9 Program/Process Weakness because surveillance procedure 43.606.001 Traversing In-Core Probe Shear Valve Explosive Charge Test and Replacement is adequate, as written. No changes to the procedure are required due to this event. This procedure works well to replace expired squibs before the next refueling outage as long as the date of the refueling outage is not changed. No additional squibs needed to be replaced in RF15 due to expiration date DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 228 of 270
| |
| | |
| based on RF16 being scheduled for Fall 2013. When RF16 was moved out to 2/2014, the TRVEND 24MCGNF319001 Rev 1 critical date for this SST event was verified, but the squib expiration dates were not. Page 342 of 395 There was nothing in place to reevaluate the expiration dates if the outage was moved out to a later date. This deficiency has been corrected by the SST Coordinator being required to review the completed SST event and adjust the critical date of the next SST event based on the earliest expiration date of the squibs. The Corrective Actions are: The SST Coordinator has been added as a post work reviewer to each of the events and will adjust the critical date of the next SST event based on the earliest expiration date of the squibs. This action item addresses cause code PR9 Program/Process Weakness, since the SST critical date will coincide with the earliest squib expiration date and will accurately be reviewed if a future refueling outage is moved out from the original date.
| |
| Event Title Associated SRs and Function 1983 PERFORM 43.606.001 TRAVERSING IN-CORE PROBE SHEAR VALVE SR 3.6.1.3.10
| |
| 'D' EXPLOSIVE CHARGE
| |
| # Performances: 2 # Failures: 0 24 Month Justification: Notes: Surveillance test rotates with Events 0981 (TIP Shear Vlv A), 1981 (TIP Shear Vlv B), 1982 (TIP Shear Vlv C), and 1984 (TIP Shear Vlv E)
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 1984 PERFORM 43.606.001 TRAVERSING IN-CORE PROBE SHEAR VALVE SR 3.6.1.3.10
| |
| 'E' EXPLOSIVE CHARGE
| |
| # Performances: 2 # Failures: 0 24 Month Justification: Notes: Surveillance test rotates with Events 0981 (TIP Shear Vlv A), 1981 (TIP Shear Vlv B), 1982 (TIP Shear Vlv C), and 1983 (TIP Shear Vlv D)
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 229 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 343 of 395 2068 PERFORM 64.080.033 MAIN STEAM LINE RADIATION DETECTOR SR 3.3.6.1.4-2.d SR 3.3.6.1.5-2.d D11N600E CALIBRATION WITH CHANNEL B SR 3.3.7.2.3 SR 3.3.7.3.3 SR 3.6.1.3.8
| |
| # Performances: 7 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 10/10/2018 A SPF Note: "D11R603 calculated efficiencies fails low - Informed CRS and initiated The identified failure(s) would not have CARD 18-28141" CARD 18-28141 states: "During performance of 64.080.033, prevented the performance of the required calibration of MSL Rad monitor D11N006E failed its calculated efficiencies on the safety function of the equipment. Therefore, recorder (D11R603) when routed through processing unit D11K603B. Efficiencies were this failure will have no impact on an low similar to those found during performance of 64.080.030 on 10/9/18 (CARD 18- extension to a 24 month surveillance 28100). The output on the processing unit (D11K603B) read correctly while the recorder interval.
| |
| output failed low. Reportability/Operability Review states: "Main Steam Line radiation monitor E (spare) was calibrated and determined to be within tolerance per 64.080.030.
| |
| The associated recorder, D11-R603 Channel B did not provide accurate data. MSL Radiation Monitor E demonstrated its ability to generate a trip signal based radiation levels detected. The recorder provides control room indication but is not required for operability. WO 52113739 is referenced WO 52113739 MSL Rad Monitor B Recorder calculated efficiencies fail low status per Maximo = CAN Event Title Associated SRs and Function 2069 PERFORM 64.080.034 MAIN STEAM LINE RADIATION DETECTOR SR 3.3.6.1.4-2.d SR 3.3.6.1.5-2.d D11N600F CALIBRATION WITH CHANNEL D SR 3.3.7.2.3 SR 3.3.7.3.3 SR 3.6.1.3.8
| |
| # Performances: 7 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 230 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 344 of 395 2090 PERFORM 43.404.001 DIVISION 1 SGTS CHARCOAL SAMPLE SR 5.5.7.c WITHDRAWAL
| |
| # Performances: 7 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 231 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 345 of 395 2100 PERFORM 24.202.08 SEC-5.2 (Dw Press) HPCI LSFT & PUMP SR 3.3.5.1.5-3.a SR 3.3.5.1.5-3.b OPERABILITY AT 1025 PSIG SR 3.5.1.11
| |
| # Performances: 7 # Failures: 4 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 3/3/2011 A SPF Note: "E4150-F008 will not close fully without holding close button. Valve also is The identified failure(s) would not have not fully closed when MCR H11-P602 indication for valve position shows full closed. prevented the performance of the required Resolution states: Previous CRIS Dot 155 placed issue documented in CARD 10-32190. safety function of the equipment. Therefore, Valve positions verified locally. Verified by contactor operation at MCC position and this failure will have no impact on an verified by system response (flowrate). Stroke time of valve measured by both MCR extension to a 24 month surveillance indication and contactor positioning at MCC. Both stroke times fall within limits." interval.
| |
| Within the surveillance noted on page 112 are "Note 1: Step 5.2.88 - E4150-F008 full close indication on H11-P602 comes in early before valve is full shut. See CARD 10-32190. Valve verified closed by system response (0 gpm flow), local position indication and by MCC contactor positioning at MCC 2PB-1 Position 6A. CARD 10-32190 documents pushbutton problem on H11-P602. Note 2: Step 5.2.121 - See same comments above. Stroke time recorded by MCR valve position indication on H11-P602.
| |
| Stroke time also measured at MCC 2PB-1 Position 6A via contactor positioning. This stroke time was 100.5 sec and meets acceptance criteria (BTC) of Step 5.2.121" 8/30/2012 A SPF Note 2: "Step 5.2.66.d nomenclature for step referenced is incorrect. Verified data The identified failure(s) would not have points were correct. Also Step 5.2.75 .6.c & .d step nomenclature should reference Steps prevented the performance of the required in 5.2.75 vice 5.1.65. Notified CRS, CARD 12-27249" CARD 12-27249 states: safety function of the equipment. Therefore, "Calculation data in 24.202.08 steps 5.2.66 and 5.2.75 reference steps for section 5.1. this failure will have no impact on an These are obvious "cut and paste errors" but need to be corrected. These should reflect extension to a 24 month surveillance the data collected per section 5.2." See DCR 13-0187SPF Note 3: "Elevated CST interval.
| |
| temperature were recorded in error. CARD 12-26895 documents the CST Temp Loop would not calibrate and there is a discrepancy between local temp and MCR indication.
| |
| Verified delta between MCR indicated temperature and local temp. A 40F difference exists. Corrected recorded temperatures by subtracting 40F. Recalculated and verified acceptance criteria still met.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 232 of 270
| |
| | |
| 8/27/2015 A SPF Note 1: "Step 5.2.101: E41-R609 read approximately 70 psig with 2D51 locked in. The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 Current configuration has system in a pressure lock. 5.2.101 can be signed off SAT but Page 346 of 395 prevented the performance of the required sequence of steps 5.2.101 and 5.2.103 are incorrect. System Eng informed and provided safety function of the equipment. Therefore, input. Reviewed revisions to 24.202.01, Step 5.1.88 opens E4100-F025 prior to this failure will have no impact on an verifying check valve E4100-F005 is properly seated. CARD 15-26057" CARD states: extension to a 24 month surveillance "Step 5.2.101 and 5.2.103 are sequenced wrong. Step 5.2.103 must be performed first. interval.
| |
| The same steps are correctly sequenced in 24.202.01 (steps 5.1.88 and 5.1.89). As sequenced now there is pressure locked in suction of HPCI pump which impacts evaluating acceptance criteria in step 5.2.101. When step 5.2.103 is performed there is no question evaluating E4150-F005 check valve in step 5.2.101." 24.202.08 rev 9 DCR 15-0857 made requested change. SPF Note 2: "Step 5.2.172 E4100-F025 failed to stroke within owners specified limit. Second stroke time IAW P&L resulted in same stroke time, 8.3 seconds. CARD 15-26058 submitted" CARD states: "E4100F025, HPCI Cond to DRW OTBD ISO VLV, failed to stroke within Owner specified limit IAW 24.202.08, step 5.2.172. Owner specified limit is 1.9 to 7.3 seconds, valve stroked closed in 8.3 seconds. E4100F025 stroked in 8.3 seconds the second time." Reportability/Operability Review states: "Safety position for E4100F025 is closed and function was proven during surveillance. Slow stroke time does not affect the ability to perform its safety function."
| |
| CARD Closure Summary: "Steps were placed in 24.202.01 (Rev. 106) and 24.202.08 (Rev. 8) to stroke time test E4100-F025 on 7/30/15 and 8/3/15 respectively. When Operations ran 24.202.08 on 8/27/15, which is first time stroke time test was performed after baseline measurement was obtained, E4100-F025 failed surveillance acceptance criteria. Direct cause: TESTING (OM3) because stroke time failure was a result of how the test was performed; not degradation. Indirect cause: VERIFICATION PRACTICES (IP11) because IST Program owner did not verify position of test within surveillance.
| |
| Test was placed at a step in surveillance that did not match baseline conditions. This happened because Operations lined out step number on SPF and it confused IST Program Engineer. IST Engineer should have gone to tagging center to ask Operations to interpret line out. IST prepared a MMA26 to allow Operations to confirm baseline measurements were collected prior to pump test within surveillance. (See attached).
| |
| MMA26 requested that new measurements be collected with HPCI turbine idle. Stroke time measurements, collected prior while HPCI turbine / pump was idle, were found to be nearly identical to baseline average of 4.6 seconds. This confirms original baseline stroke measurements were collected prior to HPCI pump test. This in turn confirms there is no degradation of valve. Revision of 24.202.01(Rev.107) and 24.202.08 (Rev.9) completed. Stroke time measurements are now taken at a step in surveillances that has identical conditions to baseline test.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 233 of 270
| |
| | |
| 5/26/2017 A SPF Notes 1,2: "Steps 5.2.16, 5.2.17 - E4100-F029 stroke times not updated following The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 valve maintenance. CARD 17-24849 submitted" CARD 17-24849 states: "E4100F029 Page 347 of 395 prevented the performance of the required (HPCI Stm Sply Drn Pot Otbd Iso valve) is stroke timed both closed and open. Stroke safety function of the equipment. Therefore, time close for this valve on two attempts was 8.8 seconds both times. This is outside IST this failure will have no impact on an limit of 2.9 to 8.6 seconds. Further, stroke time open on two attempts was 10.5 seconds extension to a 24 month surveillance and 10.7 seconds. These times do not meet IST limits of 2.6 to 7.8 seconds OR owner interval.
| |
| specified limit of 2.1 to 8.3 seconds. Discussion with System Engineer revealed new stroke times were baselined in WO 45667801 step 160.2. New IST and Owner Specified Limits were not updated into surveillance 24.202.08." Reportability/Operability Review states: "This condition has no impact on HPCI performing its intended function nor its operability. The stroke time was re-baselined during RF18, but the surveillance was not revised. The revision came through today and stroke times were verified to be satisfactory. HPCI remains OPERABLE." Action Item Completion Comments state:
| |
| "The E4100F029 valve and actuator was replaced in RF18 and stroke times changed due to the larger size actuator. The procedure was not updated to included the new stroke times prior to the surveillance." Operations requested that an IST evaluation be performed to revise the surveillance (24.202.08) to help them clear the LCO. IST Evaluation 17-022 was performed on 5/25/17 and was used to revise 24.202.08 (revision 13). IST Evaluation 17-022 concluded that the changes against the reference stroke time were due to the maintenance and that a change to the acceptance criteria was acceptable.
| |
| Partial surveillance test was performed to stroke time of E4100-F029 on 5/26/2017 satisfactorily. SPF Note 3: "Step 5.2.42 - E4100-F025 closed in Step 5.2.13 and not reopened but is required to be open in Step 5.2.42. TCN T12706 issued to open E4100-F025 prior to Step 5.2.42, CARD 17-24854 issued." CARD 17-24854 states:
| |
| "E4100F025 is closed at step 5.1.13 of 24.202.08 (rev 12) (also 5.2.13) for timing measurement. The valve is to required to be verified open at step 5.1.42 (also 5.2.42) and has not been re-opened by procedural steps. This discrepancy led to delays in performing 24.202.08 section 5.2." TCN was incorporated into rev 13. Surveillance completed satisfactorily.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 234 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 348 of 395 2102 PERFORM 42.309.06 DIV 2 18 MONTH 130/260 VDC BATTERY CHECK SR 3.8.4.3 SR 3.8.4.4 (2B-2 ONLY) SR 3.8.4.5.a SR 3.8.4.5.b SR 3.8.4.7
| |
| # Performances: 4 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/19/2009 A SPF Note (Event 2102) states: "2B-2 Equalize Timer not functioning properly for The identified failure(s) would not have timing. CARD 09-22744 Action requested / WO per information." CARD 09-22744 prevented the performance of the required states: "Battery Charger 2B-2, Equalize Timer, noted as Not Functioning Properly. The safety function of the equipment. Therefore, Equalize Timer Dial has Maintained its current position of 19 hours for the past 5 hours. this failure will have no impact on an 2B-2 Timer is performing the Equalize Voltage Function which was verified by extension to a 24 month surveillance Checking Battery Bank Voltage Directly at the 2B-2 Battery Bank." interval.
| |
| Reportability/Operability Review states: "The equalize timer has no impact on normal battery charging therefore no operability issues." WO 29694454 requested. Per Maximo WO 29694454 status is cancelled. POD Notes state: "Added CARD 09-22744 to E791080100 to repair or replace 24 hour equalize timer." WO E791080100 - Replace Control Boards in Div. 2 130 VDC Charger 2B-2, replaced equalize timer, completed charger cal/inspect satisfactorily. Note at Acceptance Criteria Step 8.2 indicates:
| |
| "CARD 09-22790 documents abnormal indications. TE-R32-09-040 evaluated the condition and determined it to be acceptable." In Step 6.16.1 of SOE 08-05, found an anomaly on top of the black (+) plates of Battery 2B-1. CARD 09-22790 initiated.
| |
| CARD 09-22790 states: "Step 6.16.1 of SOE 08-05 performs an inspection of the new battery installed during RF13. A grey material was noted on top of the positive and negative plates during the inspection. This was unexpected. Both the Div 1 and new BOP batteries were inspected and do not exhibit this same anomaly." The CARD goes on to state that a battery representative was dispatched to inspect the condition and determined that the grey material on top of the plates internal to the battery is lead sulfate. The lead sulfate on top of the battery plates will not have an adverse impact on the performance of the battery. In addition to the grey material on top of the plates, some of the cell separators are warped or frayed. Two of the cells (9 and 109) have a white appearance on the side edge of one of the positive (black) plates. Separator material is non-conductive and is used to separate the positive and negative plates from each other to keep them from shorting together. Therefore, any warping or fraying will not prevent the separator from performing its function since this is only seen on the edges of the separator. The last item of interest is the plate straps on a few of the cells do not have a smooth appearance. This is at the top of the cell where the plates transition to the positive or negative posts that extend to the exterior of the battery. The DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 235 of 270
| |
| | |
| uneven look of the plate straps is caused by the manufacturing process. If this process TRVEND 24MCGNF319001 Rev 1 was not properly performed, a high resistance connection would cause the battery to fail Page 349 of 395 its load test performed at the factory.
| |
| 3/29/2017 A SPF Note: "During the inspection portion of the procedure 42.309.06, Step 6.1.1. it was The identified failure(s) would not have identified that 95% of the cells had top cracks and positive terminals lifting out of the prevented the performance of the required jar. CARD 17-22739 initiated to document and trend." CARD 17-22739 states: safety function of the equipment. Therefore, "During the load tests of the Div 2 station batteries, 2B-1 and 2B-2, under SPF's this failure will have no impact on an 44108051 and 43908340 it was identified in the inspection portion of procedure extension to a 24 month surveillance 42.309.06 that 95% of the cells have cell top cracking and positive post lifting. interval.
| |
| Numerous Cards have been initiated over this condition. Consulted the system engineer and these conditions are normal wear and are being tracked over the life of the Battery.
| |
| This is a trending Card. The Battery load test performed satisfactory on 2B-1, and 2B-2." Reportability/Operability Review states: "The cracks were noted on approximately 95% of the battery cells. The hairline cracks on the battery cells mentioned in this CARD by visual examination are on the surface of the covers and do not reveal signs of leakage.There is no adverse impact on the function of the Div 2 battery. There is no impact on the ability of the Div 2 Batteries to perform their safety related function."
| |
| Event Title Associated SRs and Function 2103 PERFORM 42.309.07 DIV 2 (5 YEAR) 130/260 VDC BATTERY CHECK SR 3.8.4.8 (2B-2 ONLY)
| |
| # Performances: 2 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 2219 PERFORM 42.309.04 DIV 2 BATTERY CHARGER LOAD TEST - 2B-2 SR 3.8.4.6 ONLY
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 236 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 350 of 395 2220 PERFORM 42.309.04 DIV 2 BATTERY CHARGER LOAD TEST - 2B1-2 SR 3.8.4.6 ONLY
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 2244 PERFORM 24.321.03 DEDICATED SHUTDOWN(3L) H21P626 SR 3.3.3.2.2 OPERABILITY - ONLINE
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 2257 PERFORM 24.203.02 SEC-5.2 DIVISION 1 CSS SIMULATED SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b AUTOMATIC ACTUATION TEST SR 3.3.5.1.6-1.d SR 3.3.5.3.3-1.b SR 3.5.1.11 SR 3.5.1.14 SR 3.5.2.9
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 2258 PERFORM 24.203.03 SEC-5.2 DIVISION 2 CSS SIMULATED SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b AUTOMATIC ACTUATION TEST SR 3.3.5.1.6-1.d SR 3.3.5.3.3-1.b SR 3.5.1.11 SR 3.5.1.14 SR 3.5.2.9
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 237 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 351 of 395 2263 PERFORM 24.204.03 DIV 1 & 2 LPCI SIMUL. AUTO ACT. TEST (Recirc SR 3.5.1.14 Vlv's)
| |
| # Performances: 1 # Failures: 0 24 Month Justification: Notes: Per Maximo: Perform 0263 OR (1263 + 2263) depending on equipment availability.
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 238 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 352 of 395 2272 PERFORM 42.610.02 Div 1, NORMAL FEED, EPA's A & C, SR 3.3.8.2.2.a SR 3.3.8.2.2.b CAL/FUNCTIONAL SR 3.3.8.2.2.c SR 3.3.8.2.3
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 10/20/2015 A SPF Note: As Found Underfrequency Trip of C7100S003C outside acceptance criteria. The identified failure(s) would not have Notified SM, adjusted per procedure. Wrote CARD 15-28048. CARD 15-28048 states: prevented the performance of the required "at step 6.2.1.7, the As Found value for Underfrequency trip of C7100S003C was safety function of the equipment. Therefore, 57.07 Hz. The Acceptance Criteria is 57.1-57.3 Hz." Calibration was performed per this failure will have no impact on an Step 6.2.1.8 with As Left value of 57.20 Hz. Reportability/Operability Review states: extension to a 24 month surveillance "No operability or reportability assessment required." The breaker did trip although interval.
| |
| below the acceptance range of the procedure. Since the breaker did trip and no violation of technical Specification occurred, no loss of function occurred with this event. With no loss of function, there was no Maintenance Rule Functional Failure, Maintenance Preventable Functional Failure, or Repetitive Maintenance Preventable Functional Failure occurred with this event.
| |
| 3/24/2017 A SPF Note: As Found Overvoltage Trip of C7100S003A was high at 131.5 Vac The identified failure(s) would not have Recalibrated per procedure, wrote CARD 17-22507. CARD 17-22507states: "the prevented the performance of the required following did not meet as found acceptance criteria: 1) voltage to frequency converter as safety function of the equipment. Therefore, found 11885 (criteria is 11940 to 12060) - calibrated to as left 12003, 2) over voltage as this failure will have no impact on an found 131.5 (criteria is 129 to 131) - calibrated as left 129.9, 3) as left undervoltage extension to a 24 month surveillance trip is 109.9 (criteria is 109 to 111). Reportability/Operability Review states: "All interval.
| |
| parameters were calibrated to within acceptance criteria and testing has been completed satisfactorily. There is no current impact on the ability of the C7100S003A EPA breaker to perform its design function. The RPS A EPA breaker, C7100S003A, remains operable.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 239 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 353 of 395 2274 PERFORM 42.610.04 Div 2, NORMAL FEED, EPA's B & D, SR 3.3.8.2.2.a SR 3.3.8.2.2.b CAL/FUNCTIONAL SR 3.3.8.2.2.c SR 3.3.8.2.3
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/7/2010 A SPF Note 1: Step 6.2.2.2 (D EPA) Keylock S2 went to breaker trip as soon as key was The identified failure(s) would not have inserted in the switch. - Replaced under WO 31035220 WO 31035220 (started on prevented the performance of the required 10/27/2010) - Replace SW1, SW2, XFMR 1 and Tefzel wiring in EPA Bkr D Pnl was safety function of the equipment. Therefore, completed and on 11/2/2010 and per Task 40, Step 1, protection was released to allow this failure will have no impact on an functional testing of RPS "D" Electrical Protection Assembly, C7100S003D. extension to a 24 month surveillance Surveillance testing per 42.610.04 began on 11/5/2010 at 0815. SPF Note 2: Step interval.
| |
| 6.3.1.3.c did not get high state when 120V was applied. At this point we stopped. Output breaker of MG Set tripped unexpectedly. Per Maint Foreman we backed out and requested a tagout of the MG Set and EPAs. CARD 10-30187. CARD 10-30187 states:
| |
| At Step 6.2.2.2 (D EPA) Keylock S2 went to breaker trip as soon as key was inserted in the switch. At Step 6.3.1.3.c when 120V is applied, you should get a "high state" at E4.
| |
| A high state reading did not appear at E4. While performing the above step the output breaker of the B MG tripped as well as the D EPA breaker for unknown reasons.
| |
| Reportability/Operability Review states: C7102S001B
| |
| | |
| == Description:==
| |
| RPS WEST MG SET "B" SYSTEM RPS B supported functions are currently inoperable for outage related work, including the surveillance listed above, and documented on LCO 10-0345. Problem description notes: This switch is very sensitive when the key is placed in the lock. The switch will easily "snap" to the center position upon placing the key in the lock. The switch should remain in the extreme left position until intentionally moved to the center position.SPF Note 3: After completion of Step 6.2.2m, Step 22 removed key from switch S2 caused breaker to trip. - Revising WR 31035220 to T/S switch S2 and replace as necessary. Original WO 31035220 scope was to replace SW1, SW2, XFMR 1 and Tefzel wiring in EPA Bkr D. On 11/6/2010, WO 31035220, Rev 1 provided additional steps to replace S2 switch due to failure during testing. On 11/7/2010, WO 31035220, Rev 2 provided additional steps to replace S2 switch, once again. Work was completed and PMT performed using surveillance 42.610.04 satisfactorily. CARD notes: One of the two switches issued on 11/07/2010 from batch 25575 delivered on 3/30/2009 was determined, based on the functional problems exhibited in the card condition, to be defective. The cause of this defect cannot be determined but the most probable cause is mfg defect. Actions were taken in this card to determine if this defect was exhibited in additional switches. The 2nd switch in the batch was tested and the result was satisfactory. An additional 4 switches were procured DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 240 of 270
| |
| | |
| and delivered in June 2011 (batch: 37687), action item 3 tested these switches and the TRVEND 24MCGNF319001 Rev 1 results were satisfactory. Following the noted defect an additional 5 switches were tested Page 354 of 395 satisfactory. Additionally, an increased inventory (Qty of 4) of this particular switch has been invested in to provide ample backup if this concern is exhibited again. Close card no further action required. Maintenance Rule Functional Failure analysis states: " Since the keylock switch S2 had just been installed as part of the PM event C725 and the discovery that the keylock switch failed to function properly occurred as part of the PMT for the PM event, this event is not a Functional Failure under Maintenance Rule.
| |
| Event Title Associated SRs and Function 2280 PERFORM 24.207.11 SEC-5.2 RBCCW/EECW DIV 2 VALVE POSITION SR 3.3.3.1.2-8 INDICATION VERIF
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/10/2017 A SPF Note 1: "Closed light would not illuminate, local stroke PIT SAT. Close light still The identified failure(s) would not have needs resolution. CARD 17-23319. CARD 17-23319 states: "closed light for the prevented the performance of the required P4400F607B did not illuminate, Locally valve stoked correctly. during the stroke, in the safety function of the equipment. Therefore, close direction, the close light flickered once and never lit,changed light bulbs no this failure will have no impact on an affect, during open stoke the closed light flickered once,current the valve is opened in extension to a 24 month surveillance the MCR and locally." WO 47470406 written. WO 47470406 completed, found loose interval.
| |
| wiring in limit switch. Tightened lose wiring and tested SAT.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 241 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 355 of 395 2281 PERFORM 24.307.01 SECT 5.1 EDG 11 LOSS OF OFFSITE POWER SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 3/20/2014 A SPF states: EDG 11 was manually tripped after Step 5.1.33 due to fire at Turbo The EDG did start and load and was only Charger. Removed EDG 11 from service IAW 23.307. CARD 14-22612 submitted. manually shut down by operators. New CARD 14-22612 states: "While performing LOP/LOCA testing per 24.307.01 (step design was put on EDG 11 post-fire which 5.1.34 carrying ~1800kW and ~1100 kVAR in parallel with offsite), EDG 11 was has a flap that covers the seam and manually tripped (locally) due to fire from lagging on the turbo inlet flange area of the redirects any oils onto the floor away from exhaust manifold. CO2 was used to extinguish the fire. Inspection of the immediate area the exhaust. The identified failure(s) would reveals no damage to governor and only surface indication of the fire. not have prevented the performance of the Reportability/Operability Review states: EDG 11 declared inoperable and added to LCO required safety function of the equipment.
| |
| 2014-0096. The Operator who put the fire out, the System Engineer, and Maintenance Therefore, this failure will have no impact Electrician, who were all present at the fire, stated the flame was no more than 12 on an extension to a 24 month surveillance inches high. The EDG 11 fire was extinguished within one minute from several blasts of interval.
| |
| CO2 from the hand held fire extinguisher. The damage was limited to insulation lagging only. AP-913 CONSEQUENTIAL FAILURE EVENT CLOCK RESET SCREENING determined: This failure would not have resulted in the inability to control a critical safety function (e.g. Reactor water level and pressure, Primary and Secondary Containment, Drywell temperature and pressure, Spent Fuel Pool temperature and level, etc.), or capability to shutdown the Reactor and maintain it in a shutdown condition. The EDG did start and load and was only manually shut down by operators.
| |
| This failure is NOT a failure of an MSPI monitored component. Evaluation has shown a reasonable assurance that the fire would have subsided after several minutes and the EDG would have continued to operate. During the investigation on 3/20/14 it was determined a lube oil leak from EDG 11 front engine cover on the control side was seeping through the seam of insulation lagging which accumulated on top of the exhaust manifold under lagging insulation at the control side of the turbo inlet flange area on EDG 11. The accumulation of oil on the exhaust manifold resulted in the fire after the exhaust manifold had heated up during the engine run for surveillance 24.307.01.
| |
| Mechanical Maintenance found multiple bolts loose on the front cover of the EDG.
| |
| However, after torqueing these bolts the leak was still evident a few hours later. While the engine was in standby a slow drip rate (< 1 drip per 5 minutes) of oil pooled up on top of the four-barrel exhaust inlet to the Control Side (CS) turbocharger from the front engine cover leak. Decision was made to use a sealant to prevent the leak from continuing. Since the front cover is a non-pressurized boundary, and high temperatures (above 250 degrees F) would not be seen, Pro-Seal 34 was used on the seam between the DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 242 of 270
| |
| | |
| front cover and engine block (WO 38176344). This stopped the leak. Background TRVEND 24MCGNF319001 Rev 1 Information included with CARD 14-22612 states: CARD 12-29936 was initiated on Page 356 of 395 12/12/2012 which identified smoke in the EDG 11 engine room during the monthly surveillance run of the engine. CARD stated most of the exhaust/smoke in the engine room appeared to be coming from under the insulating blanket over the control side 4 barrel exhaust manifold. When the engine is first loaded, exhaust temperatures increase and the oil that is inside or outside of the exhaust manifold burns off. After about 15-20 minutes of loaded engine run time, the generation of exhaust/smoke in the engine room subsides. CARD requested a work order to inspect the EDG 11 control side 4 barrel exhaust manifold for possible cracks and stated it would require removal of the insulation blankets and may require removal of hard insulation (if any exist) under the insulation blankets. Based on the fact exhaust/smoke cleared up after the engine had been loaded, System Engineering stated EDG 11 was able to perform its intended function since the smoke dissipates within 15-20 minutes. CARD 12-29936 Reportability/Operability Review states the smoke/exhaust could be caused by small oil leaks where the oil collects within the insulation and burns off or a small crack on the exhaust manifold. In either case, there is not a concern with EDG 11 being able to meet its intended safety functions as demonstrated by satisfactory completion 24.307.14 operability surveillance. CARD 12-29936 initiated Work Order 35778469 to inspect EDG 11 exhaust manifold to determined cause of smoke and implement corrective action. Work Order 35778469 was coded a priority 5 and was scheduled for an EDG 11 safety system outage (SSO); scheduled during a planned EDG 11 SSO on 1/13/14.
| |
| However, the EDG 11 SSO was rescheduled from 1/13/14 to 5/13/14, which was after RF16. Thus, the EDG 11 fire occurred on 3/20/14 during RF16 prior to the new schedule date of 5/13/14 for Work Order 35778469. Stated in CARD 14-22612 Description/Investigation: System Engineering and Operations are used to seeing some smoke during initial operation of an EDG. Due to the design of the engine, some oil will accumulate inside the exhaust manifold from barring the engine over from the previous run. In addition, some oil will enter the inside of exhaust manifold during the initial start of the engine and operation at low load due to the piston rings not having as good a seal allowing some oil to enter the cylinder combustion chamber and then enter the exhaust manifold. When the engine is first loaded to approximately 1750 kW and combined exhaust temperatures increase to approximately 650 degrees F, the oil that is inside or outside of the exhaust manifold normally burns off. After approximately 15-20 minutes of loaded engine run time, the generation of exhaust/smoke subsides. During the engine runs prior to the 3/20/2014 fire, System Engineering had seen more smoke at EDG 11 than on EDGs 12, 13, and 14 when the engine was first loaded to approximately 1750 kW and then saw the smoke clear after approximately 15-20 minutes of loaded engine run time. Thus, even though EDG 11 had more smoke than the other three EDGs, most of the smoke that was at EDG 11 was thought to have been coming from inside the exhaust manifold and leaking out of the exhaust manifold flanges and did not present a fire hazard. Since previous CARD 12-29936 had already initiated Work Order 35778469 to inspect EDG 11 exhaust manifold to determine the cause of smoke and implement corrective action, no new CARDs were initiated by DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 243 of 270
| |
| | |
| System Engineering or Operations for the EDG 11 smoke. Because the insulation TRVEND 24MCGNF319001 Rev 1 lagging on EDG 11 exhaust manifold had not been removed to inspect for possible Page 357 of 395 cracks or oil leaks as requested by Work Order 35778469, the risk significance of a fire hazard was not properly understood or challenged by Operations and System Engineering. It is concluded that a higher priority, such as priority 3 or 4, should have been given to Work Order 35778469 by Operations to do the inspection much sooner than the next scheduled EDG 11 SSO. It is expected that completion of Work Order 35778469 would have removed the insulation lagging and allowed the accumulation of lube oil on the exhaust manifold to be found and the source of the oil leak corrected which would have prevented the EDG 11 fire on 3/20/14. From CARD 14-22612, THE DIRECT CAUSE IS M14 - Cause Code: M10 - Mechanical Damage, M19 -
| |
| Gasket/O-ring/Seal Failure - A fiber gasket located between the control side of the EDG 11 front cover and the engine block had failed which allowed lube oil to leak and accumulate on top of the exhaust manifold under the lagging insulation and resulted in a fire during a loaded run of EDG 11. The damage was limited to only the lagging.
| |
| CARD 14-22612 includes two Apparent Causes which are summarized as follows: 1)
| |
| The fiber gasket located between the front cover and the control side of EDG 11 front cover and the engine block failed due to repetitive cyclic compression/decompression that takes place on the gasket during the removal of the top cover of the EDG for its 24 month PM inspections. A 1 1/2 inch section of the front cover gasket was missing. These two conditions resulted in oil leakage from the front cover. 2) Monitoring by plant personnel did not identify a lube oil leak which resulted in an accumulation of oil on top of the exhaust manifold, under the lagging insulation at the control side of the turbo inlet flange area on EDG 11, which presented a fire hazard. Operations did not identify or challenge the risk significance related to CARD 12-29936 initiated on 12/12/2012 and assign the proper priority to the work order for a smoking engine; the lagging was not removed and source of smoke was not identified to determine if a fire hazard existed. Some of the CARD 14-22612 Corrective Actions are: 1) Replacement of lagging insulation blankets on the EDG 11 and EDG 13 exhaust manifolds prior to the turbo on the control side (CS) and opposite control side (OCS) with a different configuration to eliminate the seam that is located right under the corner of the front cover. The new configuration has a flap to divert oil leaks to the floor and prevent oil from leaking into the seam opening and pooling on the exhaust manifold piping. 2)
| |
| Tightening of the bolts on the front engine cover and applied an approved sealant to the area of the leak on EDG 11 front engine cover to eliminate the leak that caused the fire until the split front cover could be installed. Also torque checks were performed on the other remaining engine front cover bolts. 3) Replace the one piece front cover with the new split cover design, as well as replacing the front cover gaskets. 4) New technical requirement was added to the 24-month PM to inspect areas around and under front engine cover and front engine cover gasket for evidence of oil leaks. If evidence of leaks are found, replace gasket. 5) Revised maintenance procedure 34.307.001 to perform a torque check on all the engine front cover bolts to verify proper crush of the front cover gasket. 6) Revised PM events W836, W840, W844, and W848 (PERFORM 24 MONTH PM TASKS PER 34.307.001 ON EMERGENCY DIESEL GENERATOR) in Maximo DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 244 of 270
| |
| | |
| to revise the PM job plans to specifically look for small fuel oil or lube oil leaks that can TRVEND 24MCGNF319001 Rev 1 come in contact with the exhaust manifold with the EDG in standby following Page 358 of 395 completion of work and with the engine running.
| |
| 4/15/2017 A SPF states: "Step 5.1.86 Jacket Coolant Trouble still in with temperature at 104F (also The identified failure(s) would not have step 6.1.3). Sect 5.2 will be performed as soon as LO temperature lowers < 150F. prevented the performance of the required CARD 17-23557 submitted for evaluation and repair" CARD 17-23557 states: "EDG-11 safety function of the equipment. Therefore, JCS Trouble would not clear Low Temperature Alarm with temperature at 104F. Need this failure will have no impact on an evaluation performed, and if required generate a WO to calibrate or replace switch." extension to a 24 month surveillance interval.
| |
| Reportability/Operability Review states: EDG 11 Jacket Coolant temperature low is a non essential trip and would not impact the operation of EDG 11 if required to start to perform its safety related function. EDG 11 will remain OPERABLE with the Standby Jacket Coolant Temperature >85F. EDG-11 is currently inoperable for RF-18 testing.
| |
| This issue will not prevent restoring EDG 11 to operable status.NOTE: CARD was initiated on 4/15/2017, 06:50:34PM; CARD Notes state that alarm is currently clear, 4/15/17, 07:24:13PM. WO 47506434, Calibrate R30NA04A JCS Stby Htr is referenced. WO 47506434 to calibrate switch was issued on 4/17/2017 and completed SAT on 8/6/2018.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 245 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 359 of 395 2282 PERFORM 24.307.02 SECT 5.1 EDG 12 LOSS OF OFFSITE POWER SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| Two failures are identified as unique failure which is not indicative of a repetitive time based failure mechanism. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/21/2015 D SPF Note 1: "Manually tripped EDG 12 locally due to loss of 72EB-2D. Breaker tripped The identified failure is unique and does not after LOCA Test from Sequencer panel, Entered 'Loss of 64C' and 'Loss of 72C' to occur on a repetitive basis and is not reenergize buses and loads. EDG 12 remains shutdown. MCC 72EB-2D remains associated with a time-based failure deenergized, D7 EECW - (No EESW Pump) 72CF restored. All bus relays are reset. mechanism. Therefore, this failure will have CARD 15-29239 submitted." CARD 15-29239 states: "During the performance of no impact on an extension to a 24 month 24.307.02 - Emergency Diesel Generator 12 - Loss of Offsite Power and ECCS Start surveillance interval.
| |
| With Loss of Offsite Power Test, on step 5.1.32 & 5.1.33, a LOCA signal is injected into the Digital load sequencer to resequence the loads. Following trip and reclosing of 12EB-EB3 (EDG 12 output breaker) the EDG12 DGSW Pump attempted to start and lost power. This created a situation in which an EDG was running and sequencing on loads with no forced Diesel Generator Service Water. The operating crew tripped EDG 12 using the local overspeed trip. AOPs for loss of 64C and 72C were entered. The operating crew backed out of the surveillance. Bus 64C and 72C have been restored IAW the SOPs. Request investigation and work order to repair."
| |
| Reportability/Operability Review states: "DGSW pump tripped during EDG 12 LOP testing; Supply breaker to the MCC 72EB-2D was found tripped. DGSW pump could not support function for running the EDG. EDG 12 DGSW pump declared inoperable. LCO 2015-0568." Surveillance 24.307.02 was reviewed to ensure the appropriate conditions were set to close breakers 72EB-2D for EDG12 DGSW and 72EB-2C for Division 1 EESW pump. On 11/21/15 during performance of 23.307.02 a LOCA signal was initiated via Step 5.1.32 & 5.1.33 (CARD 15-29239) to sequence loads on to EDG-12.
| |
| Approximately 45-50 seconds into the load sequence, 72EB POS 2D closed then tripped approximately 1 second later. EDG 12 was the manually tripped due to a loss of EDG-12 DGSW C pump. Work order 44339839 released to Work Group at 0455 11/22/2015:1.
| |
| Test Power Shield - if bad replace, if trip/reset button not working may need to check MCC 72EB-2D loads2. Verify resistor for local red light is not shorted, also a physical inspection to ensure not shorted to adjacent terminals - if resistor shorted replace, if terminals shorted repair.3. Insulation resistance checks on breaker control wiring and feed to MCC - repair if required.4. Test load shed string associated with 4NV94 -
| |
| verify working correctly, replace relays as necessary5. Test relay 4NV94 - replace if required.WO 44339839 was completed. No issues identified with all components inspected. Conclusion was that the issue is within the breaker. Confirmed that 72EB-2D DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 246 of 270
| |
| | |
| was REFURBED in 2009. It was an Extent of Condition position from CARD 09-27133. TRVEND 24MCGNF319001 Rev 1 The breaker was inspected by Maintenance and no issues were found with the breaker. Page 360 of 395 On 11/22/15, WO 44340274 initiated to replace the 72EB-2D breaker with a refurbished/PM'd spare. On 11/23/15 during performance of 23.307.02, Section 5.1 (WO 44349460) of EDG12 LOP/LOCA when a LOCA signal was initiated (CARD 15-29278), Division 1 EESW pump (72EB-2C) tripped immediately after re-sequencing the second time, whereas, EDG-12 DGSW C Pump (R1600S017A, 72EB-2D) re-started as expected. LOR 27X-12EB was observed cycling following the closure of 12EB-EB3.
| |
| 72EB-2C attempted to close and tripped immediately during load sequencing. The following are other facts from the event:* 27X 12EB LOR Turning on and off (Load Sequence correlates with cycling).* Relay 3NV94 on and off with 27X-12EB by design (Could not confirm other 94 relays).* 72EB-2C did not re-close (closed and re-opened - per video view of breaker lights).* In Relay Room, 12EB light flashed in/out during evolution. (note: also saw this a few times Saturday 11/21/2015) This is the XK31 indicating light on drawing I-2714-22. This is lit from 12EB Load Shed Relay 2MR69 (Drawings I-N-2572-18 Grid D-7, B-7 & I-2714-22).* EDSW restarted as expected (see video).* EESW tripped today AND Saturday (see pump flow curves).*
| |
| Checked Potential Transformers (PT); circuits good.* Check EB3 52S and 52H cell switch. Indications show these are positioned properly.Work order 44346132 "Inspect and Test 27X-12EB, 27-XY, and 27-YZ" was completed. It was determined that the issue was caused by erratic cycling of the LOR 27X-12EB. The relay was replaced and issue was resolved. A failure analysis will be conducted on the LOR 27X-12EB in order to determine the cause of the failure. This CARD will track the failure analysis of LOR 27X-12EB. Failure analysis of LOR 27X-12EB was completed. "Direct Cause found to be inconclusive. Simulation performed wedged a piece of a foreign material behind the trip lever which replicated the original failure. After disassembly of the relay, substance was observed as being drier than normal grease and came off of the lockout relay's internal parts in chunks. The failure analysis led to the conclusion that hardened grease found in the relay could have become foreign material and caused cycling of the relay."
| |
| CORRECTIVE ACTIONS: Twenty one PMs were created to replace selected LOR relays (see CARD 15-29239). This CARD action plan is applicable to CARDs 15-29239 and 15-29278. The issues in those CARDs were the result of the failure of LOR 27X-DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 247 of 270
| |
| | |
| 11/23/2015 A SPF Note 1: Step 5.1.38, Step 1.c, 72C-2D failed to close in. CARD 15-29280 The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 written." CARD 15-29280 states: "During performance of 24.307.02, Breaker 72C-2D Page 361 of 395 prevented the performance of the required was being restored and tripped. SOER shows breaker closed at 12:08:11.567 seconds safety function of the equipment. Therefore, and tripped at 12:08:14.719 seconds. Reports from the field showed no Flags, the 94 this failure will have no impact on an device was de-energized and the 52XX relay was picked up. An acrid odor was also extension to a 24 month surveillance interval.
| |
| noticed by this breaker. Informed CRS, left in tripped for further evaluation."
| |
| Investigation detailed that breaker 72C position 2D feeds non-safety related and non-risk significant distribution cabinet 72C-2D. This failure resulted in the loss of a maintenance rule non-risk significant function and a mode 2 restraint. Breaker is load shed and is not sequenced back on during a LOP or LOP/LOCA. The breaker failed to close after completion of the LOP/LOCA during restoration from the procedure. The breaker was pulled out and troubleshot under WO 44347395. It was found that the x coil (closing coil) had failed which prevented the breaker from closing. The coil was replaced and the breaker was verified to be working properly. The acrid odor indicates that the coil likely shorted. The coil was not saved for inspection. The DIRECT CAUSE E05 - Shorted/Grounded was chosen because the coil failed to create a magnetic field to close the breaker and a smell of burnt electrical insulation was noted.
| |
| Investigation noted that Review of work history for this breaker revealed breaker PM had been completed one month prior to the failure. PM indicated the x coil operated as expected. There was no indication of the coil failure that could have been detected. The breaker is refurbished every 8R and the PM is performed every 4R which is in alignment with the industry recommendations. Maintenance Rule evaluation determined because breaker failed to close, it failed to supply power to its load, and therefore, failed function R1400-02, provide power to 4160 VAC and 480 VAC Maintenance Rule Non-Risk Significant loads throughout the plant. The breaker was opened which successfully allows it to perform its function of protecting bus 72C. Therefore function R1400-01, was not lost. The PM work order, 34484681 (i.e., completed one month prior to the failure) was reviewed to determine if there was any indication of the x coil being degraded. The x coil operated as expected at 80% rated voltage (the requirement is 95%)
| |
| and the minimum megger value was greater than 550 meg-ohms. There was no indication of binding discovered during the PM or the investigation WO and the breaker was cycled for PMT at the end of each WO. There has also been no history of issues associated with this breaker serial number. Maintenance on the breaker is performed in accordance with all known industry and vendor recommendations which include the coil acceptance criteria for determining if the coil is degraded. The industry does not recommend periodic replacement of the closing or trip coils as most pending coil failures can be caught by the testing during the PM. There was no indication of the coil failure that could have been detected." As noted: "Sys Engineering- 01/28/2016 08:43:04 AM To address managers comments. This CARD gives an inappropriate level of perceived component importance due to an improper selection of MR function during the initial MRFF evaluation. The actual function lost was non-risk significant and this CARD should have only been made a Level 3. This error in the MRFF evaluation will be corrected during the update from L1-pending investigation. The failed coil was not kept for any failure analysis. As discussed in the CARD body, the PMs are consistent with the DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 248 of 270
| |
| | |
| industry recommendations for maintenance on this model of circuit breaker which are TRVEND 24MCGNF319001 Rev 1 reviewed yearly at the Circuit Breakers Users Group meeting and is based on plant Page 362 of 395 experiences. These recommendations do not include periodic replacement of the closing or trip coils. Fermi should maintain alignment with the industry/vendor recommendations."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 249 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 363 of 395 2283 PERFORM 24.307.03 SECT 5.1 EDG 13 LOSS OF OFFSITE POWER SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| One failure is identified as a unique failure which is not indicative of a repetitive time based failure mechanism. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/25/2010 A SPF Note: " Step 5.1.56 EDG 13 was not operated unloaded for five minutes due to leak The identified failure(s) would not have at #3 opposite control side injection pump to fuel header gasket increasing - CARD 10- prevented the performance of the required 30701 previously identified this issue. Added note to CARD concerning increased safety function of the equipment. Therefore, leakage rate. WO 32047813 repaired Fuel Oil pump leaks on 11/25/2010 this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 4/14/2017 D SPF Note 1 - "During performance of surveillance, #12 Drywell Cooling Fan The identified failure is unique and does not (T4700C012) did not restart during load sequencing following loss of offsite power auto occur on a repetitive basis and is not start signal to EDG 13. Walkdown at MCC 72E 5B found an acrid odor. MCC 73E 5B associated with a time-based failure was de-energized. To back out of surveillance, steps were performed to load EDG 13, mechanism. Therefore, this failure will have restore offsite power to 65E, and then shutdown EDG 13 to place in standby conditions. no impact on an extension to a 24 month Steps are NA that were not required to accomplish this. CARD 17-23496" CARD 17- surveillance interval.
| |
| 23496 states: "Drywell Cooling Fan 12 did not restart during the load sequence following simulated loss of power. Reference Acceptance Criteria Step 5.1.17. The CMC switch for T4700C012 was in Auto and indicated TRIPPED upon attempted restart. A couple minutes later all indications were lost at the CMC switch. Field walkdown found an acrid odor at MCC 72E 5B. The MCC was deenergized and initial investigation shows indication of a burnt contactor. Investigate cause and repair." CARD Reportability/Operability Review states: "72E-5B was de-energized following the failure, to de-energize the MCC for Drywell Fan #12. The inoperability is tracked on LCO 2017-0210. 24.307.03 was backed out of, with only part of Section 5.1 complete."
| |
| Investigation by electrical maintenance and operations found the contactor coil burnt.
| |
| The Direct Cause is E04 - insulation breakdown because the coil insulation broke down and shorted resulting in the inability to close the contactor and start the drywell cooler.
| |
| WO 47495796 initiated to replace contactor. A replacement contactor (i.e., 2 Overload blocks and Aux contact block) was installed and DWC #12 operated as expected.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 250 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 364 of 395 2284 PERFORM 24.307.04 SECT 5.1 EDG 14 LOSS OF OFFSITE POWER SR 3.3.5.1.5-1.a SR 3.3.5.1.5-1.b
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| One failure is identified as an event driven failures which are not indicative of a repetitive time based failure mechanism. The other failure did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/28/2012 C SPF Note 2: "72F 3A Brkr failed to close which stopped T4600C004 from starting. This is an event driven failure in that breaker CARD 12-23915 submitted." See "Description of Failure" for Event 284 (WO secondary contacts were not cleaned 31841074) thoroughly which contributed directly to the As Found condition. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| 4/13/2017 A SPF Note 1: "Step 5.1.25.1 N/A, Section 5.2 will be performed, Step 6.1.3.1 also. The identified failure(s) would not have CARD 17-23400 previously submitted on this concern for DCR." CARD 17-23400 was prevented the performance of the required initiated after it was discovered during markup of surveillance that substep 5.1.25.1 safety function of the equipment. Therefore, directs disconnecting the chart recorder leads. CARD 17-23400 states: "From the this failure will have no impact on an revision summary, "9) Added removal of chart recorder and restoration of RWCU, extension to a 24 month surveillance interval.
| |
| MPU2 and MPU3 to Section 5.1 if desired." The step added to 5.1.25 is not conditional and this is a Continuous Use procedure." As noted in the CARD: " DCR 16-1329 did not implement change to step 5.1.25 note to state "if desired" (e.g. not intending to perform section 5.2. ) Section 5.2 needs the recorder installed, and has step to remove it after data is obtained. Step 5.1.25.1 can be N/A'd in the current revision and documented as such on the SPF, this will not affect acceptance criteria or intent of surveillance."
| |
| CARD closed to DCR 17-0575.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 251 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 365 of 395 2295 PERFORM 42.610.01 Div 1, ALTERNATE FEED, EPA's E & G, SR 3.3.8.2.2.a SR 3.3.8.2.2.b CAL/FUNC SR 3.3.8.2.2.c SR 3.3.8.2.3
| |
| # Performances: 7 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 12/7/2015 A SPF Note: "As Found underfrequency on C7100S003E high out of band. Adjusted to The identified failure(s) would not have within band. CARD 15-29732" CARD 15-29732 states: "Div 1 Alternate Feed EPA's prevented the performance of the required per 42.610.01, the As Found setpoint for C7100S003E was 57.48 Hz. Acceptance safety function of the equipment. Therefore, Criteria tolerance is 57.3 - 57.1 Hz. Notified SM and supervisor. Adjusted to 57.21 Hz this failure will have no impact on an per 42.610.01. Wrote Trend Card to document." Reportability/Operability Review states: extension to a 24 month surveillance "Acceptance Criteria toleranceis 57.1 - 57.3 Hz. Per 42.601.01 the underfrequency trip interval.
| |
| was reset to within tolerance (57.21 Hz) and the test was completed sat. All acceptance criteria and testing has been completed satisfactorily. No operability concern exist. The RPS A alternate EPA breaker, C7100S003E, remains operable." Action Item Completion Comments: "Maintenance Rule Functional Failure evaluations determined that the event is not a MRFF and thus based on the original OSC note, this CARD is treated as a Trend Only."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 252 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 366 of 395 2297 PERFORM 42.610.03 Div 2, ALTERNATE FEED, EPA's F & H, SR 3.3.8.2.2.a SR 3.3.8.2.2.b CAL/FUNC SR 3.3.8.2.2.c SR 3.3.8.2.3
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 8/7/2012 A SPF Note: "C7100S003H Logic Board could not be tested SAT or adjusted - CARD 12- The identified failure(s) would not have 26524" CARD 12-26524 states: "alternate feed EPA breaker C7100S003H, did not meet prevented the performance of the required the as found undervoltage time delay acceptance criteria of 3.0 to 3.1 seconds. Procedure safety function of the equipment. Therefore, allows for the adjustment of the time delay. When adjusting the potentiometer, the time this failure will have no impact on an delay was inconsistent from one test to another. Performed several tests without extension to a 24 month surveillance disturbing the pot with continued inconsistent results (example, OOS low at 2.88, adjust interval.
| |
| pot to increase time delay, trip would occur instantaneously). Wiped potentiometer several times, readjusted to original setting with unsatisfactory results. Made final setting adjustment and tested four times without touching adjustment pot... 3.02s, 2.88s, 2.88s and 0.08s. Stopped work...informed Maintenance Foreman and Shift Mgr, wrote CARD." Reportability/Operability Review states: "Only the in service EPA breakers are required to be operable. The normal EPA breaker that is in service is not affected by this condition and remains OPERABLE." Maintenance Rule Functional Failure evaluation completed; event is not a Maintenance Rule Functional Failure. WO 35091774 requested. WO 35091774 replaced logic card in C7100S003H with new Card and completed testing per 42.610.03, SAT.
| |
| Event Title Associated SRs and Function 2322 PERFORM 24.408.04 SEC-5.2 DIV 2 PRIMARY CONT MONT SYS VLV SR 3.3.3.1.2-8 OP AND POS IND VERIF
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 253 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 367 of 395 2440 PERFORM 44.210.059 ECCS/ADS/MDS D1 SRV SOLENOID FUNC TEST SR 3.3.5.1.5-4.a SR 3.3.5.1.5-4.b SR 3.3.5.1.5-4.c SR 3.3.5.1.5-4.d SR 3.3.5.1.5-4.e SR 3.3.5.1.5-4.f SR 3.3.5.1.5-4.g SR 3.3.5.1.5-4.h SR 3.3.5.1.5-5.a SR 3.3.5.1.5-5.b SR 3.3.5.1.5-5.c SR 3.3.5.1.5-5.d SR 3.3.5.1.5-5.e SR 3.3.5.1.5-5.f SR 3.3.5.1.5-5.g SR 3.3.5.1.5-5.h SR 3.3.5.1.6-4.i SR 3.3.5.1.6-5.i SR 3.3.6.3.4-1 SR 3.3.6.3.4-2 SR 3.3.6.3.4-3 SR 3.4.3.2 SR 3.5.1.13 SR 3.6.1.6.1 SR 3.6.1.6.2
| |
| # Performances: 3 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 2441 PERFORM 44.210.060 ECCS/ADS/MDS D2 SRV SOLENOID FUNC TEST SR 3.3.5.1.5-4.a SR 3.3.5.1.5-4.b SR 3.3.5.1.5-4.c SR 3.3.5.1.5-4.d SR 3.3.5.1.5-4.e SR 3.3.5.1.5-4.f SR 3.3.5.1.5-4.g SR 3.3.5.1.5-4.h SR 3.3.5.1.5-5.a SR 3.3.5.1.5-5.b SR 3.3.5.1.5-5.c SR 3.3.5.1.5-5.d SR 3.3.5.1.5-5.e SR 3.3.5.1.5-5.f SR 3.3.5.1.5-5.g SR 3.3.5.1.5-5.h SR 3.3.5.1.6-4.i SR 3.3.5.1.6-5.i SR 3.3.6.3.4-1 SR 3.3.6.3.4-2 SR 3.3.6.3.4-3 SR 3.4.3.2 SR 3.5.1.13 SR 3.6.1.6.1 SR 3.6.1.6.2
| |
| # Performances: 3 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 254 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 368 of 395 2527 PERFORM 44.020.502 INBD SDC-HEAD SPRAY AUTO ISOLATION SR 3.3.6.1.5-6.a SR 3.3.6.1.5-6.b LOGIC FUNCTIONAL SR 3.5.2.8 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 2528 PERFORM 44.020.001 SECT 6.3 NSSS MSIV DRNS/ RECIRC SAMPLE SR 3.3.6.1.5-1.a SR 3.3.6.1.5-1.b INBD VLV'S LOGIC SYS FUNC SR 3.3.6.1.5-1.d SR 3.3.6.1.5-1.e SR 3.3.6.1.5-1.g SR 3.3.6.1.5-2.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-2.c SR 3.3.6.1.5-2.d SR 3.5.2.8 SR 3.6.1.3.8
| |
| # Performances: 7 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 2529 PERFORM 44.020.001 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 1 SR 3.3.6.1.5-1.a SR 3.3.6.1.5-1.b LOGIC SYSTEM FUNCTIONAL SR 3.3.6.1.5-1.d SR 3.3.6.1.5-1.e SR 3.3.6.1.5-1.g SR 3.3.6.1.5-2.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-2.c SR 3.3.6.1.5-2.d SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 255 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 369 of 395 2530 PERFORM 44.020.001 SECT 6.5 - NS4 DIV 1 SECONDARY CONT, DW SR 3.3.6.1.5-1.a SR 3.3.6.1.5-1.b SUMP & DRN, CCHVAC LF SR 3.3.6.1.5-1.d SR 3.3.6.1.5-1.e SR 3.3.6.1.5-1.g SR 3.3.6.1.5-2.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-2.c SR 3.3.6.1.5-2.d SR 3.3.6.1.5-7.a SR 3.3.6.2.5-1 SR 3.3.6.2.5-2 SR 3.3.6.2.5-3 SR 3.3.6.2.5-4 SR 3.3.7.1.6-1 SR 3.3.7.1.6-2 SR 3.3.7.1.6-3 SR 3.6.1.3.8 SR 3.6.4.2.3 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 2540 PERFORM 44.020.011 PHASE 3 RX LOW WATER LEVEL 1, TRIP SYS SR 3.3.6.1.7-1.a A, CHANNEL A, RTT
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 2623 PERFORM 44.020.046 PHASE 3 MAIN STEAM LINE FLOW, DIV 2, SR 3.3.6.1.7-1.c CHANNEL D, RTT
| |
| # Performances: 4 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 256 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 370 of 395 2809 PERFORM 44.060.002 RCIC SYSTEM LOGIC FUNCTIONAL TEST - SR 3.3.3.2.2 SR 3.3.5.2.5-1 ONLINE SR 3.3.5.2.5-2 SR 3.3.5.2.5-3 SR 3.3.6.1.5-4.a SR 3.3.6.1.5-4.b SR 3.3.6.1.5-4.c SR 3.3.6.1.5-4.d SR 3.3.6.1.5-4.e SR 3.5.3.5 SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| Two failures are identified as event driven failures which are not indicative of a repetitive time based failure mechanism. There are no other failures; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of a change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 2/16/2010 C SPF Notes 2 issues: 1) "Step 6.5.12 The 1D24 Annunciator never did alarm or This is an event driven failure in that the test subsequently clear. Discussed with CRS and I&C Supervisor. Told to continue with equipment (Fluke VOM) being utilized only surveillance." 2) "Step 6.6.9.2 VOM 2 indicates approx. 550 ohms. Also Step 8.1. applies small current through the contacts Discussed with CRS and I&C Supervisor (observing). During discussion/evaluation being tested which may not be sufficient period of approx. 20 minutes, saw resistance vary from approx. 15 ohms to 33 enough to pass through even minor Megohms. Per CRS, note it, and move on. Continued with surveillance; no additional contamination. As a result, relay contacts problems. Refer to CARD 10-21400." CARD 10-21400 states: "...an unexpected that were expected to be closed and were resistance was detected in the E51-K20 (E5100M020) relay. Specifically, step 6.6.9.2 actually closed, appeared to be open as did not meet Acceptance Criteria. This step measures resistance between terminals A-32 indicated on the test equipment being used.
| |
| and A-36 (relay K20, contacts 3-4). Expected resistance is 0 ohms. Actual measured This was considered a "one time fluke resistance during performance of the surveillance was 550 ohms and slowly increased to anomaly that could not be reproduced in the 33 megohms. This indicates contacts 3-4 have failed in the closed (deenergized) state. lab" during the procedure performance.
| |
| This condition affects the ability of the E5150F013 to close on a RCIC Turbine trip Therefore, this failure will have no impact signal." Cause of the failure is stated as follows: "Surface contamination on relay on an extension to a 24 month surveillance contact surfaces is expected and unavoidable (tarnish and dust). The wiping action of the interval.
| |
| relay is typically sufficient to remove these contaminates. However, stubborn contamination may not be removed during the first few wipes of the relay. Depending on the level of contamination, different test devices will indicate different levels of resistance. The surveillance utilizes a Fluke VOM for resistance determination in this surveillance. Since the VOM only applies small currents through the contacts being tested the current level may not be sufficient enough to pass through even minor contamination. This would result in a high calculated resistance reading, which can be construed as a failed surveillance. If a different meter with a stronger current source is used, minor contamination does not present sufficient resistance to the current flow and the calculated resistance will be lower. The minor surface contamination does not prevent the relay contact from performing its intended function because in the logic chain, the contacts carry high enough currents to overcome this minor resistance.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 257 of 270
| |
| | |
| Engineering concluded that the voltage from the Fluke used for the surveillance is very TRVEND 24MCGNF319001 Rev 1 low and may not measure correctly the resistance of the contact with the very low Page 371 of 395 voltage that the unit can supply. To determine if the relay had truly failed its surveillance, a bench test was developed to test the relay contact resistance at rated power and loads. Bench test results indicated that the relay contact 3-4 would have worked as required. Therefore, the in-situ testing of the relay with a fluke meter is very conservative due to low voltage and may allow for a false failure to be concluded for a relay contact." WO 30934249 replaced E51-K20 relay on 2-16-2010. This event was determined to not be a MRFF.
| |
| 11/11/2014 C SPF: "While performing 6.6.5.1 when E5150F001 reached full open, VOM 1 flickered This is an event driven failure in that the test but did not settle in at a value. Then returned to 110 ohms. All other steps were SAT. equipment (VOM) being utilized to Talked to Supervisor and CRS to reperform 6.5 & 6.6 to get a reading for 6.6.5.1, document the test results failed during the installed a different meter." Sections 6.5 and 6.6 were completed successfully on second procedure performance. As a result, the performance of those sections. procedure acceptance criteria was not able to be confirmed as acceptable; a second VOM was used and steps were performed, once again, to confirm results. Therefore, this failure will have no impact on an extension to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 3293 PERFORM 43.401.711 DIV 1 CORE SPRAY INJECTION CHECK VALVE SR 3.3.5.1.6-1.d SR 3.3.5.3.3-1.b EXERCISE TEST
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 3294 PERFORM 43.401.712 DIV 2 CORE SPRAY INJECTION CHECK VALVE SR 3.3.5.1.6-1.d SR 3.3.5.3.3-1.b EXERCISE TEST
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 258 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 372 of 395 3300 PERFORM 44.220.110 SECT. 6.1 (H21P015) GRP 2 INST LINES EFCV'S, SR 3.6.1.3.9 FUNCTIONAL TEST
| |
| # Performances: 1 # Failures: 1 24 Month Justification: Notes: Performance includes 3300A, B, C, D and E Ref. DTE-19001, Section 3 Design Inputs One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/24/2010 A SPF notes four issues: 1) "Step 6.4.10.2.a and b. No Closed lights. See WO 29748936, All three valves were able to perform the switches were adjusted and retest was SAT." WO 29748936 was written (4/27/09) in intended safety function. The identified support of CARD 09-23281 (written 4/26/09). CARD 09-23281 states: "B31-F506A failure(s) would not have prevented the Excess flow check valve has no indication . The check valve worked until 4/25/09 until performance of the required safety function the "A" recirc pump was shut down. Troubleshoot and repair". WO 29748936 was of the equipment. Therefore, this failure will completed on 11/24/2010 to adjust limit switches satisfactorily. 2) "Step 6.5.11.2.a & b., have no impact on an extension to a 24 no closed lights also Step 6.5.11.4. See WO 29748902, Definitely got a good "check" month surveillance interval.
| |
| the first time but closed L/S's weren't properly aligned - doesn't appear to be resetting properly, as shown by subsequent tests for closure (3 times) did not get the flow/check action at P022 drain like we did the first time; believe check valve is now stuck closed.
| |
| New CARD 10-31289." WO 29748902 was written in support of CARD 09-23249 (written 4/25/09). The Corrective Actions stated in CARD 09-23249 are: "Work order 29748902 initiated to replace B31-F503B in RF14. Work order is included in RF14 potential scope and also included on the B3100 System Health Report as a targeted milestone to return system health to GREEN." During this performance of 44.220.110, WO 29748902 was revised as stated: "The original scope of this work order was to replace Excess Flow Check Valve B31-F503B due to its poor maintenance history, a replacement valve could not be received in time for RFl4 so it is desired to fix only the dual indication at this time. The purpose of this work order is to replace the limit switches for B31-F503B and to adjust limit switches for proper indication. NOTE: This work request is written to utilize 18 month surveillance 44.220.110 to establish initial conditions, perform testing and calibration, and to restore and IV instruments back to service." WO 29748902 was completed as revised satisfactorily. New CARD 10-31289 (written for this 11/24/2010 event performance) Description/Investigation states:
| |
| "B31F503B has been worked every refuel outage since RF8 except for RF10. The original plan for RF14 was a complete valve replacement. The work package was planned in January 2010 and the EFCV was ordered by the planner. The part did not arrive for RF 14 because there was a discrepancy between the vendor and the item master number. The part was never ordered due to this discrepancy. We knew going into RF14 that we were not going to be successful, but we had a commitment to attempt to repair the indication. A new Work Order was generated for RF15, the WO number is 32174694 and the EFCV was ordered by the planner." CARD 10-31289 Closure DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 259 of 270
| |
| | |
| Summary states: "The Vendor discrepancy was cleared up and a new PO was created for TRVEND 24MCGNF319001 Rev 1 the Work Order in RF15." CARD Reportability/Operability Review states: "B31F503B, Page 373 of 395 Recirc Loop B flow instrumentation EFCV, is a PCIV. During the RPV pressure test the B31F503B demonstrated isolation function by closing as demanded. B31F503B remains operable as a PCIV." CARD Description/Investigation details that: " The valve is closing properly and passes the Closing Functional exam (Step 6.6.11.2.c) in 44.220.110. The valve will successfully close on demand to satisfy it's safety function. It is evident the valve is currently open - providing it's function as a source valve for Recirc Flow instrumentation." 3) "Step 6.5.11.6.a & b. and 6.5.11.7, no open lights. Step 6.5.11.8, Adjustment for B31-F503B position switches is not required per SM." B21-F503A red Open lights on Panel H21-P402H and H11-P805 were verified ON in WO 29748902.
| |
| : 4) "Step 7.1, Table 1 B21-N003A should be C32-N003A, CRS Informed, CARD 10-31151 written" CARD 10-31151 states: "...Verified C32-N003A is correct by referring to page 5 where step 6.1.5 is taking C32-N003A out of service (not B21-N003A)." DCR 10-1613 was initiated to process this procedure revision.
| |
| Event Title Associated SRs and Function 3300A PERFORM 44.220.110 SECT. 6.2 (H21P025) GRP 2 INST LINES EFCV'S, SR 3.6.1.3.9 FUNCTIONAL TEST
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 3300 Event Title Associated SRs and Function 3300B PERFORM 44.220.110 SECT. 6.3 (H21P009) GRP 2 INST LINES EFCV'S, SR 3.6.1.3.9 FUNCTIONAL TEST
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 3300 Event Title Associated SRs and Function 3300C PERFORM 44.220.110 SECT. 6.4 (H21P006) GRP 2 INST LINES EFCV'S, SR 3.6.1.3.9 FUNCTIONAL TEST
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 3300 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 260 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 374 of 395 3300D PERFORM 44.220.110 SECT. 6.5 (H21P022) GRP 2 INST LINES EFCV'S, SR 3.6.1.3.9 FUNCTIONAL TEST
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 3300 Event Title Associated SRs and Function 3300E PERFORM 44.220.110 SECT. 6.6 (H21P421A) GRP 2 -N21F539B only SR 3.6.1.3.9
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 3300 Event Title Associated SRs and Function 3301 PERFORM 44.220.112 SECT. 6.1 (H21P009) GROUP 4 INST LINES SR 3.6.1.3.9 EFCV'S, FUNCTIONAL TEST
| |
| # Performances: 1 # Failures: 0 24 Month Justification: Notes: Performance of this Event covers 3301A, B, C, D and E in all cases within the analysis period.
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 3301A PERFORM 44.220.112 SECT. 6.6 (B21F517B only) GROUP 4 INST LINES SR 3.6.1.3.9 EFCV'S, FUNCTIONAL TEST
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 3301 Event Title Associated SRs and Function 3301B PERFORM 44.220.112 SECT. 6.2 (H21P015) GROUP 4 INST LINES SR 3.6.1.3.9 EFCV'S, FUNCTIONAL TEST
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 3301 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 261 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 375 of 395 3301C PERFORM 44.220.112 SECT. 6.3 (H21P016) GROUP 4 INST LINES SR 3.6.1.3.9 EFCV'S, FUNCTIONAL TEST
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 3301 Event Title Associated SRs and Function 3301D PERFORM 44.220.112 SECT. 6.4 (H21P035) GROUP 4 INST LINES SR 3.6.1.3.9 EFCV'S, FUNCTIONAL TEST
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 3301 Event Title Associated SRs and Function 3301E PERFORM 44.220.112 SECT. 6.5 (H21P421B) GROUP 4 INST LINES SR 3.6.1.3.9 EFCV'S, FUNCTIONAL TEST
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by Event 3301 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 262 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 376 of 395 3302 PERFORM 44.220.113 (Sec-6.1-H21P006)GRP 5 INSTRUMENT LINE SR 3.6.1.3.9 EXCESS FLOW CHECK VALVE FUNCTIONAL
| |
| # Performances: 1 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 11/20/2015 A SPF noted: "At Step 6.1.23.6, dual indication on reset. Attempted to check and reset G33F583 was tested satisfactorily for its again, still dual. Supervisor, CRS, SM informed. Valve indicates at least partial open. Tech Spec Excess Flow Check Valve Intend to proceed and verify indication restored for G33N037. Indication restored with function. Following restoration the G33F583 G33N037 return to service. CARD 15-29159 written." CARD 15-29159 states: "At step indicated dual. Valve indication eventually 6.1.23.6, G33F583 (Excess Flow Check Valve) showed dual indication on reset." corrected on its own. WO was not required.
| |
| Reportability/Operability Review states: "During the RPV Leakage Test, G33F583 was The identified failure(s) would not have tested satisfactorily for its Tech Spec Excess Flow Check Valve function. Following prevented the performance of the required restoration the G33F583 indicated dual. Dual indication does not impact function and safety function of the equipment. Therefore, RWCU Bottom Head flow indication remained normal for existing plant conditions. this failure will have no impact on an G33F583 remains OPERABLE." CARD Note states: "indication corrected to open extension to a 24 month surveillance interval.
| |
| indication without action at some point following surveillance. Exact time of correction is unknown." Per Maximo WO 44335025 Status CAN; Log Notes "System Eng walkdown this condition on 3/22/16 and concurs with cancelling WO. Condition no longer exists".
| |
| Event Title Associated SRs and Function 3302A PERFORM 44.220.113 (Sec-6.2-H21P009)GRP 5 INSTRUMENT LINE SR 3.6.1.3.9 EXCESS FLOW CHECK VALVE FUNCTIONAL
| |
| # Performances: 1 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 263 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 377 of 395 3302B PERFORM 44.220.113 (Sec-6.3-H21P025)GRP 5 INSTRUMENT LINE SR 3.6.1.3.9 EXCESS FLOW CHECK VALVE FUNCTIONAL
| |
| # Performances: 1 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 3304 PERFORM 44.220.111 SECT. 6.1 (H21P005) GROUP 3 INST LINES SR 3.6.1.3.9 EFCV'S, FUNCTIONAL TEST
| |
| # Performances: 1 # Failures: 0 24 Month Justification: Notes: Performance of this Event covers 3304A and B in all cases within the analysis period.
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 3304A PERFORM 44.220.111 SECT. 6.2 (H21P010) GROUP 3 INST LINES SR 3.6.1.3.9 EFCV'S, FUNCTIONAL TEST
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by 3304 Event Title Associated SRs and Function 3304B PERFORM 44.220.111 SECT. 6.3 (H21P038) GROUP 3 INST LINES SR 3.6.1.3.9 EFCV'S, FUNCTIONAL TEST
| |
| # Performances: 0 # Failures: 0 24 Month Justification: Notes: Completed by 3304 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 264 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 378 of 395 3307 PERFORM 44.220.114 SECT. 6.1 (H21P010) GROUP 6 INSTRUMENT SR 3.6.1.3.9 LINE EXCESS FLOW CHECK VALVE FUNCTIONAL
| |
| # Performances: 1 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 3307A PERFORM 44.220.114 SECT. 6.2 (H21P022) GROUP 6 INSTRUMENT SR 3.6.1.3.9 LINE EXCESS FLOW CHECK VALVE FUNCTIONAL
| |
| # Performances: 1 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 4/12/2017 A SPF notes two issues: 1) "Step 6.2.16.3, on both H11P805 and H21P402H the Closed The function of B31F515B valve was not light failed to illuminate. Both Open lights did extinguish." 2) All Acceptance Criteria lost, B31F515B closed as required to meet its steps SAT with exception of 6.2.16.3.a due to discrepancy 1). CRS and I&C Supervisor intended isolation function. The identified notified. CARD 17-23442 written. CARD 17-23442 states: "Check valve checked as failure(s) would not have prevented the there was no leakage to drain. Pulled the bulbs at the H21-P402H panel. On visual performance of the required safety function inspection, it was verified that the bulbs were blown at that panel. Recommend checking of the equipment. Therefore, this failure will the light bulbs on H11P805 as well. It is unlikely but possible that both bulbs were blown have no impact on an extension to a 24 at same time. The issue also indicates it might be a switch problem." month surveillance interval.
| |
| Reportability/Operability Review states: "During testing of the B31F515B EFCV, during the RPV leakage test, the EFCV closed as expected and performed its isolation function (44.220.112 completed satisfactorily). The B31F515B did not indicate close but check valve performed satisfactorily. B31F515B closes as required to meet its intended isolation function. B31F515B remains OPERABLE." CARD 17-23442 Action Item Completion Comments state: "During the testing, B31F515B closed as expected and performed its isolation function, as stated in the Shift Manager's comments." Per Maximo WO 47505854 Status CAN; Log Notes state: "The condition was corrected -
| |
| that is, the light bulb at the H21-P402H panel was replaced, eliminating the condition."
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 265 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 379 of 395 3528 PERFORM 44.020.602 OTBD SDC - HEAD SPRAY AUTO ISOLATION SR 3.3.6.1.5-6.a SR 3.3.6.1.5-6.b LOGIC FUNCTIONAL SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 3529 PERFORM 44.020.002 NSSSS MSIV DRN/ RECIRC SAMPLE OTBD SR 3.3.6.1.5-1.a SR 3.3.6.1.5-1.b VLV'S LOGIC SYS FUNC SR 3.3.6.1.5-1.d SR 3.3.6.1.5-1.e SR 3.3.6.1.5-1.g SR 3.3.6.1.5-2.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-2.c SR 3.3.6.1.5-2.d SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 3530 PERFORM 44.020.002 SECT 6.4 - VENT/PURGE ISO NSSSS DIV 2 SR 3.3.6.1.5-1.a SR 3.3.6.1.5-1.b LOGIC SYSTEM FUNCTIONAL SR 3.3.6.1.5-1.d SR 3.3.6.1.5-1.e SR 3.3.6.1.5-1.g SR 3.3.6.1.5-2.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-2.c SR 3.3.6.1.5-2.d SR 3.6.1.3.8
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 266 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 380 of 395 3531 PERFORM 44.020.002 SECT 6.5 - NS4 DIV 2 SECONDARY CONT, DW SR 3.3.6.1.5-1.a SR 3.3.6.1.5-1.b SUMP & DRN, CCHVAC LF SR 3.3.6.1.5-1.d SR 3.3.6.1.5-1.e SR 3.3.6.1.5-1.g SR 3.3.6.1.5-2.a SR 3.3.6.1.5-2.b SR 3.3.6.1.5-2.c SR 3.3.6.1.5-2.d SR 3.3.6.1.5-7.a SR 3.3.6.2.5-1 SR 3.3.6.2.5-2 SR 3.3.6.2.5-3 SR 3.3.7.1.6-1 SR 3.3.7.1.6-2 SR 3.3.7.1.6-3 SR 3.6.1.3.8 SR 3.6.4.2.3 SR 3.6.4.3.3 SR 3.7.3.3
| |
| # Performances: 6 # Failures: 1 24 Month Justification: Notes:
| |
| One failure identified which did not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 5/1/2012 A SPF Note 1: " Unable to satisfy acceptance criteria for Steps 6.5.19.2, 8.5 and unable to The identified failure(s) would not have verify Step 6.5.21.2. T4901F602 indicated dual prior to performance of Step 6.5.19.2. prevented the performance of the required Attempted to open. Close light did not clear. Continued on. Step 6.5.21.2 attempted to safety function of the equipment. Therefore, open. Close light did not clear. Attempted to close w/CRS concurrence. Open light did this failure will have no impact on an not clear. - SM, CRS I/C Supervisor informed. CARD 12-24028 written. Continued extension to a 24 month surveillance with Surv. Acceptance Criteria not met.SPF Note 2: "Following investigation of interval.
| |
| T4901F602 performance and discussion with licensed Operator performing surveillance verification that T4901F602 would not open was accomplished by lack of response of light indications on MCRPB's. Following reset of isolation signal PB lights responded as expected when valve was stroked open and closed. (dual indications remained but lights blinked when valve was stroked.) CARD 12-24028 states: "While stroking the T4901-F602, Div 2 DW Pneumatics Supply Inboard Isolation Valve, the valve only indicated dual. Stationed operator at MCC during a stoke and noticed the contactor would pick-up and drop-out approx 18 seconds later during both open and closed strokes(last stroke time was 18.2 seconds (10/16/11), with IST limitof 14.8< BTC
| |
| >20.0 sec) Then stationed an operator locally at the valve and they reported valve being full closed then full open locally with dual still indicated in MCR Request work order for troubleshooting and adjusting limit switches."Reportability/Operability Review states:
| |
| "T4901F601 has been declared inoperable and documented on LCO 12-0247." WO 34405491 requested. WO 34405491 completed adjustments to limit switches. Returned to Service 5/1/2012 DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 267 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 381 of 395 3730 PERFORM 44.020.604 NS4 DIV 1 TIP ISO VALVES LOGIC SR 3.6.1.3.8 FUNCTIONAL
| |
| # Performances: 5 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 3866 PERFORM 64.120.040 CONTAINMENT AREA HIGH RANGE SR 3.3.3.1.2-7 RADIATION MONITOR DIV 1 RAD CAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Event Title Associated SRs and Function 3867 PERFORM 64.120.041 CONTAINMENT AREA HIGH RANGE SR 3.3.3.1.2-7 RADIATION MONITOR DIV 2 RAD CAL
| |
| # Performances: 6 # Failures: 0 24 Month Justification: Notes:
| |
| There were no failures, therefore the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 268 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Event Title Associated SRs and Function Page 382 of 395 3887 PERFORM 44.210.006 DRYWELL SUMP FLOW CHANNEL SR 3.4.6.3 CALIBRATION/FUNCTIONAL
| |
| # Performances: 6 # Failures: 2 24 Month Justification: Notes:
| |
| The failures do not impact any safety function; therefore, the surveillance test history supports the conclusion that the impact, if any, on system availability will be small as a result of the change to a 24 month surveillance interval.
| |
| Failure Review:
| |
| Perf. Date Fail Cat. Description of Failure Justification of Failure 8/16/2012 A SPF note: "Transmitter had air in the lines per Data on Table 3. Performed transmitter The identified failure(s) would not have venting per Attachment 6 with Supervision and CRS approval." During performance, prevented the performance of the required G11-R600 Blue Pen Indication As Found Data did not meet Acceptable Performance safety function of the equipment. Therefore, Tolerance (APT). During calibration of G11-N003 flow transmitter As Found Data was this failure will have no impact on an outside of Acceptable Performance Tolerance (APT) range. Attachment 1, Step 4 refers extension to a 24 month surveillance to Attachment 6 if As Found Data is "non repeatable or non-linear". Transmitter was interval.
| |
| vented per Attachment 6, then calibrated per Attachment 1 successfully with all data within As Left Tolerance.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 269 of 270
| |
| | |
| 8/8/2018 A SPF note: "Step 6.3.10 leaves out Table 5 for G11-R600 Recorder cal. This is not The identified failure(s) would TRVEND not have 24MCGNF319001 Rev 1 acceptance criteria. See CARD 18-25953. Informed Supervisor and CS. Completed Page 383 of 395 prevented the performance of the required surveillance." CARD 18-25953 states: "The significance of this is that recorder G safety function of the equipment. Therefore, 11R600 red pen indication can be left out of calibration. This recorder was outside of this failure will have no impact on an LAT and did not get calibrated during the performance of this procedure. This is not extension to a 24 month surveillance acceptance criteria. The procedure also needs to include additional steps after step interval.
| |
| 6.3.10, 3 to re-calibrate G11-K603 integrator. This is due to the fact that any calibration of the loop components can change the tolerance of the integrator which is acceptance criteria. Reportability/Operability Review states: "The drywell sumps are used for leakage monitoring. The Drywell Equipment Drain Sump level, flow and pump run time integrators are used to determine changes in identified leakage in the drywell. The Drywell Equipment Drain Sump Effluent Flow integrator is the instrumentation used to meet the TRM requirements. All ACCEPTANCE CRITERIA associated with the flow integrator were met. The flow indication on the G11R600 is not used for determining DW leakage rates, and is not a required indication. The Drywell Equipment Drain Sump level, flow and pump run time system remains OPERABLE." Also noted Reportability/Operability Review is: "The flow recorder point is outside of the Leave Alone Tolerance (LAT) only for the 100% (125 gpm) calibration point. It is within the LAT for all calibration points (100 gpm and below). The normal operating range when the equipment drain sump is pumped is below 100 gpm. So, the MCR flow indication remains accurate for the ranges that the system normally operates." Review of the CARD and of the affected procedure was performed; I&C procedure writer concurred the requested changes should be implemented using a DCR. DCR 18-1780 was initiated.
| |
| DTE-19001, Rev. 1 --Fermi 2 Technical Specification Event Failure History Evaluation 1-July-2019 Page 270 of 270
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 384 of 395 Engineering Report No. DTE-19001 Revision 1 ATTACHMENT 4 TECHNICAL SPECIFICATION EVENT "UNIQUE FAILURES" (6 PAGES)
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 385 of 395 ATTACHMENT 4 - FERMI 2 TECHNICAL SPECIFICATION EVENT "UNIQUE FAILURES" Event Date Description of Failure Justfication of Failure 0263 4/9/2017 SPF Note: "At Step 5.2.35.2, 72CF threw on to 72F Bus. It did not affect stroke The identified failure is unique and does not times." CARD 17-23266 submitted. CARD 17-23266 states: "72C-3C tripped. occur on a repetitive basis and is not associated Walkdown of the breaker found a trip of the 87 device (over current) and the Lockout with a time-based failure mechanism.
| |
| Relay. Surveillance 24.204.03 (LPCI Simulated Automatic Actuation Test) was in Therefore, this failure will have no impact on progress at step 5.2.35.2. Loads off swing bus 72CF were transferred to position 72F- an extension to a 24 month surveillance 5F as expected. No other abnormalities were noted. This event is similar to CARD interval.
| |
| 15-28495." Reportability/Operability Review states: Declared LPCI Swing bus inoperable and added condition to LCO 2016-0381. Applied mode 1, 2 and 3 restraints." CARD Cause: "The Direct Cause was: Degraded CT. This was the only change to the circuit since successful completion of the circuit. The Apparent Cause is Abnormal Electrical Stress from a loose connection/open circuit in RF17 (CARD 15-28495). The open circuit of the CT in RF17 could have developed high voltages and degraded the CT. This degradation cannot be detected at low current test conditions. Due to the fast acting relaying the high voltages may not have been long enough in duration to cause a complete failure of the CT. A Contributing Cause is Degradation of the 87 relay time delay. Original manufacture time delay curve states the relay should actuate between 14 and 38 milliseconds and should be around 30 at the test values utilized by Fermi. The 87 relay is actuating at 8 milliseconds. Cause Code E01-Setpoint Drift. Corrective Actions: DC/AC-Replace the affected CT's at 72C-F MCC completed. CC-Replace the 87 relay with a relay including a time delay per ERE-44596 - completed. The extent of the apparent cause is limited to CT's that have been open circuited. There is one other known occurrence in which a CT was open circuited. This was the failed knife switch in the 345KV relay house coming out of RF17. This CT has been operated throughout the last cycle in the range it is expected to operate at and has not shown any degradation. The extent of the contributing cause is limited to the 50 and 87 relays in the 72C-3C circuit. The model relay was not found used in any other locations. The 50 and 87 relays were replaced under ERE-44596. This failure was determined to be a Functional Failure as when breaker 72C, position 3C tripped unexpectedly this resulted in inability of the breaker to supply power to MCC 72-CF which is a risk significant load. Failure of Function R1400-01 resulted. MRFF Evaluation Justification states: The causal analysis determined that the cause was most likely that the CT was degraded during the RF17 event in which the CT was open-circuited. Fermi performed testing on the CT which did not reveal the degradation due to the differences in testing capabilities and in-field currents. There was also no OE or industry recommendations to suggest DTE-19001, Rev. 1 - Fermi 2 Technical Specification Event "Unique Failures" 1-July-2019 Page 2 of 6
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 386 of 395 Event Date Description of Failure Justfication of Failure that the CT should be replaced just because it was open-circuited since it passed testing. The closest cause code is M3 as the CT tested SAT and there was no industry recommendation or OE available to suggest that any other actions should have been taken in RF17 to prevent this failure. Therefore this is not a Maintenance Preventable Functional Failure. The performance criteria of 0 bus failures has been exceeded. CARD 17-23803 has been submitted to evaluate the system for classification of (a)(1) status. CARD 17-23803 states: The system has been evaluated for (a)(1) status and the 8/7/17 MR Expert panel approved the system to remain (a)(2). This recommendation is because the only maintenance preventable failure was an HU issue not an equipment issue. There are also no actions to be driven by a Get-Well-Plan to improve the reliability of the equipment. WO 47455670 replaced CT-1 Current Transformers with new CTs in MCC 72C-F, position 1C and also replaced both 50 & 87 relays at Bus 72C-3C. Partial performance of 24.204.03, Section 5.2 was performed as PMT for this Work Order.
| |
| 0766 4/2/2009 SPF Note 1: "Table 5 As Found data all high outside As Found tolerance."SPF The identified failure is unique and does not Note 2: "Step 6.2.7 Required limit exceeded for 19.85% (See Table 5) Step 6.2.9 occur on a repetitive basis and is not associated Unable to calibrate transmitter due to large deadband at zero adjustment (either with a time-based failure mechanism.
| |
| 0.988 or 1.023, closest to 1.000) Informed CRS and SM CARD 09-22140 - Back out Therefore, this failure will have no impact on of surveillance, performed 6.2.10 - 6.2.12, 6.2.20.2, 6.2.20.3, 6.2.21, 7.0, 7.4, 8.2" an extension to a 24 month surveillance CARD 09-22140 states: "Unable to adjust zero pot of transmitter B21N095B, NB RX interval.
| |
| LVL 3 TRIP (NARROW RNG) DIV2 LVL XMTR for Main Turbine/N and S FW Turbine Level 8 Trips and ADS located on Rack H21P005. Deadband is 0.988 to 1.023 Vdc even after cleaning of pot. All As Found values were approx. 0.035 high throughout range. Required limit of 1.821 Vdc at 19.85% was exceeded with reading at 1.827 Vdc. Transmitter replacement is recommended. Mode 2 restraint.
| |
| WO 29640637 requested. WO 29640637 scope is: replace B21N095B, Div 2 Reactor Level Narrow Range Transmitter with a new transmitter. B21N095B replaced with "like for like" transmitter and calibrated to within As Left tolerance successfully. WO feedback states: "Transmitter probably original installation, went out due to age."
| |
| DTE-19001, Rev. 1 - Fermi 2 Technical Specification Event "Unique Failures" 1-July-2019 Page 3 of 6
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 387 of 395 Event Date Description of Failure Justfication of Failure 2282 11/21/201 SPF Note 1: "Manually tripped EDG 12 locally due to loss of 72EB-2D. Breaker The identified failure is unique and does not tripped after LOCA Test from Sequencer panel, Entered 'Loss of 64C' and 'Loss of occur on a repetitive basis and is not associated 72C' to reenergize buses and loads. EDG 12 remains shutdown. MCC 72EB-2D with a time-based failure mechanism.
| |
| remains deenergized, D7 EECW - (No EESW Pump) 72CF restored. All bus relays Therefore, this failure will have no impact on are reset. CARD 15-29239 submitted." CARD 15-29239 states: "During the an extension to a 24 month surveillance performance of 24.307.02 - Emergency Diesel Generator 12 - Loss of Offsite Power interval.
| |
| and ECCS Start With Loss of Offsite Power Test, on step 5.1.32 & 5.1.33, a LOCA signal is injected into the Digital load sequencer to resequence the loads. Following trip and reclosing of 12EB-EB3 (EDG 12 output breaker) the EDG12 DGSW Pump attempted to start and lost power. This created a situation in which an EDG was running and sequencing on loads with no forced Diesel Generator Service Water.
| |
| The operating crew tripped EDG 12 using the local overspeed trip. AOPs for loss of 64C and 72C were entered. The operating crew backed out of the surveillance. Bus 64C and 72C have been restored IAW the SOPs. Request investigation and work order to repair." Reportability/Operability Review states: "DGSW pump tripped during EDG 12 LOP testing; Supply breaker to the MCC 72EB-2D was found tripped. DGSW pump could not support function for running the EDG. EDG 12 DGSW pump declared inoperable. LCO 2015-0568." Surveillance 24.307.02 was reviewed to ensure the appropriate conditions were set to close breakers 72EB-2D for EDG12 DGSW and 72EB-2C for Division 1 EESW pump. On 11/21/15 during performance of 23.307.02 a LOCA signal was initiated via Step 5.1.32 & 5.1.33 (CARD 15-29239) to sequence loads on to EDG-12. Approximately 45-50 seconds into the load sequence, 72EB POS 2D closed then tripped approximately 1 second later. EDG 12 was the manually tripped due to a loss of EDG-12 DGSW C pump.
| |
| Work order 44339839 released to Work Group at 0455 11/22/2015:1. Test Power Shield - if bad replace, if trip/reset button not working may need to check MCC 72EB-2D loads2. Verify resistor for local red light is not shorted, also a physical inspection to ensure not shorted to adjacent terminals - if resistor shorted replace, if terminals shorted repair.3. Insulation resistance checks on breaker control wiring and feed to MCC - repair if required.4. Test load shed string associated with 4NV94 - verify working correctly, replace relays as necessary5. Test relay 4NV94 -
| |
| replace if required.WO 44339839 was completed. No issues identified with all components inspected. Conclusion was that the issue is within the breaker.
| |
| Confirmed that 72EB-2D was REFURBED in 2009. It was an Extent of Condition position from CARD 09-27133. The breaker was inspected by Maintenance and no issues were found with the breaker. On 11/22/15, WO 44340274 initiated to replace the 72EB-2D breaker with a refurbished/PM'd spare. On 11/23/15 during performance of 23.307.02, Section 5.1 (WO 44349460) of EDG12 LOP/LOCA when DTE-19001, Rev. 1 - Fermi 2 Technical Specification Event "Unique Failures" 1-July-2019 Page 4 of 6
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 388 of 395 Event Date Description of Failure Justfication of Failure a LOCA signal was initiated (CARD 15-29278), Division 1 EESW pump (72EB-2C) tripped immediately after re-sequencing the second time, whereas, EDG-12 DGSW C Pump (R1600S017A, 72EB-2D) re-started as expected. LOR 27X-12EB was observed cycling following the closure of 12EB-EB3. 72EB-2C attempted to close and tripped immediately during load sequencing. The following are other facts from the event:* 27X 12EB LOR Turning on and off (Load Sequence correlates with cycling).* Relay 3NV94 on and off with 27X-12EB by design (Could not confirm other 94 relays).* 72EB-2C did not re-close (closed and re-opened - per video view of breaker lights).* In Relay Room, 12EB light flashed in/out during evolution.
| |
| (note: also saw this a few times Saturday 11/21/2015) This is the XK31 indicating light on drawing I-2714-22. This is lit from 12EB Load Shed Relay 2MR69 (Drawings I-N-2572-18 Grid D-7, B-7 & I-2714-22).* EDSW restarted as expected (see video).* EESW tripped today AND Saturday (see pump flow curves).*
| |
| Checked Potential Transformers (PT); circuits good.* Check EB3 52S and 52H cell switch. Indications show these are positioned properly.Work order 44346132 "Inspect and Test 27X-12EB, 27-XY, and 27-YZ" was completed. It was determined that the issue was caused by erratic cycling of the LOR 27X-12EB. The relay was replaced and issue was resolved. A failure analysis will be conducted on the LOR 27X-12EB in order to determine the cause of the failure. This CARD will track the failure analysis of LOR 27X-12EB. Failure analysis of LOR 27X-12EB was completed. "Direct Cause found to be inconclusive. Simulation performed wedged a piece of a foreign material behind the trip lever which replicated the original failure.
| |
| After disassembly of the relay, substance was observed as being drier than normal grease and came off of the lockout relay's internal parts in chunks. The failure analysis led to the conclusion that hardened grease found in the relay could have become foreign material and caused cycling of the relay." CORRECTIVE ACTIONS: Twenty one PMs were created to replace selected LOR relays (see CARD 15-29239). This CARD action plan is applicable to CARDs 15-29239 and 15-29278. The issues in those CARDs were the result of the failure of LOR 27X-12EB.
| |
| DTE-19001, Rev. 1 - Fermi 2 Technical Specification Event "Unique Failures" 1-July-2019 Page 5 of 6
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 389 of 395 Event Date Description of Failure Justfication of Failure 2283 4/14/2017 SPF Note 1 - "During performance of surveillance, #12 Drywell Cooling Fan The identified failure is unique and does not (T4700C012) did not restart during load sequencing following loss of offsite power occur on a repetitive basis and is not associated auto start signal to EDG 13. Walkdown at MCC 72E 5B found an acrid odor. MCC with a time-based failure mechanism.
| |
| 73E 5B was de-energized. To back out of surveillance, steps were performed to load Therefore, this failure will have no impact on EDG 13, restore offsite power to 65E, and then shutdown EDG 13 to place in an extension to a 24 month surveillance standby conditions. Steps are NA that were not required to accomplish this. CARD interval.
| |
| 17-23496" CARD 17-23496 states: "Drywell Cooling Fan 12 did not restart during the load sequence following simulated loss of power. Reference Acceptance Criteria Step 5.1.17. The CMC switch for T4700C012 was in Auto and indicated TRIPPED upon attempted restart. A couple minutes later all indications were lost at the CMC switch. Field walkdown found an acrid odor at MCC 72E 5B. The MCC was deenergized and initial investigation shows indication of a burnt contactor.
| |
| Investigate cause and repair." CARD Reportability/Operability Review states: "72E-5B was de-energized following the failure, to de-energize the MCC for Drywell Fan
| |
| #12. The inoperability is tracked on LCO 2017-0210. 24.307.03 was backed out of, with only part of Section 5.1 complete." Investigation by electrical maintenance and operations found the contactor coil burnt. The Direct Cause is E04 - insulation breakdown because the coil insulation broke down and shorted resulting in the inability to close the contactor and start the drywell cooler. WO 47495796 initiated to replace contactor. A replacement contactor (i.e., 2 Overload blocks and Aux contact block) was installed and DWC #12 operated as expected.
| |
| DTE-19001, Rev. 1 - Fermi 2 Technical Specification Event "Unique Failures" 1-July-2019 Page 6 of 6
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 390 of 395 Engineering Report No. DTE-19001 Revision 1 ATTACHMENT 5 TECHNICAL SPECIFICATION EVENT "UNIQUE FAILURES" EVALUATION (6 PAGES)
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 391 of 395 ATTACHMENT 5 - FERMI 2 TECHNICAL SPECIFICATION EVENT "UNIQUE FAILURES" EVALUATION Event Date Description of Failure Unique Failure Review 0263 4/9/2017 SPF Note: "At Step 5.2.35.2, 72CF threw on to 72F Bus. It did not affect stroke No similar failures are identified, therefore the times." CARD 17-23266 submitted. CARD 17-23266 states: "72C-3C tripped. failure is not repetitive in nature. No time based Walkdown of the breaker found a trip of the 87 device (over current) and the mechanisms are apparent. Therefore, this failure Lockout Relay. Surveillance 24.204.03 (LPCI Simulated Automatic Actuation is unique and any subsequent failure would not Test) was in progress at step 5.2.35.2. Loads off swing bus 72CF were transferred result in a significant impact on to position 72F-5F as expected. No other abnormalities were noted. This event is system/component availability.
| |
| similar to CARD 15-28495." Reportability/Operability Review states: Declared LPCI Swing bus inoperable and added condition to LCO 2016-0381. Applied mode 1, 2 and 3 restraints." CARD Cause: "The Direct Cause was: Degraded CT. This was the only change to the circuit since successful completion of the circuit. The Apparent Cause is Abnormal Electrical Stress from a loose connection/open circuit in RF17 (CARD 15-28495). The open circuit of the CT in RF17 could have developed high voltages and degraded the CT. This degradation cannot be detected at low current test conditions. Due to the fast acting relaying the high voltages may not have been long enough in duration to cause a complete failure of the CT. A Contributing Cause is Degradation of the 87 relay time delay. Original manufacture time delay curve states the relay should actuate between 14 and 38 milliseconds and should be around 30 at the test values utilized by Fermi. The 87 relay is actuating at 8 milliseconds. Cause Code E01-Setpoint Drift. Corrective Actions: DC/AC-Replace the affected CT's at 72C-F MCC completed. CC-Replace the 87 relay with a relay including a time delay per ERE-44596 - completed. The extent of the apparent cause is limited to CT's that have been open circuited. There is one other known occurrence in which a CT was open circuited. This was the failed knife switch in the 345KV relay house coming out of RF17. This CT has been operated throughout the last cycle in the range it is expected to operate at and has not shown any degradation.
| |
| The extent of the contributing cause is limited to the 50 and 87 relays in the 72C-3C circuit. The model relay was not found used in any other locations. The 50 and 87 relays were replaced under ERE-44596. This failure was determined to be a Functional Failure as when breaker 72C, position 3C tripped unexpectedly this resulted in inability of the breaker to supply power to MCC 72-CF which is a risk significant load. Failure of Function R1400-01 resulted. MRFF Evaluation Justification states: The causal analysis determined that the cause was most likely that the CT was degraded during the RF17 event in which the CT was open-circuited. Fermi performed testing on the CT which did not reveal the DTE-19001, Rev. 1 Attachment 5 - Fermi 2 Technical Specification Event "Unique Failures" Evaluation 1-July-2019 Page 2 of 6
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 392 of 395 Event Date Description of Failure Unique Failure Review degradation due to the differences in testing capabilities and in-field currents.
| |
| There was also no OE or industry recommendations to suggest that the CT should be replaced just because it was open-circuited since it passed testing. The closest cause code is M3 as the CT tested SAT and there was no industry recommendation or OE available to suggest that any other actions should have been taken in RF17 to prevent this failure. Therefore this is not a Maintenance Preventable Functional Failure. The performance criteria of 0 bus failures has been exceeded. CARD 17-23803 has been submitted to evaluate the system for classification of (a)(1) status. CARD 17-23803 states: The system has been evaluated for (a)(1) status and the 8/7/17 MR Expert panel approved the system to remain (a)(2). This recommendation is because the only maintenance preventable failure was an HU issue not an equipment issue. There are also no actions to be driven by a Get-Well-Plan to improve the reliability of the equipment. WO 47455670 replaced CT-1 Current Transformers with new CTs in MCC 72C-F, position 1C and also replaced both 50 & 87 relays at Bus 72C-3C. Partial performance of 24.204.03, Section 5.2 was performed as PMT for this Work Order.
| |
| 0766 4/2/2009 SPF Note 1: "Table 5 As Found data all high outside As Found tolerance."SPF There is a total of one failure of the Rosemount Note 2: "Step 6.2.7 Required limit exceeded for 19.85% (See Table 5) Step 6.2.9 1153DB4RCN003 transmitter. No time based Unable to calibrate transmitter due to large deadband at zero adjustment (either mechanisms are apparent. Therefore this failure 0.988 or 1.023, closest to 1.000) Informed CRS and SM CARD 09-22140 - Back is unique and any subsequent failure would not out of surveillance, performed 6.2.10 - 6.2.12, 6.2.20.2, 6.2.20.3, 6.2.21, 7.0, 7.4, result in a significant impact on 8.2" CARD 09-22140 states: "Unable to adjust zero pot of transmitter system/component availability.
| |
| B21N095B, NB RX LVL 3 TRIP (NARROW RNG) DIV2 LVL XMTR for Main Turbine/N and S FW Turbine Level 8 Trips and ADS located on Rack H21P005.
| |
| Deadband is 0.988 to 1.023 Vdc even after cleaning of pot. All As Found values were approx. 0.035 high throughout range. Required limit of 1.821 Vdc at 19.85% was exceeded with reading at 1.827 Vdc. Transmitter replacement is recommended. Mode 2 restraint. WO 29640637 requested. WO 29640637 scope is: replace B21N095B, Div 2 Reactor Level Narrow Range Transmitter with a new transmitter. B21N095B replaced with "like for like" transmitter and calibrated to within As Left tolerance successfully. WO feedback states:
| |
| "Transmitter probably original installation, went out due to age."
| |
| DTE-19001, Rev. 1 Attachment 5 - Fermi 2 Technical Specification Event "Unique Failures" Evaluation 1-July-2019 Page 3 of 6
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 393 of 395 Event Date Description of Failure Unique Failure Review 2282 11/21/2015 SPF Note 1: "Manually tripped EDG 12 locally due to loss of 72EB-2D. Breaker There are a total of two failures identified related tripped after LOCA Test from Sequencer panel, Entered 'Loss of 64C' and 'Loss to Electroswitch Lockout relays (1Model 7823DD of 72C' to reenergize buses and loads. EDG 12 remains shutdown. MCC 72EB- and 1 Model 7802D) over the review period. In 2D remains deenergized, D7 EECW - (No EESW Pump) 72CF restored. All bus one case, the model 7823DD LOR (electrically relays are reset. CARD 15-29239 submitted." CARD 15-29239 states: "During operated), failed to operate as expected, in two the performance of 24.307.02 - Emergency Diesel Generator 12 - Loss of Offsite instances, both during the same required 18 Power and ECCS Start With Loss of Offsite Power Test, on step 5.1.32 & 5.1.33, month performance in 11/2015. The second a LOCA signal is injected into the Digital load sequencer to resequence the identified failure in the 11/2015 performance was loads. Following trip and reclosing of 12EB-EB3 (EDG 12 output breaker) the discovered during a subsequent performance of EDG12 DGSW Pump attempted to start and lost power. This created a situation the surveillance two days after the first in which an EDG was running and sequencing on loads with no forced Diesel performance without any corrective action Generator Service Water. The operating crew tripped EDG 12 using the local performed on the failed Model 7823DD LOR.
| |
| overspeed trip. AOPs for loss of 64C and 72C were entered. The operating crew The failure analysis led to the conclusion that backed out of the surveillance. Bus 64C and 72C have been restored IAW the hardened grease found in the relay "could have" SOPs. Request investigation and work order to repair." Reportability/Operability become foreign material and caused cycling of the Review states: "DGSW pump tripped during EDG 12 LOP testing; Supply relay. In the other case, for the Model 7802D, breaker to the MCC 72EB-2D was found tripped. DGSW pump could not support once again the LOR failed to operate and similar function for running the EDG. EDG 12 DGSW pump declared inoperable. LCO analysis was performed as related to hardened 2015-0568." Surveillance 24.307.02 was reviewed to ensure the appropriate lubrication having separated due to aging, conditions were set to close breakers 72EB-2D for EDG12 DGSW and 72EB-2C however, as noted in the analysis, hardened for Division 1 EESW pump. On 11/21/15 during performance of 23.307.02 a lubrication could only impact operation of LOCA signal was initiated via Step 5.1.32 & 5.1.33 (CARD 15-29239) to electrically operated Lockout relays, therefore this sequence loads on to EDG-12. Approximately 45-50 seconds into the load (and other mechanical reset) Lockout relays are sequence, 72EB POS 2D closed then tripped approximately 1 second later. EDG not affected. Each of the relays was replaced. The 12 was the manually tripped due to a loss of EDG-12 DGSW C pump. Work identified failure of the grease in the lockout order 44339839 released to Work Group at 0455 11/22/2015:1. Test Power relay, which in turn became foreign material, is Shield - if bad replace, if trip/reset button not working may need to check MCC identified as a time-dependent failure in the 72EB-2D loads2. Verify resistor for local red light is not shorted, also a meeting minutes for OSRO Meeting No. 1449 physical inspection to ensure not shorted to adjacent terminals - if resistor dated August 30, 2018. For extent of condition, shorted replace, if terminals shorted repair.3. Insulation resistance checks on PMs were created to replace 21 LORs. While breaker control wiring and feed to MCC - repair if required.4. Test load shed some LORs have already been replaced, the string associated with 4NV94 - verify working correctly, replace relays as remaining are currently scheduled for replacement necessary5. Test relay 4NV94 - replace if required.WO 44339839 was through early 2023 as indicated in the completed. No issues identified with all components inspected. Conclusion was Surveillance Test Evaluation Form contained that the issue is within the breaker. Confirmed that 72EB-2D was REFURBED in within OSRO No 1449. Therefore, this failure is 2009. It was an Extent of Condition position from CARD 09-27133. The breaker unique and any subsequent failure would not was inspected by Maintenance and no issues were found with the breaker. On result in a significant impact on 11/22/15, WO 44340274 initiated to replace the 72EB-2D breaker with a system/component availability.
| |
| refurbished/PM'd spare. On 11/23/15 during performance of 23.307.02, Section DTE-19001, Rev. 1 Attachment 5 - Fermi 2 Technical Specification Event "Unique Failures" Evaluation 1-July-2019 Page 4 of 6
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 394 of 395 Event Date Description of Failure Unique Failure Review 5.1 (WO 44349460) of EDG12 LOP/LOCA when a LOCA signal was initiated (CARD 15-29278), Division 1 EESW pump (72EB-2C) tripped immediately after re-sequencing the second time, whereas, EDG-12 DGSW C Pump (R1600S017A, 72EB-2D) re-started as expected. LOR 27X-12EB was observed cycling following the closure of 12EB-EB3. 72EB-2C attempted to close and tripped immediately during load sequencing. The following are other facts from the event:* 27X 12EB LOR Turning on and off (Load Sequence correlates with cycling).* Relay 3NV94 on and off with 27X-12EB by design (Could not confirm other 94 relays).* 72EB-2C did not re-close (closed and re-opened - per video view of breaker lights).* In Relay Room, 12EB light flashed in/out during evolution. (note: also saw this a few times Saturday 11/21/2015) This is the XK31 indicating light on drawing I-2714-22. This is lit from 12EB Load Shed Relay 2MR69 (Drawings I-N-2572-18 Grid D-7, B-7 & I-2714-22).* EDSW restarted as expected (see video).* EESW tripped today AND Saturday (see pump flow curves).* Checked Potential Transformers (PT); circuits good.*
| |
| Check EB3 52S and 52H cell switch. Indications show these are positioned properly.Work order 44346132 "Inspect and Test 27X-12EB, 27-XY, and 27-YZ" was completed. It was determined that the issue was caused by erratic cycling of the LOR 27X-12EB. The relay was replaced and issue was resolved. A failure analysis will be conducted on the LOR 27X-12EB in order to determine the cause of the failure. This CARD will track the failure analysis of LOR 27X-12EB. Failure analysis of LOR 27X-12EB was completed. "Direct Cause found to be inconclusive. Simulation performed wedged a piece of a foreign material behind the trip lever which replicated the original failure. After disassembly of the relay, substance was observed as being drier than normal grease and came off of the lockout relay's internal parts in chunks. The failure analysis led to the conclusion that hardened grease found in the relay could have become foreign material and caused cycling of the relay." CORRECTIVE ACTIONS: Twenty one PMs were created to replace selected LOR relays (see CARD 15-29239).
| |
| This CARD action plan is applicable to CARDs 15-29239 and 15-29278. The issues in those CARDs were the result of the failure of LOR 27X-12EB.
| |
| DTE-19001, Rev. 1 Attachment 5 - Fermi 2 Technical Specification Event "Unique Failures" Evaluation 1-July-2019 Page 5 of 6
| |
| | |
| TRVEND 24MCGNF319001 Rev 1 Page 395 of 395 Event Date Description of Failure Unique Failure Review 2283 4/14/2017 SPF Note 1 - "During performance of surveillance, #12 Drywell Cooling Fan No similar failures are identified, therefore the (T4700C012) did not restart during load sequencing following loss of offsite failure is not repetitive in nature. No time based power auto start signal to EDG 13. Walkdown at MCC 72E 5B found an acrid mechanisms are apparent. Therefore, this failure odor. MCC 73E 5B was de-energized. To back out of surveillance, steps were is unique and any subsequent failure would not performed to load EDG 13, restore offsite power to 65E, and then shutdown EDG result in a significant impact on 13 to place in standby conditions. Steps are NA that were not required to system/component available.
| |
| accomplish this. CARD 17-23496" CARD 17-23496 states: "Drywell Cooling Fan 12 did not restart during the load sequence following simulated loss of power. Reference Acceptance Criteria Step 5.1.17. The CMC switch for T4700C012 was in Auto and indicated TRIPPED upon attempted restart. A couple minutes later all indications were lost at the CMC switch. Field walkdown found an acrid odor at MCC 72E 5B. The MCC was deenergized and initial investigation shows indication of a burnt contactor. Investigate cause and repair." CARD Reportability/Operability Review states: "72E-5B was de-energized following the failure, to de-energize the MCC for Drywell Fan #12.
| |
| The inoperability is tracked on LCO 2017-0210. 24.307.03 was backed out of, with only part of Section 5.1 complete." Investigation by electrical maintenance and operations found the contactor coil burnt. The Direct Cause is E04 -
| |
| insulation breakdown because the coil insulation broke down and shorted resulting in the inability to close the contactor and start the drywell cooler. WO 47495796 initiated to replace contactor. A replacement contactor (i.e., 2 Overload blocks and Aux contact block) was installed and DWC #12 operated as expected.
| |
| DTE-19001, Rev. 1 Attachment 5 - Fermi 2 Technical Specification Event "Unique Failures" Evaluation 1-July-2019 Page 6 of 6}}
| |