ML20198L657: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.        . .    .
{{#Wiki_filter:.
i                                                         .
i L
L IIOWA STATE UNIVERSITY                                                           R"***"'"n"** 1 E gie,e,in, OF SCIENCE AN D TECH NOLOGY                                                     2o25 H. M. Black Engineering Building     i Ames. Iowa 5o011216o 515 294 1423 Docket No. 50-116                                 ,                        FAX 515 294 3261.
IIOWA STATE UNIVERSITY R"***"'"n"** 1 E gie,e,in, OF SCIENCE AN D TECH NOLOGY 2o25 H. M. Black Engineering Building i
Ames. Iowa 5o011216o 515 294 1423 Docket No. 50-116 FAX 515 294 3261.
l t
l t
December 28,1998
December 28,1998 L
!                                                                                                                                l L        U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission i.
: i.       Atta: Document Control Desk
Atta: Document Control Desk
        - Washington, D.C. 20555 i
- Washington, D.C. 20555 i


==Subject:==
==Subject:==
Line 30: Line 31:


==Dear Sir:==
==Dear Sir:==
 
l _
The technical specifications for the UTR-10 reactor facility are being updated to reflect l_        the change in the facility's operating status.                                                                       <
The technical specifications for the UTR-10 reactor facility are being updated to reflect the change in the facility's operating status.
Enclosed are three copies of the complete text of the technical specifications with the changes incorporated. Additions have been underlined and deletions have been annotated.
Enclosed are three copies of the complete text of the technical specifications with the changes incorporated. Additions have been underlined and deletions have been annotated.
Three copies of a separate attachment are also included as an explanation for the changes.
Three copies of a separate attachment are also included as an explanation for the changes.
Questions may be directed to me during normal working hours at (515) 294-0539.
Questions may be directed to me during normal working hours at (515) 294-0539.
Sincerely, l         Scott E. Wendt Reactor Manager Enclosure 0"aUU04 c:(without enclosures)
Sincerely, l
A.F. Rohach, Chm., Reactor Use Committee D.B. Bullen, Facility Director                                                                     L
Scott E. Wendt Reactor Manager 0"aUU04 Enclosure c:(without enclosures)
!                E.E. Sobottka, Dir., Environmental Health & Safety
A.F. Rohach, Chm., Reactor Use Committee D.B. Bullen, Facility Director L
                                                                                                            /
E.E. Sobottka, Dir., Environmental Health & Safety
R.A. Jacobson, Chm., Radiation Safety Committee                                           ;
/
j                T. Burdick, US NRC, Region III                                                           I W.R. DeVries, Chm., Mechanical Engineering Department 9901050083 991228 !J PDR P      ADOCK 05000116i                                                                             t PDRg!                                                                     l l I
R.A. Jacobson, Chm., Radiation Safety Committee j
i
T. Burdick, US NRC, Region III I
W.R. DeVries, Chm., Mechanical Engineering Department 9901050083 991228 !J PDR ADOCK 05000116i t
P PDRg!
l l
I i


        =
=
Explanation of changes to the ISU UTR-10 Technical Specifications Possession Only License Amendment Iowa State University has permanently ceased reactor operations at the UTR-10 reactor facility and is in the process of decommissioning the reactor. The UTR-10 technical specifications are being updated to reflect the change in the facility's operating status.
Explanation of changes to the ISU UTR-10 Technical Specifications Possession Only License Amendment Iowa State University has permanently ceased reactor operations at the UTR-10 reactor facility and is in the process of decommissioning the reactor. The UTR-10 technical specifications are being updated to reflect the change in the facility's operating status.
The Decommissioning Plan for the reactor will be submitted to the NRC for review in early 1999. This update to the techrical specifications will govern activities at the facility until the Decommissioning Plan is approved and demolition begins.
The Decommissioning Plan for the reactor will be submitted to the NRC for review in early 1999. This update to the techrical specifications will govern activities at the facility until the Decommissioning Plan is approved and demolition begins.
In general, the proposed changes to the technical specifications can be described as eliminating all references to reactor operations and related items. Only items necessary for fuel transfer operations remain in the Safety Limits, the Limiting Conditions for Operation, and the Surveillance Requirements. Similarly, the Administrative Controls section has been edited eliminating the items dealing with reactor operations, but keeping all items that deal with fuel transfer operations. The Definitions section and the Design Features section were not changed. Table 1, shown on the next page, summarizes the uroposed changes to all of the sections of the technical specifications. Table 2 provides a more detailed explanation of changes to sections that had to be modified in a piecemeal fashion.
In general, the proposed changes to the technical specifications can be described as eliminating all references to reactor operations and related items. Only items necessary for fuel transfer operations remain in the Safety Limits, the Limiting Conditions for Operation, and the Surveillance Requirements. Similarly, the Administrative Controls section has been edited eliminating the items dealing with reactor operations, but keeping all items that deal with fuel transfer operations. The Definitions section and the Design Features section were not changed. Table 1, shown on the next page, summarizes the uroposed changes to all of the sections of the technical specifications. Table 2 provides a more detailed explanation of changes to sections that had to be modified in a piecemeal fashion.
Finally, the proposed changes to section 3.7, which describes the area radiction monitors, needs funher explanation. It is proposed that the number of area radiation monitors be reduced from the five that were required for reactor operations to two. The two remaining area radiation monitors are required to monitor the spent fuel storage pit. A third area monitor will be utilized as an installed spare.
Finally, the proposed changes to section 3.7, which describes the area radiction monitors, needs funher explanation. It is proposed that the number of area radiation monitors be reduced from the five that were required for reactor operations to two. The two remaining area radiation monitors are required to monitor the spent fuel storage pit. A third area monitor will be utilized as an installed spare.
I t   .
I t


3 Table 1. Summary of changes to the UTR-10 Technical Specifications for Possession only License Amendment.
3 Table 1. Summary of changes to the UTR-10 Technical Specifications for Possession only License Amendment.
Section
Section Title of Section Type of changes
          #    Title of Section                                     Type of changes
.l.0 Definitions '
        .l.0   Definitions '                                         No Changes 2.0   Safety Limits & Limiting Safety System Settings 2.1-   Safety Limits                                         Content Deleted 2.2     Limiting Safety System Settings                       Content Deleted 3.0     Limiting Conditions for Operations 3.1     Reactor Core Parameters                               Content Deleted 3.2 -   Reactor Control & Safety Systems                     Content Deleted 3.3     Coolant Systems                                       Content Deleted 3.4     Confinement                                           Modified - Deleted operating part 3.5     Ventilation Systems                                 No Chan; 3.6     Emergency Power                                       Modified - Deleted operating part 3.7     Radiation Monitoring                                 Modified - Deleted operating part 3.8     Experiments                                         Content Deleted 4.0     Surveillance Requirements 4.1     Reactor Core Parameters                             Content Deleted 4.2     Reactor Control & Safety Systems                     Content Deleted 4.3     Coolant Systems                                     Content Deleted 4.4     Confinement                                           No Changes 4.5     Ventilation Systems                                   No Changes 4.6     Emergency Power                                       No Changes 4.7     Radiation Monitoring                                 Modified - Deleted operating part 4.8     Experiments                                           Content Deleted 5.0     Design Features                                       No Changes 5.1     Site & Facility Description                           No Changes 5.2     Reactor Coolant System                               No Changes 5.3     Reactor Core, Fuel and Safety System                 No Changes 5.4     Fissionable Material Storage                         No Changes 6.0     Administrative Controls 6.1     Organization                                         Modified - Deleted operating part 6.2     Review & Audit                                       Modified - Deleted operating part 6.3 -   Procedures                                           Modified - Deleted operating part 6.4     Experiment Review & Approval                         Content Deleted 6.5     Required Actions                                     Modified - Deleted operating part 6.6     Reports                                               Modified - Deleted operating piut 6.7     Records                                               No Changes 2
No Changes 2.0 Safety Limits & Limiting Safety System Settings 2.1-Safety Limits Content Deleted 2.2 Limiting Safety System Settings Content Deleted 3.0 Limiting Conditions for Operations 3.1 Reactor Core Parameters Content Deleted 3.2 -
Reactor Control & Safety Systems Content Deleted 3.3 Coolant Systems Content Deleted 3.4 Confinement Modified - Deleted operating part 3.5 Ventilation Systems No Chan; 3.6 Emergency Power Modified - Deleted operating part 3.7 Radiation Monitoring Modified - Deleted operating part 3.8 Experiments Content Deleted 4.0 Surveillance Requirements 4.1 Reactor Core Parameters Content Deleted 4.2 Reactor Control & Safety Systems Content Deleted 4.3 Coolant Systems Content Deleted 4.4 Confinement No Changes 4.5 Ventilation Systems No Changes 4.6 Emergency Power No Changes 4.7 Radiation Monitoring Modified - Deleted operating part 4.8 Experiments Content Deleted 5.0 Design Features No Changes 5.1 Site & Facility Description No Changes 5.2 Reactor Coolant System No Changes 5.3 Reactor Core, Fuel and Safety System No Changes 5.4 Fissionable Material Storage No Changes 6.0 Administrative Controls 6.1 Organization Modified - Deleted operating part 6.2 Review & Audit Modified - Deleted operating part 6.3 -
Procedures Modified - Deleted operating part 6.4 Experiment Review & Approval Content Deleted 6.5 Required Actions Modified - Deleted operating part 6.6 Reports Modified - Deleted operating piut 6.7 Records No Changes 2


4 Table 2. Explanation of changes to selected sections of UTR-10 Technical Specifications in conjunction with Possession only License Amendment.
4 Table 2. Explanation of changes to selected sections of UTR-10 Technical Specifications in conjunction with Possession only License Amendment.
Section
Section Title of Section Explanation of changes 3.4 Confinement Delaed old specification A (3.4.3.A) and accompanying Bases.
                    #              Title of Section         Explanation of changes
!                  3.4               Confinement               Delaed old specification A (3.4.3.A) and accompanying Bases.
Relabeled old specification B (3.4.3.B) to be new specification A.
Relabeled old specification B (3.4.3.B) to be new specification A.
3.6               Emergency Power           In Specifications, replaced reference to reactor being made critical                 l L                                                             with fuel transfer operation being performed. In Bases, deleted reference to reactor.
3.6 Emergency Power In Specifications, replaced reference to reactor being made critical L
l                 3.7               Radiation Monitoring     .
with fuel transfer operation being performed. In Bases, deleted reference to reactor.
'                                                                      In Specifications, replaced reference to reactor being made critical with fuel transfer operation beir.g performed.
l 3.7 Radiation Monitoring In Specifications, replaced reference to reactor being made critical with fuel transfer operation beir.g performed.
3 Deleted old specification B (3.7.3.B) and old specification C l
3 Deleted old specification B (3.7.3.B) and old specification C (3.7.3.C).
(3.7.3.C).
In Bases, deleted reference to experiments, the deionizer radiation detector, changed description of area units in reactor facility.
                                                              .        In Bases, deleted reference to experiments, the deionizer radiation detector, changed description of area units in reactor facility.
l Deleted Bases for Specifications B and C.
l                                                             .        Deleted Bases for Specifications B and C.
l Deleted reference in Table 3-3 to deionizer radiation unit.
l                                                             .
j Deleted footnotes (b), (c), and (d) to Table 3-3.
Deleted reference in Table 3-3 to deionizer radiation unit.
J e
j                                                             e      Deleted footnotes (b), (c), and (d) to Table 3-3.
4.7 Radiation Monitoring Deleted old specification C (4.7.3.C) and E (4.7.3.E) and accompanying Bases. Relabeled old specification D (4.7.3.D) to be new specification C.
J 4.7               Radiation Monitoring     Deleted old specification C (4.7.3.C) and E (4.7.3.E) and accompanying Bases. Relabeled old specification D (4.7.3.D) to be new specification C.
6.1 Organization Under Staffing (1), changed requirements from those when reactor is i
l 6.1               Organization             Under Staffing (1), changed requirements from those when reactor is                   '
not secured to those during fuel transfer operations.
i                                                            not secured to those during fuel transfer operations.                                 ;
l Under Staffing (2), eliminated events requiring direction of senior reactor operator to only fuel transfer operations.
l                                                             Under Staffing (2), eliminated events requiring direction of senior                   '
Under Staffing (3), rev erded parts (b) and (c).
reactor operator to only fuel transfer operations.
6.2 Review & Audit Under Review Function, deleted references to experiments and operating abnormalities. Deleted list items old (3) and old (6).
Under Staffing (3), rev erded parts (b) and (c).                                     '
6.2               Review & Audit           Under Review Function, deleted references to experiments and operating abnormalities. Deleted list items old (3) and old (6).
Renumbered other items, old (4), (5), (7) and (8).
Renumbered other items, old (4), (5), (7) and (8).
6.3                 Procedures               Deleted references to reactor and reactor maintenance. Reworded old (2). Deleted list items old (1) and old (3). Renumbered other items,
6.3 Procedures Deleted references to reactor and reactor maintenance. Reworded old (2). Deleted list items old (1) and old (3). Renumbered other items, old (2), (4), (5), (6) and (7).
,                                                            old (2), (4), (5), (6) and (7).
6.5 Required Actions Deleted section 6.5.1. Deleted old item (1) in section 6.5.2.
6.5                 Required Actions Deleted section 6.5.1. Deleted old item (1) in section 6.5.2.
l Renumbered old item (2) and (3).
l                                                           Renumbered old item (2) and (3).
6.6 Reports In section 6.6.1, deleted old #1 and #2. Renumbered old 3-7.
6.6                 Reports                 In section 6.6.1, deleted old #1 and #2. Renumbered old 3-7.
In section 6.6.2, deleted old item a. Relabeled old b and c. Under old 4
In section 6.6.2, deleted old item a. Relabeled old b and c. Under old 4                                                           item c, deleted (i), (ii), (iii) and (iv). Relabeled (v) and (vi).
item c, deleted (i), (ii), (iii) and (iv). Relabeled (v) and (vi).
3 i                                                                                                   _        _}}
3 i
_}}

Latest revision as of 10:10, 10 December 2024

Forwards Complete Text of TSs for UTR-10 Reactor Facility Which Are Being Updated to Reflect Change in Facility Operating Status
ML20198L657
Person / Time
Site: University of Iowa
Issue date: 12/28/1998
From: Wendt S
IOWA STATE UNIV., AMES, IA
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198L662 List:
References
NUDOCS 9901050083
Download: ML20198L657 (4)


Text

.

i L

IIOWA STATE UNIVERSITY R"***"'"n"** 1 E gie,e,in, OF SCIENCE AN D TECH NOLOGY 2o25 H. M. Black Engineering Building i

Ames. Iowa 5o011216o 515 294 1423 Docket No. 50-116 FAX 515 294 3261.

l t

December 28,1998 L

U.S. Nuclear Regulatory Commission i.

Atta: Document Control Desk

- Washington, D.C. 20555 i

Subject:

Request for Possession only License Amendment - Update of Technical Specifications for the Iowa State University Reactor Facility

Dear Sir:

l _

The technical specifications for the UTR-10 reactor facility are being updated to reflect the change in the facility's operating status.

Enclosed are three copies of the complete text of the technical specifications with the changes incorporated. Additions have been underlined and deletions have been annotated.

Three copies of a separate attachment are also included as an explanation for the changes.

Questions may be directed to me during normal working hours at (515) 294-0539.

Sincerely, l

Scott E. Wendt Reactor Manager 0"aUU04 Enclosure c:(without enclosures)

A.F. Rohach, Chm., Reactor Use Committee D.B. Bullen, Facility Director L

E.E. Sobottka, Dir., Environmental Health & Safety

/

R.A. Jacobson, Chm., Radiation Safety Committee j

T. Burdick, US NRC, Region III I

W.R. DeVries, Chm., Mechanical Engineering Department 9901050083 991228 !J PDR ADOCK 05000116i t

P PDRg!

l l

I i

=

Explanation of changes to the ISU UTR-10 Technical Specifications Possession Only License Amendment Iowa State University has permanently ceased reactor operations at the UTR-10 reactor facility and is in the process of decommissioning the reactor. The UTR-10 technical specifications are being updated to reflect the change in the facility's operating status.

The Decommissioning Plan for the reactor will be submitted to the NRC for review in early 1999. This update to the techrical specifications will govern activities at the facility until the Decommissioning Plan is approved and demolition begins.

In general, the proposed changes to the technical specifications can be described as eliminating all references to reactor operations and related items. Only items necessary for fuel transfer operations remain in the Safety Limits, the Limiting Conditions for Operation, and the Surveillance Requirements. Similarly, the Administrative Controls section has been edited eliminating the items dealing with reactor operations, but keeping all items that deal with fuel transfer operations. The Definitions section and the Design Features section were not changed. Table 1, shown on the next page, summarizes the uroposed changes to all of the sections of the technical specifications. Table 2 provides a more detailed explanation of changes to sections that had to be modified in a piecemeal fashion.

Finally, the proposed changes to section 3.7, which describes the area radiction monitors, needs funher explanation. It is proposed that the number of area radiation monitors be reduced from the five that were required for reactor operations to two. The two remaining area radiation monitors are required to monitor the spent fuel storage pit. A third area monitor will be utilized as an installed spare.

I t

3 Table 1. Summary of changes to the UTR-10 Technical Specifications for Possession only License Amendment.

Section Title of Section Type of changes

.l.0 Definitions '

No Changes 2.0 Safety Limits & Limiting Safety System Settings 2.1-Safety Limits Content Deleted 2.2 Limiting Safety System Settings Content Deleted 3.0 Limiting Conditions for Operations 3.1 Reactor Core Parameters Content Deleted 3.2 -

Reactor Control & Safety Systems Content Deleted 3.3 Coolant Systems Content Deleted 3.4 Confinement Modified - Deleted operating part 3.5 Ventilation Systems No Chan; 3.6 Emergency Power Modified - Deleted operating part 3.7 Radiation Monitoring Modified - Deleted operating part 3.8 Experiments Content Deleted 4.0 Surveillance Requirements 4.1 Reactor Core Parameters Content Deleted 4.2 Reactor Control & Safety Systems Content Deleted 4.3 Coolant Systems Content Deleted 4.4 Confinement No Changes 4.5 Ventilation Systems No Changes 4.6 Emergency Power No Changes 4.7 Radiation Monitoring Modified - Deleted operating part 4.8 Experiments Content Deleted 5.0 Design Features No Changes 5.1 Site & Facility Description No Changes 5.2 Reactor Coolant System No Changes 5.3 Reactor Core, Fuel and Safety System No Changes 5.4 Fissionable Material Storage No Changes 6.0 Administrative Controls 6.1 Organization Modified - Deleted operating part 6.2 Review & Audit Modified - Deleted operating part 6.3 -

Procedures Modified - Deleted operating part 6.4 Experiment Review & Approval Content Deleted 6.5 Required Actions Modified - Deleted operating part 6.6 Reports Modified - Deleted operating piut 6.7 Records No Changes 2

4 Table 2. Explanation of changes to selected sections of UTR-10 Technical Specifications in conjunction with Possession only License Amendment.

Section Title of Section Explanation of changes 3.4 Confinement Delaed old specification A (3.4.3.A) and accompanying Bases.

Relabeled old specification B (3.4.3.B) to be new specification A.

3.6 Emergency Power In Specifications, replaced reference to reactor being made critical L

with fuel transfer operation being performed. In Bases, deleted reference to reactor.

l 3.7 Radiation Monitoring In Specifications, replaced reference to reactor being made critical with fuel transfer operation beir.g performed.

3 Deleted old specification B (3.7.3.B) and old specification C (3.7.3.C).

In Bases, deleted reference to experiments, the deionizer radiation detector, changed description of area units in reactor facility.

l Deleted Bases for Specifications B and C.

l Deleted reference in Table 3-3 to deionizer radiation unit.

j Deleted footnotes (b), (c), and (d) to Table 3-3.

J e

4.7 Radiation Monitoring Deleted old specification C (4.7.3.C) and E (4.7.3.E) and accompanying Bases. Relabeled old specification D (4.7.3.D) to be new specification C.

6.1 Organization Under Staffing (1), changed requirements from those when reactor is i

not secured to those during fuel transfer operations.

l Under Staffing (2), eliminated events requiring direction of senior reactor operator to only fuel transfer operations.

Under Staffing (3), rev erded parts (b) and (c).

6.2 Review & Audit Under Review Function, deleted references to experiments and operating abnormalities. Deleted list items old (3) and old (6).

Renumbered other items, old (4), (5), (7) and (8).

6.3 Procedures Deleted references to reactor and reactor maintenance. Reworded old (2). Deleted list items old (1) and old (3). Renumbered other items, old (2), (4), (5), (6) and (7).

6.5 Required Actions Deleted section 6.5.1. Deleted old item (1) in section 6.5.2.

l Renumbered old item (2) and (3).

6.6 Reports In section 6.6.1, deleted old #1 and #2. Renumbered old 3-7.

In section 6.6.2, deleted old item a. Relabeled old b and c. Under old 4

item c, deleted (i), (ii), (iii) and (iv). Relabeled (v) and (vi).

3 i

_