VinoINIA Ex.ecTRIC AND Powen COMPANY RIcnwonn, VIRGINIA 23261 January 8,1999 United States Nuclear Regulatory Commission                 Serial No. 99-013 Attention: Document Control Desk                             NAPS /JHL Washington, D. C. 20555                                     Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VinoINIA Ex.ecTRIC AND Powen COMPANY RIcnwonn, VIRGINIA 23261 January 8,1999 United States Nuclear Regulatory Commission Serial No.
99-013 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos.
50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the December 1998 Monthly Operating Report for North Anna Power ~
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the December 1998 Monthly Operating Report for North Anna Power ~
Station Units 1 and 2.
Station Units 1 and 2.
Very truly yours, duA?4/
Very truly yours, duA?4/
W. R. Matthews Site Vice President Enclosure Commitments made in this letter: None.
W. R. Matthews Site Vice President Enclosure Commitments made in this letter: None.
cc:   U. S. Nuclear Regulatory Commission Region ll Atlanta Federal Center                                               ~~
cc:
61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 glf      ,
U. S. Nuclear Regulatory Commission Region ll Atlanta Federal Center
Mr. M. J. Morgan NRC Senior Resident inspector North Anna Power Station 9901190169 991231 PDR   ADOCK 05000338 R                   PDR;         ,,  ,
~~
c       '''
glf 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident inspector North Anna Power Station 9901190169 991231 PDR ADOCK 05000338 R
PDR; c
w.
w.


e l
e VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT DECEMBER 1998 I
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION                   ;
MONTHLY OPERATING REPORT                   !
DECEMBER 1998                         ,
l I
(
(
l t
l t
l l
l l
l Approved;                      b                             / 7 p Site Vice President         Date Q s i
b
/ 7 p
l Approved; Site Vice President Date Q
s i
l l
l l
P s
P s


r 8     l                                                                                                                      l
l l
          .                                                                                                                          i
r 8
'                                                                                                                                      1 l                                                                                                                                      l OPERATING DATA REPORT                                                     i Docket No.: 50-338                       i Date: 01/05/99                     l
i 1
l OPERATING DATA REPORT i
Docket No.: 50-338 i
Date: 01/05/99


==Contact:==
==Contact:==
W. R. Matthews Telephone: (540) 894-2101
W. R. Matthews Telephone: (540) 894-2101 1.
: 1. Unit Namen                 ....                      North Anna Unit 1
Unit Namen North Anna Unit 1 2.
: 2. Reporting Period:. ..                               December,1998
Reporting Period:...
: 3. Licensed Thermal Power (MWt):.       .                  2,893                                                 ,
December,1998 3.
: 4. Nameplate Rating (Gross MWe):...         .                979.74                                             ;
Licensed Thermal Power (MWt):.
: 5. Design Electrical Rating (Net MWe)::         .            907
2,893 4.
: 6. Maximum Dependable Capacity (Gross MWe):                 940                                               '
Nameplate Rating (Gross MWe):...
: 7. Maximum Dependable Capacity (Net MWe): .. .               893                                               !
979.74 5.
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
Design Electrical Rating (Net MWe)::
907 6.
Maximum Dependable Capacity (Gross MWe):
940 7.
Maximum Dependable Capacity (Net MWe):...
893 8.
If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
N/A l
N/A l
: 9. Power Level To Which Restricted, if Any (Net MWe): N/A
9.
: 10. Reasons For Restrictions, if Any:     N/A This Month     Year-To-Date       Cumulative       i
Power Level To Which Restricted, if Any (Net MWe): N/A 10.
: 11. Hours in Reporting Period                                           744.0           8,760.0         179,940.0 i
Reasons For Restrictions, if Any:
: 12. Hours Reactor Was Critical                                           744.0           8,170.2         141,425.2 ,
N/A This Month Year-To-Date Cumulative i
: 13. Reactor Reserve Shutdown Hours                                         0.0             39.2           7,134.2
: 11. Hours in Reporting Period 744.0 8,760.0 179,940.0 i
: 14. Hours Generator On-Line                                             744.0           8,092.4         138,259.8 :
: 12. Hours Reactor Was Critical 744.0 8,170.2 141,425.2
l
: 13. Reactor Reserve Shutdown Hours 0.0 39.2 7,134.2
: 15. Unit Reserve Shutdown Hours                                           0.0               0.0               0.0 t'               16. Gross Thermal Energy Generated (MWH)                         2,151,717.5     23,160,556.4       373,695,028.9
: 14. Hours Generator On-Line 744.0 8,092.4 138,259.8
: 17. Gross Electrical Energy Generated (MWH)                         715,835.0       7,587,217.0       159,757,870.0 t
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
: 18. Net Electrical Energy Generated (MWH)                           682,440.0       7,217,055.0       116,361,238.0 *
t'
: 19. Unit Service Factor                                               100.0 %           92.4 %             76.8 %
: 16. Gross Thermal Energy Generated (MWH) 2,151,717.5 23,160,556.4 373,695,028.9
: 20. Unit Availability Factor                                           100 0%             92.4%             76.8 %
: 17. Gross Electrical Energy Generated (MWH) 715,835.0 7,587,217.0 159,757,870.0 t
: l.               21. Unit Capacity Factor (Using MDC Net)                               102.7 %           92.3 %             72.4 %
: 18. Net Electrical Energy Generated (MWH) 682,440.0 7,217,055.0 116,361,238.0
: 22. Unit Capacity Factor (Using DER Net)                               101.1 %           90.8 %             71.3 %
: 19. Unit Service Factor 100.0 %
: 23. Unit Forced Outage Rate                                             0.0%             0.7%               7.9%
92.4 %
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
76.8 %
N/A                                                     '
: 20. Unit Availability Factor 100 0%
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
92.4%
l
76.8 %
: 26. Unit in Test Status (Prior to Commercial Operation):
l.
FORECAST               ACHIEVED l                                                       INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION j.
: 21. Unit Capacity Factor (Using MDC Net) 102.7 %
I                           _
92.3 %
72.4 %
: 22. Unit Capacity Factor (Using DER Net) 101.1 %
90.8 %
71.3 %
: 23. Unit Forced Outage Rate 0.0%
0.7%
7.9%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
l 26.
Unit in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
!j.
I


i   .
i c
c AVERAGE DAILY UNIT POWER LEVEL                                                               {
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 01/05/99
Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 01/05/99


==Contact:==
==Contact:==
W. R. Matthews Telephone: (540) 894-2101 MoWrH:     December,1998 Average Daily Power Level                           Average Daily Power Level Day                   (MWe - Net)                   Day                       (MWe - Net) l 1                       919                       17                                 904 l
W. R. Matthews Telephone: (540) 894-2101 MoWrH:
2                       919                       18                                 916                       '
December,1998 Average Daily Power Level Average Daily Power Level Day (MWe - Net)
3                        920                       19                                 918                       '
Day (MWe - Net) l 1
4                        919                       20                                 919                       t 5                       919                       21                                 919 6                       919'                       22                                 918 7                       918                       23                                 918 8                       918                       24                                 918                       I 9                       918                       25                                 918                       I 10                       918                       26                                 918 I
919 17 904 l
11                       919                       27                                 918                       i 12                       919                       28                                 918 l
2 919 18 916 3
13                       919                       29                                 915 14                       912                       30                                 915                       t I
920 19 918 4
                                                                                                                                            )
919 20 919 t
15                       916                       31                                 911                         1 l
5 919 21 919 6
16                       918 I
919' 22 918 7
!                                                                                                                                            i INSTRUCTIONS l
918 23 918 8
On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to               !
918 24 918 I
the nearest whole megawatt.
9 918 25 918 I
10 918 26 918 I
11 919 27 918 i
12 919 28 918 13 919 29 915 14 912 30 915 t
I
)
15 916 31 911 1
l 16 918 I
i INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
4 i
4 i
l i
l i


r     ,
r Docket No.: 50-338 Unit Name: Nortt Ama Unit i Date: 01/0N99
Docket No.: 50-338 Unit Name: Nortt Ama Unit i Date: 01/0N99


==Contact:==
==Contact:==
W. F. t/httM.ws Telephone: (540,8344t01 NORTH ANNA POWER STATION
W. F. t/httM.ws Telephone: (540,8344t01 NORTH ANNA POWER STATION
                                                                                                                                \
\\
i UNIT NO.: _1 f.10 NTH December 1998
UNIT NO.: _1 i
f.10 NTH December 1998


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 2                                                 !
OF OPERATING EXPERIENCE Page 1 of 2 Listed below in chronological sequence is a summary of operating experiences for this month which required load k
Listed below in chronological sequence is a summary of operating experiences for this month which required load     k reductions or resulted in significant non-load related incidents.
reductions or resulted in significant non-load related incidents.
DAlf                               3 22                         ER!8 December 1,1998                       0000               Began the month in Mode 1,100% power,964 MWe.
DAlf 3 22 ER!8 December 1,1998 0000 Began the month in Mode 1,100% power,964 MWe.
December 14,1998                     0057               Ramped Unit 1 to 95% power,921 MWe for condenser water box maintenance.
December 14,1998 0057 Ramped Unit 1 to 95% power,921 MWe for condenser water box maintenance.
0300               Condenser water box maintenance complete. Ramped Unit 1 to 100% power,959 MWe.
0300 Condenser water box maintenance complete. Ramped Unit 1 to 100% power,959 MWe.
December 31,1998                     2400               Ended month in Mode 1,100% power,963 MWe.
December 31,1998 2400 Ended month in Mode 1,100% power,963 MWe.
I i
i l
l l
i i
i i
I 1
I 1


    . _ _ _ . ._.                    ~           _. .        _. .          ._        .      . . . _ _ . _ . . . - . __ - - _ = _ _ _ . ._                 _ _ .
~
    .                                                                                                                                                                j l
... _ _. _... -. __ - - _ = _ _ _.._
l Docket No.: 50-338                           '
j l
Unit Name: North Anna Unit 1               l Date: 01/05/99                 j
Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 01/05/99 j


==Contact:==
==Contact:==
W. R. Matthews Te'ephone: (540) 894-2101 l
W. R. Matthews Te'ephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EcuALTo OR GREATER THAN 20%)
UNIT SHUTDOWN AND POWER REDUCTION (EcuALTo OR GREATER THAN 20%)
REPORT MONTH: December,1998 (1)
REPORT MONTH: December,1998                                                                     ,
(2)
(1)                   (2)         (3)                   (4)                 (5)
(3)
Method                                                                                           f Duration                   of     LER No. System       Component                     Cause & Corrective Action       .
(4)
Date     Type     Hours       Reason   Shutting                 Code             Code                   to Prevent Recurrence Down Reactor e
(5)
None during the reporting period.                                                               !
Method f
Duration of LER No.
System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Reactor e
None during the reporting period.
k I
k I
l 1
1 1
1 (1)                           (2)                                                                     (3)
(1)
F: Forced                   REASON:                                                           METHOD:
(2)
S: Scheduled               A- Equipment Failure (Explain)                                   1 - Manual B- Maintenance or Test                                           2- Manual Scram C- Refueling                                                     3- Automatic Scram D- Regulatory Restriction                                         4     -
(3)
F: Forced REASON:
METHOD:
S: Scheduled A-Equipment Failure (Explain) 1 - Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4
Other (Explain)
Other (Explain)
E- Operator Training & Licensing Examination F- Administrative G - - Operational Error (Explain)
E-Operator Training & Licensing Examination F-Administrative G - - Operational Error (Explain)
(4)                                                                                                     (5)
(4)
Exhibit G Instructions for Preparation of Data Entry Sheets                                   Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit G Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)
I
I
: l.                                                                                                                                                                   ,
!l.
f-
f-
  ~
~
l
l


            ~
~
OPERATING DATA REPORT Docket No.: 50-339 Date: 01/05/99
OPERATING DATA REPORT Docket No.: 50-339 Date: 01/05/99


==Contact:==
==Contact:==
W. R. Matthews Telephone: (540) 894-2101
W. R. Matthews Telephone: (540) 894-2101 1.
: 1. Unit Name:-                                   . North Anna Unit 2
Unit Name:-
: 2.     Reporting Period:-           . . . .              December,1998
North Anna Unit 2 2.
: 3. Licensed Thermal Power (MWt):-                       2,893
Reporting Period:-
: 4. Nameplate Rating (Gross MWe):                           979
December,1998 3.
: 5. Design Electrical Rating (Net MWe)::                   907
Licensed Thermal Power (MWt):-
: 6. Maximum Dependable Capacity (Gross MWe): . .           944
2,893 4.
: 7. Maximum Dependable Capacity (Net MWe):       .        897
Nameplate Rating (Gross MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
979 5.
Design Electrical Rating (Net MWe)::
907 6.
Maximum Dependable Capacity (Gross MWe):..
944 7.
Maximum Dependable Capacity (Net MWe):
897 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A f
N/A f
: 9. Power Level To Which Restricted, if Any (Net MWe): N/A
9.
: 10. Reasons For Restrictions,if Any:       N/A This Month       Year-To-Dalf       Cumulative
Power Level To Which Restricted, if Any (Net MWe): N/A 10.
: 11. Hours in Reporting Period                                       744.0             8,760.0         158,208.0
Reasons For Restrictions,if Any:
: 12. Hours Reactor Was Critical                                       744.0             0,073.0         133,788.2
N/A This Month Year-To-Dalf Cumulative 11.
: 13.     Reactor Reserve Shutdown Hours                                     0.0               57.3           7,241.5
Hours in Reporting Period 744.0 8,760.0 158,208.0 12.
: 14. Hours Generator On-Line                                           744.0             8,051.1         132,573.3
Hours Reactor Was Critical 744.0 0,073.0 133,788.2 13.
: 15. Unit Reserve Shutdown Hours                                         0.0                 0.0               0.0
Reactor Reserve Shutdown Hours 0.0 57.3 7,241.5 14.
: 16. Gross Thermal Energy Generated (MWH)                       2.151,182.6         22,933,515.7     363,726,695.7
Hours Generator On-Line 744.0 8,051.1 132,573.3 15.
                '17. Gross Electrical Energy Generated (MWH)                     701,755.0         7,454,402.0     118,956,916.0
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
: 18. Net Electrical Energy Generated (MWH)                       668,434.0         7,086,105.0     113.614,073.0
Gross Thermal Energy Generated (MWH) 2.151,182.6 22,933,515.7 363,726,695.7
: 19. Unit Service Factor                                             100.0 %             91.9 %             83.8 %
'17.
: 20. Unit Availability Factor                                       100.0 %             91.9 %             83.8 %
Gross Electrical Energy Generated (MWH) 701,755.0 7,454,402.0 118,956,916.0 18.
: 21. Unit Capacity Factor (Using MDC Net) -                         100.2 %             90.2 %             79.9 %
Net Electrical Energy Generated (MWH) 668,434.0 7,086,105.0 113.614,073.0 19.
: 22. Unit Capacity Factor (Using DER Net)                             99.1 %             89.2 %             79.2 %
Unit Service Factor 100.0 %
: 23. Unit Forced Outage Rate                                           0.0%               0.3%               4.8%
91.9 %
83.8 %
20.
Unit Availability Factor 100.0 %
91.9 %
83.8 %
21.
Unit Capacity Factor (Using MDC Net) -
100.2 %
90.2 %
79.9 %
22.
Unit Capacity Factor (Using DER Net) 99.1 %
89.2 %
79.2 %
23.
Unit Forced Outage Rate 0.0%
0.3%
4.8%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
None
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:                       N/A
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
N/A
: 26. Unit in Test Status (Prior to Commercial Operation):
: 26. Unit in Test Status (Prior to Commercial Operation):
FORECAST               ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I


l   -
l l
l l                                                    AVERAGE DAILY UNIT POWER LEVEL l                                                                                                 Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 01/05/99
l AVERAGE DAILY UNIT POWER LEVEL l
Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 01/05/99


==Contact:==
==Contact:==
W. R. Matthews Telephone: (540) 894-2101 MONTH:     December,1998                                                                                                       I i
W. R. Matthews Telephone: (540) 894-2101 MONTH:
I
December,1998 I
!                                          Average Daily Power Level                     ~ Average Daily Power Level                         !
i Average Daily Power Level
t Day                   (MWe - Net)               Day                   (MWe Net)'                                  '
~ Average Daily Power Level t
Day (MWe - Net)
Day (MWe Net)'
i 1
i 1
1                       900                   17                       898                                     ,
1 900 17 898 l
l 2                       900                   18                       899 i
2 900 18 899 i
3                       9N                     19                       899 i                             4                       900                   20                       899 l                             5                       900                   21                       899                                     j 1
3 9N 19 899 i
6                        900                   22                       890 1
4 900 20 899 l
7                       899             _
5 900 21 899 j
23                       897                                     !
1 6
8                        899                   24                       898                                     )
900 22 890 1
i c                              9                       899                   25                       898 l                                                                                                                                               l 10                       899                   26                       897
7 899 23 897 8
                                                                                                                                                ]
899 24 898
11                       900                   27                       898                                     l 12                       900                   28                       898
)
(                             13                       900                   29                       897 14                       899                   30                       897 l                             15                       897                   31                       898 16                       898 l-             INSTRUCTIONS -
i 9
l On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to               l the nearest whole megawatt.
899 25 898 c
l l
10 899 26 897
]
11 900 27 898 l
12 900 28 898
(
13 900 29 897 14 899 30 897 l
15 897 31 898 16 898 l-INSTRUCTIONS -
l On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
6
6
(.                        .
(.
                                                                                                                            . _    ~ s
~
s


      .                                                                                                                              \
\\
        .+
.+
Docket No.: 50-339 Unit Name: North Anna Unit 2 Date:                 01/05/99
Docket No.: 50-339 Unit Name: North Anna Unit 2 Date:
01/05/99


==Contact:==
==Contact:==
Line 217: Line 298:
==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.
Dalt                   Ilmt                         Etta December 1,1998       0000           Began the month in Mode 1,100% power,945 MWe, December 22,1998 1020                 Ramped Unit 2 to 91% power,867 MWe for Turbine Valve Freedom Testing (TVFT).
Dalt Ilmt Etta December 1,1998 0000 Began the month in Mode 1,100% power,945 MWe, December 22,1998 1020 Ramped Unit 2 to 91% power,867 MWe for Turbine Valve Freedom Testing (TVFT).
1654           TVFT completed satisfactorily. Ramped Unit 2 to 100% power,942 MWe.
1654 TVFT completed satisfactorily. Ramped Unit 2 to 100% power,942 MWe.
December 31,1998 2400                 Ended the month in Modo 1,100% power,942 MWe.
December 31,1998 2400 Ended the month in Modo 1,100% power,942 MWe.


                          .    .      _          _. .          . . _ . _ _        _ . . . _ . _ . _ _ .            m.     - . _ . . - . _ . _ . .. . _ _
m.
  ~
~
        ~e Docket No.: 50-339                           1 Unit Name: North Anna Unit 2                 r Date: 01/05/99
~e Docket No.: 50-339 1
Unit Name: North Anna Unit 2 r
Date: 01/05/99


==Contact:==
==Contact:==
W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EouALTo oR GREATER THAN 20%)
W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EouALTo oR GREATER THAN 20%)
REPORT MONTH: December,1998 (1)               (2)         (3)                   (4)                     (5)
REPORT MONTH: December,1998 (1)
Method                                                                                             i Duration                 of         LER No. System             Component           Cause & Corrective Action Date     Type     Hours     Reason     Shutting               Code                   Code           to Prevent Recurrence               ,
(2)
Down Rx None during the reporting period.                                                                 ;
(3)
(4)
(5)
Method i
Duration of LER No.
System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx None during the reporting period.
i l
i l
(1)                         (2)                                                               (3)
(1)
F: Forced                   REASON:                                                         METHOD:
(2)
S: Scheduled               A- Equipment Failure (Explain)                                   1   -
(3)
Manual                                     i B- Maintenance or Test                                           2- Manual Scram C- Refueling                                                     3- Automatic Scram D- Regulatory Restriction                                       4- Other (Explain) j
F: Forced REASON:
,                                        E- Operator Training & Licensing Examination
METHOD:
!                                        F- Administrative G- Operational Error (Explain)
S: Scheduled A-Equipment Failure (Explain) 1 Manual i
(4)                                                                                           (5)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain) j E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)
: l.           Exhibit G Instructions for Preparation of Data Entry Sheets                                 Exhibit 1 - Same Source j             for Licensee Event Report (LER) File (NUREG 0161) j l-
(4)
(5) l.
Exhibit G Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source j
for Licensee Event Report (LER) File (NUREG 0161) j l-
,}}
,}}

Latest revision as of 08:19, 10 December 2024

Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With
ML20199C878
Person / Time
Site: North Anna  
Issue date: 12/31/1998
From: Matthews W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
99-013, 99-13, NUDOCS 9901190169
Download: ML20199C878 (9)


Text

. -. _.

o b

VinoINIA Ex.ecTRIC AND Powen COMPANY RIcnwonn, VIRGINIA 23261 January 8,1999 United States Nuclear Regulatory Commission Serial No.99-013 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the December 1998 Monthly Operating Report for North Anna Power ~

Station Units 1 and 2.

Very truly yours, duA?4/

W. R. Matthews Site Vice President Enclosure Commitments made in this letter: None.

cc:

U. S. Nuclear Regulatory Commission Region ll Atlanta Federal Center

~~

glf 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident inspector North Anna Power Station 9901190169 991231 PDR ADOCK 05000338 R

PDR; c

w.

e VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT DECEMBER 1998 I

(

l t

l l

b

/ 7 p

l Approved; Site Vice President Date Q

s i

l l

P s

l l

r 8

i 1

l OPERATING DATA REPORT i

Docket No.: 50-338 i

Date: 01/05/99

Contact:

W. R. Matthews Telephone: (540) 894-2101 1.

Unit Namen North Anna Unit 1 2.

Reporting Period:...

December,1998 3.

Licensed Thermal Power (MWt):.

2,893 4.

Nameplate Rating (Gross MWe):...

979.74 5.

Design Electrical Rating (Net MWe)::

907 6.

Maximum Dependable Capacity (Gross MWe):

940 7.

Maximum Dependable Capacity (Net MWe):...

893 8.

If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

N/A l

9.

Power Level To Which Restricted, if Any (Net MWe): N/A 10.

Reasons For Restrictions, if Any:

N/A This Month Year-To-Date Cumulative i

11. Hours in Reporting Period 744.0 8,760.0 179,940.0 i
12. Hours Reactor Was Critical 744.0 8,170.2 141,425.2
13. Reactor Reserve Shutdown Hours 0.0 39.2 7,134.2
14. Hours Generator On-Line 744.0 8,092.4 138,259.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l

t'

16. Gross Thermal Energy Generated (MWH) 2,151,717.5 23,160,556.4 373,695,028.9
17. Gross Electrical Energy Generated (MWH) 715,835.0 7,587,217.0 159,757,870.0 t
18. Net Electrical Energy Generated (MWH) 682,440.0 7,217,055.0 116,361,238.0
19. Unit Service Factor 100.0 %

92.4 %

76.8 %

20. Unit Availability Factor 100 0%

92.4%

76.8 %

l.

21. Unit Capacity Factor (Using MDC Net) 102.7 %

92.3 %

72.4 %

22. Unit Capacity Factor (Using DER Net) 101.1 %

90.8 %

71.3 %

23. Unit Forced Outage Rate 0.0%

0.7%

7.9%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

l 26.

Unit in Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED l

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

!j.

I

i c

AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 01/05/99

Contact:

W. R. Matthews Telephone: (540) 894-2101 MoWrH:

December,1998 Average Daily Power Level Average Daily Power Level Day (MWe - Net)

Day (MWe - Net) l 1

919 17 904 l

2 919 18 916 3

920 19 918 4

919 20 919 t

5 919 21 919 6

919' 22 918 7

918 23 918 8

918 24 918 I

9 918 25 918 I

10 918 26 918 I

11 919 27 918 i

12 919 28 918 13 919 29 915 14 912 30 915 t

I

)

15 916 31 911 1

l 16 918 I

i INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

4 i

l i

r Docket No.: 50-338 Unit Name: Nortt Ama Unit i Date: 01/0N99

Contact:

W. F. t/httM.ws Telephone: (540,8344t01 NORTH ANNA POWER STATION

\\

UNIT NO.: _1 i

f.10 NTH December 1998

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 2 Listed below in chronological sequence is a summary of operating experiences for this month which required load k

reductions or resulted in significant non-load related incidents.

DAlf 3 22 ER!8 December 1,1998 0000 Began the month in Mode 1,100% power,964 MWe.

December 14,1998 0057 Ramped Unit 1 to 95% power,921 MWe for condenser water box maintenance.

0300 Condenser water box maintenance complete. Ramped Unit 1 to 100% power,959 MWe.

December 31,1998 2400 Ended month in Mode 1,100% power,963 MWe.

i l

i i

I 1

~

... _ _. _... -. __ - - _ = _ _ _.._

j l

Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 01/05/99 j

Contact:

W. R. Matthews Te'ephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EcuALTo OR GREATER THAN 20%)

REPORT MONTH: December,1998 (1)

(2)

(3)

(4)

(5)

Method f

Duration of LER No.

System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Reactor e

None during the reporting period.

k I

1 1

(1)

(2)

(3)

F: Forced REASON:

METHOD:

S: Scheduled A-Equipment Failure (Explain) 1 - Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4

Other (Explain)

E-Operator Training & Licensing Examination F-Administrative G - - Operational Error (Explain)

(4)

(5)

Exhibit G Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)

I

!l.

f-

~

l

~

OPERATING DATA REPORT Docket No.: 50-339 Date: 01/05/99

Contact:

W. R. Matthews Telephone: (540) 894-2101 1.

Unit Name:-

North Anna Unit 2 2.

Reporting Period:-

December,1998 3.

Licensed Thermal Power (MWt):-

2,893 4.

Nameplate Rating (Gross MWe):

979 5.

Design Electrical Rating (Net MWe)::

907 6.

Maximum Dependable Capacity (Gross MWe):..

944 7.

Maximum Dependable Capacity (Net MWe):

897 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A f

9.

Power Level To Which Restricted, if Any (Net MWe): N/A 10.

Reasons For Restrictions,if Any:

N/A This Month Year-To-Dalf Cumulative 11.

Hours in Reporting Period 744.0 8,760.0 158,208.0 12.

Hours Reactor Was Critical 744.0 0,073.0 133,788.2 13.

Reactor Reserve Shutdown Hours 0.0 57.3 7,241.5 14.

Hours Generator On-Line 744.0 8,051.1 132,573.3 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWH) 2.151,182.6 22,933,515.7 363,726,695.7

'17.

Gross Electrical Energy Generated (MWH) 701,755.0 7,454,402.0 118,956,916.0 18.

Net Electrical Energy Generated (MWH) 668,434.0 7,086,105.0 113.614,073.0 19.

Unit Service Factor 100.0 %

91.9 %

83.8 %

20.

Unit Availability Factor 100.0 %

91.9 %

83.8 %

21.

Unit Capacity Factor (Using MDC Net) -

100.2 %

90.2 %

79.9 %

22.

Unit Capacity Factor (Using DER Net) 99.1 %

89.2 %

79.2 %

23.

Unit Forced Outage Rate 0.0%

0.3%

4.8%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Down at End of Report Period, Estimated Date of Start-up:

N/A

26. Unit in Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I

l l

l AVERAGE DAILY UNIT POWER LEVEL l

Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 01/05/99

Contact:

W. R. Matthews Telephone: (540) 894-2101 MONTH:

December,1998 I

i Average Daily Power Level

~ Average Daily Power Level t

Day (MWe - Net)

Day (MWe Net)'

i 1

1 900 17 898 l

2 900 18 899 i

3 9N 19 899 i

4 900 20 899 l

5 900 21 899 j

1 6

900 22 890 1

7 899 23 897 8

899 24 898

)

i 9

899 25 898 c

l l

10 899 26 897

]

11 900 27 898 l

12 900 28 898

(

13 900 29 897 14 899 30 897 l

15 897 31 898 16 898 l-INSTRUCTIONS -

l On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

6

(.

~

s

\\

.+

Docket No.: 50-339 Unit Name: North Anna Unit 2 Date:

01/05/99

Contact:

W. R. Matthews Telephone: (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.:_2 MONTH: December 1998

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.

Dalt Ilmt Etta December 1,1998 0000 Began the month in Mode 1,100% power,945 MWe, December 22,1998 1020 Ramped Unit 2 to 91% power,867 MWe for Turbine Valve Freedom Testing (TVFT).

1654 TVFT completed satisfactorily. Ramped Unit 2 to 100% power,942 MWe.

December 31,1998 2400 Ended the month in Modo 1,100% power,942 MWe.

m.

~

~e Docket No.: 50-339 1

Unit Name: North Anna Unit 2 r

Date: 01/05/99

Contact:

W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EouALTo oR GREATER THAN 20%)

REPORT MONTH: December,1998 (1)

(2)

(3)

(4)

(5)

Method i

Duration of LER No.

System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx None during the reporting period.

i l

(1)

(2)

(3)

F: Forced REASON:

METHOD:

S: Scheduled A-Equipment Failure (Explain) 1 Manual i

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain) j E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)

(4)

(5) l.

Exhibit G Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source j