ML20199D438: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:_ - _ _ _ _. _ - - _ | ||
_ et 3~ s | _ et 3~ s fy | ||
) | |||
. l( | |||
GPU Nuclear,Inc. | GPU Nuclear,Inc. | ||
U.S. Route #9 South nucteAn | |||
Tel(6 9714%0 | ;:,og' L., | ||
Tel(6 9714%0 6730-97-2266, 1997 November 11 U; S Nuclear Regulatory Commiss:en Attention: Document Control Desk Washington, DC 20555 | |||
==Dear Sir:== | ==Dear Sir:== | ||
==SUBJECT:== | ==SUBJECT:== | ||
Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report - October,1997 Enclosed are two copics of the October,1997 Monthly Operating Report for Oyster Creek | Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report - October,1997 Enclosed are two copics of the October,1997 Monthly Operating Report for Oyster Creek Nuclear Station. The content and format ofinformation submitted in this report is in - | ||
accordance with the guidance provided by Generic Letter 97-02. Corrections to cumulative data have been made as noted on Appendix A. | accordance with the guidance provided by Generic Letter 97-02. Corrections to cumulative data have been made as noted on Appendix A. | ||
If you should have any questions, p' ease contact Ms. Brenda DeMerchant, Oyster Creek Regulatory Affairs Engineer, at 609-971-4642. | If you should have any questions, p' ease contact Ms. Brenda DeMerchant, Oyster Creek Regulatory Affairs Engineer, at 609-971-4642. | ||
Very truly yours, | Very truly yours, | ||
~ | |||
}_ | |||
~~ | |||
a. | |||
t Enclosures gT1L cc: | Michael B. Roche 4 'e Vice President & Director Oyster Creek | ||
NRC Project Manager NRC Sr. Resident Inspector | . MBR/BDeM/gl. | ||
t Enclosures gT1L cc: | |||
Administrator, Region I(2 copies) | |||
NRC Project Manager NRC Sr. Resident Inspector gglg\\.gjj(}]lllll 9711200334 471031 7 e | |||
PDR ADOCK 05000219 J | |||
t R | |||
PDR | |||
4 | 4 APPENDIX A Operating Data Report - | ||
Dbcket No.: 219 Date: | |||
' November 6,1997 Completed Bv: David M. Egan i | |||
REPORTING PERIO.D: October,1097 | .Telechone: | ||
(609) 971-4818 t | |||
REPORTING PERIO.D: October,1097 MONTH YEAR TO DATE CUMULATIVE 1. | |||
The nominal net electrical output of the unit specified by - | DESIGN ELECTRICAL RATING (MWe NET). | ||
The nominal net electrical output of the unit specified by - | |||
650 the utility and used fw the purpose of plant design. | |||
2. | |||
MAXIMUM DEPENDABLE CAP ACITY (MWe NET). | |||
p | "e gross electrical output as measured at the output 619 terminals of the turbine generator during the most r:strictive seasonal conditions minus the normal station service loads. | ||
p 3. | |||
De total number ofhours during the gross hours of the | NUMBER OF HOURS REACTOR WAS CRITICAL. | ||
De total number ofhours during the gross hours of the 745 6795.9 168,378.3 reporting perio''. that the reactor was critical. | |||
(Service llours)The total number of hours during the gross hours of the reporting period that the unit operated with the 745 | 4. | ||
HOURS GENERkTOR ON LINE, (Service llours)The total number of hours during the gross hours of the reporting period that the unit operated with the 745 6701 3 164'619 1 breakers closed to the station bus. The sum of the hours that the generator was on line plus the total outage hours in the reportmg period. | |||
He total number of hou s | 5. | ||
UNIT RESERV" SHUTDOWN HOURS. | |||
per:od, expressed in magawatt hours. Negative quantities should not be used. | He total number of hou s during the gross hours of the reporting period that the unit was removed from service for 0 | ||
0 0 | |||
cconomic or similar reasons but was available for operation. | |||
6. | |||
NET ELECTRICAL ENERGY (MWH) ne gross electrical output of the unit measured at the output termmals of the turbine generator minus the normal | |||
- 465>642 4,137,805 92,346,371** | |||
station service loads during the gross hours of the reportmg per:od, expressed in magawatt hours. Negative quantities should not be used. | |||
s | |||
* Design values have no " Year to Date" or " Cumulative" significance. | * Design values have no " Year to Date" or " Cumulative" significance. | ||
" Corrected Cumulative Not MWH values for June: 90,728,420 July: 91,166,512 August: 91,431,091 September: 91,880,729 | |||
l l | l l | ||
Appendix B Unit Shutdowns Docket No. | Appendix B Unit Shutdowns Docket No. | ||
* Duration Reason' | 50-219 Date: | ||
(Hours) | 11/06/97 Completed By: | ||
David M. Egan Telechone: | |||
(609)971-4818 Reporting Period: | |||
S Scheduled | October 1997 No. | ||
Date Type | |||
* Duration Reason' Method of Cause & Corrective Action to l | |||
(Hours) | |||
Shutting Down Prevent Recurrence l | |||
2 Reactor 6 | |||
97/10/03 S | |||
0 b | |||
I Planned power reduction to perform quarterly nuie steam isolation vake testing 1 | |||
2 F Forced Reason: | |||
Method: | |||
S Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Exfain) l i | |||
E-Op rator Training & Licensing Examination l | |||
F-Administrative GWrational Error (Explain) | |||
II4her (Explain) | II4her (Explain) | ||
Summary: Oyster Creek performed one significant power reduction during October to execute quarterly main steam isolation valve testing. The plant generated 465,642 MWh net electric, which was 101.0% ofits MDC rated capacity. | Summary: Oyster Creek performed one significant power reduction during October to execute quarterly main steam isolation valve testing. The plant generated 465,642 MWh net electric, which was 101.0% ofits MDC rated capacity. | ||
..}} | |||
Latest revision as of 08:13, 10 December 2024
| ML20199D438 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 10/31/1997 |
| From: | Egan D, Roche M GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 6730-97-2266, GL-97-02, GL-97-2, NUDOCS 9711200334 | |
| Download: ML20199D438 (3) | |
Text
_ - _ _ _ _. _ - - _
_ et 3~ s fy
)
. l(
GPU Nuclear,Inc.
U.S. Route #9 South nucteAn
- ,og' L.,
Tel(6 9714%0 6730-97-2266, 1997 November 11 U; S Nuclear Regulatory Commiss:en Attention: Document Control Desk Washington, DC 20555
Dear Sir:
SUBJECT:
Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report - October,1997 Enclosed are two copics of the October,1997 Monthly Operating Report for Oyster Creek Nuclear Station. The content and format ofinformation submitted in this report is in -
accordance with the guidance provided by Generic Letter 97-02. Corrections to cumulative data have been made as noted on Appendix A.
If you should have any questions, p' ease contact Ms. Brenda DeMerchant, Oyster Creek Regulatory Affairs Engineer, at 609-971-4642.
Very truly yours,
~
}_
~~
a.
Michael B. Roche 4 'e Vice President & Director Oyster Creek
. MBR/BDeM/gl.
t Enclosures gT1L cc:
Administrator, Region I(2 copies)
NRC Project Manager NRC Sr. Resident Inspector gglg\\.gjj(}]lllll 9711200334 471031 7 e
PDR ADOCK 05000219 J
t R
4 APPENDIX A Operating Data Report -
Dbcket No.: 219 Date:
' November 6,1997 Completed Bv: David M. Egan i
.Telechone:
(609) 971-4818 t
REPORTING PERIO.D: October,1097 MONTH YEAR TO DATE CUMULATIVE 1.
DESIGN ELECTRICAL RATING (MWe NET).
The nominal net electrical output of the unit specified by -
650 the utility and used fw the purpose of plant design.
2.
MAXIMUM DEPENDABLE CAP ACITY (MWe NET).
"e gross electrical output as measured at the output 619 terminals of the turbine generator during the most r:strictive seasonal conditions minus the normal station service loads.
p 3.
NUMBER OF HOURS REACTOR WAS CRITICAL.
De total number ofhours during the gross hours of the 745 6795.9 168,378.3 reporting perio. that the reactor was critical.
4.
HOURS GENERkTOR ON LINE, (Service llours)The total number of hours during the gross hours of the reporting period that the unit operated with the 745 6701 3 164'619 1 breakers closed to the station bus. The sum of the hours that the generator was on line plus the total outage hours in the reportmg period.
5.
UNIT RESERV" SHUTDOWN HOURS.
He total number of hou s during the gross hours of the reporting period that the unit was removed from service for 0
0 0
cconomic or similar reasons but was available for operation.
6.
NET ELECTRICAL ENERGY (MWH) ne gross electrical output of the unit measured at the output termmals of the turbine generator minus the normal
- 465>642 4,137,805 92,346,371**
station service loads during the gross hours of the reportmg per:od, expressed in magawatt hours. Negative quantities should not be used.
s
- Design values have no " Year to Date" or " Cumulative" significance.
" Corrected Cumulative Not MWH values for June: 90,728,420 July: 91,166,512 August: 91,431,091 September: 91,880,729
l l
Appendix B Unit Shutdowns Docket No.
50-219 Date:
11/06/97 Completed By:
David M. Egan Telechone:
(609)971-4818 Reporting Period:
October 1997 No.
Date Type
- Duration Reason' Method of Cause & Corrective Action to l
(Hours)
Shutting Down Prevent Recurrence l
2 Reactor 6
97/10/03 S
0 b
I Planned power reduction to perform quarterly nuie steam isolation vake testing 1
2 F Forced Reason:
Method:
S Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Exfain) l i
E-Op rator Training & Licensing Examination l
F-Administrative GWrational Error (Explain)
II4her (Explain)
Summary: Oyster Creek performed one significant power reduction during October to execute quarterly main steam isolation valve testing. The plant generated 465,642 MWh net electric, which was 101.0% ofits MDC rated capacity.
..