ML20199K139: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ . _ _ _ - ._ _ _ _                                                            ___                    _ _ . _ . _ . _ _ _ _ .                  _ _ . . . _ _
{{#Wiki_filter:_ _ _ _ _. _ _ _ -._ _ _ _
l l
l 5.0 ADMINISTRATIVE CONTROLS -
5.0           ADMINISTRATIVE CONTROLS -
-$;19 Cnyhnt Irakane Rate Testine Program A program shall be established to implement the leakage rate testing of the' containment as' required by 10 CFR 50.54(o) and.10 CFR150iAppendix J. Option B, as modified byTapproved exemptions.-
                  -$;19           Cnyhnt Irakane Rate Testine Program A program shall be established to implement the leakage rate testing of the' containment as' required by 10 CFR 50.54(o) and.10 CFR150iAppendix J. Option B, as modified byTapproved exemptions.-
This program shall be in accordanceLwith the guidelines contained in RegulatorysGuide 1,163, ^
This program shall be in accordanceLwith the guidelines contained in RegulatorysGuide 1,163, ^
                                  '' Performance-Based Containment leak-Test Program, dated September 1995,[as modified by the
'' Performance-Based Containment leak-Test Program, dated September 1995,[as modified by the
                                                                                                        ~
~
-                                following exceptions:
following exceptions:
(1)? ilIf the Personnel Air L6ck (PAL) ~is opened during periods when icontainment integrit is no't
(1)? ilIf the Personnel Air L6ck (PAL) ~is opened during periods when icontainment integrit is no't
                                          ^
^
required, the PAL door seals shall be tested at'the end'of such periods and the entire PAL                               ,
required, the PAL door seals shall be tested at'the end'of such periods and the entire PAL shall be tested within 14 days after RCS temperature Tg> 210"Fi (2)z LType A' tests may;be' deferred for penetrations of the' steel pressure retaining' boundary where the nominal diameter does not exceed one inch; (3)) : Elapsed time between consecutive Type A tests used toldetermi_ne performance shall be'at least
shall be tested within 14 days after RCS temperature Tg> 210"Fi (2)z LType A' tests may;be' deferred for penetrations of the' steel pressure retaining' boundary where the nominal diameter does not exceed one inch;
~
                                                                                                                                            ~                      ~
~
(3)) : Elapsed time between consecutive Type A tests used toldetermi_ne performance shall be'at least 24 months or refueling interval.-
24 months or refueling interval.-
                                                                                                        ~
The containment design accidentfpressure (P,) lis 60'psig?
The containment design accidentfpressure (P,) lis 60'psig?
The maximum' allowable primary containment leakage rate, Isat P,, shall be 0.1Wofl: containment
~
                                                                                    ~'
The maximum' allowable primary containment leakage rate, Isat P,, shall be 0.1Wofl: containment air weight per 4
,                                air weight per 4
~'
                                                            ~
leakage Rate acceptance criteria arei
leakage Rate acceptance criteria arei
: a.              ~Contauncrileakage" rate acceptance criterion'is s 1.0 I!,t During" unit"startup following testing in accordance.with this program? the leakage rate acceptance criteria are s 0.601, .
~
Maximum Pathway Leakage Rate (MXPLR) for Type _B and C tests and s 0.75 L , for Type
~Contauncrileakage" rate acceptance criterion'is s 1.0 I!,t During" unit"startup following a.
                                                                                          ~           ~
testing in accordance.with this program? the leakage rate acceptance criteria are s 0.601,.
                                                                                                                                                                            ~'
Maximum Pathway Leakage Rate (MXPLR) for Type _B and C tests and s 0.75 L, for Type A' tests.
A' tests.
~
b.1             ) Personnel Air Lobk testing ac'ceptance criteria ~arci 1(1)         Overall Personnel Air' Lock leakage is [s10.1 L Li when tested at :2 PJ.
~
                                                  )(2)7 1 For ~eachlPAlfdoor, seal leakime rah is s 0.01- Llwhen pressurized toA5.0 psigi cc               ' Containment Purge Valvel(PCV-742A/B/C/D) testing acceptanceTeriterionlisi LFor each Containment Purge Valve,[ leakage rate is < 18,000 SCCM when tested at 2 3 li.
~'
de     ~
b.1
Lif at a.sy; time'when containment integrity. is req'uired and the total Type B~and CTnicasured leakage rate exceeds.0 60 I, Minimum Pathway Leakage Rate.(MNPLR)J repairs shall be
) Personnel Air Lobk testing ac'ceptance criteria ~arci 1(1)
:                                                    initiated inunediately E If repairs and retesting fail to demonstrate conformance to this acceptance criteria within 48 hours; then containment shall be declared inoperable.
Overall Personnel Air' Lock leakage is [s10.1 L L when tested at :2 PJ.
i
)(2)7 1 For ~eachlPAlfdoor, seal leakime rah is s 0.01-Llwhen pressurized toA5.0 psigi cc
' Containment Purge Valvel(PCV-742A/B/C/D) testing acceptanceTeriterionlisi LFor each Containment Purge Valve,[ leakage rate is < 18,000 SCCM when tested at 2 3 li.
de Lif at a.sy; time'when containment integrity. is req'uired and the total Type B~and CTnicasured
~
leakage rate exceeds.0 60 I, Minimum Pathway Leakage Rate.(MNPLR)J repairs shall be initiated inunediately E If repairs and retesting fail to demonstrate conformance to this acceptance criteria within 48 hours; then containment shall be declared inoperable.
The provisions of Specification 3'.0.1'do not applyLtoTthe test l frequencies specified in"ths Containment
The provisions of Specification 3'.0.1'do not applyLtoTthe test l frequencies specified in"ths Containment
                                - Leakage Rate Testing Program.
- Leakage Rate Testing Program.
The previsions of Specification 3.0.4 are applicable"to' the Containment Leakage Rate; Testing                   '
The previsions of Specification 3.0.4 are applicable"to' the Containment Leakage Rate; Testing Progrem.
Progrem.
5-263 JAmendment' 9712010027 971121 PDR ADOCK 05000285 P
,                                                                                              5-263                                                   JAmendment' 9712010027 971121 PDR               ADOCK 05000285 P                                                 PDR
PDR


U.S. Nuclear Regulatory Comission LIC-97-0175' ATTACHMENT B
U.S. Nuclear Regulatory Comission LIC-97-0175' ATTACHMENT B


DISCUSSION, JUSTIFICATION AND NO SIGNIFICANT HAZARDS CONSIDERATION
DISCUSSION, JUSTIFICATION AND NO SIGNIFICANT HAZARDS CONSIDERATION
              . . DISCUSSION AND JUSTIFICATION:
.. DISCUSSION AND JUSTIFICATION:
The Station  Omaha (FCS)Public Power Unit No. District (0Spec 1 Technical      PPD) k cations poses to revise (TS)       the Fort Calhoun to implement Option B of the recently revised 10 CFR Part 50 Appendix J. The proposed isnplementation is consistent with Regulatory Guide 1.163, Performance-Based Containment Leak Test Program," September 1995, industry guidance contained in NEI 94-01, Revision 0, " Industry Guideline for Implementing Performance-Based Option of 10 CFR 50, Appendix J," and NEI 94-01 Errata Sheet, and ANSI /ANS 56.8-1994 with the following exceptions:
The Omaha Public Power District (0 PPD) k poses to revise the Fort Calhoun Station (FCS) Unit No. 1 Technical Spec cations (TS) to implement Option B of the recently revised 10 CFR Part 50 Appendix J.
(1)       If the Personnel Air Lock (PAL) is opened during periods when containment integrity is not required, the PAL door seals shall be tested at the end of such periods and the entire PAL shall be tested within 14 days after RCS temperature T,,a > 210'F.
The proposed isnplementation is consistent with Regulatory Guide 1.163, Performance-Based Containment Leak Test Program," September 1995, industry guidance contained in NEI 94-01, Revision 0, " Industry Guideline for Implementing Performance-Based Option of 10 CFR 50, Appendix J," and NEI 94-01 Errata Sheet, and ANSI /ANS 56.8-1994 with the following exceptions:
(2)       Section 9.2.4 of NEI-94-01 on Containment Repairs and Modifications specifies that Type A testing may be deferred for welds attaching to the steel pressure retaining boundary whose nominal diameter does not exceed one inch. OPPD propoces to allow Ty)e A testing to be deferred for penetrations of the steel retaining aoundary where the diameter does not exceed one inch.
(1)
(3)       Section 9.2.3 of NEI-94-01 specifies at least a 24 month interval between Type A tests is required to establish a performance baseline.
If the Personnel Air Lock (PAL) is opened during periods when containment integrity is not required, the PAL door seals shall be tested at the end of such periods and the entire PAL shall be tested within 14 days after RCS temperature T,,a > 210'F.
(2)
Section 9.2.4 of NEI-94-01 on Containment Repairs and Modifications specifies that Type A testing may be deferred for welds attaching to the steel pressure retaining boundary whose nominal diameter does not exceed one inch.
OPPD propoces to allow Ty)e A testing to be deferred for penetrations of the steel retaining aoundary where the diameter does not exceed one inch.
(3)
Section 9.2.3 of NEI-94-01 specifies at least a 24 month interval between Type A tests is required to establish a performance baseline.
OPPD proposes to allow 24 months or refueling interval between Type A tests, since FCS is on an 18 month refueling interval.
OPPD proposes to allow 24 months or refueling interval between Type A tests, since FCS is on an 18 month refueling interval.
In addition, OPPD requests that the following previously approved Specifications remain in effect:
In addition, OPPD requests that the following previously approved Specifications remain in effect:
(1)       For each PAL door, seal leakage rate is 5 0.01 L, when pressurized to a 5.0 psig.
(1)
(2)       For each Containment Purge Valve, leakage rate is < 18,000 SCCM when tested at n P,.
For each PAL door, seal leakage rate is 5 0.01 L, when pressurized to a 5.0 psig.
(3)       If at any time when containment integrity is required, the total Type B and C measured leakage rate exceeds 0.60 L , repairs shall be initiated immediately. If repairs and retesting faii to demonstrate conformance to the acceptance criteria within 48 hours, then containment shall be declared inoperable.
(2)
For each Containment Purge Valve, leakage rate is < 18,000 SCCM when tested at n P,.
(3)
If at any time when containment integrity is required, the total Type B and C measured leakage rate exceeds 0.60 L, repairs shall be initiated immediately.
If repairs and retesting faii to demonstrate conformance to the acceptance criteria within 48 hours, then containment shall be declared inoperable.
1
1
  .      -          -              .                          _      _    _                          _              -}}
-}}

Latest revision as of 04:16, 8 December 2024

Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program
ML20199K139
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/21/1997
From:
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20199K106 List:
References
NUDOCS 9712010027
Download: ML20199K139 (3)


Text

_ _ _ _ _. _ _ _ -._ _ _ _

l 5.0 ADMINISTRATIVE CONTROLS -

-$;19 Cnyhnt Irakane Rate Testine Program A program shall be established to implement the leakage rate testing of the' containment as' required by 10 CFR 50.54(o) and.10 CFR150iAppendix J. Option B, as modified byTapproved exemptions.-

This program shall be in accordanceLwith the guidelines contained in RegulatorysGuide 1,163, ^

Performance-Based Containment leak-Test Program, dated September 1995,[as modified by the

~

following exceptions:

(1)? ilIf the Personnel Air L6ck (PAL) ~is opened during periods when icontainment integrit is no't

^

required, the PAL door seals shall be tested at'the end'of such periods and the entire PAL shall be tested within 14 days after RCS temperature Tg> 210"Fi (2)z LType A' tests may;be' deferred for penetrations of the' steel pressure retaining' boundary where the nominal diameter does not exceed one inch; (3)) : Elapsed time between consecutive Type A tests used toldetermi_ne performance shall be'at least

~

~

24 months or refueling interval.-

The containment design accidentfpressure (P,) lis 60'psig?

~

The maximum' allowable primary containment leakage rate, Isat P,, shall be 0.1Wofl: containment air weight per 4

~'

leakage Rate acceptance criteria arei

~

~Contauncrileakage" rate acceptance criterion'is s 1.0 I!,t During" unit"startup following a.

testing in accordance.with this program? the leakage rate acceptance criteria are s 0.601,.

Maximum Pathway Leakage Rate (MXPLR) for Type _B and C tests and s 0.75 L, for Type A' tests.

~

~

~'

b.1

) Personnel Air Lobk testing ac'ceptance criteria ~arci 1(1)

Overall Personnel Air' Lock leakage is [s10.1 L L when tested at :2 PJ.

i

)(2)7 1 For ~eachlPAlfdoor, seal leakime rah is s 0.01-Llwhen pressurized toA5.0 psigi cc

' Containment Purge Valvel(PCV-742A/B/C/D) testing acceptanceTeriterionlisi LFor each Containment Purge Valve,[ leakage rate is < 18,000 SCCM when tested at 2 3 li.

de Lif at a.sy; time'when containment integrity. is req'uired and the total Type B~and CTnicasured

~

leakage rate exceeds.0 60 I, Minimum Pathway Leakage Rate.(MNPLR)J repairs shall be initiated inunediately E If repairs and retesting fail to demonstrate conformance to this acceptance criteria within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />; then containment shall be declared inoperable.

The provisions of Specification 3'.0.1'do not applyLtoTthe test l frequencies specified in"ths Containment

- Leakage Rate Testing Program.

The previsions of Specification 3.0.4 are applicable"to' the Containment Leakage Rate; Testing Progrem.

5-263 JAmendment' 9712010027 971121 PDR ADOCK 05000285 P

PDR

U.S. Nuclear Regulatory Comission LIC-97-0175' ATTACHMENT B

DISCUSSION, JUSTIFICATION AND NO SIGNIFICANT HAZARDS CONSIDERATION

.. DISCUSSION AND JUSTIFICATION:

The Omaha Public Power District (0 PPD) k poses to revise the Fort Calhoun Station (FCS) Unit No. 1 Technical Spec cations (TS) to implement Option B of the recently revised 10 CFR Part 50 Appendix J.

The proposed isnplementation is consistent with Regulatory Guide 1.163, Performance-Based Containment Leak Test Program," September 1995, industry guidance contained in NEI 94-01, Revision 0, " Industry Guideline for Implementing Performance-Based Option of 10 CFR 50, Appendix J," and NEI 94-01 Errata Sheet, and ANSI /ANS 56.8-1994 with the following exceptions:

(1)

If the Personnel Air Lock (PAL) is opened during periods when containment integrity is not required, the PAL door seals shall be tested at the end of such periods and the entire PAL shall be tested within 14 days after RCS temperature T,,a > 210'F.

(2)

Section 9.2.4 of NEI-94-01 on Containment Repairs and Modifications specifies that Type A testing may be deferred for welds attaching to the steel pressure retaining boundary whose nominal diameter does not exceed one inch.

OPPD propoces to allow Ty)e A testing to be deferred for penetrations of the steel retaining aoundary where the diameter does not exceed one inch.

(3)

Section 9.2.3 of NEI-94-01 specifies at least a 24 month interval between Type A tests is required to establish a performance baseline.

OPPD proposes to allow 24 months or refueling interval between Type A tests, since FCS is on an 18 month refueling interval.

In addition, OPPD requests that the following previously approved Specifications remain in effect:

(1)

For each PAL door, seal leakage rate is 5 0.01 L, when pressurized to a 5.0 psig.

(2)

For each Containment Purge Valve, leakage rate is < 18,000 SCCM when tested at n P,.

(3)

If at any time when containment integrity is required, the total Type B and C measured leakage rate exceeds 0.60 L, repairs shall be initiated immediately.

If repairs and retesting faii to demonstrate conformance to the acceptance criteria within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, then containment shall be declared inoperable.

1

-