ML20202G140: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. . | {{#Wiki_filter:. . | ||
__ | |||
_ | |||
. | |||
APR 0 71986 | |||
. | |||
Docket No. | |||
50-423 | |||
NRC Construction | |||
Permit No. CPPR-113 | |||
Northeast Nuclear Energy Company | |||
ATTN: Mr. J. F. Opeka | |||
Senior Vice President - Nuclear | |||
Engineering and Operations Group | |||
P. O. Box 270 | |||
Hartford, Connecticut 06141-0270 | |||
Gentlemen: | |||
Subject: | |||
Inspection No. 50-423/85-64 | |||
This refers to the Preoperational Security Program Review conducted by | |||
Mr. William Madden of this office on November 4-8, 1985, at Millstone Unit 3, | |||
Waterford, Connecticut, of activities authorized by NRC Construction Permit | |||
No. CPPR-113 and to the discussions of our findings held by Mr. Madden with | |||
Mr. R. Vogel and other members of your staff at the conclusion of the | |||
inspection. | |||
The review was conducted to determine whether the Unit No. 3 Physical Protec- | |||
tion Program, including personnel, equipment, systems and facilities, was being | |||
effectively integrated into the proposed combined security program for the | |||
Millstone site. The review also included a special evaluation of the security | |||
force training program to determine the ability of security force personnel to | |||
carry out their duties and responsibilities by observing licensee administered | |||
examinations of a statistically selected sample of security force personnel, in | |||
the tasks in which they were qualified, to ootain results at a confidence level | |||
of 95%. Additionally, the review included interviews of key members of the | |||
security organization and project engineering staff responsible for the instal- | |||
lation and testing of security systems and equipment. The review indicated | |||
that the Unit 3 security program conformed to NRC requirements in the areas | |||
examined and was being effectively integrated into the Millstone site program. | |||
In accordance with 10 CFR 2.790(a), this letter and the enclosure will be | |||
placed in the Public Document Room. | |||
No reply to this letter is required. Your cooperation with us is appreciated. | |||
Sincerely, | |||
Original Signed by: | |||
Jern3 L J0YCSf | |||
*' | |||
deue19UMU6 860407 | |||
; | PDR | ||
ADOCK 05000423 | |||
O | |||
PDR | |||
Thomas T. Martin, L'irector | |||
Division of Radiation Safety | |||
and Safeguards | |||
Enclosure: NP' Region I Inspection Report No. 50-423/85-64 | |||
0FFICIAL RECORD COPY | |||
IR MILL 3 85-64 - 0001.0.0 | |||
; | |||
03/27/86 | |||
l | l | ||
'TEi4 | |||
& I | |||
, | , | ||
. | |||
L | L | ||
j | |||
, - , - - - - - - - , - - - - - - - - - - - | |||
0 | |||
Northeast Nuclear Energy Company | |||
2 | |||
APR 0 71986 | |||
. | |||
cc w/ enc 1: | |||
' | ' | ||
V. Papadopoli, Construction Quality Assurance Supervisor | |||
E. R. Foster, Director of G3neration Construction | |||
E. J. Mroczka, Vice President, Nuclear Operations | |||
D. O. Nordquist, Manager of Quality Assurance | |||
R.~ T. Laudenat, Manager, Generation Facilities Licensing | |||
W. D. Romberg, Station Superintendent | |||
Public Document Room (PDR) | |||
local Public Document Room (LPDR) | |||
Nuclear Safety Information Center (NSIC) | |||
NRC Senior Resident Inspector | |||
State of Connecticut | |||
bcc W/ encl: | |||
Region I Docket Room (with concurrences) | |||
Management Assistant, DRMA (w/o encl) | |||
DRP Section Chief | |||
G. Walton, SRI, BV-2 | |||
T. Shediosky, SRI, Millstone 1&2 | |||
B. Doolittle, LPM, NRR | |||
C. Gaskins, NMSS | |||
, | |||
RI:DRSS | |||
RI: SS | |||
R | |||
R -D | |||
S | |||
Madden /djh/ms | |||
Ke ig | |||
yn r | |||
Ma | |||
in | |||
f //86 | |||
7/86 | |||
6 | |||
0FFICIAL RECORD COPY | |||
IR MILL 3 85-64 - 0002.0.0 | |||
03/27/86 | |||
_ | |||
1 | |||
}} | }} | ||
Latest revision as of 02:38, 8 December 2024
| ML20202G140 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/07/1986 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20202G145 | List: |
| References | |
| NUDOCS 8604140286 | |
| Download: ML20202G140 (2) | |
See also: IR 05000423/1985064
Text
. .
__
_
.
APR 0 71986
.
Docket No.
50-423
NRC Construction
Permit No. CPPR-113
Northeast Nuclear Energy Company
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06141-0270
Gentlemen:
Subject:
Inspection No. 50-423/85-64
This refers to the Preoperational Security Program Review conducted by
Mr. William Madden of this office on November 4-8, 1985, at Millstone Unit 3,
Waterford, Connecticut, of activities authorized by NRC Construction Permit
No. CPPR-113 and to the discussions of our findings held by Mr. Madden with
Mr. R. Vogel and other members of your staff at the conclusion of the
inspection.
The review was conducted to determine whether the Unit No. 3 Physical Protec-
tion Program, including personnel, equipment, systems and facilities, was being
effectively integrated into the proposed combined security program for the
Millstone site. The review also included a special evaluation of the security
force training program to determine the ability of security force personnel to
carry out their duties and responsibilities by observing licensee administered
examinations of a statistically selected sample of security force personnel, in
the tasks in which they were qualified, to ootain results at a confidence level
of 95%. Additionally, the review included interviews of key members of the
security organization and project engineering staff responsible for the instal-
lation and testing of security systems and equipment. The review indicated
that the Unit 3 security program conformed to NRC requirements in the areas
examined and was being effectively integrated into the Millstone site program.
In accordance with 10 CFR 2.790(a), this letter and the enclosure will be
placed in the Public Document Room.
No reply to this letter is required. Your cooperation with us is appreciated.
Sincerely,
Original Signed by:
Jern3 L J0YCSf
- '
deue19UMU6 860407
ADOCK 05000423
O
Thomas T. Martin, L'irector
Division of Radiation Safety
and Safeguards
Enclosure: NP' Region I Inspection Report No. 50-423/85-64
0FFICIAL RECORD COPY
IR MILL 3 85-64 - 0001.0.0
03/27/86
l
'TEi4
& I
,
.
L
j
, - , - - - - - - - , - - - - - - - - - - -
0
Northeast Nuclear Energy Company
2
APR 0 71986
.
cc w/ enc 1:
'
V. Papadopoli, Construction Quality Assurance Supervisor
E. R. Foster, Director of G3neration Construction
E. J. Mroczka, Vice President, Nuclear Operations
D. O. Nordquist, Manager of Quality Assurance
R.~ T. Laudenat, Manager, Generation Facilities Licensing
W. D. Romberg, Station Superintendent
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
bcc W/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
G. Walton, SRI, BV-2
T. Shediosky, SRI, Millstone 1&2
B. Doolittle, LPM, NRR
C. Gaskins, NMSS
,
RI:DRSS
RI: SS
R
R -D
S
Madden /djh/ms
Ke ig
yn r
Ma
in
f //86
7/86
6
0FFICIAL RECORD COPY
IR MILL 3 85-64 - 0002.0.0
03/27/86
_
1