{{#Wiki_filter:. .                                                                         __     _
{{#Wiki_filter:. .
  .
__
                                                  APR 0 71986
_
  .
.
    Docket No.     50-423                                           NRC Construction
APR 0 71986
                                                                      Permit No. CPPR-113
.
    Northeast Nuclear Energy Company
Docket No.
    ATTN: Mr. J. F. Opeka
50-423
            Senior Vice President - Nuclear
NRC Construction
            Engineering and Operations Group
Permit No. CPPR-113
    P. O. Box 270
Northeast Nuclear Energy Company
    Hartford, Connecticut 06141-0270
ATTN: Mr. J. F. Opeka
    Gentlemen:
Senior Vice President - Nuclear
    Subject:     Inspection No. 50-423/85-64
Engineering and Operations Group
    This refers to the Preoperational Security Program Review conducted by
P. O. Box 270
    Mr. William Madden of this office on November 4-8, 1985, at Millstone Unit 3,
Hartford, Connecticut 06141-0270
    Waterford, Connecticut, of activities authorized by NRC Construction Permit
Gentlemen:
    No. CPPR-113 and to the discussions of our findings held by Mr. Madden with
Subject:
    Mr. R. Vogel and other members of your staff at the conclusion of the
Inspection No. 50-423/85-64
    inspection.
This refers to the Preoperational Security Program Review conducted by
    The review was conducted to determine whether the Unit No. 3 Physical Protec-
Mr. William Madden of this office on November 4-8, 1985, at Millstone Unit 3,
    tion Program, including personnel, equipment, systems and facilities, was being
Waterford, Connecticut, of activities authorized by NRC Construction Permit
    effectively integrated into the proposed combined security program for the
No. CPPR-113 and to the discussions of our findings held by Mr. Madden with
    Millstone site. The review also included a special evaluation of the security
Mr. R. Vogel and other members of your staff at the conclusion of the
    force training program to determine the ability of security force personnel to
inspection.
    carry out their duties and responsibilities by observing licensee administered
The review was conducted to determine whether the Unit No. 3 Physical Protec-
    examinations of a statistically selected sample of security force personnel, in
tion Program, including personnel, equipment, systems and facilities, was being
    the tasks in which they were qualified, to ootain results at a confidence level
effectively integrated into the proposed combined security program for the
    of 95%. Additionally, the review included interviews of key members of the
Millstone site. The review also included a special evaluation of the security
    security organization and project engineering staff responsible for the instal-
force training program to determine the ability of security force personnel to
    lation and testing of security systems and equipment. The review indicated
carry out their duties and responsibilities by observing licensee administered
    that the Unit 3 security program conformed to NRC requirements in the areas
examinations of a statistically selected sample of security force personnel, in
    examined and was being effectively integrated into the Millstone site program.
the tasks in which they were qualified, to ootain results at a confidence level
    In accordance with 10 CFR 2.790(a), this letter and the enclosure will be
of 95%. Additionally, the review included interviews of key members of the
    placed in the Public Document Room.
security organization and project engineering staff responsible for the instal-
    No reply to this letter is required. Your cooperation with us is appreciated.
lation and testing of security systems and equipment. The review indicated
                                                  Sincerely,
that the Unit 3 security program conformed to NRC requirements in the areas
                                                    Original Signed by:
examined and was being effectively integrated into the Millstone site program.
                                  *'                Jern3 L J0YCSf
In accordance with 10 CFR 2.790(a), this letter and the enclosure will be
      deue19UMU6 860407
placed in the Public Document Room.
      PDR   ADOCK 05000423
No reply to this letter is required. Your cooperation with us is appreciated.
      O                     PDR                 Thomas T. Martin, L'irector
Sincerely,
                                                  Division of Radiation Safety
Original Signed by:
                                                    and Safeguards
Jern3 L J0YCSf
    Enclosure: NP' Region I Inspection Report No. 50-423/85-64
*'
                                  0FFICIAL RECORD COPY       IR MILL 3 85-64 - 0001.0.0
deue19UMU6 860407
;                                                           03/27/86
PDR
ADOCK 05000423
O
PDR
Thomas T. Martin, L'irector
Division of Radiation Safety
and Safeguards
Enclosure: NP' Region I Inspection Report No. 50-423/85-64
0FFICIAL RECORD COPY
IR MILL 3 85-64 - 0001.0.0
;
03/27/86
l
l
'TEi4
& I
,
,
.
L
L
                                                                                'TEi4      &
j
                                                                                              I  .
                                                                                                  j


                                                                              , - , - - - - - - - , - - - - - - - - - - -
, - , - - - - - - - , - - - - - - - - - - -
    0
0
      Northeast Nuclear Energy Company           2 APR 0 71986
Northeast Nuclear Energy Company
    .
2
APR 0 71986
.
cc w/ enc 1:
'
'
      cc w/ enc 1:
V. Papadopoli, Construction Quality Assurance Supervisor
      V. Papadopoli, Construction Quality Assurance Supervisor
E. R. Foster, Director of G3neration Construction
      E. R. Foster, Director of G3neration Construction
E. J. Mroczka, Vice President, Nuclear Operations
      E. J. Mroczka, Vice President, Nuclear Operations
D. O. Nordquist, Manager of Quality Assurance
      D. O. Nordquist, Manager of Quality Assurance
R.~ T. Laudenat, Manager, Generation Facilities Licensing
      R.~ T. Laudenat, Manager, Generation Facilities Licensing
W. D. Romberg, Station Superintendent
      W. D. Romberg, Station Superintendent
Public Document Room (PDR)
      Public Document Room (PDR)
local Public Document Room (LPDR)
      local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
      Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
      NRC Senior Resident Inspector
State of Connecticut
      State of Connecticut
bcc W/ encl:
      bcc W/ encl:
Region I Docket Room (with concurrences)
      Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
      Management Assistant, DRMA (w/o encl)
DRP Section Chief
      DRP Section Chief
G. Walton, SRI, BV-2
      G. Walton, SRI, BV-2
T. Shediosky, SRI, Millstone 1&2
      T. Shediosky, SRI, Millstone 1&2
B. Doolittle, LPM, NRR
      B. Doolittle, LPM, NRR
C. Gaskins, NMSS
      C. Gaskins, NMSS
,
                                                                                                                          ,
RI:DRSS
      RI:DRSS               RI: SS         R             R -D   S
RI: SS
      Madden /djh/ms       Ke ig             yn r       Ma   in
R
                          f //86               7/86               6
R -D
                                0FFICIAL RECORD COPY     IR MILL 3 85-64 - 0002.0.0
S
                                                          03/27/86
Madden /djh/ms
                                                                                                                          l
Ke ig
                                                                                                                          l
yn r
  _
Ma
                                                                                                                          1
in
f //86
7/86
6
0FFICIAL RECORD COPY
IR MILL 3 85-64 - 0002.0.0
03/27/86
_
1
}}
}}

Latest revision as of 02:38, 8 December 2024

Forwards Preoperational Security Program Review Rept 50-423/85-64 on 851104-08.Security Program Conformed to NRC Requirements in Areas Examined & Effectively Integrated Into Site Program
ML20202G140
Person / Time
Site: Millstone 
Issue date: 04/07/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20202G145 List:
References
NUDOCS 8604140286
Download: ML20202G140 (2)


See also: IR 05000423/1985064

Text

. .

__

_

.

APR 0 71986

.

Docket No.

50-423

NRC Construction

Permit No. CPPR-113

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject:

Inspection No. 50-423/85-64

This refers to the Preoperational Security Program Review conducted by

Mr. William Madden of this office on November 4-8, 1985, at Millstone Unit 3,

Waterford, Connecticut, of activities authorized by NRC Construction Permit

No. CPPR-113 and to the discussions of our findings held by Mr. Madden with

Mr. R. Vogel and other members of your staff at the conclusion of the

inspection.

The review was conducted to determine whether the Unit No. 3 Physical Protec-

tion Program, including personnel, equipment, systems and facilities, was being

effectively integrated into the proposed combined security program for the

Millstone site. The review also included a special evaluation of the security

force training program to determine the ability of security force personnel to

carry out their duties and responsibilities by observing licensee administered

examinations of a statistically selected sample of security force personnel, in

the tasks in which they were qualified, to ootain results at a confidence level

of 95%. Additionally, the review included interviews of key members of the

security organization and project engineering staff responsible for the instal-

lation and testing of security systems and equipment. The review indicated

that the Unit 3 security program conformed to NRC requirements in the areas

examined and was being effectively integrated into the Millstone site program.

In accordance with 10 CFR 2.790(a), this letter and the enclosure will be

placed in the Public Document Room.

No reply to this letter is required. Your cooperation with us is appreciated.

Sincerely,

Original Signed by:

Jern3 L J0YCSf

  • '

deue19UMU6 860407

PDR

ADOCK 05000423

O

PDR

Thomas T. Martin, L'irector

Division of Radiation Safety

and Safeguards

Enclosure: NP' Region I Inspection Report No. 50-423/85-64

0FFICIAL RECORD COPY

IR MILL 3 85-64 - 0001.0.0

03/27/86

l

'TEi4

& I

,

.

L

j

, - , - - - - - - - , - - - - - - - - - - -

0

Northeast Nuclear Energy Company

2

APR 0 71986

.

cc w/ enc 1:

'

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of G3neration Construction

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R.~ T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bcc W/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

G. Walton, SRI, BV-2

T. Shediosky, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

C. Gaskins, NMSS

,

RI:DRSS

RI: SS

R

R -D

S

Madden /djh/ms

Ke ig

yn r

Ma

in

f //86

7/86

6

0FFICIAL RECORD COPY

IR MILL 3 85-64 - 0002.0.0

03/27/86

_

1