        - In Reply Refer To:
- In Reply Refer To:
        Docket: 50-298/86-21
Docket:
        Nebraska Public Power District
50-298/86-21
        ATTN:   J. M. Pilant, Manager, Technical
Nebraska Public Power District
                                  _
ATTN:
                    Staff-Nuclear Power Group
J. M. Pilant, Manager, Technical
        P. O. Box 499
_
        Columbus, NE       68601
Staff-Nuclear Power Group
        Gentlemen:
P. O. Box 499
        This refers to the inspection conducted by Messrs. D. L. DuBois and E. A.
Columbus, NE
        Plettner of this office during the period June 1 through June-30, 1986, of
68601
        activities authorized by NRC Operating License DPR-46 for Cooper Nuclear
Gentlemen:
        Station, and to the discussion of our findings with Mr. G. R. Horn and other
This refers to the inspection conducted by Messrs. D. L. DuBois and E. A.
        members of your staff at the conclusion of the inspection.
Plettner of this office during the period June 1 through June-30, 1986, of
        Areas examined during the inspection included action you have taken with regard
activities authorized by NRC Operating License DPR-46 for Cooper Nuclear
        to previously identified inspection findings, Licensee Event Reports, spent
Station, and to the discussion of our findings with Mr. G. R. Horn and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included action you have taken with regard
to previously identified inspection findings, Licensee Event Reports, spent
fuel shipments, operational safety verification, and monthly surveillance and
'
'
        fuel shipments, operational safety verification, and monthly surveillance and
maintenance activities. Within these areas, the inspection consisted of
        maintenance activities. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
4
4
        selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
        personnel, and observations by the inspectors. These findings are documented
These findings are documented
        in the enclosed inspection report.
in the enclosed inspection report.
        During this inspection, it was found that certain of your activities were in
During this inspection, it was found that certain of your activities were in
        violation.of NRC requirements.     Consequently, you are required to respond to
violation.of NRC requirements.
        this violation, in writing, in accordance with the provisions of Section 2.201
Consequently, you are required to respond to
        of the NRC's, " Rules of Practice," Part 2, Title 10, Code of Federal
this violation, in writing, in accordance with the provisions of Section 2.201
        Regulations.     Your response should be based on the specifics contained in the
of the NRC's, " Rules of Practice," Part 2, Title 10, Code of Federal
        Notice of Violation enclosed with this letter.
Regulations.
        We have also examined actions you have taken with regard to previously
Your response should be based on the specifics contained in the
        identified inspection findings. The status of these items is identified in
Notice of Violation enclosed with this letter.
        paragraph 2 of the enclosed report.
We have also examined actions you have taken with regard to previously
        The response directed by this letter and the accompanying Notice is not subject
identified inspection findings. The status of these items is identified in
        to the clearance procedures of the Office of Management and Budget as required
paragraph 2 of the enclosed report.
        by the Paperwork Reduction Act of 1980, PL 96-511.
The response directed by this letter and the accompanying Notice is not subject
            f
to the clearance procedures of the Office of Management and Budget as required
        RIV
by the Paperwork Reduction Act of 1980, PL 96-511.
                        O    bRI            RF   /         RPB       //
f
          P ttner         DLQuBois         JFJaudon       JEGagl     r 6'-
bRI
          g/@/86           q g /86                   /86   ;7 /g/f
RF
        8607310155 860724 8
/
          DR ADOCK 0500                                                                     \
RPB
                                                                                              p
//
                      -           ---   -   .-       - -     - - -     -
O
                                                                                    . ._ -
RIV
P ttner
DLQuBois
JFJaudon
JEGagl
r 6'-
g/@/86
q g /86
/86
;7 /g/f
8607310155 860724
DR
ADOCK 0500
8
\\
p
.
-
---
-
.-
-
-
-
- -
-
. .
-


r,
r,
      *
*
  ,
,
              Nebraska Public Power District                     -2-
Nebraska Public Power District
    "
-2-
              Should you have any questions concerning this inspection, we will be pleased to
Should you have any questions concerning this inspection, we will be pleased to
.            discuss them with you.
discuss them with you.
                                    ,
"
                                                                  Sincerely,
.
                                                                POriginal Signed bn
Sincerely,
                                                                'J. E. GAGLI ARDO"
,
                      -                                          J. E. Gagliardo, Chief
POriginal Signed bn
            ,                                                     Reactor Projects Branch
'J. E. GAGLI ARDO"
              Enclosures:
J. E. Gagliardo, Chief
              1.   Appendix A - Notice of Violation
-
              2.   Appendix B - NRC Inspection Report
,
        .              50-298/86-21
Reactor Projects Branch
              cc w/ enclosure:
Enclosures:
1             Nebraska Public Power District
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/86-21
.
cc w/ enclosure:
1
Nebraska Public Power District
i
i
              Guy R. Horn. Division Manager
Guy R. Horn. Division Manager
                of Nuclear Operations
of Nuclear Operations
              Cooper Nuclear Station
Cooper Nuclear Station
              P. O. Box 98
P. O. Box 98
;             Brownville, Nebraska 68321
;
              Kansas Radiation Control Program Director
Brownville, Nebraska
              Nebraska Radiation Control Program Director
68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
i
i
;            bcc to DMB (IE01)
bcc to DMB (IE01)
;
l
l
              bcc distrib. by RIV:
bcc distrib. by RIV:
              *RPB                             DRSP
*RPB
i             * Resident Inspector             R. D. Martin, RA
DRSP
i
* Resident Inspector
R. D. Martin, RA
;
;
              *Section Chief (RPB/A)           *D. Weiss, LFMB (AR-2015)
*Section Chief (RPB/A)
              *E&SPB                           *RSB
*D. Weiss, LFMB (AR-2015)
              * MIS System                     *RSTS Operator
*E&SPB
I             *RIV File
*RSB
* MIS System
*RSTS Operator
I
*RIV File
l
l
              *w/766
*w/766
,
,
,
,
I
I
i
i
          . - ,     -     - -
. - ,
                                . . . - ~,-.-. .   . . - , .     -- . - - . . - - - - - - - .- . . - - . -
-
-
-
. . . - ~,-.-.
.
. . - , .
-- . - - . . - - - - - -
- .-
. . - - . -
}}
}}

Latest revision as of 01:12, 8 December 2024

Forwards Insp Rept 50-298/86-21 on 860601-30 & Notice of Violation
ML20203F654
Person / Time
Site: Cooper 
Issue date: 07/24/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20203F659 List:
References
NUDOCS 8607310155
Download: ML20203F654 (2)


See also: IR 05000298/1986021

Text

-

.

.

- In Reply Refer To:

Docket:

50-298/86-21

Nebraska Public Power District

ATTN:

J. M. Pilant, Manager, Technical

_

Staff-Nuclear Power Group

P. O. Box 499

Columbus, NE

68601

Gentlemen:

This refers to the inspection conducted by Messrs. D. L. DuBois and E. A.

Plettner of this office during the period June 1 through June-30, 1986, of

activities authorized by NRC Operating License DPR-46 for Cooper Nuclear

Station, and to the discussion of our findings with Mr. G. R. Horn and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included action you have taken with regard

to previously identified inspection findings, Licensee Event Reports, spent

fuel shipments, operational safety verification, and monthly surveillance and

'

maintenance activities. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

4

personnel, and observations by the inspectors.

These findings are documented

in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation.of NRC requirements.

Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's, " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

f

bRI

RF

/

RPB

//

O

RIV

P ttner

DLQuBois

JFJaudon

JEGagl

r 6'-

g/@/86

q g /86

/86

7 /g/f

8607310155 860724

DR

ADOCK 0500

8

\\

p

.

-

---

-

.-

-

-

-

- -

-

. .

-

r,

,

Nebraska Public Power District

-2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

"

.

Sincerely,

,

POriginal Signed bn

'J. E. GAGLI ARDO"

J. E. Gagliardo, Chief

-

,

Reactor Projects Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-298/86-21

.

cc w/ enclosure:

1

Nebraska Public Power District

i

Guy R. Horn. Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska

68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

i

bcc to DMB (IE01)

l

bcc distrib. by RIV:

  • RPB

DRSP

i

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB/A)
  • D. Weiss, LFMB (AR-2015)
  • E&SPB
  • RSB
  • MIS System
  • RSTS Operator

I

  • RIV File

l

  • w/766

,

,

I

i

. - ,

-

-

-

. . . - ~,-.-.

.

. . - , .

-- . - - . . - - - - - -

- .-

. . - - . -