Log # TXX-4930 File # 10110 903.6 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER e 400 NOIETH OLIVE NTREET. L.B. 88 . IDALLAN. TEXAN 75208 July 22,1986 UMs7ASifES Mr. Eric H. Johnson, Director | Log # TXX-4930 File # 10110 903.6 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER e 400 NOIETH OLIVE NTREET. L.B. 88. IDALLAN. TEXAN 75208 July 22,1986 UMs7ASifES Mr. Eric H. Johnson, Director LL l | ||
J | J lLV Division of Reactor Safety and Projects | ||
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 | [ | ||
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 | |||
==SUBJECT:== | ==SUBJECT:== | ||
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | ||
DOCKET NOS. | DOCKET NOS. | ||
50-445 AND 50-446 BREAKER / FUSE C0 ORDINATION SDAR: CP-86-25 (INTERIM REPORT) | |||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On April 10, 1986, we verbally notified your Mr. R. Hall of a deficiency involving a possible concern in that without full breaker / fuse coordination, portions of the CPSES damage study could be incorrect. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). | On April 10, 1986, we verbally notified your Mr. R. Hall of a deficiency involving a possible concern in that without full breaker / fuse coordination, portions of the CPSES damage study could be incorrect. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). | ||
We have submitted an interim report logged TXX-4789, dated May 9, 1986. | We have submitted an interim report logged TXX-4789, dated May 9, 1986. | ||
We are continuing our evaluation and anticipate submitting our next report by August 29, 1986. | We are continuing our evaluation and anticipate submitting our next report by August 29, 1986. | ||
Very truly yours, | Very truly yours, | ||
/ | |||
_/ | |||
~. S. Keeley 4 | |||
Manager,NucleayLicensing JCH/arh c - NRC Region IV (0 + 1 copy) | /__ | ||
G Manager,NucleayLicensing JCH/arh c - NRC Region IV (0 + 1 copy) | |||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8608040033 860722 PDR | U. S. Nuclear Regulatory Commission Washington, D.C. | ||
h'b{ | 20555 8608040033 860722 PDR ADOCK 05000445 h'b{ | ||
p q] | p q] | ||
t O | S PDR l | ||
A sisvsssoN or rRxAs tirss2rst:s v:s.scrusc coususy t | |||
O | |||
_ _ _ _.}} | |||
Latest revision as of 01:57, 8 December 2024
| ML20203G732 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/22/1986 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-25, TXX-4930, NUDOCS 8608040033 | |
| Download: ML20203G732 (1) | |
Text
_.
Log # TXX-4930 File # 10110 903.6 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER e 400 NOIETH OLIVE NTREET. L.B. 88. IDALLAN. TEXAN 75208 July 22,1986 UMs7ASifES Mr. Eric H. Johnson, Director LL l
J lLV Division of Reactor Safety and Projects
[
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS.
50-445 AND 50-446 BREAKER / FUSE C0 ORDINATION SDAR: CP-86-25 (INTERIM REPORT)
Dear Mr. Johnson:
On April 10, 1986, we verbally notified your Mr. R. Hall of a deficiency involving a possible concern in that without full breaker / fuse coordination, portions of the CPSES damage study could be incorrect. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
We have submitted an interim report logged TXX-4789, dated May 9, 1986.
We are continuing our evaluation and anticipate submitting our next report by August 29, 1986.
Very truly yours,
/
_/
~. S. Keeley 4
/__
G Manager,NucleayLicensing JCH/arh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8608040033 860722 PDR ADOCK 05000445 h'b{
p q]
S PDR l
A sisvsssoN or rRxAs tirss2rst:s v:s.scrusc coususy t
O
_ _ _ _.