{{#Wiki_filter:Log # TXX-4925 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER . 400 NORTH OLIVE STREET. L.B. 81
{{#Wiki_filter:Log # TXX-4925 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER. 400 NORTH OLIVE STREET. L.B. 81
* DALLAS, TEXAS 7520 t July 21, 1986 cM27&ff.fAS                                                                         l                       (
* DALLAS, TEXAS 7520 t July 21, 1986 cM27&ff.fAS l
Mr. Eric H. Johnson, Director                                             l                 D;/
(
Division of Reactor Safety and Projects                                         -
Mr. Eric H. Johnson, Director l
U. S. Nuclear Regulatory Commission                                                         '-+
D;/
611 Ryan Plaza Drive, Suite 1000                                                                         !
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission
Arlington, TX 76012                                                                             '"
'-+
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS.         50-445 AND 50-446 i                   TRACEABILITY OF 1E PIGTAIL EXTENSIONS SDAR: CP-86-38 (INTERIM REPORT)
DOCKET NOS.
50-445 AND 50-446 i
TRACEABILITY OF 1E PIGTAIL EXTENSIONS SDAR: CP-86-38 (INTERIM REPORT)


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the failure of project procedures to adequately address the installation and inspection criteria for cable runs used as device pigtail extensions. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted an interim report logged TXX-4873, dated June 26, 1986.
On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the failure of project procedures to adequately address the installation and inspection criteria for cable runs used as device pigtail extensions. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted an interim report logged TXX-4873, dated June 26, 1986.
We are continuing our evaluation and anticipate submitting our next report by September 12, 1986.
We are continuing our evaluation and anticipate submitting our next report by September 12, 1986.
Very truly yours,
Very truly yours,
                                                                        //             l'80 W. G. Counsil JCH/arh
//
!        c - NRC Region IV (0+ 1 Copy)
l'80 W. G. Counsil JCH/arh c - NRC Region IV (0+ 1 Copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 88R'188M"t85lb S
U. S. Nuclear Regulatory Commission Washington, D.C.
QC                             s unvisms or rexan ununes ru.ecrusc coursur                           TY            0
20555 88R'188M"t85lb S
                                                        - -        - .     --             ._ .                .}}
TY 0
QC s unvisms or rexan ununes ru.ecrusc coursur
. - -}}

Latest revision as of 01:57, 8 December 2024

Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions.Initially Reported on 860527.Evaluation Underway.Next Rept by 860912
ML20203G735
Person / Time
Site: Comanche Peak  
Issue date: 07/21/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-38, TXX-4925, NUDOCS 8608040035
Download: ML20203G735 (1)


Text

Log # TXX-4925 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER. 400 NORTH OLIVE STREET. L.B. 81

  • DALLAS, TEXAS 7520 t July 21, 1986 cM27&ff.fAS l

(

Mr. Eric H. Johnson, Director l

D;/

Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission

'-+

611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS.

50-445 AND 50-446 i

TRACEABILITY OF 1E PIGTAIL EXTENSIONS SDAR: CP-86-38 (INTERIM REPORT)

Dear Mr. Johnson:

On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the failure of project procedures to adequately address the installation and inspection criteria for cable runs used as device pigtail extensions. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted an interim report logged TXX-4873, dated June 26, 1986.

We are continuing our evaluation and anticipate submitting our next report by September 12, 1986.

Very truly yours,

//

l'80 W. G. Counsil JCH/arh c - NRC Region IV (0+ 1 Copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 88R'188M"t85lb S

TY 0