TXX-4873, Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions.Initially Reported on 860527.Next Rept Will Be Submitted by 860721
| ML20206N909 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/26/1986 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-38, TXX-4873, NUDOCS 8607010538 | |
| Download: ML20206N909 (1) | |
Text
Log # TXX-4873 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OLIVE WTREET L.B. 51. DALLAS. TEXAS 75301 June 26, 1986 WILLIAM G. COUNSIL EEECUTivE VICE PREStOENT Mr. Eric H. Johnson, Director i
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 3 fp r ~h,790qh!
a I
611 Ryan P1aza Drive, Suite 1000 t
Arlington, TX 76012
.,j j
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) i E
DOCKET NOS. 50-445 AND 50-446 l
y TRACEABILITY OF 1E PIGTAIL EXTENSIONS
',.s.
SDAR: CP-86-38 (INTERIM REPORT)
Dear Mr. Johnson:
On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involvirig the failure of project procedures to adequately address the installation and inspection criteria for cable runs used as device pigtail extensions. This is an interim report of a potentially reportable item under j
the provision of 10CFR50.55(e).
CPSES Engineering is currently conducting an analysis of this issue to evaluate the impact of the ?ack of traceability of pigtail extensions by cable number.
We are continuing our evaluation and anticipate submitting our next report by July 21,1986.
Very truly yours, 7t4 $
1 W. G. Co gil,
1 r
i By:
G. S. Keeley Manager, Nucle icensing i
JCH/arh l
c - NRC Region IV (0 + 1 Copy)
Director, Inspection & Enforcement (15 copies) l U. S. Nuclear Regulatory Commission Washington, D.C.