TXX-4924, Interim Deficiency Rept CP-86-35 Re Motor Operators for Several Valves in Main Steam Sys.Initially Reported on 860602.Complete Evaluation & Next Rept Expected by 860912: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:F Log # TXX-4924 File # 10110 903 9 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTit OLIVE NTREET. I.B. El e DAILAN TEXAH TSSOR July 21,1986
{{#Wiki_filter:F Log # TXX-4924 File # 10110 903 9 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTit OLIVE NTREET. I.B. El e DAILAN TEXAH TSSOR July 21,1986
  ?2N 2?3?."l.h                                                                     ,
?2N 2?3?."l.h l\\
l\
Q!
                                                                                                  &Q!
]
Mr. Eric H. Johnson, Director
JUL 2 819954l I
                                                                                  ] uL J
Mr. Eric H. Johnson, Director J uL Division of Reactor Safety and Projects b
JUL 2 81995 ;
L U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 J
4l I
Arlington, TX 76012
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission                                     L                    b 611 Ryan Plaza Drive, Suite 1000                                                                 J Arlington, TX 76012


==SUBJECT:==
==SUBJECT:==
Line 31: Line 30:


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
On June 2,1986, we verbally notified you of a reportable item involving the motor operators for several valves in the main steam system (see TXX-4840).
On June 2,1986, we verbally notified you of a reportable item involving the motor operators for several valves in the main steam system (see TXX-4840).
This is a follow-up interim report on a reportable item under the provision of 10CFR50.55(e).
This is a follow-up interim report on a reportable item under the provision of 10CFR50.55(e).
Line 38: Line 36:
W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 copy)
W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 htnan4oo38e607:f s
U. S. Nuclear Regulatory Commission Washington, D.C.
ADOCK 05 On445
20555 htnan4oo38e607:f ADOCK 05 On445 s
  @, gob                       > mr s ox or rex,, vries,,c, etacr sc co,,,,ur i E-M        y i   o}}
@, gob i E-M
> mr s ox or rex,, vries,,c, etacr sc co,,,,ur y
i o}}

Latest revision as of 01:57, 8 December 2024

Interim Deficiency Rept CP-86-35 Re Motor Operators for Several Valves in Main Steam Sys.Initially Reported on 860602.Complete Evaluation & Next Rept Expected by 860912
ML20203G745
Person / Time
Site: Comanche Peak  
Issue date: 07/21/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-35, TXX-4924, NUDOCS 8608040038
Download: ML20203G745 (1)


Text

F Log # TXX-4924 File # 10110 903 9 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTit OLIVE NTREET. I.B. El e DAILAN TEXAH TSSOR July 21,1986

?2N 2?3?."l.h l\\

Q!

]

JUL 2 819954l I

Mr. Eric H. Johnson, Director J uL Division of Reactor Safety and Projects b

L U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 J

Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 MOTOR OPERATORS FOR MANUAL VALVES SDAR: CP-86-35 (INTERIM REPORT)

Dear Mr. Johnson:

On June 2,1986, we verbally notified you of a reportable item involving the motor operators for several valves in the main steam system (see TXX-4840).

This is a follow-up interim report on a reportable item under the provision of 10CFR50.55(e).

We anticipate completing our evaluation of the corrective action and submitting our next report by September 12, 1986.

Very truly yours, l@

W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 htnan4oo38e607:f ADOCK 05 On445 s

@, gob i E-M

> mr s ox or rex,, vries,,c, etacr sc co,,,,ur y

i o