3F0720-02, License Transfer - Insurance Required of a Licensee Under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w): Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:( ~ DUKE                                                                                 Crystal River Nuclear Plant 15760 W. Power Line Street ENERGY                                                                                Crystal River, FL 34428 Docket 50-302 Docket 72-1035 Operating License No. DPR-72 10 CFR 50.90 July 15, 2020 3F0720-02
{{#Wiki_filter:( ~ DUKE ENERGY July 15, 2020 3F0720-02 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428 Docket 50-302 Docket 72-1035 Operating License No. DPR-72 10 CFR 50.90  
* U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


==Subject:==
==Subject:==
Crystal River Unit 3 - License Transfer - Insurance required of a licensee under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w).
Crystal River Unit 3 - License Transfer - Insurance required of a licensee under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w).  


==References:==
==References:==
: 1. Letter, USNRC to Duke Energy Florida, LLC, "Crystal River Unit 3 Nuclear Generating Plant - Order Approving Transfer of Licensed Authority from Duke Energy Florida, LLC to ADP CR3, LLC and draft conforming administrative license amendment (EPID L-2019-LLA-0135)," dated April 1, 2020 (ADAMS Accession Nos. ML20069A023, ML20069A024)
: 1. Letter, USNRC to Duke Energy Florida, LLC, "Crystal River Unit 3 Nuclear Generating Plant - Order Approving Transfer of Licensed Authority from Duke Energy Florida, LLC to ADP CR3, LLC and draft conforming administrative license amendment (EPID L-2019-LLA-0135)," dated April 1, 2020 (ADAMS Accession Nos. ML20069A023, ML20069A024)  


==Dear Sir:==
==Dear Sir:==
 
In accordance with the Order approving the direct transfers to ADP CR3, LLC (ADP CR3) of the Duke Energy Florida, LLC (DEF) licensed authority under Facility Operating License No. DPR 72 for the Crystal River Unit 3 Nuclear Generating Plant (CR3) (the Facility License) and the general license for the CR3 Independent Spent Fuel Storage Installation (ISFSI) (the Licenses) to possess, maintain, and decommission CR3 and the ISFSI (collectively, the CR3 Facility), dated April 1, 2020 (Reference 1 ), DEF, is providing documentary evidence that arrangements with both American Nuclear Insurers (ANI) and Nuclear Electric Insurance Limited (NEIL) to add ADP CR3 and ADP SF1, LLC to policies written for the Crystal River Unit 3 Nuclear Generating Pant.
In accordance with the Order approving the direct transfers to ADP CR3, LLC (ADP CR3) of the Duke Energy Florida, LLC (DEF) licensed authority under Facility Operating License No. DPR 72 for the Crystal River Unit 3 Nuclear Generating Plant (CR3) (the Facility License) and the general license for the CR3 Independent Spent Fuel Storage Installation (ISFSI) (the Licenses) to possess, maintain, and decommission CR3 and the ISFSI (collectively, the CR3 Facility), dated April 1, 2020 (Reference 1), DEF, is providing documentary evidence that arrangements with both American Nuclear Insurers (ANI) and Nuclear Electric Insurance Limited (NEIL) to add ADP CR3 and ADP SF1, LLC to policies written for the Crystal River Unit 3 Nuclear Generating Pant.
The policies are for the appropriate amounts of insurance required of a licensee under 1 O CFR 140.11(a)(4) and 10 CFR 50.54(w), consistent with the exemptions issued for CR-3 on April 27, 2015, and March 31, 2016. This documentation is attached to this letter.
The policies are for the appropriate amounts of insurance required of a licensee under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w), consistent with the exemptions issued for CR-3 on April 27, 2015, and March 31, 2016. This documentation is attached to this letter.
No new regulatory commitments have been made in this letter.
No new regulatory commitments have been made in this letter.
If you have any questions regarding this submittal, please contact Mr. Mark Van Sicklen, Licensing Lead, Nuclear Regulatory Affairs, at (352) 501-3045.
If you have any questions regarding this submittal, please contact Mr. Mark Van Sicklen, Licensing Lead, Nuclear Regulatory Affairs, at (352) 501-3045.
I declare under penalty of perjury that the foregoing is true and correct. Executed on July 15, 2020.
I declare under penalty of perjury that the foregoing is true and correct. Executed on July 15, 2020.
s ~ ,/ , ~ /
s~,/,~/
Kevin A. Murray, Vi~e /resident Management and Construction
Kevin A. Murray, Vi~e /resident Management and Construction  


U. S. Nuclear Regulatory Commission                   Page 2 of 2 3F0720-02 KAM/mvs
U. S. Nuclear Regulatory Commission Page 2 of 2 3F0720-02 KAM/mvs  


==Attachment:==
==Attachment:==
Insurance Documentation cc:   NMSS Project Manager Director, Office of Nuclear Reactor Regulation Regional Administrator, Region I State Contact
Insurance Documentation cc:
NMSS Project Manager Director, Office of Nuclear Reactor Regulation Regional Administrator, Region I State Contact  


DUKE ENERGY FLORIDA, INC.
DUKE ENERGY FLORIDA, INC.
DOCKET NUMBER 50 - 302 / LICENSE NUMBER DPR - 72 ATTACHMENT INSURANCE DOCUMENTATION
DOCKET NUMBER 50 - 302 / LICENSE NUMBER DPR - 72 ATTACHMENT INSURANCE DOCUMENTATION


Jason Martinez, CPCU, ARM, ARe Director, Underwriting June 30, 2020 Attn: Document Control Director, Office of Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 205550001 Re: Duke Energy Florida, LLC, ADP CR3, LLC and ADP SF1, LLC NRC Operating License Amendment for Crystal River Unit 3 Generating Plant To Whom It May Concern, This letter replaces our letter of June 10, 2020, regarding the captioned subject matter.
Jason Martinez, CPCU, ARM, ARe Director, Underwriting American Nuclear Insurers 95 Glastonbury Blvd., Suite 300 Glastonbury, CT 06033-4453 jmartinez@nuclearinsurance.com Voice: (860) 682-1341 Fax: (860) 659-0002 June30,2020
This letter confirms that American Nuclear Insurers will continue to write nuclear liability insurance for the Crystal River Unit 3 Generating Plant, located in Citrus County, FL, commensurate with the effective transaction close date that the NRC adds ADP CR3, LLC and ADP SF1, LLC to the NRC operating license. The effective transaction close date is expected to be on or before October 1, 2020.
 
Upon the effective transaction close date, ANI will amend the below policy and certificate for the Crystal River Unit 3 Generating Plant as follows:
Attn:DocumentControl Director,OfficeofNuclearRegulatoryCommission U.S.NuclearRegulatoryCommission Washington,DC205550001
: a. Facility Form Policy No. NF 0195: ANI will amend the named insured to Duke Energy Florida, LLC, ADP CR3, LLC and ADP SF1, LLC in lieu of Duke Energy Florida, LLC. ANI will also amend the operator of the facility to ADP CR3, LLC in lieu of Duke Energy Florida, LLC.
 
: b. Master Worker Certificate No. NW 0579: ANI will amend the named insureds to Duke Energy Florida, LLC, ADP CR3, LLC and ADP SF1, LLC in lieu of Duke Energy Florida, LLC. ANI will also amend the operator of the facility to ADP CR3, LLC in lieu of Duke Energy Florida, LLC.
Re:DukeEnergyFlorida,LLC,ADPCR3,LLCandADPSF1,LLC NRCOperatingLicenseAmendmentforCrystalRiverUnit3GeneratingPlant
The commitment to add ADP CR3, LLC and ADP SF1, LLC as insureds remains valid thru December 31, 2020. In the event the license amendment occurs after this date, ANI will review the existing circumstances prior to reinstating our commitment to add these entities.
Please feel free to contact me with any questions or concerns.
American Nuclear Insurers  95 Glastonbury Blvd., Suite 300 Glastonbury, CT 06033-4453 jmartinez@nuclearinsurance.com Voice: (860) 682-1341 Fax: (860) 659-0002


Attn: Document Control June 30, 2020 Page 2 Yours sincerely, Jason Martinez, CPCU, ARM, ARe Director, Underwriting C: Duke Energy - Tracey Leroy and Lance Burnette Marsh - Tim Farward, Mark Webster, Jake Compton, Chip Hardie
ToWhomItMayConcern,


NEIL ~-
ThisletterreplacesourletterofJune10,2020,regardingthecaptionedsubjectmatter.
BRUCE A. SASSI President & Chief Ex,*cut,vt' Officer Nuclear Electric Insurance Limited 1201 N Market St, Suite 1100 Wilmington, DE 19801 office +1302 573 2224 mobile +1484 639 7308 bsassl@myneil.com June 24, 2020 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
 
ThisletterconfirmsthatAmericanNuclearInsurerswillcontinuetowritenuclearliability insurancefortheCrystalRiverUnit3GeneratingPlant,locatedinCitrusCounty,FL, commensuratewiththeeffectivetransactionclosedatethattheNRCaddsADPCR3,LLCand ADPSF1,LLCtotheNRCoperatinglicense.Theeffectivetransactionclosedateisexpectedto beonorbeforeOctober1,2020.
 
Upontheeffectivetransactionclosedate,ANIwillamendthebelowpolicyandcertificatefor theCrystalRiverUnit3GeneratingPlantasfollows:
: a. FacilityFormPolicyNo.NF0195:ANIwillamendthenamedinsuredtoDukeEnergy Florida,LLC,ADPCR3,LLCandADPSF1,LLCinlieuofDukeEnergyFlorida,LLC.ANI willalsoamendtheoperatorofthefacilitytoADPCR3,LLCinlieuofDukeEnergy Florida,LLC.
: b. MasterWorkerCertificateNo.NW0579:ANIwillamendthenamedinsuredstoDuke EnergyFlorida,LLC,ADPCR3,LLCandADPSF1,LLCinlieuofDukeEnergyFlorida, LLC.ANIwillalsoamendtheoperatorofthefacilitytoADPCR3,LLCinlieuofDuke EnergyFlorida,LLC.
 
ThecommitmenttoaddADPCR3,LLCandADPSF1,LLCasinsuredsremainsvalidthru December31,2020.Intheeventthelicenseamendmentoccursafterthisdate,ANIwillreview theexistingcircumstancespriortoreinstatingourcommitmenttoaddtheseentities.
 
Pleasefeelfreetocontactmewithanyquestionsorconcerns.
 
Attn:DocumentControl June30,2020 Page2
 
Yourssincerely,
 
JasonMartinez,CPCU,ARM,ARe Director,Underwriting
 
C:DukeEnergy-TraceyLeroyandLanceBurnette Marsh-TimFarward,MarkWebster,JakeCompton,ChipHardie
 
June 24, 2020 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001  


==Subject:==
==Subject:==
Crystal River Unit 3 Nuclear Generating Plant Transfer of NRC License to ADP CR3, LLC
Crystal River Unit 3 Nuclear Generating Plant Transfer of NRC License to ADP CR3, LLC  


==Dear Sir:==
==Dear Sir:==
 
NEIL ~ -
At the request of the insured, Duke Energy Florida, LLC ("Duke"), Nuclear Electric Insurance Limited (NEIL) agrees it will:
BRUCE A. SASSI President & Chief Ex,*cut,vt' Officer Nuclear Electric Insurance Limited 1201 N Market St, Suite 1100 Wilmington, DE 19801 office +1302 573 2224 mobile +1484 639 7308 bsassl@myneil.com At the request of the insured, Duke Energy Florida, LLC ("Duke"), Nuclear Electric Insurance Limited (NEIL) agrees it will:
* name ADP CR3, LLC as additional insured on policy no. P20-081 (Primary Property) upon being notified by Duke that the NRC has added ADP CR3, LLC to the license for Crystal River 3 Generating Plant
name ADP CR3, LLC as additional insured on policy no. P20-081 (Primary Property) upon being notified by Duke that the NRC has added ADP CR3, LLC to the license for Crystal River 3 Generating Plant name ADP SFl, LLC as an additional insured on policy no. P20-081 (Primary Property) upon being notified by Duke that ADP SFl, LLC has become a general licensee under 10 CFR 72.6 endorse policy no. P20-081 (Primary Property) and update the certificate of insurance to name ADP CR3, LLC as the operator of the facility, upon being notified by Duke that the NRC has added ADP CR3, LLC to the license for Crystal River 3 Generating Plant Please feel free to contact me should you have any questions.
* name ADP SFl, LLC as an additional insured on policy no. P20-081 (Primary Property) upon being notified by Duke that ADP SFl, LLC has become a general licensee under 10 CFR 72.6
* endorse policy no. P20-081 (Primary Property) and update the certificate of insurance to name ADP CR3, LLC as the operator of the facility, upon being notified by Duke that the NRC has added ADP CR3, LLC to the license for Crystal River 3 Generating Plant Please feel free to contact me should you have any questions.
President & Chief Executive Officer}}
President & Chief Executive Officer}}

Latest revision as of 01:02, 8 December 2024

License Transfer - Insurance Required of a Licensee Under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w)
ML20203M138
Person / Time
Site: Crystal River  
(DPR-072)
Issue date: 07/15/2020
From: Murray K
Duke Energy Florida
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
3F0720-02
Download: ML20203M138 (6)


Text

( ~ DUKE ENERGY July 15, 2020 3F0720-02 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428 Docket 50-302 Docket 72-1035 Operating License No. DPR-72 10 CFR 50.90

Subject:

Crystal River Unit 3 - License Transfer - Insurance required of a licensee under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w).

References:

1. Letter, USNRC to Duke Energy Florida, LLC, "Crystal River Unit 3 Nuclear Generating Plant - Order Approving Transfer of Licensed Authority from Duke Energy Florida, LLC to ADP CR3, LLC and draft conforming administrative license amendment (EPID L-2019-LLA-0135)," dated April 1, 2020 (ADAMS Accession Nos. ML20069A023, ML20069A024)

Dear Sir:

In accordance with the Order approving the direct transfers to ADP CR3, LLC (ADP CR3) of the Duke Energy Florida, LLC (DEF) licensed authority under Facility Operating License No. DPR 72 for the Crystal River Unit 3 Nuclear Generating Plant (CR3) (the Facility License) and the general license for the CR3 Independent Spent Fuel Storage Installation (ISFSI) (the Licenses) to possess, maintain, and decommission CR3 and the ISFSI (collectively, the CR3 Facility), dated April 1, 2020 (Reference 1 ), DEF, is providing documentary evidence that arrangements with both American Nuclear Insurers (ANI) and Nuclear Electric Insurance Limited (NEIL) to add ADP CR3 and ADP SF1, LLC to policies written for the Crystal River Unit 3 Nuclear Generating Pant.

The policies are for the appropriate amounts of insurance required of a licensee under 1 O CFR 140.11(a)(4) and 10 CFR 50.54(w), consistent with the exemptions issued for CR-3 on April 27, 2015, and March 31, 2016. This documentation is attached to this letter.

No new regulatory commitments have been made in this letter.

If you have any questions regarding this submittal, please contact Mr. Mark Van Sicklen, Licensing Lead, Nuclear Regulatory Affairs, at (352) 501-3045.

I declare under penalty of perjury that the foregoing is true and correct. Executed on July 15, 2020.

s~,/,~/

Kevin A. Murray, Vi~e /resident Management and Construction

U. S. Nuclear Regulatory Commission Page 2 of 2 3F0720-02 KAM/mvs

Attachment:

Insurance Documentation cc:

NMSS Project Manager Director, Office of Nuclear Reactor Regulation Regional Administrator, Region I State Contact

DUKE ENERGY FLORIDA, INC.

DOCKET NUMBER 50 - 302 / LICENSE NUMBER DPR - 72 ATTACHMENT INSURANCE DOCUMENTATION

Jason Martinez, CPCU, ARM, ARe Director, Underwriting American Nuclear Insurers 95 Glastonbury Blvd., Suite 300 Glastonbury, CT 06033-4453 jmartinez@nuclearinsurance.com Voice: (860) 682-1341 Fax: (860) 659-0002 June30,2020

Attn:DocumentControl Director,OfficeofNuclearRegulatoryCommission U.S.NuclearRegulatoryCommission Washington,DC205550001

Re:DukeEnergyFlorida,LLC,ADPCR3,LLCandADPSF1,LLC NRCOperatingLicenseAmendmentforCrystalRiverUnit3GeneratingPlant

ToWhomItMayConcern,

ThisletterreplacesourletterofJune10,2020,regardingthecaptionedsubjectmatter.

ThisletterconfirmsthatAmericanNuclearInsurerswillcontinuetowritenuclearliability insurancefortheCrystalRiverUnit3GeneratingPlant,locatedinCitrusCounty,FL, commensuratewiththeeffectivetransactionclosedatethattheNRCaddsADPCR3,LLCand ADPSF1,LLCtotheNRCoperatinglicense.Theeffectivetransactionclosedateisexpectedto beonorbeforeOctober1,2020.

Upontheeffectivetransactionclosedate,ANIwillamendthebelowpolicyandcertificatefor theCrystalRiverUnit3GeneratingPlantasfollows:

a. FacilityFormPolicyNo.NF0195:ANIwillamendthenamedinsuredtoDukeEnergy Florida,LLC,ADPCR3,LLCandADPSF1,LLCinlieuofDukeEnergyFlorida,LLC.ANI willalsoamendtheoperatorofthefacilitytoADPCR3,LLCinlieuofDukeEnergy Florida,LLC.
b. MasterWorkerCertificateNo.NW0579:ANIwillamendthenamedinsuredstoDuke EnergyFlorida,LLC,ADPCR3,LLCandADPSF1,LLCinlieuofDukeEnergyFlorida, LLC.ANIwillalsoamendtheoperatorofthefacilitytoADPCR3,LLCinlieuofDuke EnergyFlorida,LLC.

ThecommitmenttoaddADPCR3,LLCandADPSF1,LLCasinsuredsremainsvalidthru December31,2020.Intheeventthelicenseamendmentoccursafterthisdate,ANIwillreview theexistingcircumstancespriortoreinstatingourcommitmenttoaddtheseentities.

Pleasefeelfreetocontactmewithanyquestionsorconcerns.

Attn:DocumentControl June30,2020 Page2

Yourssincerely,

JasonMartinez,CPCU,ARM,ARe Director,Underwriting

C:DukeEnergy-TraceyLeroyandLanceBurnette Marsh-TimFarward,MarkWebster,JakeCompton,ChipHardie

June 24, 2020 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 Nuclear Generating Plant Transfer of NRC License to ADP CR3, LLC

Dear Sir:

NEIL ~ -

BRUCE A. SASSI President & Chief Ex,*cut,vt' Officer Nuclear Electric Insurance Limited 1201 N Market St, Suite 1100 Wilmington, DE 19801 office +1302 573 2224 mobile +1484 639 7308 bsassl@myneil.com At the request of the insured, Duke Energy Florida, LLC ("Duke"), Nuclear Electric Insurance Limited (NEIL) agrees it will:

name ADP CR3, LLC as additional insured on policy no. P20-081 (Primary Property) upon being notified by Duke that the NRC has added ADP CR3, LLC to the license for Crystal River 3 Generating Plant name ADP SFl, LLC as an additional insured on policy no. P20-081 (Primary Property) upon being notified by Duke that ADP SFl, LLC has become a general licensee under 10 CFR 72.6 endorse policy no. P20-081 (Primary Property) and update the certificate of insurance to name ADP CR3, LLC as the operator of the facility, upon being notified by Duke that the NRC has added ADP CR3, LLC to the license for Crystal River 3 Generating Plant Please feel free to contact me should you have any questions.

President & Chief Executive Officer