TXX-4773, Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Final Determination Will Be Based on Review of Actual Conditions Conducted by S&W.Next Rept Expected by 860627: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:O                                               O           Le9 , 1xx-4773 File # 10110 TEXAS UTILITIES GENERATING COMPAhT MKYW AY TOWER
{{#Wiki_filter:O O
Le9, 1xx-4773 File # 10110 TEXAS UTILITIES GENERATING COMPAhT MKYW AY TOWER
* 400 NORT15 O1JVE NTREET,1.B. IB L e IDALI.Aal. TEEAN TS308 April 24, 1986 ggggg)
* 400 NORT15 O1JVE NTREET,1.B. IB L e IDALI.Aal. TEEAN TS308 April 24, 1986 ggggg)
Mr. Eric H. Johnson, Director                                                         APR 2 91986 Division of Reactor Safety and Projects                                       ~
APR 2 91986 Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects
~
U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012


Line 25: Line 27:


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
 
On February 6, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the control of stamps used to identify super hilti kwik bolts.
On February 6, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the control of stamps used to identify super hilti kwik bolts. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4728, dated March 7, 1986.
This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4728, dated March 7, 1986.
The final determination of this issue will be based upon review of actual conditions as documented by nonconformance reports. This evaluation will be conducted by Stone & Webster Engineering Corporation. We anticipate submitting our next report by June 27, 1986.
The final determination of this issue will be based upon review of actual conditions as documented by nonconformance reports.
Very truly yours, W. G. Counsil JCH/arh I       c - NRC Region IV (0 + 1 copy)
This evaluation will be conducted by Stone & Webster Engineering Corporation. We anticipate submitting our next report by June 27, 1986.
Very truly yours, W. G. Counsil JCH/arh I
c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8605060318 860424 PDR     ADOCK 05000445 S                         PDR A DIVISION OF TEXAN UT11111EM ELECTRIC CtDMPANY}}
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8605060318 860424 PDR ADOCK 05000445 S
PDR A DIVISION OF TEXAN UT11111EM ELECTRIC CtDMPANY}}

Latest revision as of 20:57, 7 December 2024

Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Final Determination Will Be Based on Review of Actual Conditions Conducted by S&W.Next Rept Expected by 860627
ML20203P076
Person / Time
Site: Comanche Peak  
Issue date: 04/24/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-08, CP-86-8, TXX-4773, NUDOCS 8605060318
Download: ML20203P076 (1)


Text

O O

Le9, 1xx-4773 File # 10110 TEXAS UTILITIES GENERATING COMPAhT MKYW AY TOWER

  • 400 NORT15 O1JVE NTREET,1.B. IB L e IDALI.Aal. TEEAN TS308 April 24, 1986 ggggg)

APR 2 91986 Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects

~

U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION D0CKET NOS. 50-445 AND 50-446 INSTALLATION OF SUPER HILTI KWIK BOLTS SDAR: CP-86-08 (INTERIM REPORT)

Dear Mr. Johnson:

On February 6, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the control of stamps used to identify super hilti kwik bolts.

This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4728, dated March 7, 1986.

The final determination of this issue will be based upon review of actual conditions as documented by nonconformance reports.

This evaluation will be conducted by Stone & Webster Engineering Corporation. We anticipate submitting our next report by June 27, 1986.

Very truly yours, W. G. Counsil JCH/arh I

c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8605060318 860424 PDR ADOCK 05000445 S

PDR A DIVISION OF TEXAN UT11111EM ELECTRIC CtDMPANY