TXX-4942, Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms & Structures.Initially Reported on 851220. Evaluation Continuing.Next Rept Will Be Submitted by 860926: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:tcg 0 TXX-4942 Fiie # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . 400 NORTH OIJVE STREET, L.3,. el . DALLAN. TEXAN 75308 July 30,1986
{{#Wiki_filter:tcg 0 TXX-4942 Fiie # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OIJVE STREET, L.3,. el. DALLAN. TEXAN 75308 July 30,1986
.YS$7ASJES                                                                             T   g {g           3' Mr. Eric H. Johnson, Director                                                         ~IE      -
.YS$7ASJES T g { g 3'
Division of Reactor Safety and Projects                                       .
~IE Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects b
b U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000                                             '
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
Arlington, TX 76012


==SUBJECT:==
==SUBJECT:==
Line 27: Line 26:


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
 
On December 20, 1985, we verbally notified your Mr. R. Hall of a deficiency involving Seismic Category II platforms and structures.
On December 20, 1985, we verbally notified your Mr. R. Hall of a deficiency involving Seismic Category II platforms and structures. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
We have submitted interim reports logged TXX-4669 and TXX-4857, dated January 20, 1986, and June 13, 1986, respectively.
We have submitted interim reports logged TXX-4669 and TXX-4857, dated January 20, 1986, and June 13, 1986, respectively.
We are continuing our evaluation and anticipate submitting our next report by September 26, 1986.
We are continuing our evaluation and anticipate submitting our next report by September 26, 1986.
Very truly ours
Very truly ours
                                                                                /Kdaw:,
/Kdaw:,
W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 copy)
W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 860808C233 860730           5 DR   ADOCK 0500 gf W                                                                                                 g 17 4 ,,,v,,,,,y ,,, r,:m i,1,ur,,:~ ,:,.wn,,c n,,,,.a s v                       , p i}}
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 860808C233 860730 DR ADOCK 0500 5
gf W g 17 4,,,v,,,,,y,,, r,:m i,1,ur,,:~,:,.wn,,c n,,,,.a s v
, p i}}

Latest revision as of 19:48, 7 December 2024

Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms & Structures.Initially Reported on 851220. Evaluation Continuing.Next Rept Will Be Submitted by 860926
ML20204H866
Person / Time
Site: Comanche Peak  
Issue date: 07/30/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-85-53, TXX-4942, NUDOCS 8608080233
Download: ML20204H866 (1)


Text

tcg 0 TXX-4942 Fiie # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OIJVE STREET, L.3,. el. DALLAN. TEXAN 75308 July 30,1986

.YS$7ASJES T g { g 3'

~IE Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects b

U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 SEISMIC CATEGORY II PLATFORMS AND STRUCTURES SDAR: CP-85-53 (INTERIM REPORT)

Dear Mr. Johnson:

On December 20, 1985, we verbally notified your Mr. R. Hall of a deficiency involving Seismic Category II platforms and structures.

This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

We have submitted interim reports logged TXX-4669 and TXX-4857, dated January 20, 1986, and June 13, 1986, respectively.

We are continuing our evaluation and anticipate submitting our next report by September 26, 1986.

Very truly ours

/Kdaw:,

W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 860808C233 860730 DR ADOCK 0500 5

gf W g 17 4,,,v,,,,,y,,, r,:m i,1,ur,,:~,:,.wn,,c n,,,,.a s v

, p i