TXX-4669, Interim Deficiency Rept CP-85-53 Re Fabrication of Approx 30 Platforms/Structures.Initially Reported on 851220. Completion of Insp & Engineering Efforts Anticipated by 860430 & 0520,respectively
| ML20140D229 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/20/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-85-53, TXX-4669, NUDOCS 8601290225 | |
| Download: ML20140D229 (1) | |
Text
_
Log # TXX-4669 TEXAS UTILITIES GENERATING COMPANY File # 10110 NKYW AY TOWER e 400 NORTH OIJVE NTREET. I.B. MI e DAI.I.AN. TPX AM 75201 January 20, 1986
.7ASUJfSf.~at IM@ FROW /1K!9 i
s JAN221986 Mr. Eric H. Johnson, Acting Director Division of Reactor Safety and Projects U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 SEISMIC CATEGORY II PLATFORMS SDAR:
Dear Mr. Johnson:
On December 20, 1985 we verbally notified your Mr. Raymond Hall of a defi-ciency involving the fabrication of approximately thirty (30) platforms / structures in Units 1 and 2.
This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We antici-pate completion of the inspection and engineering efforts by April 30, 1986 and May 20, 1986, respectively.
We are continuing our evaluation and anticipate completion by June 13, 1986.
Very truly yours, 4
MWdt W. G. Counsil JCH/ arm c - NRC Region IV (C + 1 copy)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 8601290225 860120 gDR ADOCK 050 g 5 Y
S&
A unvassos or rexas m suries us.scruic coursur 9 ----
-