TXX-4942, Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms & Structures.Initially Reported on 851220. Evaluation Continuing.Next Rept Will Be Submitted by 860926

From kanterella
(Redirected from TXX-4942)
Jump to navigation Jump to search
Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms & Structures.Initially Reported on 851220. Evaluation Continuing.Next Rept Will Be Submitted by 860926
ML20204H866
Person / Time
Site: Comanche Peak  
Issue date: 07/30/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-85-53, TXX-4942, NUDOCS 8608080233
Download: ML20204H866 (1)


Text

tcg 0 TXX-4942 Fiie # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OIJVE STREET, L.3,. el. DALLAN. TEXAN 75308 July 30,1986

.YS$7ASJES T g { g 3'

~IE Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects b

U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 SEISMIC CATEGORY II PLATFORMS AND STRUCTURES SDAR: CP-85-53 (INTERIM REPORT)

Dear Mr. Johnson:

On December 20, 1985, we verbally notified your Mr. R. Hall of a deficiency involving Seismic Category II platforms and structures.

This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

We have submitted interim reports logged TXX-4669 and TXX-4857, dated January 20, 1986, and June 13, 1986, respectively.

We are continuing our evaluation and anticipate submitting our next report by September 26, 1986.

Very truly ours

/Kdaw:,

W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 860808C233 860730 DR ADOCK 0500 5

gf W g 17 4,,,v,,,,,y,,, r,:m i,1,ur,,:~,:,.wn,,c n,,,,.a s v

, p i