TXX-4942, Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms & Structures.Initially Reported on 851220. Evaluation Continuing.Next Rept Will Be Submitted by 860926
| ML20204H866 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/30/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-85-53, TXX-4942, NUDOCS 8608080233 | |
| Download: ML20204H866 (1) | |
Text
tcg 0 TXX-4942 Fiie # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OIJVE STREET, L.3,. el. DALLAN. TEXAN 75308 July 30,1986
.YS$7ASJES T g { g 3'
~IE Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects b
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 SEISMIC CATEGORY II PLATFORMS AND STRUCTURES SDAR: CP-85-53 (INTERIM REPORT)
Dear Mr. Johnson:
On December 20, 1985, we verbally notified your Mr. R. Hall of a deficiency involving Seismic Category II platforms and structures.
This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
We have submitted interim reports logged TXX-4669 and TXX-4857, dated January 20, 1986, and June 13, 1986, respectively.
We are continuing our evaluation and anticipate submitting our next report by September 26, 1986.
Very truly ours
/Kdaw:,
W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 860808C233 860730 DR ADOCK 0500 5
gf W g 17 4,,,v,,,,,y,,, r,:m i,1,ur,,:~,:,.wn,,c n,,,,.a s v
, p i