TXX-6366, Notifies That Full Compliance Achieved on 870326 Re Commitment to Retrain Warehouse & QC Personnel in Requirements of Receiving & Insp Procedures in Response to Violations Noted in Insp Repts 50-445/86-14 & 50-446/86-11: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:==                             Log # TXX-6366 P9         ~~
{{#Wiki_filter:==
File # 10130 1       -                                  IR 86-14 C         C                                   86-11 7t# ELECTRIC                     Ref # 10CFR2.201
Log # TXX-6366 P9 File # 10130
  %illiam G. Coumil em,3, s w, 3,,u,,                                                         March 27, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
~~
1 IR 86-14 C
C 86-11 7t# ELECTRIC Ref # 10CFR2.201
%illiam G. Coumil em,3, s w, 3,,u,,
March 27, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS. 50-445/86-14 AND 50-445/86-11 REVISED DATE OF FULL COMPLIANCE FOR NOV ITEM A REF:       TUGC0 letter TXX-6186 from W. G. Counsil to E. H. Johnson dated January 16, 1987 Gentlemen:
DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS. 50-445/86-14 AND 50-445/86-11 REVISED DATE OF FULL COMPLIANCE FOR NOV ITEM A REF:
TUGC0 letter TXX-6186 from W. G. Counsil to E. H. Johnson dated January 16, 1987 Gentlemen:
In our referenced response to Notice of Violation 445/8614-V-01 and 446/8611-V-01 (Item A), we committed to a Date of Compliance of January 21, 1987. This commitment required the retraining of warehouse and QC personnel in the requirements of receiving and inspection procedures with emphasis on the segregation of damaged materials.
In our referenced response to Notice of Violation 445/8614-V-01 and 446/8611-V-01 (Item A), we committed to a Date of Compliance of January 21, 1987. This commitment required the retraining of warehouse and QC personnel in the requirements of receiving and inspection procedures with emphasis on the segregation of damaged materials.
The retraining of the appropriate personnel was (.ompleted on March 26, 1987.
The retraining of the appropriate personnel was (.ompleted on March 26, 1987.
Therefore, the actual date that full compliance was achieved was March 26, 1987.
Therefore, the actual date that full compliance was achieved was March 26, 1987.
Very truly yours, hl&AS W. G. Counsil RSB/ef c - Mr. E. H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV B704010440 870327 PDR       ADOCK 05000445 G                       PDR                                                                       g/hO  0
Very truly yours, hl&AS W. G. Counsil RSB/ef c - Mr. E. H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV B704010440 870327 PDR ADOCK 05000445 hO g/
                              = %<in ois, sireci on. xi n.iias, ina, 7320i
G PDR 0
                                                                                                    .\ l
= %<in ois, sireci on. xi n.iias, ina, 7320i
                                                    -    -                    . _ _ _}}
.\\
l
. _ _ _}}

Latest revision as of 15:42, 7 December 2024

Notifies That Full Compliance Achieved on 870326 Re Commitment to Retrain Warehouse & QC Personnel in Requirements of Receiving & Insp Procedures in Response to Violations Noted in Insp Repts 50-445/86-14 & 50-446/86-11
ML20205J890
Person / Time
Site: Comanche Peak  
Issue date: 03/27/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-6366, NUDOCS 8704010448
Download: ML20205J890 (1)


Text

==

Log # TXX-6366 P9 File # 10130

~~

1 IR 86-14 C

C 86-11 7t# ELECTRIC Ref # 10CFR2.201

%illiam G. Coumil em,3, s w, 3,,u,,

March 27, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS. 50-445/86-14 AND 50-445/86-11 REVISED DATE OF FULL COMPLIANCE FOR NOV ITEM A REF:

TUGC0 letter TXX-6186 from W. G. Counsil to E. H. Johnson dated January 16, 1987 Gentlemen:

In our referenced response to Notice of Violation 445/8614-V-01 and 446/8611-V-01 (Item A), we committed to a Date of Compliance of January 21, 1987. This commitment required the retraining of warehouse and QC personnel in the requirements of receiving and inspection procedures with emphasis on the segregation of damaged materials.

The retraining of the appropriate personnel was (.ompleted on March 26, 1987.

Therefore, the actual date that full compliance was achieved was March 26, 1987.

Very truly yours, hl&AS W. G. Counsil RSB/ef c - Mr. E. H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV B704010440 870327 PDR ADOCK 05000445 hO g/