Log i TXX-4781 File # 10115 IE 85-03 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTH OEJVE NTREET. L.H. 81
Log i TXX-4781 File # 10115 IE 85-03 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTH OEJVE NTREET. L.H. 81
* DALIAN. TEXAS 75201 May 14, 1986               r - -
* DALIAN. TEXAS 75201 May 14, 1986 r - -
                                                                                                          *n     .:  .
*n NN?:?i??2,".ib NAY I 61986 i t
NN?:?i??2,".ib                                                                           -
Mr. Robert D. Martin h/
t NAY I 61986 i Mr. Robert D. Martin Regional Administrator, Region IV                                     -
c Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
c h/
U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011


==SUBJECT:==
==SUBJECT:==
Line 30: Line 28:


==Dear Mr. Martin:==
==Dear Mr. Martin:==
Item (e) of IE Bulletin 85-03 requires, by May 16, 1986, the submittal of a written report to the NRC that:
Item (e) of IE Bulletin 85-03 requires, by May 16, 1986, the submittal of a written report to the NRC that:
O reports the results of item (a) of the bulletin and 0 contains the program to accomplish items (b) through (d) including a schedule for completion of these items.
O reports the results of item (a) of the bulletin and 0 contains the program to accomplish items (b) through (d) including a schedule for completion of these items.
The Westinghouse Owners Group (WOG) has undertaken a program to generically address item (a) of the bulletin. A description of the program was transmitted to the NRC in a letter from L. D. Butterfield to Tom Novak dated March 18, 1986.       The results of the WOG program, which was completed in April of 1986, provide each member utility with a methodology for the completion of the plant specific portion of item (a) of the bulletin.
The Westinghouse Owners Group (WOG) has undertaken a program to generically address item (a) of the bulletin. A description of the program was transmitted to the NRC in a letter from L. D. Butterfield to Tom Novak dated March 18, 1986.
The results of the WOG program, which was completed in April of 1986, provide each member utility with a methodology for the completion of the plant specific portion of item (a) of the bulletin.
We raouest a two month extension to the bulletin reporting deadline to plan the actidties for the plant specific requirements of the bulletin.
We raouest a two month extension to the bulletin reporting deadline to plan the actidties for the plant specific requirements of the bulletin.
Very truly yours, N
Very truly yours, N
W. G. Counsil BSD/arh c- U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20502 Mr. Vince Noonan
W. G. Counsil BSD/arh c-U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20502 Mr. Vince Noonan
{
{
8605210175 860514 PDR     ADOCK 05000445
8605210175 860514
                                                                                                                  /
/
7/      0 3
PDR ADOCK 05000445 7/
G                     PDR
0 3
      %-so7 A DEVEN10N OF TEXAN tJTillTIES Et2LTRIC COMPANY W}}
G PDR W
A DEVEN10N OF TEXAN tJTillTIES Et2LTRIC COMPANY
%-so7}}

Latest revision as of 15:07, 7 December 2024

Requests 2-month Extension to Provide plant-specific Response to IE Bulletin 85-003.Westinghouse Owners Group Provided Generic Response on 860318
ML20205P137
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/14/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-85-003, IEB-85-3, TXX-4781, NUDOCS 8605210175
Download: ML20205P137 (1)


Text

_.

Log i TXX-4781 File # 10115 IE 85-03 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTH OEJVE NTREET. L.H. 81

  • DALIAN. TEXAS 75201 May 14, 1986 r - -
  • n NN?:?i??2,".ib NAY I 61986 i t

Mr. Robert D. Martin h/

c Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 IE BULLETIN 85-03

Dear Mr. Martin:

Item (e) of IE Bulletin 85-03 requires, by May 16, 1986, the submittal of a written report to the NRC that:

O reports the results of item (a) of the bulletin and 0 contains the program to accomplish items (b) through (d) including a schedule for completion of these items.

The Westinghouse Owners Group (WOG) has undertaken a program to generically address item (a) of the bulletin. A description of the program was transmitted to the NRC in a letter from L. D. Butterfield to Tom Novak dated March 18, 1986.

The results of the WOG program, which was completed in April of 1986, provide each member utility with a methodology for the completion of the plant specific portion of item (a) of the bulletin.

We raouest a two month extension to the bulletin reporting deadline to plan the actidties for the plant specific requirements of the bulletin.

Very truly yours, N

W. G. Counsil BSD/arh c-U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20502 Mr. Vince Noonan

{

8605210175 860514

/

PDR ADOCK 05000445 7/

0 3

G PDR W

A DEVEN10N OF TEXAN tJTillTIES Et2LTRIC COMPANY

%-so7