Log i TXX-4781 File # 10115 IE 85-03 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTH OEJVE NTREET. L.H. 81 | Log i TXX-4781 File # 10115 IE 85-03 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTH OEJVE NTREET. L.H. 81 | ||
* DALIAN. TEXAS 75201 May 14, 1986 | * DALIAN. TEXAS 75201 May 14, 1986 r - - | ||
*n NN?:?i??2,".ib NAY I 61986 i t | |||
NN?:?i??2,".ib | Mr. Robert D. Martin h/ | ||
c Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 | |||
U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 30: | Line 28: | ||
==Dear Mr. Martin:== | ==Dear Mr. Martin:== | ||
Item (e) of IE Bulletin 85-03 requires, by May 16, 1986, the submittal of a written report to the NRC that: | Item (e) of IE Bulletin 85-03 requires, by May 16, 1986, the submittal of a written report to the NRC that: | ||
O reports the results of item (a) of the bulletin and 0 contains the program to accomplish items (b) through (d) including a schedule for completion of these items. | O reports the results of item (a) of the bulletin and 0 contains the program to accomplish items (b) through (d) including a schedule for completion of these items. | ||
The Westinghouse Owners Group (WOG) has undertaken a program to generically address item (a) of the bulletin. A description of the program was transmitted to the NRC in a letter from L. D. Butterfield to Tom Novak dated March 18, 1986. | The Westinghouse Owners Group (WOG) has undertaken a program to generically address item (a) of the bulletin. A description of the program was transmitted to the NRC in a letter from L. D. Butterfield to Tom Novak dated March 18, 1986. | ||
The results of the WOG program, which was completed in April of 1986, provide each member utility with a methodology for the completion of the plant specific portion of item (a) of the bulletin. | |||
We raouest a two month extension to the bulletin reporting deadline to plan the actidties for the plant specific requirements of the bulletin. | We raouest a two month extension to the bulletin reporting deadline to plan the actidties for the plant specific requirements of the bulletin. | ||
Very truly yours, N | Very truly yours, N | ||
W. G. Counsil BSD/arh c- U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20502 Mr. Vince Noonan | W. G. Counsil BSD/arh c-U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. | ||
20502 Mr. Vince Noonan | |||
{ | { | ||
8605210175 860514 PDR | 8605210175 860514 | ||
/ | |||
PDR ADOCK 05000445 7/ | |||
G | 0 3 | ||
G PDR W | |||
A DEVEN10N OF TEXAN tJTillTIES Et2LTRIC COMPANY | |||
%-so7}} | |||
Latest revision as of 15:07, 7 December 2024
| ML20205P137 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/14/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Martin R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| IEB-85-003, IEB-85-3, TXX-4781, NUDOCS 8605210175 | |
| Download: ML20205P137 (1) | |
Text
_.
Log i TXX-4781 File # 10115 IE 85-03 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTH OEJVE NTREET. L.H. 81
- DALIAN. TEXAS 75201 May 14, 1986 r - -
- n NN?:?i??2,".ib NAY I 61986 i t
Mr. Robert D. Martin h/
c Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 IE BULLETIN 85-03
Dear Mr. Martin:
Item (e) of IE Bulletin 85-03 requires, by May 16, 1986, the submittal of a written report to the NRC that:
O reports the results of item (a) of the bulletin and 0 contains the program to accomplish items (b) through (d) including a schedule for completion of these items.
The Westinghouse Owners Group (WOG) has undertaken a program to generically address item (a) of the bulletin. A description of the program was transmitted to the NRC in a letter from L. D. Butterfield to Tom Novak dated March 18, 1986.
The results of the WOG program, which was completed in April of 1986, provide each member utility with a methodology for the completion of the plant specific portion of item (a) of the bulletin.
We raouest a two month extension to the bulletin reporting deadline to plan the actidties for the plant specific requirements of the bulletin.
Very truly yours, N
W. G. Counsil BSD/arh c-U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20502 Mr. Vince Noonan
{
8605210175 860514
/
PDR ADOCK 05000445 7/
0 3
G PDR W
A DEVEN10N OF TEXAN tJTillTIES Et2LTRIC COMPANY