ML20206A824: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_ - - _ _ . - _ _             - - - - _ - _ - - _ -            - - - - - . _      --
{{#Wiki_filter:_ - - _ _. - _ _
March 30, 1987 Docket Hos. 50-327/328 MEMORANDUM FOR:                     K. Hooks, IE Technical Program Manager - Construction Category TVA Employee Concern Program FROM:                               John A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects                                                           ;
March 30, 1987 Docket Hos. 50-327/328 MEMORANDUM FOR:
K. Hooks, IE Technical Program Manager - Construction Category TVA Employee Concern Program FROM:
John A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects


==SUBJECT:==
==SUBJECT:==
TRANSMITTAL OF ELEMENT. REPORTS IN THE CONSTRUCTION CATEGORY By {{letter dated|date=March 16, 1987|text=letter dated March 16, 1987}}, TVA transmitted revised final element reports 11206 and 17105 from the Construction Category. Attached are these two reports along with the associated transmittal letter from TVA. Please note that these reports have been revised to incorporate NRC staff comments. All 3? final reports for Sequoyah in this category have been already submitted.
TRANSMITTAL OF ELEMENT. REPORTS IN THE CONSTRUCTION CATEGORY By {{letter dated|date=March 16, 1987|text=letter dated March 16, 1987}}, TVA transmitted revised final element reports 11206 and 17105 from the Construction Category. Attached are these two reports along with the associated transmittal letter from TVA. Please note that these reports have been revised to incorporate NRC staff comments. All 3? final reports for Sequoyah in this category have been already submitted.
Please review the status of the Construction Elements Reports and where possible combine initiatives / actions to reduce the total number of safety evaluations (SEs) required tc address these reports. However, all issues in each element report should be addressed in SEs and your cover letter should identify these reports. I am attempting to provide a status report, with estimated SE comple-tion dates, regarding all Employee Concerns every two weeks. Your memorandum of March 13, 1987, thru R. Lee Spessard on EC reports is the type of information I required. That report was excellent for our reporting needs. J. Donohew and B. K. Singh are my points of contacts on EC.
Please review the status of the Construction Elements Reports and where possible combine initiatives / actions to reduce the total number of safety evaluations (SEs) required tc address these reports. However, all issues in each element report should be addressed in SEs and your cover letter should identify these reports.
I am attempting to provide a status report, with estimated SE comple-tion dates, regarding all Employee Concerns every two weeks. Your memorandum of March 13, 1987, thru R. Lee Spessard on EC reports is the type of information I required. That report was excellent for our reporting needs.
J. Donohew and B. K. Singh are my points of contacts on EC.
Original signed by John A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office offSpecial Projects
Original signed by John A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office offSpecial Projects


==Enclosures:==
==Enclosures:==
 
As stated cc w/ enclosures:
As stated cc w/ enclosures:                                                   ~
~
G. Zech                         J. Kelly 8704000186 B70330 B. D. Liaw                                                       fDR ADOCK 05000327 A. Herdt                                                                                 PDR '
G. Zech J. Kelly 8704000186 B70330 B. D. Liaw fDR ADOCK 05000327 A. Herdt PDR M. Poston Brown DISTRIBUTION w/o enclosures BHayes SEQ Rdg cPRC System.
M. Poston Brown DISTRIBUTION w/o enclosures BHayes               SEQ Rdg cPRC System.                                                           SAconnelly           Projects Rdg TVA0P (3) S. Richardson AR 5209                                       OGC-Bethesda NGrace                                                               SEbneter JHolonich                                                             JKeppler KRarr                                                                 JDonohew RKSingh                                                               CJamerson CJulian TVA:0SP                       RC:TVA:0SP                             AO:TVA:0SP                               TVA:0SP BKSinch                       JDonohew                               JZwolinski                               CJamerson 3/20/87     c 1y3/20/87                                             3/p /87                                     3}}
SAconnelly Projects Rdg TVA0P (3) S. Richardson AR 5209 OGC-Bethesda NGrace SEbneter JHolonich JKeppler KRarr JDonohew RKSingh CJamerson CJulian TVA:0SP RC:TVA:0SP AO:TVA:0SP TVA:0SP BKSinch JDonohew JZwolinski CJamerson 3/20/87 c 1y3/20/87 3/p /87 3}}

Latest revision as of 02:31, 7 December 2024

Forwards Two Revised Final Element Repts 11206 & 17105 from Const Category.Review of Status of Const Element Repts & Combination of Initiatives/Actions to Reduce Total Number of Safety Evaluations Required Requested.W/O Encls
ML20206A824
Person / Time
Site: Sequoyah  
Issue date: 03/30/1987
From: Zwolinski J
NRC OFFICE OF SPECIAL PROJECTS
To: Hooks K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8704080186
Download: ML20206A824 (1)


Text

_ - - _ _. - _ _

March 30, 1987 Docket Hos. 50-327/328 MEMORANDUM FOR:

K. Hooks, IE Technical Program Manager - Construction Category TVA Employee Concern Program FROM:

John A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects

SUBJECT:

TRANSMITTAL OF ELEMENT. REPORTS IN THE CONSTRUCTION CATEGORY By letter dated March 16, 1987, TVA transmitted revised final element reports 11206 and 17105 from the Construction Category. Attached are these two reports along with the associated transmittal letter from TVA. Please note that these reports have been revised to incorporate NRC staff comments. All 3? final reports for Sequoyah in this category have been already submitted.

Please review the status of the Construction Elements Reports and where possible combine initiatives / actions to reduce the total number of safety evaluations (SEs) required tc address these reports. However, all issues in each element report should be addressed in SEs and your cover letter should identify these reports.

I am attempting to provide a status report, with estimated SE comple-tion dates, regarding all Employee Concerns every two weeks. Your memorandum of March 13, 1987, thru R. Lee Spessard on EC reports is the type of information I required. That report was excellent for our reporting needs.

J. Donohew and B. K. Singh are my points of contacts on EC.

Original signed by John A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office offSpecial Projects

Enclosures:

As stated cc w/ enclosures:

~

G. Zech J. Kelly 8704000186 B70330 B. D. Liaw fDR ADOCK 05000327 A. Herdt PDR M. Poston Brown DISTRIBUTION w/o enclosures BHayes SEQ Rdg cPRC System.

SAconnelly Projects Rdg TVA0P (3) S. Richardson AR 5209 OGC-Bethesda NGrace SEbneter JHolonich JKeppler KRarr JDonohew RKSingh CJamerson CJulian TVA:0SP RC:TVA:0SP AO:TVA:0SP TVA:0SP BKSinch JDonohew JZwolinski CJamerson 3/20/87 c 1y3/20/87 3/p /87 3