ML20206S217: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. .. .
{{#Wiki_filter:....
3.5.3     Safety Features Actuation System Setpoints Applicability This specification applics to the safety features actuation system actuation setpoints.
3.5.3 Safety Features Actuation System Setpoints Applicability This specification applics to the safety features actuation system actuation setpoints.
Objective To provide for automatic initiation of the safety features actuation system in the event of a breach of reactor coolant system integrity.
Objective To provide for automatic initiation of the safety features actuation system in the event of a breach of reactor coolant system integrity.
Specification The safety features actuation setpoints and permissible bypasses shall be as follows:
Specification The safety features actuation setpoints and permissible bypasses shall be as follows:
Functional Unit                 Actinn                         Setpoint High Reactor Building     Reactor Building Spray         $30 psig (44.7 psia)
Functional Unit Actinn Setpoint High Reactor Building Reactor Building Spray
$30 psig (44.7 psia)
Pressure
Pressure
* High Pressure Injection         54 psig (18.7 psia)
* High Pressure Injection 54 psig (18.7 psia)
Start of Reactor Building Cooling and Reactor Building Isolation           54 psig (18.7 psia)
Start of Reactor Building Cooling and Reactor Building Isolation 54 psig (18.7 psia)
Reactor Bldg. Ventilation       54 psig (18.7 psia)
Reactor Bldg. Ventilation 54 psig (18.7 psia)
Low Pressure Injection           54 psig (18.7 psia)
Low Pressure Injection 54 psig (18.7 psia)
Penetration Room Ventilation 54 psig (18.7-psia)
Penetration Room Ventilation 54 psig (18.7-psia)
Low Reactor Coolant       High Pressure Injection         21526 psig System Pressure **         Low Pressure Injection         21526 psig Start of Reactor Building Cooling and Reactor Building Isolation           21526 psig
Low Reactor Coolant High Pressure Injection 21526 psig System Pressure **
    *May be bypassed during reactor building leak rate test.
Low Pressure Injection 21526 psig Start of Reactor Building Cooling and Reactor Building Isolation 21526 psig
  **May be bypassed below 1750 psig and is automatically reinstated above 1750 psig.
*May be bypassed during reactor building leak rate test.
With the safety features actuation setpoints less conservative than the above values, declare the channel inoperable and apply the applicable Action requirements of Table 3.5.1-1 until the channel is restored to OPERABLE status with the trip setpoint adjusted consistent with the trip setpoint value.                                                                           ,
**May be bypassed below 1750 psig and is automatically reinstated above 1750 psig.
Amendment No. 49,57                         49 8607070311 860624             h PDR   ADOCK 05000313           #
With the safety features actuation setpoints less conservative than the above values, declare the channel inoperable and apply the applicable Action requirements of Table 3.5.1-1 until the channel is restored to OPERABLE status with the trip setpoint adjusted consistent with the trip setpoint value.
                                  ;N P                  PDR  .
Amendment No. 49,57 49 8607070311 860624 h
PDR ADOCK 05000313 P
PDR
;N


l l
... o Bases High Reactor Building Pressure The basis for the 30 psig and 4 psig setpoints for the high pressure signal is to establish a setting which would be reached in adequate time in the event of a DBA, cover a spectrum of break sizes and yet be far enough above normal operation maximum internal pressure to prevent spurious initiation.
          . .. o Bases High Reactor Building Pressure The basis for the 30 psig and 4 psig setpoints for the high pressure signal is to establish a setting which would be reached in adequate time in the event of a DBA, cover a spectrum of break sizes and yet be far enough above normal operation maximum internal pressure to prevent spurious initiation.
I Low Reactor Coolant System Pressure The basis for the 1526 psig low reactor coolant pressure setpoint for high and low pressure injection initiation is to establish a value which is high
I               Low Reactor Coolant System Pressure
]
;              The basis for the 1526 psig low reactor coolant pressure setpoint for high and low pressure injection initiation is to establish a value which is high
enough such that protection is provided for the entire spectrum of break sizes and is far enough below normal operating pressure to prevent spurious initiation. (1)
]               enough such that protection is provided for the entire spectrum of break sizes and is far enough below normal operating pressure to prevent spurious initiation. (1)
REFERENCE (1) FSAR, Section 14.2.2.5 (2) B&W Calculation 32-1158581 t
REFERENCE (1) FSAR, Section 14.2.2.5 (2) B&W Calculation 32-1158581 t
i i
i i
Line 45: Line 48:
1 i
1 i
4 1
4 1
Amendment No. 49                               50
Amendment No. 49 50
        , _ . _            _  ,                _ _ _ _ , .      ,_ _ . . . _ _. _ _ . . . _ .                          _ __.}}
_ __.}}

Latest revision as of 23:34, 6 December 2024

Proposed Tech Specs,Increasing Low RCS Pressure Engineered Safeguards Actuation Sys Initiation Setpoint
ML20206S217
Person / Time
Site: Arkansas Nuclear 
Issue date: 06/24/1986
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20206S204 List:
References
NUDOCS 8607070311
Download: ML20206S217 (2)


Text

....

3.5.3 Safety Features Actuation System Setpoints Applicability This specification applics to the safety features actuation system actuation setpoints.

Objective To provide for automatic initiation of the safety features actuation system in the event of a breach of reactor coolant system integrity.

Specification The safety features actuation setpoints and permissible bypasses shall be as follows:

Functional Unit Actinn Setpoint High Reactor Building Reactor Building Spray

$30 psig (44.7 psia)

Pressure

  • High Pressure Injection 54 psig (18.7 psia)

Start of Reactor Building Cooling and Reactor Building Isolation 54 psig (18.7 psia)

Reactor Bldg. Ventilation 54 psig (18.7 psia)

Low Pressure Injection 54 psig (18.7 psia)

Penetration Room Ventilation 54 psig (18.7-psia)

Low Reactor Coolant High Pressure Injection 21526 psig System Pressure **

Low Pressure Injection 21526 psig Start of Reactor Building Cooling and Reactor Building Isolation 21526 psig

  • May be bypassed during reactor building leak rate test.
    • May be bypassed below 1750 psig and is automatically reinstated above 1750 psig.

With the safety features actuation setpoints less conservative than the above values, declare the channel inoperable and apply the applicable Action requirements of Table 3.5.1-1 until the channel is restored to OPERABLE status with the trip setpoint adjusted consistent with the trip setpoint value.

Amendment No. 49,57 49 8607070311 860624 h

PDR ADOCK 05000313 P

PDR

N

... o Bases High Reactor Building Pressure The basis for the 30 psig and 4 psig setpoints for the high pressure signal is to establish a setting which would be reached in adequate time in the event of a DBA, cover a spectrum of break sizes and yet be far enough above normal operation maximum internal pressure to prevent spurious initiation.

I Low Reactor Coolant System Pressure The basis for the 1526 psig low reactor coolant pressure setpoint for high and low pressure injection initiation is to establish a value which is high

]

enough such that protection is provided for the entire spectrum of break sizes and is far enough below normal operating pressure to prevent spurious initiation. (1)

REFERENCE (1) FSAR, Section 14.2.2.5 (2) B&W Calculation 32-1158581 t

i i

.l l

1 i

4 1

Amendment No. 49 50

_ __.