GPU Nuclear Corporation Nuclear
GPU Nuclear Corporation
        ~
~
Nuclear
::: g = 388 Forked River.New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number:
::: g = 388 Forked River.New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number:
December 23, 1986 5000-86-1118 Mr. William F. Kane, Director Division of Reactor Projects Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
December 23, 1986 5000-86-1118 Mr. William F. Kane, Director Division of Reactor Projects Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406


==Dear Mr. Kane:==
==Dear Mr. Kane:==
==Subject:==
==Subject:==
Oyster Creek Nuclear Generating Station Docket No. 50-219 IE Bulletin 85-03 Motor Operated Valves Your letter of October 28, 1986 evaluated GPU Nuclear's response to IE Bulletin 85-03 " Motor Operating Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings", and requested additional information. An extension of the due date to December 23, 1986 was granted by Mr. R. Conte of the NRC on December 16, 1986.
Oyster Creek Nuclear Generating Station Docket No. 50-219 IE Bulletin 85-03 Motor Operated Valves Your letter of October 28, 1986 evaluated GPU Nuclear's response to IE Bulletin 85-03 " Motor Operating Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings", and requested additional information. An extension of the due date to December 23, 1986 was granted by Mr. R. Conte of the NRC on December 16, 1986.
Attachment I provides the revised response to item "e" of IE Bulletia 85-03. The maximum differential pressure values are for safety related Motor Operated. Valves in both the Core Spray and Isolation Condenser Systems at Oyster Creek. They result from GPUN's review of all normal and abnormal operating conditions to which the valve could be subjected. These values will form the basis of the analytical work to determine valve opening and closing thrust requirements and appropriate switch settings.
Attachment I provides the revised response to item "e" of IE Bulletia 85-03. The maximum differential pressure values are for safety related Motor Operated. Valves in both the Core Spray and Isolation Condenser Systems at Oyster Creek. They result from GPUN's review of all normal and abnormal operating conditions to which the valve could be subjected. These values will form the basis of the analytical work to determine valve opening and closing thrust requirements and appropriate switch settings.
In accordance with your letter of October 28, 1986, the evaluation of this concern, including the implementation of the torque switch settings and any resultant corrective actions (items "b" through "d" of IE Bulletin 85-03), is projected for completion by November 15, 1987. The final report on this project will be submitted to the NRC by January 14, 1987.
In accordance with your letter of October 28, 1986, the evaluation of this concern, including the implementation of the torque switch settings and any resultant corrective actions (items "b" through "d" of IE Bulletin 85-03), is projected for completion by November 15, 1987. The final report on this project will be submitted to the NRC by January 14, 1987.
8701270406 B61223 PDR   ADOCK 05000219 P                   PDR 1;&: ((
8701270406 B61223 PDR ADOCK 05000219 P
PDR 1;&: ((
GPU Nuclear Corporation is a subsidiary of the General Pubhc Utihties Corporahon
GPU Nuclear Corporation is a subsidiary of the General Pubhc Utihties Corporahon
                                                                                                                      \\
\\\\


4
4
        * .Sillia2   F. Kane, Director Divisicn cf R:act:r Projects - USNRC:
.Sillia2 F. Kane, Director Divisicn cf R:act:r Projects - USNRC:
Page 2 If any further information is required, please contact Mr. John Rogers of my staff at -(609)971-4893.
Page 2 If any further information is required, please contact Mr. John Rogers of my staff at -(609)971-4893.
Very truly yours,
Very truly yours,
                                                /2 F G.bL A esf R. F. Wilson Vice Pres.Jent Technical Functions RFW:JJR: dam (0183A)
/2 F G.bL A esf R. F. Wilson Vice Pres.Jent Technical Functions RFW:JJR: dam (0183A)
Attachment cc: Mr. Jack N. Donohew, Jr.
Attachment cc: Mr. Jack N. Donohew, Jr.
U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue, Phillips Bldg.
U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue, Phillips Bldg.
Bethesda, MD 20014 Mail Stop No. 314 NRC Resident Inspector Oyster Creek Nuclear Generating Station
Bethesda, MD 20014 Mail Stop No. 314 NRC Resident Inspector Oyster Creek Nuclear Generating Station


INLET   MAX.                               MAX.
INLET MAX.
PRESS., OPENING                           CLOSING                                                                       .-
MAX.
VALVE                 PSIC   DELTA P                           DELTA P                                                                   ,
PRESS.,
TAG NO       FUNCTION           PSI           BASIS                 PSI           BASIS                                                     .
OPENING CLOSING VALVE PSIC DELTA P DELTA P TAG NO FUNCTION PSI BASIS PSI BASIS V-14-30,33 ISO Cond.
V-14-30,33 ISO Cond. 1250   1250   The highest RCS pressure   1250   The highest RCS pressure steamside                   based on highest set               based on highest set pres-inboard                     pressure of safety valves,         sure of safety valves, 1239!
1250 1250 The highest RCS pressure 1250 The highest RCS pressure steamside based on highest set based on highest set pres-inboard pressure of safety valves, sure of safety valves, 1239!
isolation                   1239 12 psig,                     12 psig (Ref. T.S.2.3) as (Ref.T.S.2.3) as inlet             inlet pressure. HELB causes pressure.                         atm. pressure downstream.
isolation 1239 12 psig, 12 psig (Ref. T.S.2.3) as (Ref.T.S.2.3) as inlet inlet pressure. HELB causes pressure.
atm. pressure downstream.
Assume closure of MSIV due to a transient, causing no downstream pressure.
Assume closure of MSIV due to a transient, causing no downstream pressure.
Valve is opened after
Valve is opened after completion of IST.
;                                          completion of IST.
V-14-31,32 ISO Cond.
V-14-31,32 ISO Cond. 1250   1250   Same as above               1250   Same as above.
1250 1250 Same as above 1250 Same as above.
steamside out board isolation V-14-36,37 ISO Cond. 1250   1250   Same as above               1250   Same as above condensate inboard isolation                                                                                                                               .
steamside out board isolation V-14-36,37 ISO Cond.
V-14-34,35 ISO Cond.     1250       0 Valves are normally         1250   If valves are open for Condensate                 closed, and not expected           initiation, HELB will outboard                   to be open after a HELB           require closure, j             isolation i
1250 1250 Same as above 1250 Same as above condensate inboard isolation V-14-34,35 ISO Cond.
t 7164d
1250 0
Valves are normally 1250 If valves are open for Condensate closed, and not expected initiation, HELB will outboard to be open after a HELB require closure, isolation j
i t
7164d


INLET   MAX.                               MAX.
INLET MAX.
PRESS., OPENING                           CLOSING                                 ''
MAX.
VALVE               PSIG   DELTA P                           DELTA P                                       .
PRESS., OPENING CLOSING VALVE PSIG DELTA P DELTA P TAG NO FUNCTION PSI BASIS PSI BASIS V-20-3, 4 Core Spray 5
TAG NO       FUNCTION         PSI           BASIS               PSI             BASIS                   ,-
10 Valves normally open to 35 Valve is closed:
V-20-3, 4 Core Spray     5     10   Valves normally open to       35   Valve is closed:
32,33 Suction torus which is at atmos-
32,33   Suction                   torus which is at atmos-             1) During normal OPS as Isolation                 pheric pressure during                   part of surveillance Valves                     operation. Valve is cycled           2) As a result of a leak only during surveillance                 in the C.S. Piping testing. Max pressure               3) #2 concurrent with a is static head during                   blowdown (Pmax=30 psia) surveillance.(This assumes         Case (3) is the max pressure that a DBA does not               case. Closing AP is based occur concurrently with           on (3) surveillance testing.)
: 1) During normal OPS as Isolation pheric pressure during part of surveillance Valves operation. Valve is cycled
V-20-12,18 Core Spray   350     350   Valves Normally open         350   Valve is closed:
: 2) As a result of a leak only during surveillance in the C.S. Piping testing. Max pressure
Test                       during operation, cycled             1)During Surveillance Isolation                 during monthly testing.               Testing Valves                     Max. differential is pump           2)If containment ISO shut off head                         valves leak back, the test ISO valves can be closed.
: 3) #2 concurrent with a is static head during blowdown (Pmax=30 psia) surveillance.(This assumes Case (3) is the max pressure that a DBA does not case. Closing AP is based occur concurrently with on (3) surveillance testing.)
V-20-12,18 Core Spray 350 350 Valves Normally open 350 Valve is closed:
Test during operation, cycled 1)During Surveillance Isolation during monthly testing.
Testing Valves Max. differential is pump 2)If containment ISO shut off head valves leak back, the test ISO valves can be closed.
While a leak of the isolation valves would result in reactor pressure in the CS piping, the pressure rise would be limited by the relief valves which are set at 350 psig.
While a leak of the isolation valves would result in reactor pressure in the CS piping, the pressure rise would be limited by the relief valves which are set at 350 psig.
7164d
7164d


INLET   MAX.                             MAX.
INLET MAX.
PRESS., OPENING                           CLOSING                                                   ..
MAX.
VALVE                 PSIG   DELTA P                           DELTA P                                   .
PRESS.,
TAC NO       FUNCTION           PSI           BASIS               PSI           BASIS                   h V-20-15,21 Outside DW   350     350   Valves are interlocked to 1250   RCS Design Pressure 40,41   Isolation                   open at paes1285. Pumps Valves                     will be operating on min.
OPENING CLOSING VALVE PSIG DELTA P DELTA P TAC NO FUNCTION PSI BASIS PSI BASIS h
V-20-15,21 Outside DW 350 350 Valves are interlocked to 1250 RCS Design Pressure 40,41 Isolation open at paes1285. Pumps Valves will be operating on min.
recire @ close to shutoff head (350 psig) when valves go open.
recire @ close to shutoff head (350 psig) when valves go open.
V-20-26,27 Core Spray           350   Valves are cycled during   350   Valves normally closed Test Valves                 monthly pump tests. Max           during plant operation. If pressure will be pump             open during an event, the shutoff head (350 psig).         valves will go closed against max. pump head (350 psig).
V-20-26,27 Core Spray 350 Valves are cycled during 350 Valves normally closed Test Valves monthly pump tests. Max during plant operation.
If pressure will be pump open during an event, the shutoff head (350 psig).
valves will go closed against max. pump head (350 psig).
7164d
7164d
                                                                                                            . . . . . . .}}
.......}}

Latest revision as of 19:54, 6 December 2024

Forwards Revised Response to Item E of IE Bulletin 85-003, Motor Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Review & Corrective Action Will Be Completed by 871115
ML20207Q475
Person / Time
Site: Oyster Creek
Issue date: 12/23/1986
From: Wilson R
GENERAL PUBLIC UTILITIES CORP.
To: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
5000-86-1118, IEB-85-003, IEB-85-3, NUDOCS 8701270406
Download: ML20207Q475 (5)


Text

GPU Nuclear Corporation

~

Nuclear

g = 388 Forked River.New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number:

December 23, 1986 5000-86-1118 Mr. William F. Kane, Director Division of Reactor Projects Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Kane:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 IE Bulletin 85-03 Motor Operated Valves Your letter of October 28, 1986 evaluated GPU Nuclear's response to IE Bulletin 85-03 " Motor Operating Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings", and requested additional information. An extension of the due date to December 23, 1986 was granted by Mr. R. Conte of the NRC on December 16, 1986.

Attachment I provides the revised response to item "e" of IE Bulletia 85-03. The maximum differential pressure values are for safety related Motor Operated. Valves in both the Core Spray and Isolation Condenser Systems at Oyster Creek. They result from GPUN's review of all normal and abnormal operating conditions to which the valve could be subjected. These values will form the basis of the analytical work to determine valve opening and closing thrust requirements and appropriate switch settings.

In accordance with your letter of October 28, 1986, the evaluation of this concern, including the implementation of the torque switch settings and any resultant corrective actions (items "b" through "d" of IE Bulletin 85-03), is projected for completion by November 15, 1987. The final report on this project will be submitted to the NRC by January 14, 1987.

8701270406 B61223 PDR ADOCK 05000219 P

PDR 1;&: ((

GPU Nuclear Corporation is a subsidiary of the General Pubhc Utihties Corporahon

\\\\

4

.Sillia2 F. Kane, Director Divisicn cf R:act:r Projects - USNRC:

Page 2 If any further information is required, please contact Mr. John Rogers of my staff at -(609)971-4893.

Very truly yours,

/2 F G.bL A esf R. F. Wilson Vice Pres.Jent Technical Functions RFW:JJR: dam (0183A)

Attachment cc: Mr. Jack N. Donohew, Jr.

U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue, Phillips Bldg.

Bethesda, MD 20014 Mail Stop No. 314 NRC Resident Inspector Oyster Creek Nuclear Generating Station

INLET MAX.

MAX.

PRESS.,

OPENING CLOSING VALVE PSIC DELTA P DELTA P TAG NO FUNCTION PSI BASIS PSI BASIS V-14-30,33 ISO Cond.

1250 1250 The highest RCS pressure 1250 The highest RCS pressure steamside based on highest set based on highest set pres-inboard pressure of safety valves, sure of safety valves, 1239!

isolation 1239 12 psig, 12 psig (Ref. T.S.2.3) as (Ref.T.S.2.3) as inlet inlet pressure. HELB causes pressure.

atm. pressure downstream.

Assume closure of MSIV due to a transient, causing no downstream pressure.

Valve is opened after completion of IST.

V-14-31,32 ISO Cond.

1250 1250 Same as above 1250 Same as above.

steamside out board isolation V-14-36,37 ISO Cond.

1250 1250 Same as above 1250 Same as above condensate inboard isolation V-14-34,35 ISO Cond.

1250 0

Valves are normally 1250 If valves are open for Condensate closed, and not expected initiation, HELB will outboard to be open after a HELB require closure, isolation j

i t

7164d

INLET MAX.

MAX.

PRESS., OPENING CLOSING VALVE PSIG DELTA P DELTA P TAG NO FUNCTION PSI BASIS PSI BASIS V-20-3, 4 Core Spray 5

10 Valves normally open to 35 Valve is closed:

32,33 Suction torus which is at atmos-

1) During normal OPS as Isolation pheric pressure during part of surveillance Valves operation. Valve is cycled
2) As a result of a leak only during surveillance in the C.S. Piping testing. Max pressure
3) #2 concurrent with a is static head during blowdown (Pmax=30 psia) surveillance.(This assumes Case (3) is the max pressure that a DBA does not case. Closing AP is based occur concurrently with on (3) surveillance testing.)

V-20-12,18 Core Spray 350 350 Valves Normally open 350 Valve is closed:

Test during operation, cycled 1)During Surveillance Isolation during monthly testing.

Testing Valves Max. differential is pump 2)If containment ISO shut off head valves leak back, the test ISO valves can be closed.

While a leak of the isolation valves would result in reactor pressure in the CS piping, the pressure rise would be limited by the relief valves which are set at 350 psig.

7164d

INLET MAX.

MAX.

PRESS.,

OPENING CLOSING VALVE PSIG DELTA P DELTA P TAC NO FUNCTION PSI BASIS PSI BASIS h

V-20-15,21 Outside DW 350 350 Valves are interlocked to 1250 RCS Design Pressure 40,41 Isolation open at paes1285. Pumps Valves will be operating on min.

recire @ close to shutoff head (350 psig) when valves go open.

V-20-26,27 Core Spray 350 Valves are cycled during 350 Valves normally closed Test Valves monthly pump tests. Max during plant operation.

If pressure will be pump open during an event, the shutoff head (350 psig).

valves will go closed against max. pump head (350 psig).