.J JAN 2 21987 DISTRIBUTION MEMORANDUM FOR:             Chairman Zech                                 Docket' File v R. Vollmer Commissioner Roberts                           NRC PDR       T. Novak Commissioner Asselstine                       ED0 Reading   C. Rossi Commissioner Bernthal                         PD#3 Rdg. J. Heltemes, AE0D Commissioner Carr                             T. Rehm       L. 01shan H. Denton     C. Vogan FROM:                       Victor Stello, Jr.                             S. Varga     V. Stello Executive Director for Operations CONSIDERATION OF FULL POWER LICENSE FOR
~
[6"h/[g SURJECT:
.J JAN 2 21987 DISTRIBUTION MEMORANDUM FOR:
BYRON STATION, UNIT 2 Commonwealth Edison has informed us by letter of January 21, 1987 that Byron Station, Unit 2, will be ready to proceed above 5% power on January 23, 1987.
Chairman Zech Docket' File v R. Vollmer Commissioner Roberts NRC PDR T. Novak Commissioner Asselstine ED0 Reading C. Rossi Commissioner Bernthal PD#3 Rdg.
Consideration of full power licensing of Byron Station, Unit 2 is presently scheduled for the week of January 26, 1987.                 Enclosed for your use is the Byron briefing package, which includes:
J. Heltemes, AE0D Commissioner Carr T. Rehm L. 01shan H. Denton C. Vogan FROM:
: 1. The Comission Briefino Slides
Victor Stello, Jr.
: 2. The Proposed Full Power License
S. Varga V. Stello Executive Director
: 3. A copy of Safety Evaluation that is to be attached to the license 4   A copy of the Low Power License, issued on November 6, 1986 The Byron SER and Supplements 1 through 7 are also being provided for background.
[6"h/[g for Operations SURJECT:
UUX "         l .'). Cae g V'ictor Stello, Jr.
CONSIDERATION OF FULL POWER LICENSE FOR BYRON STATION, UNIT 2 Commonwealth Edison has informed us by letter of January 21, 1987 that Byron Station, Unit 2, will be ready to proceed above 5% power on January 23, 1987.
                                                      . _ :;cutive Director for Operations
Consideration of full power licensing of Byron Station, Unit 2 is presently scheduled for the week of January 26, 1987.
Enclosed for your use is the Byron briefing package, which includes:
1.
The Comission Briefino Slides 2.
The Proposed Full Power License 3.
A copy of Safety Evaluation that is to be attached to the license 4
A copy of the Low Power License, issued on November 6, 1986 The Byron SER and Supplements 1 through 7 are also being provided for background.
UUX "
l.'). Cae g 'ictor Stello, Jr.
V
_ :;cutive Director for Operations


==Enclosures:==
==Enclosures:==
As stated cc:
SECY OGC CONTACT:
L. Olshan x24037 870203045 87012 PDR (WD00 6 9
PDR
* SEE PREVIOUS CONCURRENCE PD#3
]PD#3 P
~
PWR-A CVogan*
~
' L01shan*:mak rqa TNovak*
g 1 jy87 1/ /87 g M06/87 1/06/87 9
NRh (T
NR R
. er H.rtt n tello g /87 1p[/87
/ 9 /87


As stated cc:    SECY OGC CONTACT:    L. Olshan x24037 870203045        87012 PDR              (WD00 6 9                        PDR
.e DISTRIBUTION MEMORANDUM FOR:
* SEE PREVIOUS CONCURRENCE
Chairman Zech Docket File R. Vollmer
                                                        ~
.Connissioner Roberts NRC PDR T. Novak Comissioner Asselstine EDO Reading C. Rossi Commissioner Bernthal PD#3 Rdg.
PD#3                                        P                                PWR-A
J. Heltemes, AEOD Commissioner Carr T. Rehm L. Olshan H. Denton
                    ~    ]PD#3                                                    TNovak*
. C. Vogan FROM:
CVogan*        -
Victor Stello, Jr.
                          ' L01shan*:mak                rqa 1/06/87      g M06/87 g                        1 jy87                        1/ /87 9
S. Varga
(T    '      '
/
NR                              NRh                    '
p/
R    . er                        H .rtt n                    tello g /87                        1p[/87                    / 9 /87
Executive Director for Operations p
 
  .e DISTRIBUTION MEMORANDUM FOR:       Chairman Zech                         Docket File     R. Vollmer
                            .Connissioner Roberts                   NRC PDR         T. Novak Comissioner Asselstine                 EDO Reading     C. Rossi Commissioner Bernthal                   PD#3 Rdg.       J. Heltemes, AEOD Commissioner Carr                     T. Rehm         L. Olshan H. Denton     . C. Vogan FROM:                 Victor Stello, Jr.                     S. Varga   /
Executive Director                              p/
for Operations                             p


==SUBJECT:==
==SUBJECT:==
CONSIDERATION OF FULL POWER LICENSE FOR '
CONSIDERATION OF FULL POWER LICENSE FOR '
BYRON STATION, UNIT 2                   ,-,
BYRON STATION, UNIT 2
                                                                    /
/
Consideration of full power licensing of Byron Stat [on, Unit 2 is presently scheduled for January 15, 1987. Enclosed for your use is the Byron briefing package, which includes:                         ,
Consideration of full power licensing of Byron Stat [on, Unit 2 is presently scheduled for January 15, 1987. Enclosed for your use is the Byron briefing package, which includes:
: 1. The Connission Briefing Slides         /
1.
: 2. The Proposed Full Power License
The Connission Briefing Slides
: 3. A copy of Safety Evaluation that is'to be attached to the license 4   A copy of the Low Power License,. issued on November 6, 1986 TheByronSERandSupplements1th[ough7arealsobeingprovidedfor background.
/
2.
The Proposed Full Power License 3.
A copy of Safety Evaluation that is'to be attached to the license 4
A copy of the Low Power License,. issued on November 6, 1986 TheByronSERandSupplements1th[ough7arealsobeingprovidedfor background.
The licensee intends to complete the low power testing and be ready to exceed 5% power on January 27, 1987.
The licensee intends to complete the low power testing and be ready to exceed 5% power on January 27, 1987.
Victor Stello, Jr.
Victor Stello, Jr.
Line 58: Line 82:


==Enclosures:==
==Enclosures:==
 
As stated cc: SECY OGC CONTACT:
As stated cc: SECY OGC CONTACT:   L. Olshan x24937 PD83                 PD#3                   AD:PWR-A PD#3 $      ,
L. Olshan x24937 PD#3 $
CVogan     y 'L01shan:mak           SVarga                 CRossi 1/0/87           1/b/87             1/ /87                   1/ /87
PD83 PD#3 AD:PWR-A CVogan y 'L01shan:mak SVarga CRossi 1/0/87 1/b/87 1/ /87 1/ /87
                                                                                          /     -
/
WR-A                 NRR                         NRR                     0 ovak                     RVollmer                     PDenton               V ello 1/ /87                     1/   /87                     1/ /87               1     87}}
WR-A NRR NRR 0
ovak RVollmer PDenton V ello 1/ /87 1/
/87 1/ /87 1
87}}

Latest revision as of 18:51, 6 December 2024

Informs That Consideration of Full Power Licensing Presently Scheduled for Wk of 870126.Briefing Package,Including Listed Items,Encl.Ser & Ssers 1-7 Also Encl.W/O Encls
ML20209A839
Person / Time
Site: Byron Constellation icon.png
Issue date: 01/22/1987
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Asselstine, Roberts, Zech
NRC COMMISSION (OCM)
References
NUDOCS 8702030456
Download: ML20209A839 (2)


Text

Y

~

.J JAN 2 21987 DISTRIBUTION MEMORANDUM FOR:

Chairman Zech Docket' File v R. Vollmer Commissioner Roberts NRC PDR T. Novak Commissioner Asselstine ED0 Reading C. Rossi Commissioner Bernthal PD#3 Rdg.

J. Heltemes, AE0D Commissioner Carr T. Rehm L. 01shan H. Denton C. Vogan FROM:

Victor Stello, Jr.

S. Varga V. Stello Executive Director

[6"h/[g for Operations SURJECT:

CONSIDERATION OF FULL POWER LICENSE FOR BYRON STATION, UNIT 2 Commonwealth Edison has informed us by letter of January 21, 1987 that Byron Station, Unit 2, will be ready to proceed above 5% power on January 23, 1987.

Consideration of full power licensing of Byron Station, Unit 2 is presently scheduled for the week of January 26, 1987.

Enclosed for your use is the Byron briefing package, which includes:

1.

The Comission Briefino Slides 2.

The Proposed Full Power License 3.

A copy of Safety Evaluation that is to be attached to the license 4

A copy of the Low Power License, issued on November 6, 1986 The Byron SER and Supplements 1 through 7 are also being provided for background.

UUX "

l.'). Cae g 'ictor Stello, Jr.

V

_ :;cutive Director for Operations

Enclosures:

As stated cc:

SECY OGC CONTACT:

L. Olshan x24037 870203045 87012 PDR (WD00 6 9

PDR

  • SEE PREVIOUS CONCURRENCE PD#3

]PD#3 P

~

PWR-A CVogan*

~

' L01shan*:mak rqa TNovak*

g 1 jy87 1/ /87 g M06/87 1/06/87 9

NRh (T

NR R

. er H.rtt n tello g /87 1p[/87

/ 9 /87

.e DISTRIBUTION MEMORANDUM FOR:

Chairman Zech Docket File R. Vollmer

.Connissioner Roberts NRC PDR T. Novak Comissioner Asselstine EDO Reading C. Rossi Commissioner Bernthal PD#3 Rdg.

J. Heltemes, AEOD Commissioner Carr T. Rehm L. Olshan H. Denton

. C. Vogan FROM:

Victor Stello, Jr.

S. Varga

/

p/

Executive Director for Operations p

SUBJECT:

CONSIDERATION OF FULL POWER LICENSE FOR '

BYRON STATION, UNIT 2

/

Consideration of full power licensing of Byron Stat [on, Unit 2 is presently scheduled for January 15, 1987. Enclosed for your use is the Byron briefing package, which includes:

1.

The Connission Briefing Slides

/

2.

The Proposed Full Power License 3.

A copy of Safety Evaluation that is'to be attached to the license 4

A copy of the Low Power License,. issued on November 6, 1986 TheByronSERandSupplements1th[ough7arealsobeingprovidedfor background.

The licensee intends to complete the low power testing and be ready to exceed 5% power on January 27, 1987.

Victor Stello, Jr.

Executive Director for Operations

Enclosures:

As stated cc: SECY OGC CONTACT:

L. Olshan x24937 PD#3 $

PD83 PD#3 AD:PWR-A CVogan y 'L01shan:mak SVarga CRossi 1/0/87 1/b/87 1/ /87 1/ /87

/

WR-A NRR NRR 0

ovak RVollmer PDenton V ello 1/ /87 1/

/87 1/ /87 1

87