ML20209A839: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Y | {{#Wiki_filter:Y | ||
.J JAN 2 21987 DISTRIBUTION MEMORANDUM FOR: | ~ | ||
[6"h/[g SURJECT: | .J JAN 2 21987 DISTRIBUTION MEMORANDUM FOR: | ||
BYRON STATION, UNIT 2 Commonwealth Edison has informed us by letter of January 21, 1987 that Byron Station, Unit 2, will be ready to proceed above 5% power on January 23, 1987. | Chairman Zech Docket' File v R. Vollmer Commissioner Roberts NRC PDR T. Novak Commissioner Asselstine ED0 Reading C. Rossi Commissioner Bernthal PD#3 Rdg. | ||
Consideration of full power licensing of Byron Station, Unit 2 is presently scheduled for the week of January 26, 1987. | J. Heltemes, AE0D Commissioner Carr T. Rehm L. 01shan H. Denton C. Vogan FROM: | ||
Victor Stello, Jr. | |||
S. Varga V. Stello Executive Director | |||
[6"h/[g for Operations SURJECT: | |||
UUX " | CONSIDERATION OF FULL POWER LICENSE FOR BYRON STATION, UNIT 2 Commonwealth Edison has informed us by letter of January 21, 1987 that Byron Station, Unit 2, will be ready to proceed above 5% power on January 23, 1987. | ||
Consideration of full power licensing of Byron Station, Unit 2 is presently scheduled for the week of January 26, 1987. | |||
Enclosed for your use is the Byron briefing package, which includes: | |||
1. | |||
The Comission Briefino Slides 2. | |||
The Proposed Full Power License 3. | |||
A copy of Safety Evaluation that is to be attached to the license 4 | |||
A copy of the Low Power License, issued on November 6, 1986 The Byron SER and Supplements 1 through 7 are also being provided for background. | |||
UUX " | |||
l.'). Cae g 'ictor Stello, Jr. | |||
V | |||
_ :;cutive Director for Operations | |||
==Enclosures:== | ==Enclosures:== | ||
As stated cc: | |||
SECY OGC CONTACT: | |||
L. Olshan x24037 870203045 87012 PDR (WD00 6 9 | |||
PDR | |||
* SEE PREVIOUS CONCURRENCE PD#3 | |||
]PD#3 P | |||
~ | |||
PWR-A CVogan* | |||
~ | |||
' L01shan*:mak rqa TNovak* | |||
g 1 jy87 1/ /87 g M06/87 1/06/87 9 | |||
NRh (T | |||
NR R | |||
. er H.rtt n tello g /87 1p[/87 | |||
/ 9 /87 | |||
.e DISTRIBUTION MEMORANDUM FOR: | |||
Chairman Zech Docket File R. Vollmer | |||
.Connissioner Roberts NRC PDR T. Novak Comissioner Asselstine EDO Reading C. Rossi Commissioner Bernthal PD#3 Rdg. | |||
J. Heltemes, AEOD Commissioner Carr T. Rehm L. Olshan H. Denton | |||
. C. Vogan FROM: | |||
Victor Stello, Jr. | |||
S. Varga | |||
/ | |||
p/ | |||
Executive Director for Operations p | |||
for Operations | |||
==SUBJECT:== | ==SUBJECT:== | ||
CONSIDERATION OF FULL POWER LICENSE FOR ' | CONSIDERATION OF FULL POWER LICENSE FOR ' | ||
BYRON STATION, UNIT 2 | BYRON STATION, UNIT 2 | ||
/ | |||
Consideration of full power licensing of Byron Stat [on, Unit 2 is presently scheduled for January 15, 1987. Enclosed for your use is the Byron briefing package, which includes: | Consideration of full power licensing of Byron Stat [on, Unit 2 is presently scheduled for January 15, 1987. Enclosed for your use is the Byron briefing package, which includes: | ||
1. | |||
The Connission Briefing Slides | |||
/ | |||
2. | |||
The Proposed Full Power License 3. | |||
A copy of Safety Evaluation that is'to be attached to the license 4 | |||
A copy of the Low Power License,. issued on November 6, 1986 TheByronSERandSupplements1th[ough7arealsobeingprovidedfor background. | |||
The licensee intends to complete the low power testing and be ready to exceed 5% power on January 27, 1987. | The licensee intends to complete the low power testing and be ready to exceed 5% power on January 27, 1987. | ||
Victor Stello, Jr. | Victor Stello, Jr. | ||
| Line 58: | Line 82: | ||
==Enclosures:== | ==Enclosures:== | ||
As stated cc: SECY OGC CONTACT: | |||
As stated cc: SECY OGC CONTACT: | L. Olshan x24937 PD#3 $ | ||
CVogan | PD83 PD#3 AD:PWR-A CVogan y 'L01shan:mak SVarga CRossi 1/0/87 1/b/87 1/ /87 1/ /87 | ||
/ | |||
WR-A | WR-A NRR NRR 0 | ||
ovak RVollmer PDenton V ello 1/ /87 1/ | |||
/87 1/ /87 1 | |||
87}} | |||
Latest revision as of 18:51, 6 December 2024
| ML20209A839 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 01/22/1987 |
| From: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Asselstine, Roberts, Zech NRC COMMISSION (OCM) |
| References | |
| NUDOCS 8702030456 | |
| Download: ML20209A839 (2) | |
Text
Y
~
.J JAN 2 21987 DISTRIBUTION MEMORANDUM FOR:
Chairman Zech Docket' File v R. Vollmer Commissioner Roberts NRC PDR T. Novak Commissioner Asselstine ED0 Reading C. Rossi Commissioner Bernthal PD#3 Rdg.
J. Heltemes, AE0D Commissioner Carr T. Rehm L. 01shan H. Denton C. Vogan FROM:
Victor Stello, Jr.
S. Varga V. Stello Executive Director
[6"h/[g for Operations SURJECT:
CONSIDERATION OF FULL POWER LICENSE FOR BYRON STATION, UNIT 2 Commonwealth Edison has informed us by letter of January 21, 1987 that Byron Station, Unit 2, will be ready to proceed above 5% power on January 23, 1987.
Consideration of full power licensing of Byron Station, Unit 2 is presently scheduled for the week of January 26, 1987.
Enclosed for your use is the Byron briefing package, which includes:
1.
The Comission Briefino Slides 2.
The Proposed Full Power License 3.
A copy of Safety Evaluation that is to be attached to the license 4
A copy of the Low Power License, issued on November 6, 1986 The Byron SER and Supplements 1 through 7 are also being provided for background.
UUX "
l.'). Cae g 'ictor Stello, Jr.
V
_ :;cutive Director for Operations
Enclosures:
As stated cc:
SECY OGC CONTACT:
L. Olshan x24037 870203045 87012 PDR (WD00 6 9
- SEE PREVIOUS CONCURRENCE PD#3
]PD#3 P
~
PWR-A CVogan*
~
' L01shan*:mak rqa TNovak*
g 1 jy87 1/ /87 g M06/87 1/06/87 9
NRh (T
NR R
. er H.rtt n tello g /87 1p[/87
/ 9 /87
.e DISTRIBUTION MEMORANDUM FOR:
Chairman Zech Docket File R. Vollmer
.Connissioner Roberts NRC PDR T. Novak Comissioner Asselstine EDO Reading C. Rossi Commissioner Bernthal PD#3 Rdg.
J. Heltemes, AEOD Commissioner Carr T. Rehm L. Olshan H. Denton
. C. Vogan FROM:
Victor Stello, Jr.
S. Varga
/
p/
Executive Director for Operations p
SUBJECT:
CONSIDERATION OF FULL POWER LICENSE FOR '
BYRON STATION, UNIT 2
/
Consideration of full power licensing of Byron Stat [on, Unit 2 is presently scheduled for January 15, 1987. Enclosed for your use is the Byron briefing package, which includes:
1.
The Connission Briefing Slides
/
2.
The Proposed Full Power License 3.
A copy of Safety Evaluation that is'to be attached to the license 4
A copy of the Low Power License,. issued on November 6, 1986 TheByronSERandSupplements1th[ough7arealsobeingprovidedfor background.
The licensee intends to complete the low power testing and be ready to exceed 5% power on January 27, 1987.
Victor Stello, Jr.
Executive Director for Operations
Enclosures:
As stated cc: SECY OGC CONTACT:
L. Olshan x24937 PD#3 $
PD83 PD#3 AD:PWR-A CVogan y 'L01shan:mak SVarga CRossi 1/0/87 1/b/87 1/ /87 1/ /87
/
WR-A NRR NRR 0
ovak RVollmer PDenton V ello 1/ /87 1/
/87 1/ /87 1
87