{{#Wiki_filter:-
{{#Wiki_filter:-
                                                                                            a
a
    ''
''
                                          SEP: I 61966
SEP: I 61966
        In Reply Refer To:
In Reply Refer To:
        Docket:   50-267/86-21
Docket:
        Public Service Company of Colorado
50-267/86-21
        ATTN:   Robert 0. Williams, Jr.
Public Service Company of Colorado
                Vice President, Nuclear Operations
ATTN:
        P. O. Box 840
Robert 0. Williams, Jr.
        Denver, Colorado 80201-0840
Vice President, Nuclear Operations
        Gentlemen:
P. O. Box 840
        This refers to the inspection conducted by Mr. H. D. Chaney of this office
Denver, Colorado 80201-0840
        during the period August 4-8, 1986, of activities authorized by NRC Operating
Gentlemen:
        License DPR-34 for Fort St. Vrain Nuclear-Generating Station, and to the
This refers to the inspection conducted by Mr. H. D. Chaney of this office
        disc ^ussion of our findings'with Mr. L. W. Singleton and other members of your
during the period August 4-8, 1986, of activities authorized by NRC Operating
        staff at the conclusion of the inspection.
License DPR-34 for Fort St. Vrain Nuclear-Generating Station, and to the
                          '
disc ^ussion of our findings'with Mr. L. W. Singleton and other members of your
              >
staff at the conclusion of the inspection.
                                    -
      Areas exa' mined during'the'litspection included radioactive material
        transportation activities, radioactive waste management, and radiological
        effluent releases. Within these areas, the inspection consisted of selective
        examination of procedures and representative. records, interviews with
      personnel, and observations by the inspector. The inspection findings are
      documented in the enclosed inspection report.
      During this inspection, it was found that one of your activities was in
      violation of NRC requirements. The corrective actions taken by your staff
      during this inspection regarding the violation are considered adequate to
      prevent a similar recurrence. Therefore, it is not necessary to respond to
      this violation in writing.
      We have also examined actions you have taken with regard to previously
        identified inspection findings.    The status of these items is identified in
      paragraph 2 of the enclosed report.
      Should you have any questions concerning this inspection, we will be pleased to
      discuss them with you.
                                                  Sincerely,
                                                  -'Desnal Sign d by;"
          N f 00!k $IO$o267    N
          O                                      J. E. Gagliardo, Chief
                                                  Reactor Projects Branch
      Enclosures:    (see next page)
'
'
      .1V.,,,S t       C.,,,S         C,sSe m C O         (d          C ,,e
-
      HDC   ey/lc     B   ay       WLFisher         JPJaudon       JEGagl   o
>
      gii88            y    i8s      ,icies        a vi8s            y              sh,
Areas exa' mined during'the'litspection included radioactive material
transportation activities, radioactive waste management, and radiological
effluent releases. Within these areas, the inspection consisted of selective
examination of procedures and representative. records, interviews with
personnel, and observations by the inspector.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that one of your activities was in
violation of NRC requirements.
The corrective actions taken by your staff
during this inspection regarding the violation are considered adequate to
prevent a similar recurrence.
Therefore, it is not necessary to respond to
this violation in writing.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
N f 00!k $IO$o267
-'Desnal Sign d by;"
O
N
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
(see next page)
(d
'
.1V.,,,S t
C.,,,S
C,sSe m C O
C ,,e
gii88
y
i8s
,icies
a vi8s
y
sh,
HDC
ey/lc
B
ay
WLFisher
JPJaudon
JEGagl
o


      ..   __ _     _         __         _.           _.         -.     _ _ . _ . . .__
..
                                                                                    -
__ _
_
__
_.
_.
-.
_
_
. _ . .
.__
-
.
.
  l3     e
l3
e
i
i
,
Public Service Company of Colorado-
                Public Service Company of Colorado-         -2-
-2-
  i
,
$               Enclosures:
i
                      Appendix A - Notice of Violation
$
Enclosures:
'
'
                1.
1.
!             2.   Appendix B - NRC Inspection Report
Appendix A - Notice of Violation
                        50-267/86-21 with Attachment - Documents Reviewed
!
,              cc w/ enclosures:
2.
Appendix B - NRC Inspection Report
50-267/86-21 with Attachment - Documents Reviewed
cc w/ enclosures:
,
,
                J. W. Gahm, Manager, Nuclear
J. W. Gahm, Manager, Nuclear
                  Production Division
.!
'
                Fort-St. Vrain Nuclear Station
                16805 WCR 19\
.l              Platteville, Colorado 80651
                L. Singleton, Manager, Quality
;                  Assurance Division
                (same address)
                Colorado Radiation Control Program Director
i
i              Colorado Public Utilities Commission
2
                bcc to DM8 (IE06) bcc distrib. by RIV:
                *RPB                        '
                                                      DRSP
                *ResidentiInspector                    R. D. Martin, RA
4
                *Section Chief (RPB/A)        ~
                                                    *RSB
  I            *Section Chief (RSB/ES)              *H. D. Chaney
  .
                *R&SPB-                '
                                                    *B. Murray
1              * MIS System                        *W.  L. Fisher
,
,
                *RSTS Operator                         R. L. Bangart
Production Division
i               *RIV File
.!
!
Fort-St. Vrain Nuclear Station
                *w/766
'
16805 WCR 19\\
.l
Platteville, Colorado 80651
L. Singleton, Manager, Quality
;
Assurance Division
(same address)
Colorado Radiation Control Program Director
i
i
Colorado Public Utilities Commission
bcc to DM8 (IE06) bcc distrib. by RIV:
2
*RPB
'
DRSP
*ResidentiInspector
R. D. Martin, RA
*Section Chief (RPB/A)
*RSB
4
I
*Section Chief (RSB/ES)
~
*H. D. Chaney
.
*R&SPB-
*B. Murray
'
1
* MIS System
*W. L. Fisher
*RSTS Operator
R. L. Bangart
,
i
*RIV File
!
*w/766
:
:
1
1
Line 127: Line 182:
,
,
I
I
l   .
l
.
}}
}}

Latest revision as of 16:42, 6 December 2024

Forwards Insp Rept 50-267/86-21 on 860804-08 & Notice of Violation.Areas Examined Included Radioactive Matl Transportation Activities,Radwaste Mgt & Radiological Effluent Releases
ML20210D235
Person / Time
Site: Fort Saint Vrain 
Issue date: 09/16/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20210D239 List:
References
NUDOCS 8609190085
Download: ML20210D235 (2)


See also: IR 05000267/1986021

Text

-

a

SEP: I 61966

In Reply Refer To:

Docket:

50-267/86-21

Public Service Company of Colorado

ATTN:

Robert 0. Williams, Jr.

Vice President, Nuclear Operations

P. O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

This refers to the inspection conducted by Mr. H. D. Chaney of this office

during the period August 4-8, 1986, of activities authorized by NRC Operating

License DPR-34 for Fort St. Vrain Nuclear-Generating Station, and to the

disc ^ussion of our findings'with Mr. L. W. Singleton and other members of your

staff at the conclusion of the inspection.

'

-

>

Areas exa' mined during'the'litspection included radioactive material

transportation activities, radioactive waste management, and radiological

effluent releases. Within these areas, the inspection consisted of selective

examination of procedures and representative. records, interviews with

personnel, and observations by the inspector.

The inspection findings are

documented in the enclosed inspection report.

During this inspection, it was found that one of your activities was in

violation of NRC requirements.

The corrective actions taken by your staff

during this inspection regarding the violation are considered adequate to

prevent a similar recurrence.

Therefore, it is not necessary to respond to

this violation in writing.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

N f 00!k $IO$o267

-'Desnal Sign d by;"

O

N

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

(see next page)

(d

'

.1V.,,,S t

C.,,,S

C,sSe m C O

C ,,e

gii88

y

i8s

,icies

a vi8s

y

sh,

HDC

ey/lc

B

ay

WLFisher

JPJaudon

JEGagl

o

..

__ _

_

__

_.

_.

-.

_

_

. _ . .

.__

-

.

l3

e

i

Public Service Company of Colorado-

-2-

,

i

$

Enclosures:

'

1.

Appendix A - Notice of Violation

!

2.

Appendix B - NRC Inspection Report

50-267/86-21 with Attachment - Documents Reviewed

cc w/ enclosures:

,

J. W. Gahm, Manager, Nuclear

,

Production Division

.!

Fort-St. Vrain Nuclear Station

'

16805 WCR 19\\

.l

Platteville, Colorado 80651

L. Singleton, Manager, Quality

Assurance Division

(same address)

Colorado Radiation Control Program Director

i

i

Colorado Public Utilities Commission

bcc to DM8 (IE06) bcc distrib. by RIV:

2

  • RPB

'

DRSP

  • ResidentiInspector

R. D. Martin, RA

  • Section Chief (RPB/A)
  • RSB

4

I

  • Section Chief (RSB/ES)

~

  • H. D. Chaney

.

  • R&SPB-
  • B. Murray

'

1

  • MIS System
  • W. L. Fisher
  • RSTS Operator

R. L. Bangart

,

i

  • RIV File

!

  • w/766

1

1

<

$

.

i

!

!

!

!

,

I

l

.