ML20210D235
| ML20210D235 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 09/16/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20210D239 | List: |
| References | |
| NUDOCS 8609190085 | |
| Download: ML20210D235 (2) | |
See also: IR 05000267/1986021
Text
-
a
SEP: I 61966
In Reply Refer To:
Docket:
50-267/86-21
Public Service Company of Colorado
ATTN:
Robert 0. Williams, Jr.
Vice President, Nuclear Operations
P. O. Box 840
Denver, Colorado 80201-0840
Gentlemen:
This refers to the inspection conducted by Mr. H. D. Chaney of this office
during the period August 4-8, 1986, of activities authorized by NRC Operating
License DPR-34 for Fort St. Vrain Nuclear-Generating Station, and to the
disc ^ussion of our findings'with Mr. L. W. Singleton and other members of your
staff at the conclusion of the inspection.
'
-
>
Areas exa' mined during'the'litspection included radioactive material
transportation activities, radioactive waste management, and radiological
effluent releases. Within these areas, the inspection consisted of selective
examination of procedures and representative. records, interviews with
personnel, and observations by the inspector.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that one of your activities was in
violation of NRC requirements.
The corrective actions taken by your staff
during this inspection regarding the violation are considered adequate to
prevent a similar recurrence.
Therefore, it is not necessary to respond to
this violation in writing.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
N f 00!k $IO$o267
-'Desnal Sign d by;"
O
N
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
(see next page)
(d
'
.1V.,,,S t
C.,,,S
C,sSe m C O
C ,,e
gii88
y
i8s
,icies
a vi8s
y
sh,
HDC
ey/lc
B
ay
WLFisher
JPJaudon
JEGagl
o
..
__ _
_
__
_.
_.
-.
_
_
. _ . .
.__
-
.
l3
e
i
Public Service Company of Colorado-
-2-
,
i
$
Enclosures:
'
1.
Appendix A - Notice of Violation
!
2.
Appendix B - NRC Inspection Report
50-267/86-21 with Attachment - Documents Reviewed
cc w/ enclosures:
,
J. W. Gahm, Manager, Nuclear
,
Production Division
.!
Fort-St. Vrain Nuclear Station
'
16805 WCR 19\\
.l
Platteville, Colorado 80651
L. Singleton, Manager, Quality
Assurance Division
(same address)
Colorado Radiation Control Program Director
i
i
Colorado Public Utilities Commission
bcc to DM8 (IE06) bcc distrib. by RIV:
2
- RPB
'
DRSP
- ResidentiInspector
R. D. Martin, RA
- Section Chief (RPB/A)
- RSB
4
I
- Section Chief (RSB/ES)
~
- H. D. Chaney
.
- R&SPB-
- B. Murray
'
1
- MIS System
- W. L. Fisher
- RSTS Operator
R. L. Bangart
,
i
- RIV File
!
- w/766
1
1
<
$
.
i
!
!
!
!
,
I
l
.