ML20210Q645: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
: c.          .
c.
8 h        50UllilRN CAlllORNIA                                                 A. Edward Scherer
[eh 50UllilRN CAlllORNIA 8
[e EDISON Nudear Regulatory Affairs An m/sov IN7 TRNA 770 sal.** company August 12,1999 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
A. Edward Scherer EDISON Nudear Regulatory Affairs An m/sov IN7 TRNA 770 sal.** company August 12,1999 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555


==Subject:==
==Subject:==
Line 26: Line 26:
Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 end 3, respectively, requires Southern California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Attachments 1 and 2 provide the subject Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.
Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 end 3, respectively, requires Southern California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Attachments 1 and 2 provide the subject Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.
If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.
If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.
Sincerely, Attachments I & 2 f
Sincerely, f
cc:       E. W. Merschoff, Regional Administrator, NRC Region IV L. Raghavan, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident inspector, San Onofre Unit 2 & 3 9900160075 990812 PDR       ADOCK 05000361 R                         PDR l
Attachments I & 2 cc:
P. O. P,ox i 28 San Clements. CA 92674 0128                                                                       -
E. W. Merschoff, Regional Administrator, NRC Region IV L. Raghavan, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident inspector, San Onofre Unit 2 & 3 9900160075 990812 PDR ADOCK 05000361 R
449,368-7501 Fax 949-368 7575 l
PDR l
P. O. P,ox i 28 San Clements. CA 92674 0128 449,368-7501 Fax 949-368 7575 l
I}}
I}}

Latest revision as of 01:38, 6 December 2024

Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units
ML20210Q645
Person / Time
Site: San Onofre  
Issue date: 08/12/1999
From: Scherer A
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20210Q651 List:
References
NUDOCS 9908160075
Download: ML20210Q645 (1)


Text

-

c.

[eh 50UllilRN CAlllORNIA 8

A. Edward Scherer EDISON Nudear Regulatory Affairs An m/sov IN7 TRNA 770 sal.** company August 12,1999 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and $3-362 Monthly Operating Reports for July 1999 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 end 3, respectively, requires Southern California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Attachments 1 and 2 provide the subject Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.

If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.

Sincerely, f

Attachments I & 2 cc:

E. W. Merschoff, Regional Administrator, NRC Region IV L. Raghavan, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident inspector, San Onofre Unit 2 & 3 9900160075 990812 PDR ADOCK 05000361 R

PDR l

P. O. P,ox i 28 San Clements. CA 92674 0128 449,368-7501 Fax 949-368 7575 l

I