ML20210U553: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
i FEB 0 51987 Docket Nos. 50-277 | i FEB 0 51987 Docket Nos. 50-277 50-278 Philadelphia Electric Company ATTN: Mr. J. W. Gallagher Vice President Nuclear Operations 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen: | ||
50-278 Philadelphia Electric Company ATTN: Mr. J. W. Gallagher Vice President Nuclear Operations 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen: | |||
==Subject:== | ==Subject:== | ||
Safeguards Regulatory Effectiveness Review at the. Peach Bottom Atomic Power Station Units Nos. 2 and 3 In our {{letter dated|date=December 30, 1986|text=December 30, 1986, letter}} to you, we advised that an NRC Regulatory Effectiveness Review (RER) was scheduled at the Peach Bottom Atomic Power Station, Units 2 and 3 during the week of June 8-10, 1987. That schedule has been revised and the RER at Peach Bottom is now scheduled for the week of August 3-7, 1987. If you have any questions regarding this change, please contact R. R. Keimig of my staff at (215) 337-5255. | Safeguards Regulatory Effectiveness Review at the. Peach Bottom Atomic Power Station Units Nos. 2 and 3 In our {{letter dated|date=December 30, 1986|text=December 30, 1986, letter}} to you, we advised that an NRC Regulatory Effectiveness Review (RER) was scheduled at the Peach Bottom Atomic Power Station, Units 2 and 3 during the week of June 8-10, 1987. That schedule has been revised and the RER at Peach Bottom is now scheduled for the week of August 3-7, 1987. | ||
If you have any questions regarding this change, please contact R. R. Keimig of my staff at (215) 337-5255. | |||
Your cooperation with us is appreciated. | Your cooperation with us is appreciated. | ||
Sincerely, Original Signed By: | Sincerely, Original Signed By: | ||
Jr.mos H. Joyner Thomas T. Martin, Director | Jr.mos H. Joyner Thomas T. Martin, Director i | ||
R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station | Division of Radiation Safety and Safeguards cc: | ||
John S. Kemper, Senior Vice President, Engineering and Production | R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station John S. Kemper, Senior Vice President, Engineering and Production Troy B. Conner, Jr., Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric G. Leitch, Nuclear Generation Manager Eugene J. Bradley, Esquire, Assistant General Counsel Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Engineer in Charge, Licensing Section Public Document Room (PDR) | ||
Local Public Document Room (LPDR) | Local Public Document Room (LPDR) | ||
Nuclear Safety Information Center (NSIC) | Nuclear Safety Information Center (NSIC) | ||
NRC Resident Inspector Commonwealth of Pennsylvania 8702180512 DR | NRC Resident Inspector Commonwealth of Pennsylvania 8702180512 ADOCKohhhj77 DR 0FFICIAL RECORD COPY | ||
\\g PDR re '. of | |||
fb Philadelphia Electric Co. | fb Philadelphia Electric Co. | ||
2 bcc '. | |||
Region I Docket Room (with concurrences) | Region I Docket Room (with concurrences) | ||
Management Assistant, DRMA Section Chief, DRP' | Management Assistant, DRMA Section Chief, DRP' R. Dube, NMSS | ||
: 0. Clar, NRR i | : 0. Clar, NRR i | ||
l 5 | l 5 | ||
i I | i I | ||
:DRSS | :DRSS | ||
g/87 | .RI:DR SS h/ca Keik/ | ||
Joyner-g/87 2/J/87 2/t'/87 0FFICIAL RECORD COPY LTRS PB/MY - 0002.0.0 02/03/87 | |||
- -. _..}} | |||
Latest revision as of 00:54, 6 December 2024
| ML20210U553 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 02/05/1987 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Gallagher J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 8702180512 | |
| Download: ML20210U553 (2) | |
Text
-
i FEB 0 51987 Docket Nos. 50-277 50-278 Philadelphia Electric Company ATTN: Mr. J. W. Gallagher Vice President Nuclear Operations 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:
Subject:
Safeguards Regulatory Effectiveness Review at the. Peach Bottom Atomic Power Station Units Nos. 2 and 3 In our December 30, 1986, letter to you, we advised that an NRC Regulatory Effectiveness Review (RER) was scheduled at the Peach Bottom Atomic Power Station, Units 2 and 3 during the week of June 8-10, 1987. That schedule has been revised and the RER at Peach Bottom is now scheduled for the week of August 3-7, 1987.
If you have any questions regarding this change, please contact R. R. Keimig of my staff at (215) 337-5255.
Your cooperation with us is appreciated.
Sincerely, Original Signed By:
Jr.mos H. Joyner Thomas T. Martin, Director i
Division of Radiation Safety and Safeguards cc:
R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station John S. Kemper, Senior Vice President, Engineering and Production Troy B. Conner, Jr., Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric G. Leitch, Nuclear Generation Manager Eugene J. Bradley, Esquire, Assistant General Counsel Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Engineer in Charge, Licensing Section Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania 8702180512 ADOCKohhhj77 DR 0FFICIAL RECORD COPY
\\g PDR re '. of
fb Philadelphia Electric Co.
2 bcc '.
Region I Docket Room (with concurrences)
Management Assistant, DRMA Section Chief, DRP' R. Dube, NMSS
- 0. Clar, NRR i
l 5
i I
- DRSS
.RI:DR SS h/ca Keik/
Joyner-g/87 2/J/87 2/t'/87 0FFICIAL RECORD COPY LTRS PB/MY - 0002.0.0 02/03/87
- -. _..