ML20211F971: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
  r
r
  4
4
                                          JUN 111986
JUN 111986
    Docket No. 50-443                                           License No. CPPR-135
Docket No. 50-443
    Public Service of New Hampshire
License No. CPPR-135
    ATTN: Mr. Robert J. Harrison
Public Service of New Hampshire
            President and Chief Executive Officer
ATTN: Mr. Robert J. Harrison
    P. O. Box 330
President and Chief Executive Officer
    Manchester, New Hampshire 03105
P. O. Box 330
    Gentlemen:
Manchester, New Hampshire 03105
    Subject:   Inspection Report No. 50-443/86-25
Gentlemen:
    A preoperational safety inspection of the radiological protection program at
Subject:
    the Seabrook Power Station Unit I was conducted on May 5-9, 1986.         The areas
Inspection Report No. 50-443/86-25
    reviewed during the inspection included:         status of previously identified
A preoperational safety inspection of the radiological protection program at
    items, organization and management controls, training and qualifications,
the Seabrook Power Station Unit I was conducted on May 5-9, 1986.
    external exposure control and personnel dosimetry, internal exposure control
The areas
    and assessment, control of radioactive materials and contamination, surveys,
reviewed during the inspection included:
    and monitoring, facilities and equipment, and maintaining exposures ALARA.
status of previously identified
    Within the scope of this inspection, no violations were identified. No reply
items, organization and management controls, training and qualifications,
    to this letter is required. Your cooperation with us is appreciated.
external exposure control and personnel dosimetry, internal exposure control
                                                Sincerely,
and assessment, control of radioactive materials and contamination, surveys,
                                                Criginn1 SIEnod D/: ,
and monitoring, facilities and equipment, and maintaining exposures ALARA.
                                              -
Within the scope of this inspection, no violations were identified.
                                                    h        hW
No reply
                                                      as T. Martin, Director
to this letter is required. Your cooperation with us is appreciated.
                                            [ Division of Radiation Safety
Sincerely,
                                                  and Safeguards
Criginn1 SI nod D/:
    Enclosure:   NRC Region I Inspection Report No. 50-443/86-25
E
    c, w/ encl:
,
    John DeVincentis, Director, Engineering and Licensing
h
    William B. Derrickson, Senior Vice President
hW
    Warren Hall, Operational Services Supervisor
as T. Martin, Director
    Donald E. Moody, Station Manager - Seabrook Station
-
    Gerald F. Mcdonald, Construction QA Manager
[ Division of Radiation Safety
    Public Document Room (PDR)
and Safeguards
    Local Public Document Room (LPDR)
Enclosure:
    Nuclear Safety Information Center (NSIC)
NRC Region I Inspection Report No. 50-443/86-25
    NRC Resident Inspector
c, w/ encl:
    State of New Hampshire
John DeVincentis, Director, Engineering and Licensing
                8606190223 860611
William B. Derrickson, Senior Vice President
                PDR   ADOCK 05000443
Warren Hall, Operational Services Supervisor
                O                 PDR
Donald E. Moody, Station Manager - Seabrook Station
                                                                                I
Gerald F. Mcdonald, Construction QA Manager
                                      OFFICIAL RECORD COPY                           -
Public Document Room (PDR)
                                                                                          4
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Hampshire
8606190223 860611
PDR
ADOCK 05000443
PDR
O
I
OFFICIAL RECORD COPY
-
4


  +
+
            '
'
      Public Service of New Hampshire           2
Public Service of New Hampshire
      bec w/ enc 1:
2
      Region I Docket Room (with concurrences)
bec w/ enc 1:
      Management Assistant, DRMA (w/o enc 1)
Region I Docket Room (with concurrences)
      - DRP Section Chief
Management Assistant, DRMA (w/o enc 1)
    .
- DRP Section Chief
.
'
'
.
.
I
I
f
f
          DRSS             RI:DRSS         RI: RS     RI:DRSS         :
DRSS
,      J.McFadden/gcb       Weadock b      Sherbini  Sha ba y          1amy
RI:DRSS
,                            //q/s6         0.hl% 6               Be}/M
RI: RS
      6/0f/86                                           b//9
RI:DRSS
                                0FFICIAL RECORD COPY -IR SEABROOK 86-25 - 0002.0.0
:
;                                                      06/04/86
b
J.McFadden/gcb
Weadock
//q/s6
0.hl% 6
Be}/M
Sherbini
Sha ba y
1amy
,
,
6/0f/86
b//9
0FFICIAL RECORD COPY
-IR SEABROOK 86-25 - 0002.0.0
06/04/86
;
}}
}}

Latest revision as of 23:25, 5 December 2024

Forwards Preoperational Safety Insp Rept 50-443/86-25 on 860505-09.No Violation Noted
ML20211F971
Person / Time
Site: Seabrook 
Issue date: 06/11/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20211F977 List:
References
NUDOCS 8606190223
Download: ML20211F971 (2)


See also: IR 05000443/1986025

Text

-

r

4

JUN 111986

Docket No. 50-443

License No. CPPR-135

Public Service of New Hampshire

ATTN: Mr. Robert J. Harrison

President and Chief Executive Officer

P. O. Box 330

Manchester, New Hampshire 03105

Gentlemen:

Subject:

Inspection Report No. 50-443/86-25

A preoperational safety inspection of the radiological protection program at

the Seabrook Power Station Unit I was conducted on May 5-9, 1986.

The areas

reviewed during the inspection included:

status of previously identified

items, organization and management controls, training and qualifications,

external exposure control and personnel dosimetry, internal exposure control

and assessment, control of radioactive materials and contamination, surveys,

and monitoring, facilities and equipment, and maintaining exposures ALARA.

Within the scope of this inspection, no violations were identified.

No reply

to this letter is required. Your cooperation with us is appreciated.

Sincerely,

Criginn1 SI nod D/:

E

,

h

hW

as T. Martin, Director

-

[ Division of Radiation Safety

and Safeguards

Enclosure:

NRC Region I Inspection Report No. 50-443/86-25

c, w/ encl:

John DeVincentis, Director, Engineering and Licensing

William B. Derrickson, Senior Vice President

Warren Hall, Operational Services Supervisor

Donald E. Moody, Station Manager - Seabrook Station

Gerald F. Mcdonald, Construction QA Manager

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

8606190223 860611

PDR

ADOCK 05000443

PDR

O

I

OFFICIAL RECORD COPY

-

4

+

'

Public Service of New Hampshire

2

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

- DRP Section Chief

.

'

.

I

f

DRSS

RI:DRSS

RI: RS

RI:DRSS

b

J.McFadden/gcb

Weadock

//q/s6

0.hl% 6

Be}/M

Sherbini

Sha ba y

1amy

,

,

6/0f/86

b//9

0FFICIAL RECORD COPY

-IR SEABROOK 86-25 - 0002.0.0

06/04/86