ML20211G063: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.. ..
                                                                                                      --
.
                                                      .
..
      .. ..         .     ..       ..
..
  ,
.
                                            Septeinber 25, 1997
.
    Mr. D. R. Gipson
- -
    Senior Vice President
,
    Nuclear Generation
Septeinber 25, 1997
    Fermi 2 Nuclear Power Plant
Mr. D. R. Gipson
    The Detroit Edison Company -
Senior Vice President
  : 6400 North Dixie Higliway
Nuclear Generation
Newport, MI 48166 -
Fermi 2 Nuclear Power Plant
    SUBJECT:       NRC SECURITY INSPECTION REPORT NO. 50-341/97012(DRS)
The Detroit Edison Company -
    Dear Mr. Gipson:
: 6400 North Dixie Higliway
    On August 6,1997, the NRC completed an inspection of the Vehicle Barrier System (VBS) at
Newport, MI 48166 -
  . your Enrico Fermi,. Unit 2 facility. The enclosed report presents the results of that 'nspection.
.
    Areas examined within your security prograrn are identified in the report. Within these areas,
SUBJECT:
    the inspection consisted of a selective examination of procedures and representative records,
NRC SECURITY INSPECTION REPORT NO. 50-341/97012(DRS)
    observations of actMiles, and interviews with staff. The objective of the inspection effo1 was to
Dear Mr. Gipson:
    determine whether activities authorized by the license were conducted safely and in
On August 6,1997, the NRC completed an inspection of the Vehicle Barrier System (VBS) at
    accordance with NRC requirements.
. your Enrico Fermi,. Unit 2 facility. The enclosed report presents the results of that 'nspection.
    Based on the results of this inspection, no violations of NRC requirements were identified.
Areas examined within your security prograrn are identified in the report. Within these areas,
    Other findings, not involving violations, were identified and are provided for your information
the inspection consisted of a selective examination of procedures and representative records,
    and review. An unresolved item was noted pertaining to the adequacy of compensatory
observations of actMiles, and interviews with staff. The objective of the inspection effo1 was to
    measures for failed tamper alarms on the VBS active gates. We have forwarded this issue to
determine whether activities authorized by the license were conducted safely and in
    our headquarters office for review. No further actions are required of your staff until this issue
accordance with NRC requirements.
    is resolved. Additiona;ly, some weaknesses with the VBS related procedures were identified.
Based on the results of this inspection, no violations of NRC requirements were identified.
  - The procedure deficiencies are primarily administrative in nature and did not decrease the
Other findings, not involving violations, were identified and are provided for your information
    effectiveness of the VBS, Our inspection has concluded that the VBS meets NRC
and review. An unresolved item was noted pertaining to the adequacy of compensatory
    requirements.
measures for failed tamper alarms on the VBS active gates. We have forwarded this issue to
                                                                                                          1
our headquarters office for review. No further actions are required of your staff until this issue
                                                                                                      //
is resolved. Additiona;ly, some weaknesses with the VBS related procedures were identified.
                                                                                                          //
- The procedure deficiencies are primarily administrative in nature and did not decrease the
      9710010446.970925
effectiveness of the VBS, Our inspection has concluded that the VBS meets NRC
                                                                      lll\llE.l5BIIE <     -
requirements.
            DP. ADOCK0500g
1
                                                                                                l6-4
////
                                                                    -                                       _
lll\\llE.l5BIIE
9710010446.970925
<
-
ADOCK0500g
DP.
l6-4
-
_


  . o
.
    D. R. Gipson                                                           2                           September 25, 1997
o
    In accordance v ith 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
D. R. Gipson
    and enclosure will be placed in the NRC Public Document Room (PDR).
2
                                                                            Sincerely,
September 25, 1997
                                                          original signed by J. M.
In accordance v ith 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
                                                                                                  Jacobsonhor
and enclosure will be placed in the NRC Public Document Room (PDR).
                                                                            John A. Grobe, Acting Director
Sincerely,
                                                                            Division of Reactor Safety
original signed by J. M. Jacobsonhor
    Docket No. 50 341
John A. Grobe, Acting Director
    License No. NPF-43
Division of Reactor Safety
    Enclosure: Inspection Report 50 341/97012(DRS)
Docket No. 50 341
    cc w/enet:       N. Peterson, Supervisor of Compliance
License No. NPF-43
                      P. A. Marquardt, Corporate Legal Department
Enclosure: Inspection Report 50 341/97012(DRS)
                      James R. Padgett, Michigan Public
cc w/enet:
                        Service Commission
N. Peterson, Supervisor of Compliance
                      Michigan Department of Environmental Quality
P. A. Marquardt, Corporate Legal Department
                      Monroe County, Emergency Management Division
James R. Padgett, Michigan Public
      Distribution:
Service Commission
Michigan Department of Environmental Quality
Monroe County, Emergency Management Division
Distribution:
Docket File w/ encl
Rill PRR w/ enc!
Rill Enf. Coordinator w/enct
,
,
      Docket File w/ encl                                  Rill PRR w/ enc!                        Rill Enf. Coordinator w/enct
PUBLIC IE 01 w/enct
    PUBLIC IE 01 w/enct                                   SRI, Fermi w/enct                       TSS w/ encl
SRI, Fermi w/enct
      OC/LFDCB w/ encl                                     LPM, NRR w/ encl                       DOCDESK w/ encl
TSS w/ encl
      DRP w/ encl                                         A. B. Beach, Rlli w/enct               CAA1 w/ encl
OC/LFDCB w/ encl
      DRS w/enci                                           J. L. Caldwell, Rlll w/enci
LPM, NRR w/ encl
DOCDESK w/ encl
DRP w/ encl
A. B. Beach, Rlli w/enct
CAA1 w/ encl
DRS w/enci
J. L. Caldwell, Rlll w/enci
:
:
      DOCUMENT NAME: G:DRS\FER97012.DRS
DOCUMENT NAME: G:DRS\\FER97012.DRS
      To receive a copy of this document, indicate in the box: "C" = C >py without
To receive a copy of this document, indicate in the box: "C" = C >py without
      attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy ,
attachment / enclosure
      OFFICE       Rlil cyjy                                   Rlli g / fgj       Rill       _,
"E" = Copy with attachment / enclosure
                                                                                                      # Rlli   ,  $gl
"N" = No copy ,
      NAME                                                     JCreed   '         MJordarf"'/W JGro$ 3 '\V-P
OFFICE
                  '
Rlil cyjy
                    GPirtle:i(
Rlli g / fgj
      DATE        9/' /97 '                                   9/'' /97           9/7 /97               9/g /971 \ V
Rill
                              #
#
                                                                  OlflCIAL RECOFlD COPY
Rlli
                                _ _ _ _ _ _ _ _ _ _ _ - -
$gl
_,
,
NAME
' GPirtle:i(
JCreed '
MJordarf"'/W JGro$ 3 '\\V-P
DATE
9/' /97 '
9/'' /97
9/7 /97
9/g /971 \\ V
#
OlflCIAL RECOFlD COPY
_ _ _ _ _ _ _ _ _ _ _ - -
}}
}}

Latest revision as of 23:24, 5 December 2024

Forwards Insp Rept 50-341/97-12 on 970804-06.No Violations Observed.Areas Examined within Licensee Security Program Identified in Rept
ML20211G063
Person / Time
Site: Fermi 
Issue date: 09/25/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
Shared Package
ML20211G067 List:
References
50-341-97-12, NUDOCS 9710010446
Download: ML20211G063 (2)


See also: IR 05000341/1997012

Text

.. ..

.

..

..

.

.

- -

,

Septeinber 25, 1997

Mr. D. R. Gipson

Senior Vice President

Nuclear Generation

Fermi 2 Nuclear Power Plant

The Detroit Edison Company -

6400 North Dixie Higliway

Newport, MI 48166 -

.

SUBJECT:

NRC SECURITY INSPECTION REPORT NO. 50-341/97012(DRS)

Dear Mr. Gipson:

On August 6,1997, the NRC completed an inspection of the Vehicle Barrier System (VBS) at

. your Enrico Fermi,. Unit 2 facility. The enclosed report presents the results of that 'nspection.

Areas examined within your security prograrn are identified in the report. Within these areas,

the inspection consisted of a selective examination of procedures and representative records,

observations of actMiles, and interviews with staff. The objective of the inspection effo1 was to

determine whether activities authorized by the license were conducted safely and in

accordance with NRC requirements.

Based on the results of this inspection, no violations of NRC requirements were identified.

Other findings, not involving violations, were identified and are provided for your information

and review. An unresolved item was noted pertaining to the adequacy of compensatory

measures for failed tamper alarms on the VBS active gates. We have forwarded this issue to

our headquarters office for review. No further actions are required of your staff until this issue

is resolved. Additiona;ly, some weaknesses with the VBS related procedures were identified.

- The procedure deficiencies are primarily administrative in nature and did not decrease the

effectiveness of the VBS, Our inspection has concluded that the VBS meets NRC

requirements.

1

////

lll\\llE.l5BIIE

9710010446.970925

<

-

ADOCK0500g

DP.

l6-4

-

_

.

o

D. R. Gipson

2

September 25, 1997

In accordance v ith 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and enclosure will be placed in the NRC Public Document Room (PDR).

Sincerely,

original signed by J. M. Jacobsonhor

John A. Grobe, Acting Director

Division of Reactor Safety

Docket No. 50 341

License No. NPF-43

Enclosure: Inspection Report 50 341/97012(DRS)

cc w/enet:

N. Peterson, Supervisor of Compliance

P. A. Marquardt, Corporate Legal Department

James R. Padgett, Michigan Public

Service Commission

Michigan Department of Environmental Quality

Monroe County, Emergency Management Division

Distribution:

Docket File w/ encl

Rill PRR w/ enc!

Rill Enf. Coordinator w/enct

,

PUBLIC IE 01 w/enct

SRI, Fermi w/enct

TSS w/ encl

OC/LFDCB w/ encl

LPM, NRR w/ encl

DOCDESK w/ encl

DRP w/ encl

A. B. Beach, Rlli w/enct

CAA1 w/ encl

DRS w/enci

J. L. Caldwell, Rlll w/enci

DOCUMENT NAME: G:DRS\\FER97012.DRS

To receive a copy of this document, indicate in the box: "C" = C >py without

attachment / enclosure

"E" = Copy with attachment / enclosure

"N" = No copy ,

OFFICE

Rlil cyjy

Rlli g / fgj

Rill

Rlli

$gl

_,

,

NAME

' GPirtle:i(

JCreed '

MJordarf"'/W JGro$ 3 '\\V-P

DATE

9/' /97 '

9/ /97

9/7 /97

9/g /971 \\ V

OlflCIAL RECOFlD COPY

_ _ _ _ _ _ _ _ _ _ _ - -