Forwards Insp Rept 50-341/97-12 on 970804-06.No Violations Observed.Areas Examined within Licensee Security Program Identified in Rept
ML20211G063
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/25/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
Shared Package
ML20211G067 List:
References
50-341-97-12, NUDOCS 9710010446
Download: ML20211G063 (2)


See also: IR 05000341/1997012

Text

.. ..

.

..

..

.

.

- -

,

Septeinber 25, 1997

Mr. D. R. Gipson

Senior Vice President

Nuclear Generation

Fermi 2 Nuclear Power Plant

The Detroit Edison Company -

6400 North Dixie Higliway

Newport, MI 48166 -

.

SUBJECT:

NRC SECURITY INSPECTION REPORT NO. 50-341/97012(DRS)

Dear Mr. Gipson:

On August 6,1997, the NRC completed an inspection of the Vehicle Barrier System (VBS) at

. your Enrico Fermi,. Unit 2 facility. The enclosed report presents the results of that 'nspection.

Areas examined within your security prograrn are identified in the report. Within these areas,

the inspection consisted of a selective examination of procedures and representative records,

observations of actMiles, and interviews with staff. The objective of the inspection effo1 was to

determine whether activities authorized by the license were conducted safely and in

accordance with NRC requirements.

Based on the results of this inspection, no violations of NRC requirements were identified.

Other findings, not involving violations, were identified and are provided for your information

and review. An unresolved item was noted pertaining to the adequacy of compensatory

measures for failed tamper alarms on the VBS active gates. We have forwarded this issue to

our headquarters office for review. No further actions are required of your staff until this issue

is resolved. Additiona;ly, some weaknesses with the VBS related procedures were identified.

- The procedure deficiencies are primarily administrative in nature and did not decrease the

effectiveness of the VBS, Our inspection has concluded that the VBS meets NRC

requirements.

1

////

lll\\llE.l5BIIE

9710010446.970925

<

-

ADOCK0500g

DP.

l6-4

-

_

.

o

D. R. Gipson

2

September 25, 1997

In accordance v ith 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and enclosure will be placed in the NRC Public Document Room (PDR).

Sincerely,

original signed by J. M. Jacobsonhor

John A. Grobe, Acting Director

Division of Reactor Safety

Docket No. 50 341

License No. NPF-43

Enclosure: Inspection Report 50 341/97012(DRS)

cc w/enet:

N. Peterson, Supervisor of Compliance

P. A. Marquardt, Corporate Legal Department

James R. Padgett, Michigan Public

Service Commission

Michigan Department of Environmental Quality

Monroe County, Emergency Management Division

Distribution:

Docket File w/ encl

Rill PRR w/ enc!

Rill Enf. Coordinator w/enct

,

PUBLIC IE 01 w/enct

SRI, Fermi w/enct

TSS w/ encl

OC/LFDCB w/ encl

LPM, NRR w/ encl

DOCDESK w/ encl

DRP w/ encl

A. B. Beach, Rlli w/enct

CAA1 w/ encl

DRS w/enci

J. L. Caldwell, Rlll w/enci

DOCUMENT NAME: G:DRS\\FER97012.DRS

To receive a copy of this document, indicate in the box: "C" = C >py without

attachment / enclosure

"E" = Copy with attachment / enclosure

"N" = No copy ,

OFFICE

Rlil cyjy

Rlli g / fgj

Rill

Rlli

$gl

_,

,

NAME

' GPirtle:i(

JCreed '

MJordarf"'/W JGro$ 3 '\\V-P

DATE

9/' /97 '

9/ /97

9/7 /97

9/g /971 \\ V

OlflCIAL RECOFlD COPY

_ _ _ _ _ _ _ _ _ _ _ - -