ML20211J935: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:'
{{#Wiki_filter:'
i S/RVs I 3.4.3 1 SURVEILLANCE REQUIREMENTS' SURVEILLANCE                       FREQUENCY i
i S/RVs 3.4.3 1
SR 3.4.3.1   Verify the safety function lift setpoints In accordance of the S/RVs are as follows:             with the         ,
SURVEILLANCE REQUIREMENTS' SURVEILLANCE FREQUENCY i
Inservice         i Number of             Setpoint         Testing Program S/RVs               (osia) 11               1150
SR 3.4.3.1 Verify the safety function lift setpoints In accordance of the S/RVs are as follows:
with the Inservice i
Number of Setpoint Testing Program S/RVs (osia) 11 1150
* 34.5 Following testing, lift settings shall be within
* 34.5 Following testing, lift settings shall be within
* 15.
* 15.
4
4
    ' HATCH UNIT 1                         3.4-8             Amendment No. 208
' HATCH UNIT 1 3.4-8 Amendment No. 208
    ; u 9 88eR B u88 6 p               PDR
; u 9 88eR B u88 6 p
PDR


j                                                                                                                                           ECCS - Operating j                                                                                                                                                                 3.5.1 SURVEILLANCE REQUIREMENTS' (continued)
j ECCS - Operating j
(                                                                 SURVEILLANCE                                                                 FREQUENCY e
3.5.1 SURVEILLANCE REQUIREMENTS' (continued)
SR 3.5.1.12                   Verify each ADS valve relief mode actuator                                             18 months strokes when manually actuated.
(
s HATCH UNIT 1                                                             3.5-6                                       Amendment No. 208
SURVEILLANCE FREQUENCY e
SR 3.5.1.12 Verify each ADS valve relief mode actuator 18 months strokes when manually actuated.
s HATCH UNIT 1 3.5-6 Amendment No. 208


      ..y.__.__.__..-___.___             - . _ _ _ . _ _ _ _ . . _ _ . - _ . _ _ _ _ . _ - _ _ _ . . . _ _ . _ _ _ _ _ . . _ .
..y.__.__.__..-___.___
S/RVs 3.4 3 0
S/RVs 3.4 3 0
l                 SURVEILLANCE REQUIREMENT $'
l SURVEILLANCE REQUIREMENT $'
SURVEILLANCE                                                                   FREQUENCY i
SURVEILLANCE FREQUENCY i
i                                                                                                                                           s i                 SR 3.4.3.1             Verify the safety function lift setpoints                                                 In accordance     j 1
i s
of the S/RVs are as followst                                                             with the Inservice Number of                           Setpoint                                       Testing Program i                                                     S/RVs                             fosia)
i SR 3.4.3.1 Verify the safety function lift setpoints In accordance j
:                                                      11                           1150
1 of the S/RVs are as followst with the Inservice Number of Setpoint Testing Program i
* 34.5                                                         i Following testing, lift settings shall be
S/RVs fosia) 11 1150
,                                            within i 1%.
* 34.5 i
Following testing, lift settings shall be within i 1%.
i I
i I
a i
a i
1 e
1 e
i i                                                                                                                                   .
i i
i 1
i 1
l d
l d
k 4
k 4
HATCH UNIT 2-                                                 3.4-8                                               Amendment No. 150 4
HATCH UNIT 2-3.4-8 Amendment No. 150 4
    . . -  - - - ,            . _ . , - .                                                        .--,.-_,--.....,_....-,___.__,,m
.--,.-_,--.....,_....-,___.__,,m


ECCS -- Operating 3.5e1 SURVEILLANCE REQUIREMENTS ^ (continued)
ECCS -- Operating 3.5e1 SURVEILLANCE REQUIREMENTS ^ (continued)
SURVEILLANCE                             FREQUENCY     j i
SURVEILLANCE FREQUENCY j
SR 3.5.1.9           -------------------NOTE--------------------
i SR 3.5.1.9
-------------------NOTE--------------------
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test.
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test.
l                             Verify, with reactor pressure s 165 psig,       It rynths
l Verify, with reactor pressure s 165 psig, It rynths
;                              'he
'he HPCI pump can develop a flow rate l
                                . HPCI pump can develop a flow rate l
k 4250 gpm against a system head corresponding to reactor pressure.
k 4250 gpm against a system head corresponding to reactor pressure.
SR 3.5.1.10         -------------------NOTE---------.-------    --
SR 3.5.1.10
-------------------NOTE---------.-------
Vessel injection / spray may be excluded.
Vessel injection / spray may be excluded.
Verify each ECCS injection / spray subsystem   18 months actuates on an actual or simulated automatic initiation signal.
Verify each ECCS injection / spray subsystem 18 months actuates on an actual or simulated automatic initiation signal.
SR 3.5.1.11           -------------------NOTE--------------------
SR 3.5.1.11
-------------------NOTE--------------------
Valve actuation may be excluded.
Valve actuation may be excluded.
Verify the ADS actuates on an actual or       18 months simulated automatic initiation signal.
Verify the ADS actuates on an actual or 18 months simulated automatic initiation signal.
SR 3.5.1.12         Verify each ADS valve relief mode Lctuator     18 months strokes when manually actuated.
SR 3.5.1.12 Verify each ADS valve relief mode Lctuator 18 months strokes when manually actuated.
(continued)
(continued)
HATCH UNIT 2                                     3.5-5               Amendment No. 150}}
HATCH UNIT 2 3.5-5 Amendment No. 150}}

Latest revision as of 22:26, 5 December 2024

Corrected TS Pps to Amends 208 & 150 for Licenses DPR-57 & NPF-5,respectively,consisting of Pps 3.4-8 & 3.5-6 for Unit 1 & Pps 3.4-8 & 3.5-5 for Unit 2 to Reflect Revised SRV Setpoints
ML20211J935
Person / Time
Site: Hatch  
Issue date: 10/06/1997
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20211J698 List:
References
NUDOCS 9710090063
Download: ML20211J935 (4)


Text

'

i S/RVs 3.4.3 1

SURVEILLANCE REQUIREMENTS' SURVEILLANCE FREQUENCY i

SR 3.4.3.1 Verify the safety function lift setpoints In accordance of the S/RVs are as follows:

with the Inservice i

Number of Setpoint Testing Program S/RVs (osia) 11 1150

  • 34.5 Following testing, lift settings shall be within
  • 15.

4

' HATCH UNIT 1 3.4-8 Amendment No. 208

u 9 88eR B u88 6 p

PDR

j ECCS - Operating j

3.5.1 SURVEILLANCE REQUIREMENTS' (continued)

(

SURVEILLANCE FREQUENCY e

SR 3.5.1.12 Verify each ADS valve relief mode actuator 18 months strokes when manually actuated.

s HATCH UNIT 1 3.5-6 Amendment No. 208

..y.__.__.__..-___.___

S/RVs 3.4 3 0

l SURVEILLANCE REQUIREMENT $'

SURVEILLANCE FREQUENCY i

i s

i SR 3.4.3.1 Verify the safety function lift setpoints In accordance j

1 of the S/RVs are as followst with the Inservice Number of Setpoint Testing Program i

S/RVs fosia) 11 1150

  • 34.5 i

Following testing, lift settings shall be within i 1%.

i I

a i

1 e

i i

i 1

l d

k 4

HATCH UNIT 2-3.4-8 Amendment No. 150 4

.--,.-_,--.....,_....-,___.__,,m

ECCS -- Operating 3.5e1 SURVEILLANCE REQUIREMENTS ^ (continued)

SURVEILLANCE FREQUENCY j

i SR 3.5.1.9


NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

l Verify, with reactor pressure s 165 psig, It rynths

'he HPCI pump can develop a flow rate l

k 4250 gpm against a system head corresponding to reactor pressure.

SR 3.5.1.10


NOTE---------.-------

Vessel injection / spray may be excluded.

Verify each ECCS injection / spray subsystem 18 months actuates on an actual or simulated automatic initiation signal.

SR 3.5.1.11


NOTE--------------------

Valve actuation may be excluded.

Verify the ADS actuates on an actual or 18 months simulated automatic initiation signal.

SR 3.5.1.12 Verify each ADS valve relief mode Lctuator 18 months strokes when manually actuated.

(continued)

HATCH UNIT 2 3.5-5 Amendment No. 150